United Nations Development Programme Country: Bosnia and Herzegovina Project Document Project Title: Bosnia and Herzegovina Municipal Training System Project (MTS), PHASE II UNDAF Outcome(s): Outcome 1, Democratic Governance: By the end of 2014, Government with participation of civil society implements practices for more transparent and accountable governance and meets the requirements of the EU Accession process. Expected CP Outcome(s): (Those linked to the project and extracted from the CPAP) Democratic Governance: UNDP will work to strengthen the capacities of the state and entity governments and parliaments, with a focus on public sector reform (strategic planning, human resources management and e governance), local governance and institutional capacity development. Expected Output(s): (Those that will result from the project and extracted from the CPAP) By 2015 capacities of BiH local governments to effectively manage development processes and deliver quality services to their citizens are strengthened via the effective support provided by the training system for local self-government employees in BiH functioning as a public mechanism for carrying out the local governments` capacity development agenda country-wide. BiH Ministry of Justice United Nations Development Programme in Bosnia and Herzegovina (BiH) FBiH Civil Service Agency, FBiH Ministry of Justice, RS Ministry of Administration and Local Self-Government, RS Civil Service Agency, both entity Associations of Municipalities and Cities Implementing Partner: Responsible Party: Key project partners: Summary narrative: The second project phase of the Municipal Training System Project will place strategic attention on strengthening of the structures and functions of the Training System for Local Self-Government Employees in BiH, as defined within the Training Strategies for Local Government Employees 2011 – 2015, so as to enable the long-term effective operation of the training mechanisms. The project will support the participatory design, affirmation and application of capacity development policies, complemented by relevant systemic tools. Furthermore, support will be provided to the design and delivery of priority training programmes for local government employees and officials, within the framework of both entity Strategies and according to the development needs of BiH local governments. Moreover, efforts will be placed to improve the enabling environment, credibility and visibility of the Training System for Local Self-Government Employees, more particularly in terms of support to development of the training market and promotion of the public training mechanism country-wide. Project Period: 3 years (36 months) Key Result Area (Strategic Plan): Democratic Governance Atlas Award ID: 00062563 Atlas Project ID: 00080102 Start date: March 2012 End Date: March 2015 PAC Meeting Date: Total budget: USD 2,137,997 Allocated resources: Government (co-funding): Other: o Sida: USD 2,037,997 o UNDP: USD 100,000 In kind contributions: TABLE OF CONTENTS SECTION I: PROJECT PROPOSAL .......................................................................................................................... 4 PART I: SITUATION ANALYSIS ........................................................................................................................ 4 1.1. Country context ................................................................................................................................... 4 1.2. Capacity development of local governments in Bosnia and Herzegovina ............................................. 5 1.3. Previous project phase ......................................................................................................................... 6 1.4. Stakeholders` review ............................................................................................................................ 6 PART II: STRATEGY .......................................................................................................................................... 8 2.1. Project rationale and relevance to the country needs ........................................................................... 8 2.2. Project overview ................................................................................................................................... 8 2.3. Project approach ................................................................................................................................. 17 2.4. Synergy with other relevant interventions...........................................................................................19 2.5. Risk analysis and mitigation proposals ................................................................................................19 PART III: MANAGEMENT ARRANGEMENTS ..................................................................................................21 PART IV: BUDGET AND FUNDING ................................................................................................................ 24 PART V: MONITORING AND EVALUATION .................................................................................................. 25 PART VI: LEGAL CONTEXT ............................................................................................................................. 26 SECTION II: PROJECT RESULTS AND RESOURCES FRAMEWORK.................................................................... 27 SECTION III: PROJECT 3-YEAR WORKPLAN BUDGET SHEET ............................................................................ 33 SECTION IV: ANNEXES ........................................................................................................................................ 37 2 LIST OF ABBREVIATIONS AMC AWP BiH CSA EU FBiH GAP GIZ HRM ILDP IMC IPA LOD MALSG MoJ MoU MTS NIM OSCE PAR RS SAA SDC Sida TA TNA ToT Training System for Local SelfGovernment Employees UNDP UNDAF USAID Association of Municipalities and Cities Annual Work Plan Bosnia and Herzegovina Civil Service Agency European Union Entity of the Federation of Bosnia and Herzegovina Governance Accountability Project Deutsche Gesellschaft für Interantionale Zusammenarbeit Human Resource Management Integrated Local Development Project Inter-Municipal Cooperation Instrument for Pre-accession Assistance Reinforcement of Local Democracy Project Ministry of Administration and Local Self-Government Ministry of Justice Memorandum of Understanding Municipal Training System UNDP national implementation modality Organisation for Security and Cooperation in Europe Public administration reform Entity of Republika Srpska Stabilisation and Association Agreement Swiss Agency for Development and Cooperation Swedish International Development Cooperation Agency Technical assistance Training Needs Assessment Training of trainers TSLSGE United Nations Development Programme UN Development Assistance Framework United States Agency for International Development 3 SECTION I: PROJECT PROPOSAL PART I: SITUATION ANALYSIS 1.1. Country context In recent years, Bosnia and Herzegovina (BiH) experienced significant progress in restoring peace and stability, as well as in moving from post-war recovery to becoming a potential candidate to the European Union (EU). In July 2008, the EU and BiH signed the Stabilization and Association Agreement (SAA), which creates a far-reaching contractual relationship between both sides entailing mutual rights and obligations. The country has fulfilled all the requirements for visa liberalization and is gradually moving towards meeting NATO and EU pre-accession requirements. Nonetheless, considerable challenges still confront BiH, which can be classified in two separate groups. The first group relates to the country being burdened with a set of systematic administrative weaknesses. That includes a cumbersome governance structure, slow transition to functional free-market economy and obsolete public sector practices, including at the local level. The second group includes considerable poverty and a widened development gap among different regions, most notably between urban centres and rural areas, characterised by social exclusion among vulnerable groups. Public administration in BiH is mostly described as too wide and too “slim” to have the capacity to act in a coordinated manner towards the demanding objectives of the post-reconstruction period, starting obviously from the European integration. The public administration reform is based on the BiH Public Administration Reform Strategy (PAR Strategy) and its Action Plan 11 outlining 6 reform areas: i) policy making and coordination capacities; ii) public finances; iii) human resources management (HRM); iv) administrative procedure; v) institutional communication; vi) information technologies. The PAR Strategy foresees measures dealing with the advancement of administrative education and training. However, BiH public administration at all government levels still does not have the issue of administrative education and training systematically resolved. Importantly, the PAR Strategy does not deal with the public service at the local self-government level; each entity has a different legislative framework for civil servants, and the majority of local government staff falls entirely outside these civil service capacity development policies and frameworks. In order to effectively address this matter, the process of establishing of a Training System for Local SelfGovernment Employees (TSLSGE) in BiH was launched in 20082. Entity Training Strategies for Local SelfGovernment Employees 2011 – 2015 were developed in 2010. The Training Strategies were adopted by both Entity Governments and both Associations of Municipalities and Cities (AMCs). Both entity Training Strategies define key principles and objectives of the training system; the target groups and priority training programmes; the institutional and financial set-up and the implementation and monitoring plans. The basic elements of the training system for local government employees are now in place, but have yet to be incorporated into usual work routines of all the authorities in charge. Such integration is the core of capacity building and public administration reform and will require change processes in which the participants acquire new behaviour patterns. Certain new policies and functions of a training system, such as networking practitioners, setting training standards, developing training market policies, training monitoring and evaluation, educating teaching personnel, developing advanced learning tools, promoting the system, and devising relevant HRM policies, have not yet been defined in greater detail. While those functions would facilitate the effective operation of the system, their development will consume time and resources that compete with the need to put the system into operation in due time. 1 The PAR Strategy and its Action Plan 1 were adopted in 2006. In 2007, a 4.5 million Euro PAR Fund was established to directly support the Strategy implementation. 2 This initiative was carried out by relevant national counterparts and supported by the Swedish International Development Cooperation Agency (Sida) and the United Nations Development Programme (UNDP) in BiH within the Municipal Training System (MTS) Project. 4 1.2. Capacity development of local governments in Bosnia and Herzegovina Throughout the past decade diverse and numerous initiatives related to capacity development and training of local self-government officials and employees in BiH took place3. However, these actions were not positioned within a coherent, systematic, instituted and demand-driven policy and system framework and consequently – could not respond the existing capacity demand in an adequate and effective manner. Like in many other developing countries, BiH local governments still lack critical capacity that would allow them to be instigators of development results. The response to this capacity gap requires the creation of an enabling environment with appropriate policy and legal frameworks, institutional development, including human resources development and strengthening of managerial systems and tools within local administrations. Several aspects need to be considered n regard to the complex capacity development enabling environment at the local level: firstly, there has been a stark contrast between real needs and the reality of training delivery, while the approach to training of local governments has been supply-driven and uncoordinated, with the cost of training regularly covered by donors. Moreover, the HRM function in local governments is either not developed at all or very weak and tends to focus on the administrative dimension of managing staff. Little value is placed on the management and development of staff competencies; only a few local governments have developed proper human resource policies and training plans, therefore, training needs are usually not articulated. Similarly, budget provisions and financial resources allocated specifically to training and education of local administrative employees are practically non-existent. In addition, the training delivery market in BiH is not very well developed and training providers have limited capacities to develop and implement high quality training programs on their own. In parallel, local governments in BiH are under pressure to reform. This pressure stems from an increasing demand for quality services on one hand, and financial constraints on the other. Changing legal environments initiated by higher government levels increase the demands on local governments to improve performance of existing, new and additional functions, and to be able to continuously adapt to changing circumstances. It is also clear that the EU pre-accession assistance has been dominated by capacity development at the state level, with local governments receiving little attention. However, EU financial support is gradually made available to local governments across BiH, although their absorption capacity remains generally weak. Yet, the advent of the EU pre-accession funding regimes under the Instrument for Pre-Accession Assistance (IPA)4 will require effective local management and delivery of projects, while successful participation in this funding window will require strong municipal capacities across a variety of planning and management disciplines. Furthermore, there is a broader European agenda to be addressed, ranging from attaining a model of local government compliant with European practices, to the building of an institutional framework capable of implementing the core EU laws (Acquis Communautaire) at the local level5. Therefore, while striving for better service delivery at the local level and being on the path towards integration to the EU, the systemic development of highly competent and professional local administration remains one of the main challenges for BiH. Initial steps towards this agenda were made by the elaboration of the Training Strategies for Local Self-Government Employees 2011 – 2015 and the establishing of the Training System for Local Government Employees and its structures, priority trainings and operational framework; however, it needs to further strengthen its capacity towards effective design, management and realisation of capacity development policies that contribute to the professionalization and skill acquirement of BiH local government employees. 3 There are 144 local self-governments in Bosnia and Herzegovina (80 in the FBiH, 63 in the RS and the Brčko District) and approximately 5,000 local government employees within the FBiH and 4,000 local government employees within the RS (Training Needs Assessments, MTS, 2009; http://www.undp.ba/index.aspx?PID=36&RID=89). 4 IPA is a mechanism for financial support to potential candidates and candidate countries for EU membership. 5Approximately 60 % of all mandatory European-law based regulations have to be carried out by local governments (Local Government Network - LOGON final guide, page 41, www.ceec-logon.net). 5 1.3. Previous project phase The first phase of the Municipal Training System (MTS) Project was launched in 2008 as the first and only of its kind system-building intervention in BiH aiming to improve the quality and scope of local government training and to address a critical gap regarding long-term capacity development of local government employees and elected officials in BiH. The first project phase (closing down in December 2011) was funded by Sida and implemented by UNDP in partnership with relevant national stakeholders. The TSLSGE in BiH is gradually emerging as a public training mechanism, meant to strengthen local governments` capacities and thus contribute to the on-going local government reform and overall country advancement. Its evolvement went through several key milestone points: at first, a comprehensive training needs assessment was conducted in 2009 in order to map the training needs of local governments country-wide, as well as to properly inform the follow up strategising for the TSLSGE. Subsequently, a policy discussion on the structure, principles and institutionalisation approaches was initiated, which brought forward a consolidated policy vision on the establishment of the training system, characterised by the setting up of 2 symmetrical sets of structures within each of the entities of Bosnia and Herzegovina. Further on, based on participatory process, both entity Training Strategies for Local Self-Government Employees were developed in 2010, setting the strategic framework of the system. In its last implementation year, the MTS Project, hand in hand with its national counterparts at entity and municipal level, embarked in hands-on setting of the structures and bodies of the training system, as defined within the entity Training Strategies (predominantly within the RS, considering the delayed adoption of the FBiH Training Strategy6), as well as designing and affirming their operational framework, so as to ensure sustainability of the training model. In parallel, 15 standardised and high quality training covering 8 training topics (defined as priority trainings within the Strategies), were designed and delivered to nearly 1000 local self-government employees and elected officials from more than 115 BiH local governments. Therefore, first project phase was pivotal in helping the target groups to start gradually introducing advanced training management routines by creating opportunities in which they could jointly review and experience all aspects and phases of the training cycle and set the capacity development agenda for local governments in BiH. An important momentum has been reached in terms of awareness and commitment of the project stakeholders on the importance of a systematic approach to capacity development and first direct benefits of such an approach have been experienced at the local level. Strategic and operational frameworks have become operational but these still need to be integrated in daily routine of all parts of the system to become genuinely an inherent systematic process. This is a process by its nature and as any other change in behaviour patterns and habits will require careful and sustained/recurring change management. On the other hand, additional new policies, functions and processes in the training system still need to be designed or set up, which requires knowledge, capacities and resources that are not available within the system and that can hardly be put in place without external support Therefore, further support to the training system remains crucial to achieve and maintain sustainable structures. Lack of support over time may result in a gradual decrease of scope in capacity development of local government employees and also in weakening/scaling-down of the already established systematic functions, processes and structures. 1.4. Stakeholders` review The key stakeholders, whose role, motivation and capacity are crucial for the overall realisation of the anticipated project follow-up, are: local governments and the relevant entity public institutions and the units within both AMCs responsible for coordination and support to capacity development and training of local governments (comprising the core structures of the Training System in each entity). 6 In FBiH, the Training Strategy adoption was subject to delays as a result of a number of factors (i.e. delayed implementation of election results, FBiH Consutitution's decision related to employment status of local government employees, etc. ). The FBiH Government reviewed and adopted the strategy in February 2012. The Government tasked with Federal Ministry of Justice and the FBiH Civil Service Agency to establish, jointly with the FBiH Association of Municipalities and Cities, a coordination body which will be responsible for the overall strategy implementation. 6 The skills level of local government staff is incommensurate with the requirements of the development process. Local governments in BiH are undergoing a gradual shift from a mainly bureaucratic approach to service orientation. This process translates into improvements in the transparency of procedures, the accountability of institutions and personnel, and greater orientation toward results for all staff. These fundamental changes reflect on the recognised and voiced out training needs of local government staff, which will increase as the reforms proceed, while the quality aspect of training becomes more important. With regard to the core structures of the Training System for Local Government Employees (respectively – for each entity), it needs to be considered that their establishment started only in early 2011, therefore, institutional and organisational capacities are rather weak. While initial capacity development assistance for the RS Training System structures7 was provided and the general operational framework - developed, such efforts will still be needed for the structures of the FBiH Training system8, once these are formally established. 7 The Training Commission (comprising representatives of the RS Civil Service Agency (CSA), the RS Ministry of Administration and Local Self-Government (MALSG), the RS AMCs); the Training Office within the RS MALSG and the Training Unit for local government elected officials within the RS AMCs. 8 The Training Coordination Body (comprising representatives of the FBiH Ministry of Justice (MoJ), the FBiH CSA and the FBiH AMCs); the Training Unit for elected officials within the FBiH AMCs and the Training Unit for local government employees (representatives of the FBiH CSA or the FBiH MoJ). 7 PART II: STRATEGY 2.1. Project rationale and relevance to the country needs The solid basis that has been created with assistance from the first phase of the MTS project, offers now a “transmission belt” for delivering high-impact learning opportunities for all local government employees, as well as the basis for integrating all aspects of the new system into the everyday work routines of the responsible stakeholders, and opportunities to add further components to the system that are essential for it to maximise its performance. The more and the faster the implementation of the training system for local government employees becomes an integral part of the regular duties of stakeholders and local governments across BiH, the more likely the new policies and practices will be aligned with and reinforced by higher levels of government (vertical integration) and become an irreversible element of human resources and local government management in BiH. Vertical integration is particularly relevant where training needs on the local level originate from policies and legislation prepared at higher government levels. Where such training needs and especially necessary resources are not anticipated in local government strategies because of the lack of vertical integration, there is a risk that those policies and legislation face slow or incomplete implementation. Although the main pillars of a modern training system for local governments have been developed in the course of implementation of the first project phase, there are other critical elements, which have not received much attention in practice considering that the relevant training structures were established only in early 2011, such as network development, training standards, accreditation of service providers, monitoring and evaluation, training of trainers, new learning tools, the development of strategic partnerships or memberships in international training networks. As highlighted in the Final Project Review, “the basic elements of the system are now in place but have yet to be integrated into the usual work routines of all the authorities in charge”. For this reason the project document focuses on a number of interventions for which the need was identified in the last phase of the project implementation as well as in the Final Project Review, with an overall goal to “further support the functional and policy capacities of the training system, its consolidation and affirmation as public mechanism for local governments’ capacity development across the country”. By rendering further support to the training system for local governments in BiH, a critical assistance to the future effective functioning of the system will be in place and ultimately – support to the achievement of its organic purpose – i.e. – professionalised, competent and skilled local government employees country-wide. Importantly, the second project phase will directly and immediately support the implementation of both entity Training Strategies for Local Government Employees 2011 – 2015 designed within the first project phase, as well as will contribute to the effective realisation of the priorities defined within the RS Strategy for Local SelfGovernment Reform 2009 – 2015. Furthermore, the project has a strong fit with the overall public administration reform agenda defined via the BiH Public Administration Strategy. In addition, it will contribute to the strengthening of local governments` absorption capacity to effectively utilise both EU, as well as other international and domestic public funds aiming to support local development and improve quality of service delivery to their citizens. The second phase will also focus on training market in BiH, which is still in development. It consists of numerous individual consultants, civil society organisations and a few consulting companies, which mainly focus on generally applicable thematic areas. There is a necessity of transformation of the market to offer training that may respond to specific practical challenges and needs that municipal employees encounter on a daily basis. 2.2. Project overview 2.2.1. Goal, output and duration The overall project goal is to contribute to the development of professional and competent BiH local governments able to effectively manage development processes and deliver quality services to their citizens via further strengthening of the functional and policy capacity of the training system for local government employees in BiH 8 and supporting its affirmation as a public mechanism for carrying out local governments` capacity development agenda country-wide. In relation to that, the second project phase will place strategic attention on strengthening of the structures and functions of the TSLSGE in BiH (and respectively – of the structures within each entity), as defined within the Training Strategies for Local Government Employees 2011 – 2015, so as to enable the long-term effective operation of the training mechanisms. Importantly, the project will continuously support the participatory design, affirmation and application of capacity development policies, complemented by relevant systemic tools. Furthermore, support will be provided to the design and delivery of priority training programmes for local government employees and officials, within the framework of both entity Strategies and according to the development needs of BiH local governments. Moreover, efforts will be placed to improve the enabling environment, credibility and visibility of the TSLSGE, more particularly in terms of support to development of the training market and promotion of the public training mechanism country-wide. These strategic lines of project intervention will ultimately contribute to the setting in function of the training system for local governments in FBiH and further operational strengthening of the training structures in the RS. This will result in enhancing institutional capacities of the training structures and in development and practical application of key capacity development policies. The project`s impact will be reflected in the sustainable operation of a public local governments` capacity development mechanism, which systemically enhances capacities of BiH local governments and equips them with the relevant knowledge and skills to discharge their functions and lead development processes in the best interest of their communities. Furthermore, this project phase will immensely contribute to the realisation of both entity Training Strategies for Local Self-Government Employees in BiH. The project`s duration is 3 years (36 months). 2.2.2. Project components, activities and target groups The project components (corresponding to the project`s objectives) and the main activities, which logically derive from the above-set project goal, are captured in the graph below: Goal: To contribute to the development of a professional and competent BiH local governments able to effectively manage development processes and deliver quality services to their citizens via further strengthening of the functional and policy capacity of the training system for local government employees in BiH and support to its affirmation as an effective public mechanism for carrying out the local governments` capacity development agenda country-wide. Component 1: Strengthening the training system`s core structures, functions and policies and support to capacity development of BiH local governments. Support to the training system`s core structures, functions and policies Support to capacity development of BiH local governments Support to creation of the training system`s tools Component 2: Support to the training system`s enabling environment, partnership building and visibility. Strengthening of the training market Promotion, partnership, visibility 9 Component 1: Strengthening the training system`s core structures, functions and policies and support to capacity development of BiH local governments. This component will comprise a set of inter-linked activities to further strengthen the Training System for Local Government Employees in BiH towards its self- and independent functioning in the future, offer high-quality capacity development for local government officials and employees (as an integral part of the training system`s scope of work) and assist in the design and deployment of the training system`s main administrative and communication tools. Activity 1: Support to the training system`s core structures, functions and policies A main activity within this component is related to provision of support to the training system`s core structures, functions and policies, pursuant to the entity Training Strategies. It envisages provision of technical assistance (TA) and guidance in strengthening of policy and operational structures with relevant functions and policies in place, which is essential for a building a training system that can effectively respond to capacity development needs of local governments. It encompasses the recurrent implementation of new management routines introduced within the first project phase and introduction of new processes and functions, which are required by the training strategies and are a prerequisite for effective functioning of the training system. In this respect, TA and guidance will be provided to the primary target group as established by the training strategies are: Training Commission, Training Office for Local Government Employees and Training Unit for Elected Local Government Officials, who will benefit from extensive technical support in establishing/strengthening relevant functions and policies pursuant to the entity training strategies. In particular, support under this action will be provided to: the RS Training Commission (comprising representatives of the RS CSA, the RS MALSG, the RS AMCs/selected representatives of local governments); the RS Training Office within the RS MALSG and the RS Training Unit for local government elected officials within the RS AMCs; the FBiH Training Coordination Body (comprising representatives of the FBiH MoJ, the FBiH CSA and the FBiH AMCs/selected representatives of local governments); the FBiH Training Unit for elected officials within the FBiH AMCs and the FBiH Training Unit for local government employees (representatives of the FBiH CSA or the FBiH MoJ)9. As for the specific role of municipalities, in addition to being targeted as training recipients (training system clients), they are also a part of the overall training system via training functions anchored within a wider HRM responsibilities (i.e. training vertical coordination, co-financing, enabling training participation). In addition, 9 municipalities have the role of hosts of the regional training localities (providing premises, maintenance costs, coordination). It is envisaged that assistance to the core structures of the training system will be provided alongside the annual operational work cycle, so as to deploy a “real-life” approach to capacity development and encourage gradual change of management routines and attitudes of participants in the training system. The existing strategic framework of the training system provides for such new routines and interaction processes, which now must be integrated into the everyday work of its structures, so they are capable of managing each phase of the system work cycle (i.e. – annual and multi-annual planning of training priorities and Training Needs Assessments (TNAs); dissemination of training offer to local governments; preparation of training activities; training delivery; monitoring and impact assessment, including of the implementation of the entity Training Strategies) on their own. Consequently, most of the envisaged actions will entail on-the-job support, coaching and TA to the training system structures, as well as possible cost-sharing of salary costs for employees within the structures of the training system10. More particularly, this activity will support the advancement of the existing, design of new and institutional anchoring of the relevant operational framework (i.e. – rulebooks, internal procedures, job 9 The relations between the project and all national partners and beneficiaries, especially in terms of provision of support and technical assistance, might be formalised via signing of Memoranda of Understanding (MoUs), which describe the responsibilities of partners, objectives, expected results and timeframe of action. 10 Within the RS Training Office (RS MALSG) and within the FBiH Training Unit for local government employees (FBiH CSA). 10 descriptions, guidelines, etc.), as well as will strengthen the understanding and capacity of the members of the training system structures to effectively perform their responsibilities, both at policy-making and operational levels. In the course of project realisation, the project team will encourage close interaction between the training structures in each entity and will steer the two parallel processes in a symmetrical manner ensuring a coherent training model country-wide. In general, the level of project assistance will be decreasing through the project implementation, with highest intensity during the first year and a shift towards a monitoring role of the project during the last year. In parallel, considering that the training system`s functions are equally important as its structures, this activity will provide substantive support, facilitation and technical assistance to the relevant partners in the process of design and practical application of several vital functions and policies. These processes will be characterised be a “shadow-assistance” by the project, while the guiding role will be taken by the relevant partners, so as to contribute to their capacity development and strengthen their ownership over the results. Central to the longterm effective operation of the training system are the following functions and policies: financial sustainability; training standards, quality assurance and accreditation; HRM function at the local level. These will be supported throughout the project implementation, based on participatory approach and vertical and horizontal interaction among the relevant stakeholders. With regard to the financial sustainability aspect, it has been set as a priority matter within each entity Training Strategy, so as to ensure sufficient financial resources for effective and independent functioning of the training system and adequately respond to the training needs of local governments. Some initial steps towards creation of a general concept for the financial sustainability of the training system were undertaken within the first project phase, whereby the principal consensus of the RS Training Commission is that training system operational costs would be covered by the training system institutions, while costs of training design and delivery would be co-shard between entity and local governments. As for the FBiH, by adopting the training strategy and establishing the relevant operational structures, the Association of Municipalities and Cities agreed to ensure the salary and operational costs of the Training Unit related to training of elected officials, while following the adoption of the training strategy by the FBiH Government, setting up co-finding mechanisms as suggested by the strategy, will be one of the key steps in establishing a sustainable training system in this entity. Therefore, this project phase will further support and facilitate the inter-institutional discussion (respectively - in each entity) on this matter, which will result in the formulation and gradual practical application (by the end of 2014) of a financial mechanism for cofunding of the training system annual budget by public resources (entity budgets, local governments). Lead stakeholders within this process will be relevant structures of the training system in each entity, together with entity Ministries of Finances and local governments. The project will provide expert assistance and advice within the process of work discussions, development and application of the financial mechanism respectively in each entity, to be fully effective in 2014. In relation to the training standards, quality assurance and accreditation function of the training system - the introduction of uniform training standards and quality assurance mechanisms is considered as an important function of the training system and as such is a novelty not only in BiH but also to a great extent in the region. Moreover, entity Training Strategies aim to set in operation the training quality assurance function by the end of 2014. Accreditation of training programmes will be conducted through a content-review process of the future training programmes against a specific set of standards that are to be established, while accreditation of training providers will include a review of overall institutional quality, capabilities and accomplishments of training providers. This function, however, is among the most challenging, complex and costly ones, due to the fact that it comprises several sub-elements, which need to be considered and developed in parallel, so as to have a comprehensive quality assurance framework. Considering this, the project will provide substantive assistance, facilitation of work discussions, expertise and support to the establishment of this function, based on the following building elements and processes: i) Assignment of responsibility for quality assurance and establishment of quality assurance body within the training system in each entity (Quality Assurance Panel) in 2012; 11 ii) Design of basic rulebooks for the body and conduct orientation and induction training to its members (2012/2013); iii) Design and affirmation of training programmes` quality standards and procedures for accreditation (2013); iv) Design and affirmation of standards and procedures for accreditation of training providers (2013); v) Pilot accreditation of training providers and selected training programmes11 in 2014, linked with certification. The assistance package related to this particular function will be developed by the project team during the first implementation year and will deploy a wide spectrum of assistance, such as coaching, independent (external) expert assistance, training, work meetings, study visit. Primary beneficiaries of this action will be the training commissions, relevant technical staff of the training system structures and members of the newly-established Quality Assurance Panels in each entity. When it comes to the HRM function at the local level, looking from the training system`s perspective, it is a key pre-condition not only for the overall sustainability of any capacity development policy, but also for the effective work of the training model per se. In order to further support the design and launch of effective reform process in this area instigated by the training system for local self-government employees, the project, together with its counterparts, will undertake several main actions, as follows: i) Further support to strengthening of the network of HRM/training focal points within local governments, initiated by the training system in each entity. The support will include information and best practices sharing, creation/strengthening existing thematic HRM fora within each entity to provide inputs and initiatives from the ground for policy and regulatory improvements; ii) Awareness raising of the importance of the HRM among senior and mid-management in local governments via publishing of best practices and information sharing; iii) Design of a policy paper12, on initiative of the training system in each entity, which is widely discussed with all relevant stakeholders. The policy paper will provide a consolidated vision on the importance of the HRM function at the local level; the general approaches to its establishment and strengthening within local administrations; the general standards in the areas of recruitment and retention of local staff, training and development of employees, performance management; possible policy recommendations to various policymakers and local governments. The policy paper will consider the existing practices and status quo in this particular area and will serve as a main policy tool of the training system, meant to provide general guidelines to local governments and support the long-term reform process in this area. The policy paper will be printed and shared to all BiH local governments. In the light of strengthening the policy-making and policy-implementation function of the training system, the project will extend support to such emerging actions via expert support and relevant activities when the need arises. iv) Delivery of the HRM training programme (already designed within the training system) and limited technical assistance in the form of general functional advice to additional local governments country-wide, aiming to cover at least 50 % of BiH local governments; v) Soft interventions to support the policy and practical application of the HRM function at the local level, such as, for example, proposing that one of the main award categories within the annual Beacon Schema contest among BiH local governments is dedicated to the HRM function and best practices. Activity 2: Support to capacity development of BiH local governments Another main activity within this component is provision of support to capacity development of BiH local governments. This activity comprises a two-fold line of action: 1) on the one side, assistance will be offered to the entity training structures in the design and delivery of the priority training programmes, as defined within the 11 The project, in close cooperation with its partners, will support the pilot accreditation of up to 2- 3 training programmes. Based on the analysis and Report on HRM with focus on organizational modalities and training function prepared under the first project phase. 12 12 entity Training Strategies (and thereafter – within the Annual Work Plans of entity partners). 2) On the other side, this activity will also support design and delivery of highly relevant training programmes for BiH local government officials and employees, arising from the Training Strategies and complementary to the ongoing reform processes, for which a strong demand arises during the course of project implementation. Such training programmes are considered highly complex and financially burdensome and as such require external support to the training system. With regard to the direct support to the entity training structures in the process of design and delivery of priority training programmes to local government officials and employees, the project will provide technical assistance (as described within the previous activity) in the preparation of the training programmes (in terms of design of ToRs, procurement and quality assurance). Via this activity, the project will financially contribute to the entity training system`s annual budgets and will complement the design and delivery of the priority training programmes13. In this regard, the project sets the following general parameters related to the design and delivery of training programmes, as well as for the number of training groups and outreach to beneficiaries14 of the training programmes: 2012 2013 2014 Basic training programme Complex training programme Basic training programme Complex training programme Basic training programme Complex training programme Design of new/upgrade of existing priority training programmes for the training system 4 training programmes (2 per entity) 2 training programmes (the same for both entities) 2 training programmes (1 per entity) 2 training programmes (the same for both entities) 2 training programmes (1 per entity) 2 training programmes (the same for both entities) Delivery of the priority training programmes (including both new and existing ones) 6 training programmes (3 per entity) 4 training programmes (2 per entity) 4 training programmes (2 per entity) 4 training programmes (2 per entity) 4 training programmes (2 per entity) 4 training programmes (2 per entity) 12 training groups 8 training groups 26 training groups (8 staff + 18 elected officials) 8 training groups 14 training groups (8 staff + 6 elected officials) 8 training groups 300 200 650 200 350 200 Number groups of training Number of envisaged beneficiaries Therefore, the secondary target group is direct beneficiaries of training - local government employees and elected officials. Training programmes to be offered to local government employees (senior local government employees - heads of departments, senior advisors; specialized administrative staff; junior local government employees) within the project will be based on the priorities identified within the Training Strategies but sufficient flexibility will be ensured to address new emerging training needs/training topics, should it be required. The key role in overseeing the design and delivery of these training programmes will lie with the Training Office within the Ministry for Administration and Local Self-Governance in the RS and the Training Office to be established within the Civil Service Agency or the Ministry of Justice in the FBiH. It is estimated that within the target group of municipal employees at least 1,300 will be covered by training under the project, in addition to training that should be provided by the Entity Training Systems budgets directly. 13 Under the assumption that at least 1 basic and 1 complex training programme will be covered by the budgets of each entity training system. 14 Beneficiaries include: local government elected officials (mayors, deputy mayors, municipal councillors); senior local government employees (Heads of Departments, senior advisors); specialised administrative staff; junior local government employees. 13 A particularly important target group will be newly-elected local government officials (mayors, deputy mayors, municipal councillors) in BiH, following the Local Election in late 2012. Within the newly developed entity Training Strategies, local government elected officials were defined as one of main target group. For this target group delivering an integrated training programme should serve as the main induction and orientation training assistance intervention, considering that most of newly elected officials do not have previous experience in local government affairs, while at the same time they are expected to be drivers of reforms in their localities15. The key role in overseeing the design and delivery of these training programmes will lie with the Training Units of both entity Associations of Municipalities and Cities. It is estimated that at least 600 newly-elected local government officials will be covered by training under the project, in addition to training that should be provided by the Associations of Municipalities and Cities. The ultimate beneficiaries of the project interventions that in its nature aim at increasing municipal capacities will be the citizens of local governments in BiH targeted by training activities as well as local business and civil society organisations, who will benefit from improved delivery of administrative and communal services and increased development efforts of their local administrations. The design of the new training programmes will be lead by the relevant structures of the entity training systems, where in the case of creation of the basic training programmes, the entire process will be implemented by applying a UNDP National Implementation Modality (NIM), which implies that each relevant national structure will be a responsible partner for the design of terms of references, organisation and conduct of procurement processes as per the existing legal framework, selection and contracting of service providers, while the project will provide the funds for these activities and will exercise a strong quality assurance role. This modality is deployed for the design of the basic training programmes only, due to the fact that these might be specific for each entity, as well as to contribute to the direct capacity development of partners to manage this sub-step within the training cycle. The design of the complex training programmes, which will be in majority of cases the same for both entities, will be procured by the UNDP (in close cooperation with the partners), so as to avoid duplication of costs for design of the same training programmes within each entity, as well as to ensure standardisation of training programmes and quality assurance. Altogether, this level of support will ensure that the training system gradually expands its portfolio of training programmes for local government employees and officials, while also adding value to the own investment of each entity budget in this area. The delivery of the priority training programmes by the entity training systems is seen as a key function, which directly contributes to capacity development of local government employees and officials, equipping them with a wide spectrum of competences and skills necessary to lead local development processes and deliver quality public services. In addition to providing assistance to the responsible training system structures in the phase of training delivery (as outlined within the previous activity), the project will provide financial contribution to the entity annual budgets with regard to this particular demanding action, to the level described within the table above. It is envisaged that the delivery of the training programmes identified within the Annual Work Plans of each entity training system will be lead by the relevant structures, under a UNDP NIM and in their capacity of a responsible partner, where each responsible structure will carry out the design of terms of references, conduct of procurement processes as per the existing legal framework, selection and contracting of training service providers16, while the project will ensure the funds for delivery of the training and overall quality assurance. It is important to note that in the course of design and delivery of complex training programmes the project will pay particular attention to piloting of training programmes prior to its inclusion in the standardised training offer. In this respect, the project will encourage thematic discussions among local government practitioners and leaders, as a main consultative tool in the process of design of training programmes. 15 The conceptual outline of the integrated training programme for newly-elected local government officials encompasses four main building blocks: i) training course “Local Government from A to Z”; ii) training course “Leadership Skills”; iii) training course “Integrated Local Development Planning and Management” and iv) written and user-friendly thematic series and know-how practicum. The training course “Local Government from A to Z” and “Leadership Skills” have already been designed within the first project phase and are ready for delivery. 16 In some cases, based on the specific situation, procurement for the design of training programs might be combined with its delivery, so as to optimize costs, reduce procedure burden and save time. 14 It should be noted that training programmes to be designed and delivered will be based on the priorities defined in the training strategies (i.e. local development planning, management and business enabling environment, spatial planning, EU integration, service delivery quality management, etc.), but sufficient flexibility will be kept to address other emerging priority needs (i.e. in cases of new legislation and policies). Human resources management is given a particular attention considering that both entity training strategies specifically addressed the establishment and operation of HRM units in local governments with particular focus on training function as important leverage in human resources. As stated above, with the contribution of the project, at least 1900 local government officials and employees, including elected officials, will directly benefit from the learning and capacity development possibilities offered by the training system in BiH in the course of the next 3 years. Naturally, these targets do not limit the delivery of additional training programmes, supported by the budgets of each entity training system or the project should a need arise. Of key importance is the project substantive contribution to providing induction competence- and skills-development training programmes to the newly-elected local government officials in BiH, following the Local Election in late 2012. Logically, this contribution will be complementary to the efforts of the entity training systems (and both AMCs) in 2013 and early 2014, considering the large number of the target group. In the course of delivery of the training programmes, maximum utilisation of the existing 9 regional training localities17 will be sought, so as to optimise delivery costs, as well as to further develop and decentralise training delivery infrastructure country-wide (simple and mid-complexity training). Such an approach to training delivery would not only paves the way for future systematic approach to organizing training in a way that would make it physically and financially better accessible to local governments but also provide excellent opportunity for intermunicipal exchange of knowledge and practices and overall strengthening of inter-municipal cooperation. When it comes to general capacity of these regional localities, the 9 training localities, with 2 monthly training organized in each locality, could accommodate up to 5,000 trainees per training year. All participants in the training programmes will be awarded with certificates18. In addition, the project will seek for strategic partnerships, synergies and alliances with other stakeholders and projects delivering training assistance to local governments (especially with regard to the effective delivery of the capacity development interventions for BiH newly-elected local government officials), as well as will place significant efforts to consolidate existing quality training programmes developed by external stakeholders19 into the training system portfolio. 2) As previously mentioned, this activity will also support the design and delivery of highly relevant basic and complex training programmes for BiH local government officials and employees, defined within the Strategies and for which a strong demand arises during the course of project implementation. By this, the project will have the flexibility to address urgent training and capacity development needs of local governments. It is envisaged that the project will design approximately 3 basic and 3 complex training programmes throughout the project implementation and will support their delivery in up to 10 training groups. Ultimately, these training programmes will be handed over to the training system portfolio of programmes and sustained in the long-run. Activity 3: Support to creation of the training system`s tools Another important activity within this component is the provision of support to creation of the training system`s tools. It is meant as complementary to the first activity and as such will provide the fundamental administrative and communication tools needed for the training system to effectively perform its functions. In general, the envisaged tools fall under two main categories: administrative (electronic, databases) tools and communication (networks, fora) tools. With regard to the administrative tools, the project will further support the update and modernisation, as well as creation of dynamic work databases (based on a simple integrated software solution) of 17 Within the first project phase, 9 regional training localities were defined and equipped, so as to serve as basic training delivery venues country-wide. These are located in: Banja Luka (RS), Bijeljina (RS), Bosanski Petrovac (FBiH), Ilidža (FBiH), Istočna Ilidža (RS), Tomislavgrad (FBiH), Trebinje (RS), Tuzla (FBiH) and Vitez (FBiH). 18 The certification of local government officials and employees will be effectively linked with the HRM policies, particularly with regard to linkage of training and performance of employees. 19 Such as, for example, training programmes developed under the UNDP/SDC ILDP, OSCE, etc. 15 primary importance to the training system. These include (but are not limited to): existing databases of training providers; beneficiaries of the training programmes; HRM/Training focal points and Secretaries within local governments and training programmes portfolio. This action will be supported by the project team, ensuring that the databases within each entity are consistent by key parameters, thus ensuring comparability of information at the country level. Furthermore, the project will support the design and launch of websites for each entity training system, as a main information, communication and promotion tool. Websites will be hosted, maintained and updated by relevant public structures of each entity training system and will comprise of the following main elements: i) news box (news, newsletters, announcements); ii) policy box with relevant information, policy papers, strategies); iii) training offer with possibilities for on-line registration of participants; iv) basic e-learning platform; v) thematic networks of the training system; vi) library box: publications and best practices. The most demanding, as well as novelty element, will be the e-learning platform. In this regard, the project will support the pilot design and launch of 2 on-line and self-paced training courses (from the existing portfolio of basic training programmes) and will assist in the process of adaptation and launch of an electronic simulation game on integrated local development for mayors, based on the existing simulation game produced by the Swedish SymbioCity network20. Considering the complexity as well as the novelty of this element in capacity development approaches in the country, a study trip to a neighbouring or another relevant country might be organised for key operational and technical staff of the training system to expose them to good practices and challenges in designing and launching on-line self-paced training courses. With regard to the training system communication tools, the project will encourage and facilitate the establishment of thematic networks of local government practitioners, in order to support interaction between stakeholders, enhance exchange of good practices and create effective and participatory discussions and consultations fora. In addition to training purposes, such thematic networks might be linked with the core policy targets of the training system, such as, for example, HRM, revenue planning, spatial planning, etc. Component 2: Support to the training system`s enabling environment, partnership building and visibility. While the first project component will primarily deal with the policy, administrative and functional capacity internal to the training system, the second project component will focus on the overall enabling environment and interaction with external stakeholders. More particularly, this entails measures to support the development of the training market, as well as actions aiming to better position, promote and globally interlink the training system for local self-government employees in BiH. Activity 1: Strengthening of the training market in BiH One of the main activities within this component is provision of assistance to strengthen the training market in BiH. The project will provide support to the development of the training market in close interaction with the structures of the training system for local government employees via participatory design of policies regulating the training market in relation to training delivery and development of recommendations for the creation of a regulatory framework that benefits the participants in the training market and facilitates the attainment of quality standards at affordable prices. This action will be also inter-linked with the process of creation of standards for accreditation of training providers (under the previous component). Logically, some assistance might be provided by the project to training organisations in the process of accreditation of training providers via practical information events and expert advice. Considering that the training market in BiH is still underdeveloped, efforts will be placed to strengthening the capacities of local training providers, via joint information events related to forthcoming training agenda of the training system (early-warning information to potential training providers, so they can be aware of forthcoming training delivery possibilities). Furthermore, following the principle of transparent procurement process, training 20 SymbioCity simulation game: http://www.btslearning.com/app/eBS/symbiocity/index.asp. 16 providers (organisations and individuals) country-wide will be invited to compete as training providers within the training system. The training system - Training Office/Training Unit for local government employees - will encourage the establishment of training providers` network and use this tool to inform and engage training providers more actively in the process of delivery of training assistance to local governments. Another measure to support strengthening of the training market will be the organisation of Trainings of Trainers (ToT) for at least 1 thematic training programme within the portfolio of the training system annually. Participants in such ToTs will include both representatives of training/local development organisations, as well as practitioners from local/higher governments. In addition, at least 1 ToT programme specifically targeting internal local government practitioners will be organised annually along basic training programmes portfolio in order to equip them with necessary training skills required for effective sharing of knowledge within a single local government unit or a wider territorial cluster of neighbouring local governments. Activity 2: Promotion, partnership development and visibility Another activity within this component is related to the promotion, partnership development and visibility of the training system for local government employees in BiH. By nature, this activity entails “soft” measures, aiming to improve and “place-market” the training system as a reliable public capacity development tool available to BiH local governments. Towards this desired situation, the project will support and facilitate the training system`s global networking and memberships in international training systems, participation of the training system members in international capacity development fora, as well as establishment of partnerships with training institutes and systems from European countries. Furthermore, the project will provide support in the process of design and wide sharing of promotion brochures and information leaflets for the training system (both in local and English languages), promotion posters for certain policy discussion processes stimulated within the training system. Together with the partners, media briefings and press releases will be prepared and widely shared on a regular basis, so as to positively utilise media channels for further promotion of the services and achievements of the training system. 2.3. Project approach 2.3.1. Levels and logic of intervention The project will have a multi-tier level of intervention, covering higher government levels (RS and FBiH entity levels) and reaching intensively the local level, via delivery of a wide scope of training programmes for local government officials and employees. While no change of legislation is envisaged, certain institutional and organisational revisions/changes, as well as instituting of new by-laws and internal procedures might be needed, so as to sustain project intervention efforts, particularly with regard to effective functioning of the structures of the training system for local government employees in BiH, as well as in relation to strengthening the HRM function at the local level. The general project intervention logic is captured in the graph below: Goal: To contribute to the development of a professional and competent BiH local governments able to effectively manage development processes and deliver quality services to their citizens via further strengthening of the functional and policy capacity of the training system for local government employees in BiH and support to its affirmation as an effective public mechanism for carrying out the local governments` capacity development agenda country-wide. Component 1: Strengthening the training system`s core structures, functions and policies and support to capacity development of BiH local governments. Component 2: Support to the training system`s enabling environment, partnership building and visibility. 17 Internal system`s environment External system`s environment 2.3.2. Visibility Visibility, media-presence and public information sharing of project activities and achievements will be ensured on a regular basis. This will not only inform and educate the broader audience on various aspects related to local development, but will also positively build the project`s identity country-wide and beyond. 2.3.3. Ownership and sustainability Via its activities, the project will ensure design, handing-over and institutional sustaining of the core products, processes and knowledge tools of the Training System for Local Self-Government Employees to the relevant institutional and organisational partners in BiH. These efforts will ultimately contribute to long-term effective functioning and sustainability of the training system and its structures. The project adopts a strategy of descending level of assistance to direct partners, which aims to gradually reduce the external technical and financial assistance offered by the project and thus ensure that the relevant partners will independently adopt and apply the newly-created work-processes, knowledge and skills. Ultimately, considering that the project is a typical system-building intervention, its sustainability will be ensured via institutional, organisational and procedural embedding of the tools, knowledge and products into the daily routine of counterparts. This relates primarily to counterparts at entity and local levels, as well as for both entity AMCs. In addition, the project will place specific attention on gradual establishing and setting in operation of financial mechanisms enabling the long-term functioning of the training system, independent of external (donor) resources and utilising primarily public resources from both entity and local levels. On the other side, project`s sustainability will be reflected in the growing ownership of the key stakeholders promoting policy change, the foundation for which was already set during the first project phase and will be further strengthened throughout the second project phase. Accordingly, the project will facilitate broad consultation processes and encourage cooperation among stakeholders (responsible ministries, CSAs, training providers, local governments, AMCs, and others) throughout the entire project cycle. In this way, local ownership of processes, structures and products will be secured. 2.3.4. Gender mainstreaming and vulnerable groups The principle of equal access to training and professional development, with specific reference to gender equality, is one of the six principles of the Entity Training Strategies. This means that training formats and programmes should be equally accessible to all so they may meet their training obligations and, at the same time, exercise their right to training and to the continuous development of their knowledge and skills. During the strategies’ preparation particular focus was placed on the gender principle when local governments training needs were assessed, data gender-disaggregated, analyzed and findings incorporated in the strategies, while both training strategies drafts were shared with the respective entity Gender Centres for their comments and suggestions prior to their finalization. In addition, the training interventions during the first project phase supported gender mainstreaming, strongly highlighting the need for equal accessibility to training and encouraging equal participation of both sexes. Therefore, the project will continue to support gender mainstreaming in all activities, through providing gender mainstreaming recommendations for each planned project activity, keeping records and evaluating participation of women and men in planning, implementation and evaluation of project activities as well as using the opportunities provided within the project (training, information sessions, resources). 18 Documents prepared within the project will use gender sensitive language or in case of limitation bear a note that terms used in one grammatical gender are considered gender neutral and relate to both women and men. 2.4. Synergy with other relevant interventions The follow-up project phase has been designed in close relevance to the strategic country development priorities, as well as by creating close interactions with other on-going projects. The project itself represents a segment of the integrated local development programme of the UNDP, more particularly with regard to the overall capacity development of local governments in BiH, therefore envisages close synergies with a package of on-going or planned UNDP projects and their components related to capacity development at the local level. Among these are: the second phase of the Integrated Local Development Project (ILDP), which is primarily funded by the Swiss Agency for Development and Cooperation and aims to support further strengthening of local strategic planning in BiH via vertical consolidation into higher government levels` strategic planning frameworks, as well as horizontal up-scaling and capacity building of local governments. The second phase of the MTS project will be closely bridged with the ILDP capacity development interventions both at entity and local levels and thus ensure sustainability and coherence of training assistance within both projects. Another relevant initiative is the EUfunded Reinforcement of Local Democracy (LOD) project, which works with selected BiH local governments towards improving their relationship with civil society, and facilitates the set of financing mechanisms for improved service delivery. Synergies might be explored also with all other ongoing/future UNDP-implemented projects, with regard to capacity development of local governments21. Synergies are to be established also with the Sida-funded “Capacity Development for the Entity Associations of Municipalities and Cities in BiH” project, working to strengthen and further institutionalise the AMCs in BiH, ensuring their independence, advocacy role, clear mandates, and accountability to their constituencies. Interaction will be also sought with the GIZ-implemented “Strengthening of Local Self-government in Bosnia and Herzegovina” project (launched in 2011), supporting activities aiming to improve capacities of 12 BiH local governments to effectively implement local development strategies. Close interaction will be at place with the EU-funded “Support to Institutional Capacity Building for Regional and Local Economic and SME Development” project (2009 – 2012), more particularly with its capacity development for local governments’ component. Another project in the sector is the Governance Accountability Project (GAP), designed to build the capacity of a critical mass of local governments to better serve their citizens within a policy and fiscal framework of good governance. This project, funded jointly by the United States Agency for International Development (USAID), Sida and the Netherlands, works with more than 72 BiH local governments, providing TA and community development co-financing. The second phase of the project will be completed by the end of 2012. Interaction will be encouraged with the local development projects of the Organisation for Security and Cooperation in Europe (OSCE), where particular interaction will be in place with regard to strategic planning, IMC, capacity development for local governments (budgeting, HRM), thematic networks for local governments. 2.5. Risk analysis and mitigation proposals Based on the lessons learnt during the first project phase and feedback from key stakeholders, which have led to the design of the second phase project proposal, an understanding of the current operating environment reveals that there are a few principal risks, which need to be addressed for the successful implementation of the project. In broader terms, the project’s risk strategy will embed attention to risk management into the operation from its early implementation. Identification, analysis and control of those risks, which may impact the project and 21 Such as, for example, the multi-donor “Srebrenica Regional Recovery Programme”; the “Mainstreaming Environmental Governance: Linking Local and National Action in BiH” Programme and the “Democratic Economic Governance: Securing Access to Water through Institutional Development and Infrastructure” Programme, supported via the Millennium Development Goals Achievement Fund, etc. 19 threaten its successful delivery, will therefore be continually conducted, and the necessary activities required for minimizing or eliminating them will be given priority. A summary of the main risks, as well as the proposed mitigation measures are presented in the table below: Main identified risks related to the project implementation Training system structures lack human and financial resources to fully implement the activities foreseen by the Training Strategies. Resistance of civil servants and employees toward learning, organisational changes and creativity Forthcoming Elections in 2012 Local Political climate in BiH is still tense and complex Type Administra tive / Financial Probability of incidence Medium Severity of impact High Mitigation measures Extensive technical support and facilitation of discussions among the relevant institutions in the formulation of a financial formula for co-funding of the training system annual budget by public resources (entity budgets, local governments) in each entity. Behavioural Medium High Systemic interaction with partners, offering onthe-job assistance, highlighting results achieved and displaying benefits for their daily routine work. Creation of positive atmosphere for teamwork and team building. Political High Medium Adequate planning of training interventions, so as to minimise delays and negative influence on project implementation. Low Engage relevant policy-makers as partners within the project; encourage transparent policy-making processes. Throughout project implementation, focus implicitly on operational and development benefits for counterparts. High Demonstrate the value added of the effective work of the training system in its initial years of operation; clearly display outreach and impact; discussions and negotiations with entity governments on the financing mechanisms, facilitate public dialogue and increasing willingness of local governments to financially support the training system based on the high quality training programmes they have access to. High Efforts to manage as wide engagement of local government employees in training programmes, so as to horizontally disperse capacities within local administrations. Political Failure to move from donor-funded to government- and/or local government-funded training system Financial Local government mid management staff turnover, particularly in a postelection period. Administra tive Low Medium High 20 PART III: MANAGEMENT ARRANGEMENTS The implementing partner of the project will be the BiH Ministry of Justice. UNDP Country Office in Bosnia and Herzegovina will provide full support to the national project implementation and will assume full responsibility and accountability for the overall management, including monitoring and evaluation of project interventions, achieving of project output and specified results, and the efficient and effective use of resources22. This is premised, on the one side, on the complex administrative structure of BiH and the need to have one implementing project partner at the state level and on the other – on the fact that institutional and administrative capacities within the national stakeholders is still not fully sufficient to undertake core functions and activities. However, it needs to be also recognised that the project will work mainly at entity and local levels and therefore UNDP will seek, where possible and following an increasing responsibility transfer to national stakeholders as per its horizontal capacity development objective, to draw in relevant entity institutions as responsible partners, and as noted above, will devolve the management of procurement of training programmes` design and delivery, allowing for a gradual transition towards National Implementation Modality (subject to positive capacity assessment of responsible parties, as per the UNDP Programme and Operations Policy and Procedures and more specifically HACT guidelines). Implementing and responsible parties Project Organisational Structure Project Board – Users – BiH Ministry of Justice – FBiH Ministry of Justice – FBiH Civil Service Agency RS Ministry of Administration and Local Self-Government – RS Civil Service Agency – FBiH and RS Associations of Municipalities and Cities Project assurance - UNDP Programme Responsible party Supplier - Executive - Swedish International Development Cooperation Agency - United Nations Development Programme Project Manager Capacity Development Officer Capacity Development Officer (Sarajevo) (Banja Luka) Project support Regional Capacity Development Assistants (Bihać, Mostar, Srebrenica, Sarajevo, 30 - 50% engagement) Responsible partners: Relevant structures within the training system with regard to the procurement procedures related to design and delivery of training programmes within the Training System for Local Government Employees 22 The roles and responsibilities for the implementation of the project will be in line with the global UNDP User Guide on Program and Project Management for Results which defines minimum requirements for ensuring accountability for programmed activities and use of resources. 21 Project Board The Project Board is the group responsible for making by consensus, management decisions for a project when guidance is required by the Project Manager, including recommendation for UNDP/Implementing Partner approval of project plans and revisions. In order to ensure UNDP’s ultimate accountability, Project Board decisions should be made in accordance to standards that shall ensure management for development results, best value money, fairness, integrity, transparency and effective international competition. The Project Board plays a critical role in commissioned project evaluations by quality assuring the evaluation process and products, and using evaluations for performance improvement, accountability and response actions. The Project Board will meet at least quarterly, or as necessary when raised by the Project Manager. This group is consulted by the Project Manager for decisions when Project Manager's tolerances (normally in terms of time and budget) have been exceeded (flexibility). Based on the approved annual work plan (AWP), the Project Board may review and approve project quarterly plans when required and authorises any major deviation from these agreed quarterly plans. It is the authority that signs off the completion of each quarterly/annual plan as well as authorises the start of the next quarterly/annual plan. It ensures that required resources are committed and arbitrates on any conflicts within the project or negotiates a solution to any problems between the projects and external bodies. In addition, it approves the appointment and responsibilities of the Project Manager and any delegation of its Project Assurance responsibilities. The Project Board will consist of the following roles: – Executive, representing project ownership, and acting as chair of the board, in this case, the UNDP Deputy Resident Representative or Assistant Resident Representative; – Suppliers, to provide services for implementation of the programme, in this case – the Sida and the UNDP; – Users, to ensure the realisation of project benefits, in this case, the BiH MoJ, the FBiH MoJ, the FBiH CSA, the RS MALSG, the RS CSA, both entity Associations of Municipalities and Cities. Project Assurance Project Assurance is the responsibility of each Project Board member. However, the role can be delegated. The project assurance role supports the Project Board by carrying out objective and independent project oversight and monitoring functions. This role ensures appropriate project management milestones are managed and completed. Project Assurance has to be independent of the Project Manager. Therefore, the Project Board cannot delegate any of its assurance responsibilities to the Project Manager. The role of Project Assurance will be performed by the UNDP Programme Officer. Project Management and project team The Project Manager has the authority to run the programme on a day-to-day basis on behalf of the UNDP BiH. The Project Manager will have the responsibility to ensure that the programme produces the required results that are capable of achieving the benefits defined in this document. S/he will be responsible for day-to-day management and will ensure that the project produces the results specified, to the required corporate standards and within the constraints of time and cost. It is envisaged that the project will have a National Project Manager. The project will also employ a core team of 2 full-time specialists to support the complex capacity development and policy interventions (one for each BiH entity). In addition, 4 Regional Capacity Development Assistants will be deployed to support the intensive organisation, coordination and delivery of training programmes from the existing UNDP regional offices (with one regional assistant with 50% engagement and 3 regional assistants with 30% engagement). Project assistance will also be ensured by 1 full-time post. 22 Other expertise and resources It is foreseen that the project will deploy both national and/or international expertise in various fields as the need arises. Equipment and vehicles were purchased as needed for the project needs within the first project phase. Accordingly, only limited resources will be invested in purchasing of new equipment or assets. 23 PART IV: BUDGET AND FUNDING The total project budget amounts to USD 2,137,997 (the budget is enclosed as Annex I). The project budget comprises the costs for project activities and the costs of the resources that are assigned to those, as well as fixed costs that are associated with the activities. With regard to the allocation of financial resources to each of the project components, approximately 89 % of the total budget is allocated to component 1, while approximately 11 % - to component 2. This distribution implies that the level of effort and investment to be realised via component 1 – i.e. – substantive support to the main structures, functions, policies and tools of the training system for local self-government employees in BiH and to country-wide capacity development of local governments is concentrated within the first component and therefore it has a structural importance to the overall project success. Reflecting the capacity development nature of the project, nearly 60 % of the total budget is allocated for design and delivery of a wide scope of training programmes for local governments, as well as for all types of technical assistance to the structures of the training system. Staff costs amount approximately to 25%, including a project manager and a project assistant, two capacity development specialists and four part-time regional capacity development assistants based in the UNDP regional offices to support complex capacity development interventions throughout the country (approx. 30% - 50 % engagement). The project will deploy numerous measures in order to achieve cost effectiveness. In terms of procurement and in recognition of the benefits of effective competition, outsourcing of services within the project will be based on competitive process, upon which a contractual award is made to the lowest priced acceptable offer. Further on, all training and capacity development assistance will be organised and delivered following the principle of clustering of partners and by utilisation of the existing Regional Training Localities, so as to ensure economy of scale. The project will seek to utilise in-kind contribution from partners. Staff costs are rationale bearing in mind activities number and volume of effort that need to be realised. The primary contributor to the project budget is Sida, where the total amount of funding amounts to USD 2,037,997 and represents approximately 95 % of the budget. UNDP`s contribution to the budget is USD 100,000 (5 % of the overall project budget). 24 PART V: MONITORING AND EVALUATION UNDP introduced results-based management as its corporate management approach, so that performance at the level of development goals and outcomes is systematically measured and improved. In that sense, monitoring and evaluation are key factors in helping improve performance and achieve results. Monitoring and evaluation will be performed through the analysis of the results-based quantitative and qualitative indicators outlined in the Project’s expected results framework and the budget allocation table. The main tools for organising the project monitoring system encompass a series of main documents, providing baseline and target quantitative and qualitative indicators, more particularly: - The Results and Resources Framework (as described within Section II of this project document); - The Annual Work Plan (AWP) (as described within Section III of this project document); - Detailed Annual Work Plans, Quarterly Work Plans detailed financial annual and quarterly plans; - Risk and issues log. The project will adopt the following reporting modalities: - Annual Narrative Report prepared by the project and submitted to the Project Board; - Annual Financial Report prepared by the project and submitted to Sida; - Mid-term project evaluation prepared by independent consultant/s and submitted to the Project Board; - Final Project Narrative Report prepared by the project and submitted to the Project Board; - Final Project Financial Report prepared by the project and submitted to Sida; - Final project evaluation prepared by independent consultant/s and submitted to the Project Board. Furthermore, Annual Project Reviews will be held late each year and will be initiated by the Project Board and may involve other project stakeholders as required. It shall focus on the extent to which progress is being made towards outputs, and that these remain aligned to appropriate outcomes. Project evaluation will look at the efficiency, effectiveness, sustainability, and relevance of the project objectives. Such analysis will ensure that quantitative results and achievements based on practical experience are not forgotten, as well as that the project builds upon lessons-learnt, sustains positive results and replicates successful initiatives. A major mid-term project review will be undertaken in late 2013 order to provide feedback from the stakeholders at all levels, and if needed, allow adjustments to the project by the Project Board. An independent final project evaluation will be conducted in mid 2015, so as to examine the overall project`s effectiveness, efficiency, sustainability, achievements, as well as capture lessons learnt and provide strategic recommendations for consolidation and/or exit-phase of the intervention. 25 PART VI: LEGAL CONTEXT This project document shall be the instrument referred to as such in Article 1 of the Standard Basic Assistance Agreement between the Government of Bosnia-Herzegovina and the United Nations Development Programme, signed by the parties on 7 December 1995. The host country implementing agency shall, for the purpose of the Standard Basic Assistance Agreement, refer to the government co-operating agency described in that Agreement. The following types of revisions may be made to this project document with the signature of the UNDP Resident Representative only, provided s/he is assured that the other signatories of the project document have no objections to the proposed changes: (a) Revisions in, or addition of, any of the annexes of the project document; (b) Revisions which do not involve significant changes in the immediate objectives, outputs, or activities of a project, but are caused by the rearrangement of inputs already agreed to or by cost increases due to inflation; and (c) Mandatory annual revisions which re-phase the delivery of agreed project inputs or increased expert or other costs due to inflation or take into account agency expenditure flexibility. 26 SECTION II: PROJECT RESULTS AND RESOURCES FRAMEWORK Intended Outcome as stated in the Country Programme Results and Resource Framework: Government at all levels modernises public sector practices through public sector reform and bases policies on sound quantitative and qualitative analysis with full participation of relevant national stakeholders, including CSOs and academia. Outcome indicators as stated in the Country Programme Results and Resources Framework, including baseline and targets: Indicator 1.2.e: Strategies for training of local governments developed in participatory way and implemented in both entities; Baseline (2010): There are no strategies for training of local government employees on any level of government developed. The regulatory framework for training and capacity building is inadequate; Target 2012 – 2014: Training Strategies implemented in both entities. Indicator 1.2.f: Number of municipalities engaged in modernizing of HRM function and development of local training plans and number of local government public employees engaged in training, both men and women, satisfied with training on offer; Baseline (2010): Quality management systems for local government training do not exist; The local training market is weak and not able to meet (increasing) training needs. Target 2012 – 2014: At least 3 priority training packages per entity, based on guidance by the Training Strategies delivered in 20 local governments. 120 local government public employees trained and using gained knowledge in daily work. Applicable Key Result Area (from 2008-11 Strategic Plan): Democratic Governance Partnership Strategy: Institutional and organisational partners at entity level responsible for management and coordination of the Training System for Local SelfGovernments, together with local governments will be engaged in the policy dialogue process related to further strengthening of the core functions and policies of the training system. Project title: and ID 00080102 (ATLAS Award ID 00062563) INTENDED OUTPUTS OUTPUT TARGETS FOR (YEARS) INDICATIVE ACTIVITIES By 2015 capacities of BiH local governments to effectively manage development processes and deliver quality services to their citizens are strengthened via the effective support provided by the training system for local self-government employees in BiH functioning as a public mechanism for carrying out the local governments` capacity development agenda country-wide. Targets: Year 1: - The training system`s core structures, as defined within the entity Training Strategies, are established (within the FBiH) and further strengthened (within the RS). - The training system`s core functions and policies (financial sustainability, HRM, quality assurance), as defined within the entity Training Strategies, designed via participatory processes, embraced by the structures and popularised among all local governments. - At least 20 % (cumulatively) of BiH local governments aware of and equipped with knowledge in the area of HRM function at the local level. 1. Strengthening the training system`s core structures, functions and policies and support to capacity development of BiH local governments 1.1. Support to the training system`s core structures, functions and policies: - TA and support to the structures of the training system through the entire annual work cycle; - Design and deployment of a financial sustainability mechanism for the long-term funding of the training systems by public resources (entity and local governments budgets); Establishment of quality assurance structures and design Baseline: 1. Both entity Training Strategies for Local RESPONSIBLE PARTIES UNDP INPUTS (USD) Total project budget: 2,137,997 Total (activity 1): 1,782,370 National staff 531,870 National consultants 147,500 International consultants 7,000 Audio Visual Printing production costs 3,000 27 INTENDED OUTPUTS Government Employees 2011 – 2015 created and set the general strategic framework for each entity training system. 2. The core structures and the basic operational framework of the Training System for Local Government Employees are formally established within the RS, while still nonexistent within the FBiH. 3. There is no viable financial mechanism to ensure longterm financial sustainability of the entity training systems based on public funding. 4. The quality assurance function of both entity training systems is not developed. 5. The training system has a portfolio of 15 training programmes for local government officials and employees in 7 training topics. 6. Average annual training delivery outreach to local government employees and officials is nearly 1000, with the direct financial and technical support of the OUTPUT TARGETS FOR (YEARS) INDICATIVE ACTIVITIES - The entity training systems, with the support of the project, design at least 6 priority training programmes and deliver them to at least 500 local government employees and officials (both men and women). - The entity training programmes` portfolio is enlarged with at least 2 additional priority training programmes developed by the project, and delivered to at least 50 local government officials and employees (both men and women). - The main administrative tools of the entity training systems (databases) are in place and functional. - At least 1 thematic network of local government practitioners established and functional, exchanging good practices and contributing to the design and application of capacity development policies. - Training providers country-wide informed about emerging training delivery possibilities within the entity training system. - At least 2 ToTs designed and delivered to at least 30 participants as a measure to strengthen the training market. and piloting of the accreditation of training providers and training programmes; - Participatory design and practical application of a harmonised policy and practice with regard to HRM at the local level initiated and supported by the training system in each entity. Year 2: - The training system`s core functions and policies (financial sustainability, HRM, quality assurance), as defined within the entity Training Strategies, start practical functioning and application. - At least 40 % (cumulatively) of BiH 1.3. Support to creation of the training system`s tools - Establishment of work databases; - Creation and launch of websites; - Launch of basic e-learning platform within the information websites; - Establishment of thematic 1.2. Support to capacity development of BiH local governments - Assistance to the entity training systems in the design and delivery of the priority training programmes, as defined within the entity Training Strategies; - Support to the design and delivery of additional training programmes for BiH local governments, arising from the Training Strategies and complementary to the ongoing reform processes, for which a strong demand arises during the course of project implementation; - Support to strengthening of coordination function of the regional training localities. RESPONSIBLE PARTIES INPUTS (USD) Contractual services companies 797,300 57,500 Travel Hiring 2 persons for the structures of the training system for a period of 24 months 120,000 63,000 UNDP Relevant entity institutions Rental & Maintenance – Premises 18,000 Communications and audio-visual equipment Rental & Maintenance of Other Equipment 20,000 Furniture 7,200 10,000 Miscellaneous 28 INTENDED OUTPUTS MTS I project. 7. HRM function at the local level is weak (particularly with regard to training management, performance evaluation) and no policy guidelines formally endorsed by the relevant institutions exist to steer the reform in this domain. 8. Training market in BiH is underdeveloped, particularly with regard to training providers capable to design and deliver highquality training programmes for local government employees. 9. Thematic networking as a consultative and practicesexchange tool is underdeveloped. Indicators: 1. At least 70 % of the entity Training Strategies for Local Government Employees implemented by early 2015; 2. Level of fully established and functional entity core structures of the training system by late 2012; Level of developed and formally adopted OUTPUT TARGETS FOR (YEARS) INDICATIVE ACTIVITIES local governments aware and equipped with knowledge with regard to the HRM function at the local level. - The entity training systems, with the support of the project, design at least 4 priority training programmes and deliver them to at least 850 local government employees and officials (both men and women). - The entity training programmes` portfolio is enlarged with at least 2 additional priority training programmes developed by the project, and delivered to at least 50 local government officials and employees (both men and women). - The decentralised training delivery improved via effective utilisation of the 9 regional training localities. - Information websites and a basic elearning platform are anchored and offer at least 2 on-line training programmes. - 2 thematic networks of local government practitioners are encouraged and established cumulatively, in order to enhance exchange of good practices and create effective and participatory discussions on capacity development priorities. - Training providers country-wide informed about emerging training delivery possibilities within the entity training system and engaged in public discussions related to the creation of a regulatory framework that benefits the participants in the training market and facilitates the networks of local government practitioners. 2. Support to the training system`s enabling environment, partnership building and visibility 2.1.Strengthening of the training market: - Development of the training market and support to accreditation of training providers; - Design and delivery of ToTs. 2.2.Promotion, partnership, visibility - Support to the training system global networking, promotion and membership in international training networks; - Study visit with respect to new elements of the training system – accreditation and certification of training programmes and providers and online training courses; - Design and wide sharing of promotion brochures and information leaflets for the training system. RESPONSIBLE PARTIES INPUTS (USD) 222,300 Total (activity 2): UNDP 7,000 National consultants International consultants 17,500 Audio Visual Printing production costs/PR 4,800 Contractual services companies 85,000 71,000 Travel 7,000 Translation costs 30,000 Contingencies 133,327 GMS 29 INTENDED OUTPUTS operational framework of the structures of the training system in each entity by early 2013; 3. Level of fully established quality assurance structures; 4. At least 80 % of the annual budget of each entity training system is ensured by public resources (entity, local governments) in 2014 based on a formal financial mechanism; 5. At least 4 new training programmes are designed each year by the training system, thus increasing the overall portfolio to at least 30 high-quality standardised priority training programmes in offer for local government employees in 2015; 6. At least 550 local government employees and officials annually obtain tailored, practical training via the training system, which directly strengthens their knowledge and skills, to cumulatively result in capacity development coverage of at least 30 % of BiH local government employees by early 2015; OUTPUT TARGETS FOR (YEARS) INDICATIVE ACTIVITIES RESPONSIBLE PARTIES INPUTS (USD) attainment of quality training standards at affordable prices. - At least 2 ToTs designed and delivered to participants as a measure to strengthen the training market. - The training system for local government employees in BiH is promoted within the region and has strengthened its international partnerships and visibility. Year 3: - The training system`s core functions and policies (quality assurance and accreditation) strengthened and pilot accreditation of training providers and selected training programmes in place. - At least 50 % (cumulatively) of BiH local governments aware and equipped with knowledge with regard to the HRM function at the local level. - The entity training systems, with the support of the project, design at least 4 priority training programmes and deliver them to at least 550 local government employees and officials (both men and women). - The entity training programmes` portfolio is enlarged with at least 2 additional priority training programmes developed by the project, and delivered to at least 50 local government officials and employees (both men and women). - 3 thematic networks of local government practitioners are 30 INTENDED OUTPUTS Level of satisfaction of trainees by the training programmes; 7. Number of local governments who undertake reform measures towards establishment /strengthening of their HRM function; 8. Number of accredited training providers and training programmes within the training system. 9. Number of thematic networks of local government practitioners established and functional by 2015; Level of visibility and recognition of the training system by its direct beneficiaries, as well as by international partners; Number of unique visits to the training system websites and number of local government employees/officials who undertook the on-line training courses. OUTPUT TARGETS FOR (YEARS) INDICATIVE ACTIVITIES RESPONSIBLE PARTIES INPUTS (USD) encouraged and established cumulatively, effectively exchanging good practices and contributing to the design and application of capacity development policies. - Training organisations country-wide informed about the general principles and standards related to accreditation of training providers and receive support in the accreditation process via information events and guidance. - Training providers` network established and functional. - At least 10 training providers and 2 training programmes are accredited within the training system by the end of 2014. - At least 2 ToTs designed and delivered to participants as a measure to strengthen the training market. Year 4: - Structures of the training system in each entity able to effectively function and manage the training cycle process on their own. The financial sustainability mechanism of the training system is applied in practice and contributes to the independent functioning of the public training mechanisms. Existing relevant training programmes offered by various organisations/donors are reviewed and consolidated within the portfolio of the training system. - All processes, knowledge tools and 31 INTENDED OUTPUTS OUTPUT TARGETS FOR (YEARS) INDICATIVE ACTIVITIES RESPONSIBLE PARTIES INPUTS (USD) products of the project are handedover to relevant partners and sustained within the training system. - The training system for local government employees in BiH is promoted within the region and has strengthened its international partnerships and visibility. 32 SECTION III: PROJECT 3-YEAR WORKPLAN BUDGET SHEET EXPECTED OUTPUTS and indicators including annual targets Output: By 2015 capacities of BiH local governments to effectively manage development processes and deliver quality services to their citizens are strengthened via the effective support provided by the training system for local self-government employees in BiH functioning as a public mechanism for carrying out the local governments` capacity development agenda country-wide. Target Year 1: The training system`s core structures are established (within the FBiH) and further strengthened (within the RS) and main training system policies discusses among stakeholders, while at least 7 core training programmes are delivered to at least 600 local government officials and employees and minimum 20 % of BiH local governments are aware of and equipped with knowledge in the area of HRM function at the local level. Target Year 2: The training system`s core structures are fully functional and manage the annual training cycle equipped with administrative and communication tools, while the financial sustainability and HRM policies are affirmed gain speed for practical application; the design and delivery of at least 6 new training programmes enriches the system`s portfolio and special focus is placed on capacity development of at least 800 local government officials PLANNED ACTIVITIES List all activities to be undertaken during the year towards stated outputs 2012 Q 1 Q 2 2013 Q 3 Q 4 Q 1 Q 2 2014 Q 3 Q 4 Q 1 Q 2 Q 3 2015 Q 4 RESPONSIBLE PARTY PLANNED BUDGET Source of funds Q1 Budget description Amount (USD) Activity result 1: The training system`s core structures, functions and policies are strengthened and support to capacity development of BiH local governments is provided via the training system. UNDP Total activity result 1 1,782,370 1.1. Support to the training system`s core structures, functions and policies UNDP Total 1.1. 382,000 National consultants 81,000 1.1.1. TA and support to the structures of the training system through the entire annual work cycle 1.1.2. Support to the design and application of core functions and policies Service providers (training venues, annual conferences) UNDP Sida, UNDP UNDP Costs for 2 persons for the structures of the training system (24 months) 36,000 120,000 National consultants 66,500 International consultants 7,000 Service providers (training venues, meetings) 42,500 Publication (HRM manual, HRM policy paper) 3,000 26,000 Travel 33 EXPECTED OUTPUTS and indicators including annual targets and staff, with increasing role of the training providers country-wide. Target Year 3: The training system`s core structures are fully functional and the quality assurance and accreditation function is in place together with a launched elearning platform for wider access to the training offer, while the design and delivery of at least 6 new training programmes further enriches the system`s portfolio and enables at least 600 local government employees and officials to strengthen their capacity and skills, with pro-active role of training providers and active work of at least 2 thematic networks cumulatively. Target Year 4: Structures of the training system in each entity able to effectively function and manage the training cycle process and apply related policies on their own by which achieve at least 70 % implementation of the entity Training Strategies, while the financial sustainability mechanism contributes to the independent functioning of the training system, and the existing training programmes offered by various organisations/donors are consolidated within the portfolio of the training system comprising at least 30 training programmes. The training system for local government employees in BiH is a recognised public tool enabling effective realisation of the local governments` capacity development agenda in BiH. Indicators: At least 70 % of the entity Training Strategies for Local Government Employees implemented by early 2015; PLANNED ACTIVITIES List all activities to be undertaken during the year towards stated outputs 1.2. Support to capacity development of BiH local governments 1.2.1. Support to the training system in the design and country-wide delivery of priority training programmes 1.2.2. Support to the design and delivery of additional training programmes of direct interest to BiH local governments 2012 Q 1 Q 2 2013 Q 3 Q 4 Q 1 Q 2 2014 Q 3 Q 4 Q 1 Q 2 Q 3 2015 Q 4 RESPONSIBLE PARTY PLANNED BUDGET Source of funds Q1 UNDP UNDP RELEVANT ENTITY INSTITUTIONAL PARTNERS UNDP Budget description Amount (USD) Total 1.2. 573,800 Service providers (companies for design and delivery of training; training venues) 444,800 Service providers (companies for design and delivery of training; training venues) 105,000 Travel 24,000 UNDP Total 1.3. 160,000 1.3.1. Creation and deployment of work databases UNDP Service provider for development of a simple software tool/database 20,000 1.3.2. Design and launch of websites UNDP Service providers 30,000 UNDP Service providers for design of on-line training courses and adaptation of a simulation game 95,000 UNDP Service providers (companies – hotel venues for discussion fora) 3,000 UNDP Service providers (companies – hotel venues for discussion fora) 1.3. Support to creation of the training system`s tools 1.3.3. Introduction of e-basic learning platform 1.3.4. Networks development 1.3.5. Thematic discussion fora 6,000 34 EXPECTED OUTPUTS and indicators including annual targets Level of fully established and functional entity core structures of the training system by late 2012; Level of developed and formally adopted operational framework of the structures of the training system in each entity by early 2013; At least 80 % of the annual budget of each entity training system is ensured by public resources (entity, local governments) in 2014 based on a formal financial mechanism; At least 4 new training programmes are designed each year by the training system, thus increasing the overall portfolio to at least 30 high-quality standardised priority training programmes in offer for local government employees in 2015; At least 550 local government employees and officials annually obtain tailored, practical training via the training system, which directly strengthens their knowledge and skills, to cumulatively result in capacity development coverage of at least 30 % of BiH local government employees by early 2015; Level of satisfaction of trainees by the training programmes; Number of thematic networks of local government practitioners established and functional by 2015; Level of visibility and recognition of the training system by its direct beneficiaries, as well as by international partners; Number of local governments who undertake reform measures towards establishment/strengthening of their HRM function; Number of accredited training providers and training programmes within the training system. Number of unique visits to the training system websites and number of local PLANNED ACTIVITIES List all activities to be undertaken during the year towards stated outputs 1.4. Capacity development expertise (project core team) 2012 Q 1 Q 2 2013 Q 3 Q 4 Q 1 Q 2 2014 Q 3 Q 4 Q 1 Q 2 Q 3 2015 Q 4 RESPONSIBLE PARTY PLANNED BUDGET Source of funds Q1 Budget description Amount (USD) Travel 6,000 Total 1.4. UNDP Core project team 326,922 Total 1.5. Project management, operational costs, premises, equipment 1.5. Project management and operational costs UNDP Activity result 2: Support to the training system`s enabling environment, partnership building and visibility UNDP Total activity result 2 222,300 2.1. Strengthening of the training market UNDP Total 2.1. 72,000 Service providers (companies – hotel venues for information meetings) 9,000 2.1.1. Support to the development of the training market UNDP Sida, UNDP 2.1.2. Training of Trainers UNDP Travel Service providers (companies for design and delivery of training; training venues) Travel 2.1.3. Support to accreditation of training providers UNDP 339,648 3,000 51,000 3,000 Service providers (companies – hotel venues for information meetings) 4,000 Travel 2,000 35 EXPECTED OUTPUTS and indicators including annual targets government employees/officials who undertook the on-line training courses. PLANNED ACTIVITIES List all activities to be undertaken during the year towards stated outputs 2.2. Promotion, partnership, visibility 2012 Q 1 Q 2 2013 Q 3 Q 4 Q 1 Q 2 2014 Q 3 Q 4 Q 1 Q 2 Q 3 2015 Q 4 RESPONSIBLE PARTY PLANNED BUDGET Source of funds Budget description Amount (USD) UNDP Total 2.2. 91,800 2.2.1. Support to establishment of partnerships with international organisations UNDP Service providers (companies for study visit including travel), participation in international fora) 80,000 2.2.2. Visibility, accountability, media promotion UNDP Printing costs (posters) 1,800 2.2.3. Publications, newsletters UNDP Printing costs (posters) 3,000 Q1 Translation costs International consultants 2.3. Monitoring and evaluation 2.4. TOTAL PROGRAMME: GMS @ 7% TOTAL BUDGET Contingencies UNDP 7,000 17,500 National consultants 7,000 Travel 4,000 Contingencies 30,000 2,004,670 133,327 2,137,997 36 SECTION IV: ANNEXES Annex I: Project budget ACTIVITY DESCRIPTION National staff (contractual service - Individuals) National consultants (TA and training; financial mechanism TA; quality assurance and accreditation expertise; HRM expertise and TA; monitoring and evaluation) International consultants (quality assurance and accreditation expertise, monitoring and evaluation) Audio Visual Printing production costs (HRM publication, information brochures, certificates, knowledge tools); Contractual services - companies (hotel venues round tables, project ceremonies, workshops, TNAs; design and delivery of training programmes) Travel (including for events, DSA, HACT) Hiring 2 persons for the structures of the training system for a period of 24 months 531,870.00 147,500.00 7,000.00 3,000.00 797,300.00 57,500.00 120,000.00 Rental & Maintenance - Premises 63,000.00 Communications and audio-visual equipment 18,000.00 Rental & Maintenance of Other Equipment 20,000.00 Furniture 10,000.00 Miscellaneous (banks charges, office supplies) 7,200.00 National consultants International consultants 7,000.00 17,500.00 Audio Visual Printing production costs/PR Contractual services - companies Travel (including study visits 49,000); 4,800.00 85,000.00 71,000.00 Translation costs Contingencies General Management Support (7% of Sida contribution) TOTAL BUDGET AMOUNT IN USD 7,000.00 30,000.00 133,327.00 2,137,997.00 37