Stock/Requirements List: MD04/MD07 Stock/Requirements List: Collective Access: Numerous ways to select Numerous ways to filter Collective Access provides a powerful tool for managing a set of materials. S/R- 1 Stock/Requirements List: MD04/MD07 Traffic lights and exception codes indicate problems with materials Material type Procurement Low level code other info Stock levels Day’s supply Selection tools Days supply graphics Display order Define traffic light: user-definable indicators S/R- 2 Stock/Requirements List: MD04/MD07 1st rcpt, 2nd rcpt include different in-process/planned material receipts Exception messages (problems with plan) are grouped by categories Traffic lights can be defined for each grouping Day’s supply shows how many days in the future inventory will be zero only considering onhand material. 1st rcpt day’s supply, 2nd rcpt day’s supply shows how many days in the future inventory will be zero considering on-hand material and material orders, depending on configuration. Exception groups icon shows which exception messages are part of which groups: S/R- 3 Stock/Requirements List: MD04/MD07 Sort (Display order): Numerous criteria to select for display order S/R- 4 Stock/Requirements List: MD04/MD07 Select one or more materials, then display material details Two ways to choose selected materials: S/R- 5 Stock/Requirements List: MD04/MD07 “Page” icon to switch between selected materials Overview Tree provides a very convenient way to select materials Choose material to display by double-clicking S/R- 6 Stock/Requirements List: MD04/MD07 Expand Header Details Double-click to call up the material master in display mode Header details present scheduling-relevant data from the material master. More data can be obtained by double-clicking on the material field. This will call up the material master in display mode—starting with the MRP1 View: S/R- 7 Stock/Requirements List: MD04/MD07 Stock/Requirements list is a snapshot—must be refreshed to show changes Navigation Profiles and Own Favorites Navigation Profiles and Own Favorites allow for user-defined transactions to be linked to the Stock/Requirements list via an Icon. To set the navigation profile, follow the pull-down menu path: EnvironmentNavigation ProfileAssign S/R- 8 Stock/Requirements List: MD04/MD07 Click on search function to list pre-defined navigation profiles ZMRPDEMO was developed for the Fitter Snacker client S/R- 9 Stock/Requirements List: MD04/MD07 Change Material Master Create Planned Independent Requirements Change Planned Independent Requirements Run MRP (Single-item, Single-level) Goods Receipt for Order Note that both the transactions to be included in the Navigation Profile, as well as the icons used to represent those transactions, are freely chosen in configuration. Navigation profiles can be created by following the menu path: Tools Customizing IMG Edit Project Production Material Requirements Planning Evaluation Define Navigation Profiles (click clock icon ) Navigation profiles are created in a similar fashion to Own Favorites. Own Favorites are configured by following the menu path: EnvironmentOwn FavoritesMaintain Which will produce the following screen: Click on New entries S/R- 10 Stock/Requirements List: MD04/MD07 Enter 1 for Navigation no. CO01 (C Oh Zero One) for Transaction code Create Production Order for Text in menu Check With initial screen Click on the Icon field, then click on the search icon After making the entries above, search for an appropriate icon: S/R- 11 Stock/Requirements List: MD04/MD07 Click on the save icon( ), then click on the back icon ( the following pop-up window: ) three times. This will produce Click Yes Click Yes and the new icon will appear, linked directly to the transaction Create Production Order: New icon, linked to transaction CO01 (Create Production Order) Using Navigation Profiles and Own Favorites Select material ##F110 using the overview tree, then click on the change material icon ( Select the MRP 1 view, then change the lot sizing procedure to the following: S/R- 12 ). Stock/Requirements List: MD04/MD07 Set to EX (Lot-for-lot) with a rounding quantity of 7 Set the lot sizing to EX with rounding quantity of 7, so that MRP runs will create production orders in multiples of 7 rather than multiple production orders of 7 cases. Save the change, and you will return to the stock requirements list. Next, click on the Create PIR icon ( ) to create Planned Independent Requirements: Enter version ##, then click on the enter icon Enter ## for version, then click on the enter icon ( S/R- 13 ): Stock/Requirements List: MD04/MD07 Enter 500 for each of the next three months, then click on save The Planned Independent Requirements Planning Table is a sophisticated tool for creating Planned Independent Requirements—“forecasted” demand values that drive the MRP process. After clicking on the save icon ( ), you will be returned to the Stock/Requirements List: Click on the refresh icon to display the new planned independent requirements You will not see the new planned independent requirements until you click on the refresh icon ( ). The navigation profiles/own favorites, in combination with the refresh requirement, provide a good tool to teach production planning in a dynamic fashion. S/R- 14 Stock/Requirements List: MD04/MD07 Alternative Units of Measure If alternative units of measure are defined for a material, then the Stock/Requirements list can be displayed in those units of measure. To change the units of measure, click on the search icon ( ): Note that case is the Base unit of measure, which means that it is the smallest unit of measure we can use for snack bars. Select PAL (Pallet), then click on the refresh icon ( Stock/Requirements List quantities will be displayed in pallet quantities: ), and the Quantities are in pallets. To see how many cases are in a pallet, doubleclick on the material field S/R- 15 Stock/Requirements List: MD04/MD07 Click on the Additional data icon Click on the Units of Measure tab to see that 1 pallet has 15 cases Click on the exit icon ( ) to return to the Stock/Requirements List. Enter both CS and PAL in the units of measure fields (there are two): then click on the refresh icon ( ) to display the Stock/Requirements in two units: S/R- 16 Stock/Requirements List: MD04/MD07 Quantities in cases and pallets Switch back to display stock with just the case (CS) units of measure. Stock Statistics and Stock Overview It is important to know not only how much is in stock, but WHERE it is as well. Click on the detail icon for the Stock row ( ): Click on the detail icon S/R- 17 Stock/Requirements List: MD04/MD07 Click on Stock overview This screen shows the status of stock material, as well as planned inward and outward movements. Click on the Stock overview icon to see where the material is located: All stock is located in storage location 300 (Finished Goods) S/R- 18 Stock/Requirements List: MD04/MD07 Click on the back icon ( ) to exit the Stock Overview, then click on the enter icon ( close the Stock Statistics window. ) to Days Supply Note the date when the stock will first become negative: Today’s date Date when stock goes negative The difference between Today’s date and the date when the stock goes negative is the Day’s Supply—how many days the current on-hand stock will satisfy demand. In the example above, it is 47 days. The Day’s Supply is shown in the Stock Requirements List Material List. To see this, either click on the back icon ( ) or the Go to Material List icon ( ): Day’s of supply now calculated Checkmark in Already Accessed column show this material has been reviewed S/R- 19 Stock/Requirements List: MD04/MD07 Impact of Planned and Production Orders on Day’s Supply Calculations Return to the Detailed display for the NRG-B bar. First, we need to make sure that the elements that are included in the Day’s Supply calculation are properly defined. To do this, create a new session ( ), then follow the menu path: Tools Customizing IMG Edit Project Production Material Requirements Planning Evaluation Define Receipt Elements for Receipt Day’s Supply (click clock icon ) Make sure that there is an X in: PO/PrOr (Production/Process Order) PO/SNSL (Purchase Order, Shipping Notification, Schedule Line) and a 2 in FPOrd (Firm Planned Order) The X entries will cause Production Orders and Purchase Orders to be included in the calculations for both the 1st Receipt Day’s Supply and the 2nd Receipt Day’s Supply. The 2 in the Firm Planned Order column mean that Firm Planned Orders will only count in the 2nd Day’s Supply Calculation. Save any changes, then return to the Stock/Requirements List. Next, we will create a production order to see it’s impact on the Day’s Supply calculations. We want to create a production order that will be completed on the date that the inventory is planned to be negative: S/R- 20 Stock/Requirements List: MD04/MD07 Note date when stock is expected to be negative Note the date when the inventory is supposed to be negative, then click on the Create Production Order icon ( ): Enter Material ##F110, Production plant ##PT and Order type PP01, then click on enter S/R- 21 Stock/Requirements List: MD04/MD07 Enter 500 for Total quant., the date when the inventory will go negative for the Finish date, then click on the save icon Click on the refresh icon to see the new production order Then click on the back icon to return to the Material List S/R- 22 Stock/Requirements List: MD04/MD07 Note that the 1st Receipt Day’s Supply and 2nd Receipt Day’s Supply are now 999.9, which is the Stock/Requirements List version of forever Return back to the detail view for material ##F110, then click on the Change PIR icon ( Enter version ##, then click on the enter icon S/R- 23 ): Stock/Requirements List: MD04/MD07 Add an additional PIR for 500 cases Add a PIR of 500 cases for a fourth month, then click on the save icon ( refresh icon ( ). Click on the ) to display the new PIR: New PIR creates a negative Available qty. Click on the back icon ( ) or the Go to Material List icon ( S/R- 24 ) to review the Day’s Supply: Stock/Requirements List: MD04/MD07 Note that the 1st Receipt Day’s Supply and 2nd Receipt Day’s Supply is longer, as it includes the production order that we created. Return back to the detail view for material ##F110, then click on the MRP icon ( ): Click on the enter icon ( ) twice to run MRP Planning. Click on the refresh icon ( display the new planned order: S/R- 25 ) to Stock/Requirements List: MD04/MD07 Click on the detail icon for the new planned order Click on change S/R- 26 Stock/Requirements List: MD04/MD07 Select the check mark to Firm the planned order, then click on save Click on the back icon ( ) or the Go to Material List icon ( ) to review the Day’s Supply: Note that the 2nd Receipt Day’s Supply includes the firmed planned order S/R- 27 Stock/Requirements List: MD04/MD07 Available Date/Goods Receipt Date To see the impact of the Available Date/Goods Receipt date display option, we need to enter a Goods Receipt Processing Time to the Material Master. Click on the Change Material Master icon ( ) and select the MRP 2 view: Set GR processing time to 1 then click on the save icon ( ). Click on the Goods Receipt/Available (GR/AV) icon ( ). NOTICE THAT NOTHING HAPPENS. That’s because the planned orders/production orders were created before the material master was changed. To see the impact of the GR/AV icon, we need to regenerate the planned orders and production orders. To do that, we need to delete the existing orders. First, click on the details icon of the production order: S/R- 28 Stock/Requirements List: MD04/MD07 Click on the details icon Then click on the change icon: Click on the change icon Then follow the pull-down menu path FunctionsDelection flagActivate S/R- 29 Stock/Requirements List: MD04/MD07 Click on the save icon ( order is gone: ), then click on the refresh icon ( ) to confirm that the production Next, click on the details icon of the planned order, then click on the change icon to change the details of the planned order: Click on the Delete Planned Order icon S/R- 30 Stock/Requirements List: MD04/MD07 Confirm that you wish to delete the planned order Click on the refresh icon ( ) to confirm that the planned order is gone: No planned orders or production orders Click on the MRP icon ( ) and run single-level MRP Planning. Click on the refresh icon ( ), then click on the Goods Receipt/Available (GR/AV) icon ( impact. S/R- 31 ) to notice the Stock/Requirements List: MD04/MD07 Customer Order Create a sales order for the ##F110 snack bars. Refresh the Stock/Requirements List. Notice the impact of the customer order on the existing planned order: Customer order has “consumed” planned order Click on the customer icon ( The vendor icon ( ) to display customer data on the sales order: ) provides similar functionality for purchase orders. S/R- 32