Fareham Local Development Framework Shaping Fareham’s Future (APPENDIX A) Annual Monitoring Report December 2005 Further Information and Contacts Information on the general Local Development Framework process, updates on the progress of Fareham’s Local Development Documents and current consultations, is available at the following website: www.fareham.gov.uk/ldf. If you have any questions regarding Fareham’s Local Development Framework, including this document, please contact a member of the Planning Policy Team at Fareham Borough Council. Telephone: 01329 236100 Ext. 2318 or 2363 Email: planningpolicy@fareham.gov.uk Address: Planning Policy Team Department of Planning and Transportation Fareham Borough Council Civic Offices Civic Way Fareham Hampshire PO16 7PU For more detailed information and guidance on the new planning system, visit the Office of the Deputy Prime Minister web-site at www.planning.odpm.gov.uk. Fareham LDF Annual Monitoring Report December 2005 Contents Page No. EXECUTIVE SUMMARY 1. INTRODUCTION 1 2. LOCAL DEVELOPMENT SCHEME DELIVERY AND IMPLEMENTATION 3 3. SAVED POLICY ANALYSIS 7 4. MONITORING FRAMEWORK PRINCIPLES AND METHODOLOGY 11 APPENDICES APPENDIX 1 – Local Development Scheme Timetable – adopted and amended versions 15 APPENDIX 2 – Development Plan Document Progress 17 APPENDIX 3 – Supplementary Planning Document Progress 19 APPENDIX 4 – Saved Policy Analysis 20 APPENDIX 5 – Contextual Data for Fareham 65 APPENDIX 6 – List of Sources 80 For further information on this Document please contact ldf@fareham.gov.uk Fareham LDF Annual Monitoring Report December 2005 Executive Summary This is the first Annual Monitoring Report (AMR) to be produced by Fareham Borough Council. It AMR forms part of the Fareham Local Development Framework and covers the period 1 April 2004 to 31 March 2005. As required by Government, this AMR was published and submitted to the Government Office for the South East (GOSE) on XX December 2005.. This AMR is presented in four main sections. Section 1– Introduction – establishes the purpose and aim of the AMR. A description of the Borough is also set out which helps to inform the content of the AMR that follows. Section 2 of the report sets out the content of the adopted Local Development Scheme and considers implementation and delivery. In particular, it records progress of all Local Development Documents and any milestones that have been reached between April 1 st 2004 and 31st March 2005. Section 3 of the report presents an analysis of the policies saved from the adopted Fareham Borough Local Plan Review (2000). This analysis focuses upon the achievements of policies as they have been implemented through planning processes within the Borough. For this AMR there is a specific focus upon housing supply in Fareham. The focus upon housing is due to increasing Government priority given to delivering housing and especially affordable dwellings. Section 4 of the report establishes a monitoring framework for this and future AMRs. This AMR focuses upon contextual indicators to assess the current state of Fareham and how this has influenced the implementation of current planning policies. This section of the report sets out how future AMRs will be more closely related to Corporate indicators to ensure that the AMR is utilised as a Corporate tool. The format of this AMR will be utilised in future years. However, the focus of future AMRs may vary as Fareham faces different issues, challenges and opportunities from year to year. For further information on this document please contact ldf@fareham.gov.uk Fareham LDF Annual Monitoring Report December 2005 1. Introduction 1.1 This is the first Annual Monitoring Report (AMR) produced by Fareham Borough Council. It forms part of the Fareham Local Development Framework (FLDF). This AMR reviews the period April 2004 to March 2005 including progress of the Local Development Scheme over this period and up to the submission of the AMR in December. Where data is not available for this period, the document clearly identifies the period for which data is available and/or how this data will be secured for AMRs in future years. The purpose and aim of this AMR is to; Establish a monitoring framework to be developed throughout the course of future AMRs Assess the delivery of all Local Development Documents in relation to the timetable and key milestones established in the adopted Fareham Local Development Scheme Assess the impact of current policies in the Fareham Local Plan Review (2000) which have been ‘saved’ under the Fareham Local Development Scheme. The impacts will be measured in relation to national and regional targets This AMR has considered the spatial portrait, vision and objectives detailed in the Sustainability Appraisal report. The vision and objectives are developed further in the Core Strategy Issues and Options Development Plan Document. Underlying these vision and objectives are the Council’s corporate vision and the vision of the Fareham Community Strategy. Fareham Borough Council’s corporate vision states ‘Fareham - the prosperous, safe and attractive place to be’. The Fareham Community Strategy states ‘our vision is to make life better for the people of Fareham Borough by working together as partners and with our local communities to achieve improvements in economic, social and environmental wellbeing that would not otherwise happen’. It is the vision and objectives above that will guide future AMRs as their content will vary in relation to changing issues, challenges and opportunities facing Fareham. For further information on this document please contact ldf@fareham.gov.uk 1 Fareham LDF Annual Monitoring Report December 2005 The Geographical Context of Fareham Fareham lies on the Solent coastline between the cities of Portsmouth and Southampton, covering an area of almost 30 square miles. Rapid development has occurred over the past 50 years, although approximately 60% of the Borough remains as countryside. The Southern and Western boundaries of the Borough are formed by the Solent and River Hamble respectively which are internationally recognised for their environmental and recreational value. The special character of the Borough’s older settlements is recognised by Conservation Area designations. Economic Fareham is a telecommunications hub with high capacity infrastructure that enables sustained business growth. The new National Air Traffic Control Centre at Swanwick has created over 750 well-paid jobs. More are set to follow, ensuring that Fareham will benefit from high-technology employment. New industrial, commercial and office development over the past 20 years has been concentrated around Junction 9 of the M27 following a successful local employment land initiative in partnership with Hampshire County Council. Fareham is located at the heart of urban South Hampshire. With its major transport infrastructure and high quality employment land, the Borough is the most buoyant economy within the South Hampshire area. Transport The M27 south coast motorway links Fareham to the wider motorway network and provides easy access to Ports and Airports. London is 75 miles away via the M3 or A3M. Two international sea ports lie close to the Borough - Portsmouth European Ferryport and Southampton cruise liner and container port. The Solent corridor’s regional international airports are also close by - Southampton Eastleigh Airport and Bournemouth Airport Britain’s leading international airports are little more than an hour away. Housing Fareham remains the largest town in the Borough but the 'Western Wards' (comprising Locks Heath, Sarisbury, Park Gate, Warsash and Titchfield Common) are now almost as large. Portchester and Stubbington/Hill Head have grown from small villages to large residential suburbs containing over 6,000 dwellings in each. Only Titchfield and Burridge retain a village scale and character. The number of dwellings has increased from approximately 12,000 in 1951 to about 45,500 in 2005 with more than 57% of the total housing stock being built since 1961. Special Factors The Borough retains a military presence in the form of HMS Collingwood, the Royal Navy’s Maritime Warfare School but the former HMS Daedalus Airfield has been declared surplus to Ministry of Defence requirements. The airfield, which straddles the Fareham/Gosport administrative boundary, is in the process of being disposed of by the MoD and the future development of the site will need to be considered through the LDF process. For further information on this document please contact ldf@fareham.gov.uk 2 Fareham LDF Annual Monitoring Report December 2005 2. Local Development Scheme Delivery and Implementation 2.1 The adopted Fareham Local Development Scheme (LDS) came into effect on 19 th April 2005 under Regulation 11(3) of the Town and Country Planning (Local Development) (England) Regulations 2004. It identifies the preparation stages and timetable for each of the Local Development Documents that the Borough Council is proposing to prepare. The adopted LDS timetable can be viewed in Appendix 1. Amendments to the Local Development Scheme Development Plan Document Timetable Amendments Following informal discussions with GOSE during Summer 2005, the Borough Council formally submitted an amendment to the adopted LDS to GOSE on … 2005 (date yet to be added). The amendment to the LDS reschedules the preparation of the Core Strategy DPD to enable the Borough Council to take into account the emerging South Hampshire subregional strategy (part of the emerging South East Plan) and related Sustainability Appraisal (SA) work being undertaken by the Partnership for Urban South Hampshire (PUSH) for the South East Regional Assembly (SEERA). Alterations to the preparation of the Core Startegy will also impact upon the preparation of the Site Allocations DPD also. Proposed amendments to the DPDs were taken to the Executive of the Council on 10th October 2005. It was agreed that the Council responds to the detailed points made in the letter received from the GOSE setting out the Council’s case for a limited delay in the Fareham Core Strategy in order to draw on, and conform with, work being undertaken on the South Hampshire Strategy, particularly over the next 3 months. The Executive agreed that officers discuss these issues with GOSE representatives in more detail. In the event that GOSE agrees revisions to the Fareham LDS in the light of further representations, the Executive Member for Planning and Transportation has been given authority to agree any changes to the Fareham LDS for formal submission to GOSE. Supplementary Planning Document Timetable Amendments The preparation timescales for the Site Development Brief for Peters Road, Locks Heath and for the Site Development Brief for Hunts Pond Road, Titchfield Common have been altered. Moving the timescales for preparation will enable full site investigations to be undertaken and also allow enough time to resolve land ownership issues. Amendments to the LDS can be viewed in Appendix 1. Following approval of the LDS on 19th April 2005 that Conservation Area Character Assessments it has since been decided to remove them from the LDS as Supplementary Planning Documents. English Heritage, with assistance from the ODPM and the Department for Culture Media and Sport, has recently published a document entitled ‘Guidance on the Management of Conservation Areas’. This guidance states that For further information on this document please contact ldf@fareham.gov.uk 3 Fareham LDF Annual Monitoring Report December 2005 Conservation Area Character Assessments are published in support of supplementary planning documents and will be taken into account by the Secretary of State in considering related planning appeals. Therefore, Conservation Area Character Assessments will be prepared, but not as SPDs. It is through this AMR that the above timetable amendments to Development Briefs and SPDs become approved by the Executive of Fareham Borough Council and in turn formally submitted to GOSE. Structure of the Fareham Local Development Framework The Fareham Local Development Framework comprises four Development Plan Documents, various Supplementary Planning Documents, a Local Development Scheme, Statement of Community Involvement, and the Annual Monitoring Report. The relationships between these documents are depicted in the diagram below. Fareham Borough Local Plan Review 2000 Saved Polices FAREHAM LOCAL DEVELOPMENT FRAMEWORK Local Development Scheme Core Strategy Conservation Area Character Assessments Statement of Community Involvement Including Key Diagram Affordable Housing Site Allocations Local Environmental Assets Housing Commercial & Retail Recreation & Community Site Development Brief Hunts Pond Road, Titchfield Common Site Development Brief Peters Road, Locks Heath Annual Monitoring Report Proposals Map and Insert Key Open Space Development Plan Documents Supplementary Planning Documents Local Development Document Progress The adopted Local Development Scheme (LDS) timetables the preparation of all Local Development Documents (LDDs). In accordance with Government Guidance in Planning Policy Statement 12 “Local Development Frameworks”, key milestones and targets have been set for each LDD to ensure that the preparation of LDDs can be measured against the timetable and milestones established in the LDS. This progress reported in the AMR. The progress of DPDs and SPDs is detailed in Appendices 2 and 3 respectively. Statement of Community Involvement (SCI) The Statement of Community Involvement was submitted to the Secretary of State on Wednesday 12th October 2005, in line with the timetable in the Adopted LDS. Following a statutory six week consultation period, the Statement of Community Involvement is For further information on this document please contact ldf@fareham.gov.uk 4 Fareham LDF Annual Monitoring Report December 2005 timetabled for adoption during April 2006. Core Strategy Development Plan Document Consultation on the Core Strategy Issues and Options document took place in June and July 2005, in line with the timetable in the Adopted LDS. As noted above, the Council has submitted amendments to its LDS which will reschedule the consultation on the Core Strategy Preferred Options document to June/July 2006. Other Development Plan Documents The other Development Plan Documents, Site Allocations, Local Environmental assets and Proposals Map, are programmed to be prepared during 2006/2007. Supplementary Planning Documents An Affordable Housing Supplementary Planning Document and Town Quay Conservation Area Character Assessment Supplementary Planning Document have been prepared and adopted. The dates of Adoption are: 5th September 2005 Town Quay Conservation Area Character Assessment SPD 5th December 2005 Affordable Housing SPD – subject to the Executive decision to be made on 5th December Significant Effects The implementation of polices and their resulting significant effects will be monitored following the Adoption of Development Plan Documents. At this stage of preparation of the Fareham Local Development Framework there are no significant effects of policy implementation to be identified, as no DPD Policies have yet been adopted. Key Findings As noted above, the need to carefully consider the implications arising from the emerging South Hampshire Sub Regional Strategy has led to the Council proposing to amend the timetable of preparation of Local Development Documents. As the Local Development Documents continue to be progressed, other issues will arise that will require further research and attention to ensure that the key findings throughout all stages of preparation are considered and where necessary acted upon. Achieving Sustainable Development The LDF process is aimed at delivering sustainable development. The Integrated Regional Framework (IRF), prepared by South East England Regional Assembly, provides a common reference point for sustainable development which is being used to inform the Fareham LDF. To ensure that development is sustainable, all LDF documents are subject to a Sustainability Appraisal (SA). Sustainability Appraisal includes the assessment of the economic, social and environmental impacts of all reasonable options that could be For further information on this document please contact ldf@fareham.gov.uk 5 Fareham LDF Annual Monitoring Report December 2005 considered during the preparation of LDF documents. A Scoping Report establishes the baseline information and criteria for assessing the document. The Sustainability Appraisal is carried out at same time as the preparation of the documents and is taken into account when decisions are made on the policies and proposals to be included in the documents. For further information on this document please contact ldf@fareham.gov.uk 6 Fareham LDF Annual Monitoring Report December 2005 3. Saved Policy Analysis Adopted Fareham Borough Local Plan Review (2000) 3.1 The Fareham Borough Local Plan Review (FBLPR) was adopted in June 2000. The FBLPR consists of a number of chapters with related policies. The chapters include: - Development Guidelines Countryside, Coast and Nature Conservation Historic Environment Housing Facilities and Services Recreation, Leisure and Tourism Employment Shopping and the Town Centre Strategy Transport 3.2 The FBLPR contains 105 policies. The FBLPR policies were not formulated to take into account the detailed monitoring and measurement now required for the Annual Monitoring Report. There are only a limited number of policies with specific time related wording, targets or indicators. Appendix 4 identifies the progress and implementation of the adopted policies. 3.3 The policies contained in the FBLPR have been utilised primarily by the Borough Council’s Development Control and Environment and Conservation departments, developers, agents and planning consultants. The assessment of saved policies that has now been undertaken will help to identify whether a policy is to be amended or replaced in future Development Plan Documents (DPDs). Analysis Methodology The analysis identifies, where possible, those policies which have not been implemented, explaining why, and setting out what steps are to be taken to ensure implementation; policies to be amended or replaced; whether policies are achieving objectives, in particular achieving sustainable development; any unintended consequences arising from the implementation of policies; whether the assumptions and objectives behind policies are still relevant; and any identified targets being achieved. For further information on this document please contact ldf@fareham.gov.uk 7 Fareham LDF Annual Monitoring Report December 2005 Housing Analysis One of the Government’s top priorities for the first round of AMRs is housing delivery, with a requirement that the AMR clearly indicates how the Borough Council is performing against its housing requirements. The progress on the development of new homes is assessed by Fareham Borough Council for a number of purposes. Policy H4 of the Hampshire County Structure Plan (1996-2001), Best Value Performance Indicator 106 New Homes on Brownfield Sites, and policies ‘saved’ in the FBLPR all seek provision and monitoring of new homes throughout the Borough. There was a net gain of 291 dwellings in Fareham between April 2004 and March 2005, the accounting year for this AMR. Housing Supply Strategic housing requirements are currently set out in the Hampshire County Structure Plan Review 2001-2011 (HCSPR) in two parts, the ‘baseline provision’ and the ‘reserve provision’. The baseline requirement for the Borough is 4740 additional dwellings between 1996 and 2011 and the reserve requirement is 1500 dwellings between 2001 and 2011. The reserve requirement will not be released for development unless monitoring by the strategic planning authorities demonstrates that there is a compelling reason to do so. The latest monitoring paper (2004) concluded that there was no need to release any of the reserve provision. 3398 additional dwellings were provided in the Borough between 1996 and 2005. This level of housing development significantly exceeds the baseline requirement for the period (2844 dwellings based on an annual average of 316 for 9 years). The need to release the three remaining large greenfield sites that are allocated for housing development was considered in the Housing Sites Position Statement 2004. The information in the Position Statement demonstrated that the identified supply of land with planning permission, identified in the Fareham Urban Housing Capacity Study and estimated windfall development, was sufficient to meet the baseline strategic housing requirement. It was therefore concluded that there was no need to release the three large greenfield sites. The Borough Council recently undertook a Best Value Review of one of the Council’s corporate objectives which is to achieve a Balanced Housing Market. The Review resulted in a 46-point Action Plan aimed at maximising the provision of additional affordable dwellings within the Borough. As part of the Best Value Review of a Balanced Housing Market, the Council’s Executive decided that the three large greenfield sites may be released if development proposals including the provision of 40 per cent affordable housing are submitted. For further information on this document please contact ldf@fareham.gov.uk 8 Fareham LDF Actual completions Projected annual completions (site based) Annual requirement taking account of past/projected completions Structure Plan allocation annualised over 15 years N.B. 1. 2. 1996/97 1997/98 1998/99 556 390 539 COMPLETIONS 1999/00 2000/01 2001/02 526 287 309 2002/03 2003/04 2004/05 229 271 291 PROJECTIONS 2007/8 2008/9 2005/06 2006/07 337 427 389 2009/10 2010/11 475 557 389 316 299 292 271 248 244 237 238 224 201 144 34 - - - 316 316 316 316 316 316 316 316 316 316 316 316 316 316 316 The figures in the table are based on the Structure Plan baseline housing requirement. The table does not take account of any increased housing requirement from 2006 onwards that may be required as a result of the South East Plan. Annual Monitoring Report For further information on this document please contact ldf@fareham.gov.uk Housing Completions and Projections December 2005 9 Fareham LDF Projected annual completions (site based) 600 556 539 557 Actual completions 526 Annual requirement taking account of past/projected completions 500 475 Structure Plan allocation annualised over 15 years 400 427 390 389 389 Annual Monitoring Report For further information on this document please contact ldf@fareham.gov.uk Projected Completions 337 309 300 291 287 271 229 200 100 0 1996/97 1997/98 1998/99 1999/00 2000/01 2001/02 2002/03 2003/04 2004/05 2005/06 2006/07 2007/8 2008/9 2009/10 2010/11 December 2005 10 Fareham LDF Annual Monitoring Report December 2005 4. Monitoring Framework – Principles and Methodology 4.1 There are a series of information, objectives, targets and indicators that relate to the Fareham LDF, and to corporate policies, that underpin the monitoring framework. The use of this information, objectives, targets and indicators helps to develop a forward looking approach through both the identification of achievements and areas for improvement. The use of contextual indicators can help to form a profile of the area, and assist in creating an assessment of the Borough. At this stage in the LDF preparation, the use of contextual indicators will form the basis for the monitoring framework. Over time, as DPD policies are formulated and progressed, a more quantitative framework will be applied to ensure the monitoring and assessment of objectives, targets and indicators is undertaken on a quantifiable basis. It is anticipated that the next Annual Monitoring Report (2005-2006) will also build upon the Fareham Borough Council Corporate Improvement Plan Indicators, and the results of the Council’s Annual Residents Survey. The Corporate Improvement Plan Indicators are currently being drafted to include the Service Plans for individual departments within the Borough Council. Utilising the Corporate Improvement Plan Indicators will ensure consistency of information reporting within future Annual Monitoring Reports and more importantly draw upon data and information utilised by many service departments throughout the Council, thus ensuring that the LDF Annual Monitoring Reports will become an important Corporate tool. Contextual indicators will also assist greatly in monitoring the implementation and measurement of the performance of ‘saved’ and future LDF policies. The proposed ODPM Core Output Indicators will also be utilised and applied to those policies which are suitable for their purpose. Data has been presented under a number of headings. These include: Demography (population, small area population forecasts, migration, age groups, ethnic origins and religious beliefs) Economy(economic activity rates, unemployment rates, earnings, productivity and output, index of competitiveness) Business and Finance (commercial development) Labour Market (employment, occupations of the working population, social groups) For further information on this Document please contact ldf@fareham.gov.uk 11 Fareham LDF Annual Monitoring Report December 2005 Education and Training (qualifications) Households and Housing (household types, household income, house prices, house price changes, affordable housing, housing stock conditions, homelessness, gypsies and travellers, housing flows, housing supply, housing trajectory, housing densities) Society (deprivation, crime rates) Environment (biodiversity, waste, air quality, noise, flooding, water quality, energy efficiency) Health (mortality rates, deaths, life expectancy) Transport and Accessibility (accessibility, car ownership, commuting) The relevant data for 2004/5 under the above headings is included within Appendix 5 of this Report. Data Availability and Gaps All of the data in this 2004/5 AMR has been collated by the Planning Policy Team. The main sources of information used this year have been the Sustainability Appraisal Baseline Report, the profile of the Borough contained in the Core Strategy DPD, various information provided by Hampshire County Council, and the Fareham State of the Borough 2004 report. It is anticipated that future Annual Monitoring Reports will utilise additional information contained within the Area Profile for Fareham prepared by the Audit Commission. This web-based resource will also be utilised as the principle resource for information gathering feeding into the Corporate Improvement Plan Indicators. It is anticipated that the 2005/2006 AMR will draw upon the Area Profile for Fareham which has recently been released by the Audit Commission more heavily. The Area Profile is made up by a number of Quality of Life Indicators which have also been built into Corporate Best Value Performance Indicators and considered by the Local Strategic Partnership and Comprehensive Performance Assessment. Missing Information Much of the data used in this report is held by Fareham Borough and Hampshire County Council. There remain a number of gaps where data has not been available. Data that is not covered in this AMR include: Social groups Noise Energy efficiency Accessibility It is considered that this data and information relating to the statistics from the 2001 Census have not been updated to cover the period 2004 to 2005, or alternatively is only available on a national level and therefore not applicable to this AMR. Topics to be covered in the 2005/2006 AMR This AMR will present as full an analysis as possible. Detailed content may vary from year For further information on this Document please contact ldf@fareham.gov.uk 12 Fareham LDF Annual Monitoring Report December 2005 to year reflecting particular local issues. Arising from this AMR analysis missing data relating to the above topics will be considered in the 2006 AMR. In particular; Accessibility: maps that depict travel times to healthcare and community facilities are currently being produced by Hampshire County Council. It is anticipated that accessibility maps will be available in time for the 2006 AMR. Energy efficiency: it is anticipated that data available relating to energy efficiency will become available by utilising the Corporate indicators which feed into Council department working and the Annual Residents Survey. Commercial development and floorspace: a full Annual Retail and Leisure Floorspace Supply monitor was not published by Hampshire County Council this year. A full survey will be carried out and published at the beginning of 2006. However, Hampshire County Council submitted a monitoring return to the South East of England Regional Agency (SEERA) which will form the basis for the Hampshire County Council Annual Retail and Leisure Floorspace Supply Monitor. Until this information is published in detail, this AMR has drawn upon the information submitted to SEERA entitled ‘Commercial and Leisure Survey 2005-2005’. This information has been utilised to address Core Output Indicators in Appendix 4 and has been tabulated in Appendix 5. It is anticipated that the full Annual Retail and Leisure Floorspace Supply Monitor will be utilised in the 2006 AMR. For further information on this Document please contact ldf@fareham.gov.uk 13 Fareham LDF Annual Monitoring Report December 2005 APPENDICES APPENDIX 1 – Local Development Scheme Timetable – adopted and amended versions APPENDIX 2 – Development Plan Document Progress APPENDIX 3 – Supplementary Planning Document Progress APPENDIX 4 – Saved Policy Analysis APPENDIX 5 – Contextual Data for Fareham APPENDIX 6 – List of Sources For further information on this Document please contact ldf@fareham.gov.uk 14 Fareham LDF Annual Monitoring Report December 2005 APPENDIX 1 LOCAL DEVELOPMENT FRAMEWORK TIMETABLE Document title Status (i.e. DPD/SPD) Statement of Community Involvement N/A Core Strategy Approved Amended DPD Site Allocations Approved Amended DPD Role and content Geographical coverage Chain of Conformity Issues and Options for DPD’s and SCI Consultation Preferred options (DPD), draft (SPD and SCI) Sets out standards and approach to involving interested parties and the community in the production of the LDF. The SCI does not apply to the Council’s general consultation procedures, only those of concern to the production of the LDF. Sets out the vision objectives and strategy for the spatial development of the area, and will provide the framework for the control of development. Whole authority area n/a July 2004 – April 2005 May 2005 – June 2005 Whole authority area General conformity with Regional Spatial Strategy To conform with the Core Strategy May 2005 – November 2005 May 2005 – November 2005 July 2006 – December 2006 January – June 2007 December 2005 – January 2006 June – July 2006 February 2007July 2007 August 2007September 2007 To allocate housing sites to meet identified needs 2006 – 2016. Whole authority area To allocate sites for retail, commercial leisure, and economic development (office & industrial) to meet identified needs for the period 2006 – 2016. January 2007February 2007 July – August 2007 Submission to Secretary of State (DPDs and SCI) October 2005 Preexamination meeting (for DPDs and SCI) January 2006 (if required) Examination (for DPDs and SCI) Adoption February 2006 (if required) April 2006 October 2006 March 2007 June 2007 December 2006 December 2007 February 2008 May 2007 August 2007 June 2008 September 2008 November 2008 January 2008 March 2008 April 2009 June 2008 November 2008 August 2008 June 2009 To identify sites for open space, sport, recreation and community facilities for the period 2006 – 2016 to meet identified needs. Local Environmental Assets Approved DPD Identifies local environmental assets to be protected, such as sites of nature conservation value, and designates the boundary of countryside areas. For further information on this Document please contact ldf@fareham.gov.uk Whole authority area To conform with the Core Strategy February 2009 September 2009 15 Fareham LDF Annual Monitoring Report December 2005 APPENDIX 1 LOCAL DEVELOPMENT FRAMEWORK TIMETABLE Document Title Status (i.e. DPD/SPD) Role and Content Geographical Coverage Chain Of Conformity Issues and Options for DPD’s and SCI Consultation Preferred options (DPD), draft (SPD and SCI) Supplements saved FBLPR policy H10 To supplement Core Strategy Supplements saved FBLPR Policy H1 n/a June 2005 – July 2005 n/a June 2008 – July 2008 August 2005 – September 2005 Affordable Housing SPD Sets out the process and mechanisms for the provision of affordable housing in Fareham, including design guidance where applicable Whole authority area Open Space SPD Site Development Brief for Peters Road, Locks Heath Approved Amended SPD Sets out the process and mechanisms for the provision of open space; including design guidance where applicable Sets out the planning, design and infrastructure requirements for residential development of the site. Whole authority area Site specific Site Development Brief for Hunts Pond Road, Titchfield Common Approved Amended SPD n/a Submission to Secretary of State (DPDs and SCI) n/a Preexamination meeting (for DPDs and SCI) n/a Examination (for DPDs and SCI) Adoption n/a December 2005 n/a n/a n/a n/a n/a n/a December 2008 February 2006 June to July 2006 Sets out the planning, design and infrastructure requirements for residential development of the site. For further information on this Document please contact ldf@fareham.gov.uk Site specific Supplements saved FBLPR Policy H1 n/a October 2005November 2005 April – May 2006 n/a n/a n/a October – November 2006 April 2006 August – September 2006 16 Fareham LDF Annual Monitoring Report December 2005 APPENDIX 2 - TIMETABLE OF MILESTONES FOR DEVELOPMENT PLAN DOCUMENTS Document title Statement of Community Involvement Status N/A Core Strategy DPD Site Allocations DPD Role and content Chain of Conformity Issues and Options for Consultation Preferred options consultation Date for submission to SoS and consultation October 2005 Examination Proposed date for adoption Progress as of December 2005 Sets out standards and approach to involving interested parties and the community in the production of the LDF. The SCI does not apply to the Council’s general consultation procedures, only those of concern to the production of the LDF. Sets out the vision objectives and strategy for the spatial development of the area, and will provide the framework for the control of development. n/a July 2004 – April 2005 May 2005 – June 2005 February 2006 (if required) April 2006 All milestones met as detailed General conformity with Regional Spatial Strategy May 2005 – November 2005 June 2006 – July 2006 December 2006 August 2007 March 2008 Issues and Options consultation carried out 31st May 2005 – 11th July 2005 To allocate housing sites to meet identified needs 2006 – 2016. To conform with the Core Strategy January 2007 – June 2007 July 2007 – August 2007 February 2008 November 2008 June 2009 Yet to commence To conform with the Core Strategy February 2007July 2007 August 2007September 2007 June 2008 February 2009 September 2009 Yet to commence Submitted to Secretary of State 12th October 2005 To allocate sites for retail, commercial leisure, and economic development (office & industrial) to meet identified needs for the period 2006 – 2016. To identify sites for open space, sport, recreation and community facilities for the period 2006 – 2016 to meet identified needs. Local Environmental Assets DPD Identifies local environmental assets to be protected, such as sites of nature conservation value, and designates the boundary of countryside areas. For further information on this Document please contact ldf@fareham.gov.uk 17 Fareham LDF For further information on this Document please contact ldf@fareham.gov.uk Annual Monitoring Report December 2005 18 APPENDIX 3 - TIMETABLE OF MILESTONES FOR SUPPLEMENTARY PLANNING DOCUMENTS Document title Affordable Housing Status SPD Open Space SPD Site Development Brief for peters Road, Locks Heath Site Development Brief for Hunts Pond Road, Titchfield Common SPD SPD Role and Content Sets out the process and mechanisms for the provision of affordable housing in Fareham, including design guidance where applicable Chain of Conformity Supplements saved FBLPR Policy H10 Date for public participation on draft June 2005 – July 2005 Proposed date for adoption December 2005 Progress as of December 2005 Public participation on draft carried out 1st July – 15th August 2005 Submitted to Executive for adoption 5th December 2005 Yet to commence Sets out the process and mechanisms for the provision of open space; including design guidance where applicable Sets out the planning, design and infrastructure requirements for residential development of the site. Supplement Core Strategy DPD June 2008 – July 2008 December 2008 Supplement saved FBLPR Policy H1 June 2006 – July 2006 October 2006 November 2006 Yet to commence Sets out the planning, design and infrastructure requirements for residential development of the site Supplement saved FBLPR Policy H1 April 2006 – May 2006 August 2006 – September 2006 Issues consultation carried out 10th & 11th August 2005 Milestones amended 19 APPENDIX 4 - FAREHAM BOROUGH LOCAL PLAN REVIEW (2000) SAVED POLICY ANALYSIS FBLPR Policy DG1: Environmental Impact Achievement Comment Development will be permitted provided that: (A) it This policy has been taken into account during does not detract from the use and enjoyment of pre-application discussions and in the adjacent land or have an adverse impact on the wider determination of applications. environment by reason of noise, dust, fumes, heat, smoke, liquids, vibration or light; (B) it provides for the satisfactory disposal of surface and waste water; (C) it is not located in areas at risk from flooding or where it would increase flood risk in other areas, except in appropriate circumstances where protection measures are provided to the necessary standards; (D) it would not be detrimental to the management and protection of water resources; and (E) the Borough Council is satisfied that, where appropriate, opportunities for the re-use of materials and recycling of materials have been maximised. DG2: Prejudice to Other Development This policy will be reviewed as part of the Core Strategy DPD. Development will not be permitted where it would prejudice the proper development of adjacent land or the development of a larger site. Where piecemeal development could delay or prevent the provision of access to adjacent land, a legal agreement will be sought to prevent the use of the land as a ‘ransom strip’. DG3: Impact on the Surrounding Area This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. Development will be permitted provided that it: (A) does not detract from the existing landscape, streetscene, skyline and building line; (B) is in keeping with the character of the surrounding area in terms of scale, layout, density, form, height, mass and space around and between buildings; (C) does not conflict with adjoining land uses or result in a volume of traffic This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. 20 21 FBLPR Policy which would adversely affect the amenity of the surrounding area. DG4: Site Characteristics Achievement Comment Development will be permitted, provided that it: (A) retains any important historic features on the site; (B) does not detract from the natural landform of the site; (C) retains areas or features of landscape or nature conservation value; (D) respects views into and out of the site; and (E) takes proper account of any contamination of the land. DG5: Design This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. Development will be permitted provided that it: (A) is of a high standard of design and, where appropriate, incorporates materials and design elements sympathetic to local character; (B) respects privacy, outlook and sunlight; (C) provides safe access for pedestrians and cyclists and vehicular traffic including, where appropriate, footpaths, cycleways and greenways; (D) provides satisfactory servicing, cycle and car parking or garaging; (E) where appropriate in the case of residential development, a useable garden or open area is provided outside the canopy of any retained trees; and where appropriate, the Council is satisfied that it has regard to: (i) the Residential Development Guidelines in Appendix 6 and the Council’s Extension Design Guide; (ii) the needs of people with disabilities and other people with impaired mobility; (iii) crime prevention measures; and (iv) the conservation of energy. DG6: Landscape Design This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. Landscape designs required to accompany planning applications or as a reserved matter will be approved provided that they comply with Policy DG4 and that, where appropriate, they; (A) respect the character and appearance of the site and any adjoining spaces and buildings; (B) contain appropriate details including a This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. 22 FBLPR Policy schedule of tree, shrub species and hard landscape materials, and the phasing and timing of works; (C) incorporate the landscaping of open areas and spaces between buildings, including, where appropriate, planting belts and the reinforcement of existing vegetation along boundaries; and (D) incorporate satisfactory arrangements for the establishment of the scheme. DG7: Signs and Advertisements Achievement Comment Signs and advertisements will be permitted, provided that they: (A) do not adversely affect the character, quality and appearance of the building or the surrounding area; (B) do not combine with existing advertisements to create an unacceptable cumulative impact; (C) do not create a hazard to public safety; and (D) in the case of a listed building or a building in a conservation area, it complies with Policies HE2 and HE7 respectively. DG8: Commercial Frontages This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. Development involving the creation of a new frontage, including the erection of blinds, canopies and shutters or the alteration of existing frontages, will be permitted provided that: (A) it takes account of the architectural characteristics of the individual building and its surrounding area; (B) it does not adversely affect the character and appearance of the building or the surrounding area; and (C) in the case of a listed building it complies with Policy HE2 or in the case of a building in a conservation area it complies with Policy HE6 and/or Policy HE8. DG9: Infrastructure Requirements This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. Development will be permitted provided that arrangements have been made for the provision of the infrastructure, services, facilities and amenities which are made necessary by that development. Where appropriate, financial contributions will be sought This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. Examples include contributions for the provision FBLPR Policy towards the improvement of existing infrastructure, services, facilities and amenities the need for which is made necessary by the development. DG10: Coldeast Hospital Permission will be granted for the following development at Coldeast Hospital: (A) reuse of the Mansion for uses within Classes B1 (Business), C1 (Hotels), C2 (Residential Institutions) and D1 (NonResidential Institutions) of the Town and Country Planning (Use Classes) Order 1987 (as amended); (B) redevelopment for housing or residential conversion of other existing buildings within the urban area; (C) a community hospital and other health facilities within the sites shown on the Proposals Map (see Policy FS4); and (D) recreational open space/parkland (see Policy R4). Provided that: (i) the development is in accordance with a comprehensive development brief to be approved by the Borough Council; (ii) the historic parkland and landscape setting of the mansion is protected (see Policy HE10); (iii) there is no significant loss of trees and the woodland areas, tree belts and individual trees are retained; (iv) existing open areas are retained apart from those required for development under (A) and (B) above; and (v) the development is in accordance with the other policies of the Plan, particularly Policy T6. Achievement of public open space and play facilities and transport infrastructure. Comment A. No consent for the Mansion house B. Planning permission granted in 1997 (outline) with reserved matters in 2004 for residential development comprising 234 units. Additional 17 units granted consent in 2004 C. No consent for community hospital. 80 bed nursing care accommodation recently completed. D. Recreational open space/parkland not provided The residential scheme(s) to date has not commenced. The land owners (English Partnerships and Primary Care Trust) are currently considering development options. The implementation of A and D are not linked to B. These will need to be considered in the future as part of discussions with the landowners. The provision of a community hospital ( C ) will be subject to further consideration by the Strategic Health Authority and Primary Care Trust. To date, whilst the principle for a community hospital is accepted, funding and a timescale for implementation are not established. The policy will be reviewed as part of the Site Allocations DPD. DG11: Seafield Park 23 Proposals for the future use or development of Seafield Park will be permitted provided that: (A) the largely open nature of the site is maintained; (B) the future use and management of the open area is resolved before any planning permission is granted; and (C) any buildings necessary to secure (A) and (B) are restricted to the part of the site within the urban Residential development for 51 units was granted in 2001 and is now complete. Open nature of site maintained though location on largely previously developed area and within urban area boundary. Remainder left open and is managed as public open space with an equipped childrens playground. This policy has now been implemented FBLPR Policy area. DG12: Daedalus Airfield Achievement Comment Planning permission will be granted for one of the following options at Daedalus Airfield (formerly HMS Daedalus) provided that it is in accordance with the other policies of the Plan, particularly T6: As at 31st March 2005, there are no planning applications that are approved or outstanding on this site (the part within Fareham Borough) in relation to Policy DG12 since the adoption of the Fareham Borough Local Plan Review 2000. The policy will be reviewed as part of the Site Allocations DPD. OPTION 1 - Retention of Three Runways and Existing Hangars (A)if planning permission is required, general The future of the site is being considered by a aviation using three runways and existing hangars; (B) Gosport and Fareham Members Strategy Group employment or recreation uses in the existing hangars and Officers Working Group from Boroughs. not required for any general aviation use or in replacement buildings located closer to the Borough boundary and adjacent to the existing main building complex in Gosport Borough; (C) use of the remaining part of the Airfield, not required for any general aviation use, for uses appropriate within the Strategic Gap, such as agriculture, public open space and other open recreation uses; and (D) access from Broom Way with a secondary access from Gosport Road. OPTION 2 - Retention of the Western Runway and Hangars (A) if planning permission is required, general aviation using only the western runway, including the use of the western hangars for aviation use; (AA) employment or recreation uses in the existing hangars not required for any general aviation use or in replacement buildings located closer to the Borough boundary and adjacent to the existing main building complex in Gosport Borough; (B) use of the remaining part of the Airfield, not required for any general aviation use, for uses appropriate within the Strategic Gap, such as agriculture, public open space and other open recreation uses; and (C) access from Broom Way with access to the Airfield from Gosport Road. OPTION 3 - No Aviation Use (A) employment or 24 FBLPR Policy Achievement recreation uses in the existing hangars or in replacement buildings located closer to the Borough boundary and adjacent to the existing main building complex in Gosport Borough; (B) uses appropriate within the Strategic Gap, such as agriculture, public open space and other open recreation uses; and (C) access from Broom Way with a possible secondary access from Gosport Road. Comment OPTION 4 - Use by One Occupier Use for education, employment or leisure/recreation by one occupier either separately, or in association with the reuse of the existing main building complex within Gosport Borough, including: (A) use of the runways, perimeter tracks, and hardstandings together with the reuse of the hangars, including the possible relocation/redevelopment of the hangars adjacent to the existing main building complex; (B) uses appropriate within the Strategic Gap, such as agriculture, public open space and other open recreation uses; and (C) access from Broom Way. C1: Development in the Countryside 25 Development in the countryside will be permitted, provided that: (A) it is essential for agricultural, forestry or horticultural purposes and/or has an overriding need for a countryside location; or (B) it is an appropriate reuse, redevelopment or limited extension of an existing building which does not have an adverse effect on the character of the building or surrounding area; or (C) within an existing institution in the countryside, it is an additional building or extension to an existing building within the institution’s curtilage; and (D) wherever possible, existing buildings are re-used in accordance with Policy C2 and H12 and, if required, any new buildings meet the criteria in Policy C3 and provided that it: (i) does not adversely affect the landscape; (ii) does not result in the loss of the best and most versatile agricultural land (Grades 1, 2 or 3a in the This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. 26 FBLPR Policy MAFF Agricultural Land Classification System); and (iii) does not adversely affect nature conservation interests. C2: Conversion of Existing Buildings in the Countryside Achievement Comment The conversion of existing buildings in the countryside in accordance with Policy C1 will be permitted provided that: (A) the building is of permanent and substantial construction and capable of conversion without major or complete reconstruction; (B) the design, where appropriate, retains the intrinsic qualities of the building and avoids inappropriate external alterations; (C) the proposal takes the form of a self-contained conversion and it does not include large extensions, the raising of the height of the building or extensive hard surfaced areas or open storage; (D) it will not lead to excessive traffic generation; and (E) it would not adversely affect the character of the area or have unacceptable environmental or amenity implications. Proposals for the conversion of existing buildings to residential use will be assessed against Policy H12. C3: New Buildings in the Countryside This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. New buildings in the countryside in accordance with Policy C1 will be permitted provided that they are: (A) not prominently sited; (B) where possible, grouped with existing buildings; (C) of appropriate size, design, materials and colour in keeping with the surrounding environment; (D) without extensive hard surfaced areas or open storage; and (E) accompanied, where appropriate, by landscape improvements, including the means of enclosure. C4: Farm-Based Diversification This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. Development associated with the diversification of an existing farm will be permitted, provided that: (A) where possible, existing buildings are re-used in This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. 27 FBLPR Policy accordance with Policy C2; (B) any new buildings which are required meet the criteria in Policy C3 and are located, where appropriate, close to existing buildings; and (C) they do not adversely affect the character of the area or have adverse environmental, amenity or traffic implications. Where possible, the proposals should form part of a farm plan which is prepared prior to the submission of the application. C5: Coastal Zone Achievement Comment Development will not be permitted within the Coastal Zone unless: (A) in the countryside, it is related to an existing use or it has an overriding need for a waterside or coastal location; (B) the development, and the extra activity it will create, does not adversely affect nature conservation interests, the special character of the coast when viewed from land or sea, the quality of the environment or recreational interests; and (C) where appropriate, it incorporates new public rights of way to, from and along the coast. Providing that it would not: (i) result in the loss of existing public access to, from or along the coast; (ii) adversely affect the amenity of users of the existing public rights of way network; and (iii) be located in areas at risk from flooding, erosion or land instability. C6: River Hamble and Fareham Lake This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. Development, including reclamation, will not be permitted on, or adjacent to the River Hamble and Fareham Lake if it would: (A) jeopardise safety and ease of navigation or have a detrimental impact on the regime of the river and Fareham Lake; (B) adversely affect nature conservation interests; (C) adversely affect the character of the area when viewed from land or from the water; (D) result in the establishment of additional houseboats; (E) adversely affect the recreational value of the area; or (F) result in increased risk of flooding or transferring the risk to other areas. C7: New Moorings This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. 28 FBLPR Policy Achievement Comment New moorings will be permitted provided that: (A) they are not located in the Mooring Restriction Areas: (i) Fareham Lake, other than at Upper Quay under Policy R8; (ii) south of Warsash Sailing Club Jetty; (iii) between Warsash Ferry and Hamble Village; (iv) south of Crableck; (v) south of Swanwick Public Hard; and (vi) the Upper Hamble and Curbridge Creek (B) the River Hamble Harbour Authority’s limit on the total number of moorings is not exceeded; and (C) there is no adverse impact on nature conservation and other environmental interests. C8: Existing Moorings within Mooring Restriction Areas This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. The replacement or relocation of existing moorings within the Mooring Restriction Areas will not be permitted unless: (A) there are no alternative locations outside the Moorings Restriction Areas: (B) it will result in improvements to navigation and the appearance of the River Hamble or Fareham Lake; and (C) there is no adverse impact on nature conservation and other environmental interests. C9: Areas of Special Landscape Character This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. Development will be permitted in the following Areas of Special Landscape Character provided that it would not adversely affect the distinctive character of the area or result in the loss of essential features or characteristics: (A) Upper Hamble Valley; (B) Lower Hamble Valley; (C) Hook Valley; (D) Meon Valley; (E) Forest of Bere; and (F) Portsdown Hill. C10: Protection of the Setting of Settlements This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. Development in the countryside on the edge of the Borough’s towns and villages will be permitted, provided that: (A) it does not result in the loss of, or adversely affect, predominantly open and undeveloped land which contributes to the landscape setting of the This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. 29 FBLPR Policy settlement; (B) the development respects the relationship of the land with, and its contribution to, the character of the settlement; and (C) the development respects or enhances the distinctive character of the land. C11: Strategic Gaps Achievement Comment Development that would physically and/or visually diminish the undeveloped land in the following gaps will not be permitted: (A) the Meon Gap between Fareham/Stubbington/Hill Head and Warsash/Locks Heath/Titchfield Common/Segensworth/Whiteley; and (B) the gap between Stubbington/Lee-on-the-Solent and Fareham/ Gosport. C12: Local Gaps This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. Development that would physically and/or visually diminish the undeveloped land in the following gaps will not be permitted: (A) Lower Swanwick - Sarisbury; (B) Sarisbury - Locks Heath; (C) Warsash - Locks Heath; (D) Segensworth - Locks Heath; (E) Wallington - Portchester; and (F) Fareham - Portchester. C13: Statutory International Nature Conservation Designations This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. Development not connected with site management for nature conservation purposes, which either by itself or cumulatively with other proposals would have a significant adverse impact on the integrity of Special Protection Areas, Special Areas of Conservation and Ramsar Sites will not be permitted, unless: (A) there are no alternative solutions; and (B) there are imperative reasons of overriding public interest. Development not connected with site management for nature conservation purposes, which either by itself or cumulatively with other proposals would have a significant adverse impact on the integrity of such sites which host priority habitat types and/or species defined by the EC Habitats Directive will not be permitted This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. FBLPR Policy unless: (i) there are no alternative solutions; and (ii) there are imperative reasons of overriding public health or safety, primary benefits to the environment or, with the agreement of the European Commission, other imperative reasons of overriding public interest. Where appropriate, a permission will be conditioned to ensure the provision of preventative measures or a legal agreement sought to secure: (a) long term management of the site; and/or (b) the provision of funds for management; and/or (c) the replacement of habitats or features lost to development. C14: Statutory National and Local Nature Conservation Designations Achievement Comment Development will not be permitted where it would adversely affect statutorily designated sites for nature conservation, including Sites of Special Scientific Interest, National Nature Reserves and Local Nature Reserves unless measures can be undertaken which prevent damage to important habitats or physical features. Where appropriate, a permission will be conditioned to ensure the provision of preventative measures or a legal agreement sought to secure: (a) long term management of the site; and/or (b) the provision of funds for management; and/or (c) the replacement of habitats or features lost to development. C15: Local Nature Reserve Allocations This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. The following areas are proposed as Local Nature Reserves and they will be safeguarded from development in order that they can be implemented during the plan period: (A) Hook-with-Warsash (extension to existing); (B) South west of Gull Coppice, Whiteley; (C) North west of Gull Coppice, Whiteley; (D) Quaveys Copse, Whiteley; and (E) Bushy Land, Whiteley. C16: Sites of Importance for Nature Conservation This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. 30 FBLPR Policy Achievement A survey of SINC’s was completed in 2004. It Development will not be permitted where it would reviewed the status of existing SINC’s and adversely affect Sites of Importance for Nature recommended the designation of additional Conservation unless the need for the development sites as part of the LDF. outweighs the nature conservation value of the site. Where appropriate, a permission will be conditioned to This policy has been taken into account during ensure the provision of preventative measures or a pre-application discussions and in the legal agreement sought to secure: (a) long term determination of applications. management of the site; and/or (b) the provision of funds for management; and/or (c) the replacement of habitats or features lost to development. C17: Sites of Nature Conservation Value 31 Development which would adversely affect nondesignated sites or features of nature conservation value will be not permitted unless, where possible, provision is made to offset the adverse impact. Where appropriate, a legal agreement will be sought to secure the replacement of habitats or features lost to development. C18: Protected Species The survey of SINC’s included a review of SNCV’s. Development which would adversely affect species, or their habitats, protected by the Habitats Regulations 1994, the Wildlife and Countryside Act 1981 or other legislation will not be permitted unless measures can be undertaken which prevent harm to the species or damage to the habitats. Where appropriate, a permission will be conditioned or a legal agreement sought to secure the protection of the species or their habitats. HE1: Archaeology This policy has been taken into account during pre-application discussions and in the determination of applications. Development which adversely affects a site of archaeological importance, whether scheduled or not, or its setting, will not be permitted. Where the preservation of archaeological remains on site is not feasible, the Borough Council will not permit development to take place unless satisfactory This policy has been taken into account during pre-application discussions and in the determination of applications. Comment This policy will be reviewed as part of the Local Environmental Assets DPD. This policy will be reviewed as part of the Local Environmental Assets DPD. This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy. Additional guidance is contained in the Fareham Biodiversity Action Plan. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. FBLPR Policy provision has been made for a programme of archaeological investigation and recording prior to the commencement of the development. If development affects a site where there is evidence that archaeological remains may exist, but their extent and importance is unknown, the Council will request developers to arrange for an archaeological field assessment to be carried out before any decision on the planning application is taken. HE2: Listed Buildings Achievement Comment Alterations, additions or other development, including changes of use, which would have an adverse effect on the character or setting of a listed building will not be permitted. HE3: Conservation Areas - Setting This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. Development within and adjoining conservation areas will not be permitted if it detracts from the setting of buildings or the wider setting of the conservation area. This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD and Conservation Area Character Assessments. This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy , Local Environmental Assets DPD and Conservation Area Character Assessments. HE4: Conservation Areas - New Development 32 New development in conservation areas, including the alteration and extension of existing buildings and changes of use, will be permitted, provided that: (A) it respects its historic context in volume, scale, form, materials and quality and does not harm the character or appearance of the area; (B) materials are appropriate to the locality and sympathetic to existing buildings; (C) changes of use are consistent with maintaining the viability, historic character and appearance of the area; (D) it does not generate levels of traffic, parking, noise or environmental problems which would be detrimental to the character or appearance of the area; and (E) detailed plans and elevations showing the proposed development, together with information regarding adjoining properties, existing trees and proposed landscape FBLPR Policy treatment are provided. HE5: Change of Use in Fareham High Street Conservation Area Changes of use to offices (Classes A2 and B1) or nonresidential institutions (Class D1) will be permitted within Fareham High Street Conservation Area, provided that: (A) there would be no prejudice to the mixed-use character of the conservation area or the retail character of the shopping area; (B) there would be no loss of a residential unit unless it is essential to protect the fabric of a building or the environment; and (C) provision can be made for off-street car parking on the site or in the vicinity without the loss of gardens and without the creation of vehicular access onto Civic Way. HE6: Conservation Areas - Shopfronts Achievement Comment This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy, and Local Environmental Assets DPD. Additional guidance will be available in the Fareham High street Conservation area Character Assessment. This document is programmed for adoption in Autumn 2006. New shopfronts in conservation areas will be permitted, provided that: (A) it does not result in the removal or alteration of features of architectural or historic value; and (B) the new design relates closely to the overall character of the building in terms of scale, style and materials, together with the use of traditional elements. HE7: Conservation Areas - Signs and Advertisements This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. New signs and advertisements in conservation areas which accord with Policy DG7 will be permitted provided that: (A) the size, design and materials are related to the building on which the sign is to be displayed; and (B) if freestanding, they are positioned so that the setting of the building or character of the area is not harmed; and (C) fascias, letters and signage are not internally illuminated. HE8: Conservation Areas - Blinds, Canopies and Shutters This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. 33 FBLPR Policy Achievement This policy has been taken into account during Blinds, canopies and security shutters in conservation pre-application discussions and in the areas will be permitted, provided that: (A) they are determination of applications. designed as an integral part of a shopfront; and (B) the size, colour, materials and design are appropriate to the character of the building. External security shutters will not be permitted. HE9: Buildings of Local Architectural or Historic Interest Comment This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. Proposals for Buildings of Local Architectural or Historic Interest (that is, buildings not on the Statutory List but contained within the Local List), involving alterations, additions or other development, including changes of use, will be permitted, provided that such development does not adversely affect their character or setting. HE10: Historic Parks and Gardens This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. Development in accordance with the other policies in the Plan will be permitted provided that it does not harm historic parks and gardens, whether of regional or local importance, or their settings. H1: Housing Allocations This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Local Environmental Assets DPD. The following sites together with existing allocations and sites with planning permission shown on the Proposals Map and listed in Appendix 5 are allocated for residential development. They will be safeguarded from any other form of permanent development in order that they are available for implementation during the plan period: 34 FBLPR Policy Number of Dwellings (indicative) New Allocated Built or Allocations (1997) Permitted (1997-99) East of 25 0 Botley Road North of Whiteley 260 Peters Road 210 0 0 0 Achievement Without Permission (1999) 25 Site under construction 260 Part permitted, site under construction Part of site not released, Permission will be granted for schemes with 40% affordable housing. No permission Greenfield site not released. Permission will be granted for schemes with 40% affordable housing. No permission Greenfield site not released. Permission will be granted for schemes with 40% affordable housing 210 Hunts Pond Road 240 Segensworth Road - North 160 East of Whiteley Lane Segensworth Road - South 15 17 0 65 63 0 Catisfield Lane Former WT Station Former Wicor School Chalk Pit, Hill Road 30 0 30 75 0 75 20 35 0 20 20 0 1,160 263 840 0 Comment 240 160 105 dwellings completed; part of the remainder under construction. 17 dwellings completed 63 dwellings completed No planning permission 75 dwellings completed 35 dwellings completed 24 dwellings completed 35 36 FBLPR Policy H2: Residential Development in the Urban Area Achievement Comment Residential infilling, redevelopment and development on neglected, derelict and underused land within the urban areas shown on the Proposals Map will be permitted, provided that it conforms with the relevant policies of the Plan, particularly HE2-5, H3 and those in Chapter 3: Development Guidelines. H3: Areas of Special Residential Character A significant amount of residential development has been permitted within the urban area. The proportion of total housing development on previously developed land has increased significantly. The current high proportion of housing on previously developed land partly reflects the decision not to release three large greenfield sites. The policy will be reviewed in the LDF. Residential infilling and redevelopment in the Areas of Special Residential Character will only be permitted if it is demonstrated that residential character will not be harmed: (A) Green Lane, Swanwick; (B) Holly Hill Lane, Sarisbury; (C) Thornton Avenue/Crofton Way, Warsash; (D) Newtown Road, Warsash; (E) Hook Park Road, Warsash; (F) South-West Hill Head; (G) Crofton Avenue/Salterns Road, Hill Head; (H) Kiln Road/Park Lane, Fareham; (I) Downend, Fareham; (J) The Avenue, Fareham; (K) Kiln Road, Fareham; (L) Locks Road, Locks Heath; and (M) Fareham Park Road, Fareham. H4: Retention of Housing Planning permissions have been granted for residential development in several of the Areas of Special Residential Character. The guidance in PPG3 has been taken into account as well as the policy. This has resulted in higher density development being permitted which, in several cases, has resulted in changes in character contrary to the intention of the policy. The policy will be reviewed in the LDF. Change of use or development which results in the loss of residential accommodation will be permitted, provided that: (A) the new use is for the establishment of a small business, a medical or dental practice or another community facility to serve the wider residential area; and (B) a unit of accommodation is retained. H5: Conversions to Flats The policy has generally achieved the aim of retaining residential accommodation with losses only being permitted where the use complies with the policy. The policy will be reviewed in the LDF. The conversion and/or extension of offices, existing dwellings and of vacant floorspace above shops to smaller self-contained units of accommodation will be permitted, provided that: (A) the proposal, or the cumulative impact of the proposal with other similar proposals would not adversely affect the character of Conversions of offices and floorspace above shops have been permitted, particularly in Fareham town centre. The policy will be reviewed in the LDF. 37 FBLPR Policy the area, particularly in conservation areas, or have unacceptable environmental, amenity or traffic implications; (B) intrusive features, for example, rear fire escapes or external access stairways are sympathetically designed and, where there may be problems of overlooking, housed in a covered structure; (C) the property to be converted is not a small family dwelling but is large enough to enable the provision of new dwellings with adequate space standards; (D) with the exception of the town centre and other commercial locations, appropriate outdoor amenity space is provided; and (E) where appropriate, the proposal meets the criteria in Policies DG3, HE2, and HE4. H6: Houses in Multiple Occupation Achievement Comment The sub-division of existing dwellings within the urban area for the purposes of multiple occupation will be permitted, provided that: (A) the property to be converted is not a small family dwelling; (B) a satisfactory living environment for the occupants is provided; (C) the proposal, or the cumulative impact of the proposal with other similar proposals would not adversely affect the character of the area, particularly in conservation areas, or have unacceptable environmental, amenity or traffic implications; and (D) where appropriate, the proposal meets the criteria in Policies DG3, HE2, and HE4. H7: Elderly Persons’ Housing, Rest Homes and Nursing Homes There has been limited demand for multiple occupation in the Borough, but permissions has been granted for The policy will be reviewed in the LDF. The provision of specialised accommodation for the elderly, rest homes and nursing homes on suitable sites within the urban area will be permitted, provided that: (A) the cumulative impact of the proposal with other similar proposals would not adversely affect the character of the area, particularly in conservation areas, or have unacceptable environmental, amenity or traffic implications; (B) where appropriate, the Nursing homes, and extensions to existing nursing homes have been permitted in accordance with the policy. The policy will be reviewed in the LDF. 38 FBLPR Policy proposal meets the criteria in Policies DG3, HE2, and HE4; and (C) appropriate outdoor amenity space is provided except where the property adjoins an existing public open space. H8: Community-Based Supported Housing Units Achievement Comment Community-based supported housing units will be permitted within existing residential areas within the urban area, provided that: (A) they contain adequate safeguards to protect the residential amenity of the occupiers of neighbouring properties; (B) the cumulative impact of the proposal with other similar proposals would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implication; and (C) appropriate outdoor amenity space is provided except where the property adjoins an existing public open space. H9: Annexes for Dependent Relatives Permissions have been granted for community based supported housing units in accordance with the policy. The policy will be reviewed in the LDF. The provision of self-contained annexes to accommodate dependent relatives will be permitted, provided that: (A) it is not possible to satisfactorily cater for dependent relatives within the existing dwelling;(B) the annexe is capable of incorporation into, or use as, an ancillary part of the existing dwelling when there is no longer a need for the annexe; and (C) adequate gardens and car parking spaces are provided. Where the annexe is detached from the original dwelling, a legal agreement will be sought to prevent the use of the annexe as a separate dwelling. H10: Affordable Housing Permissions have been granted for selfcontained annexes in accordance with the policy. The policy will be reviewed in the LDF. Residential development will be permitted provided that the provision of a proportion of affordable housing to meet the proven needs of local people who cannot afford to buy or rent a house locally on the open housing market has been secured on appropriate sites. During 2004/05 five planning permissions have been granted for development subject to the provision of affordable housing. The permissions have secured the provision of 68 affordable dwellings on the five sites and a contribution towards the provision of further 9 affordable dwellings elsewhere. The policy will be reviewed in the LDF. FBLPR Policy Achievement Comment H11: Residential Development in the Countryside Residential development in the countryside will not be permitted unless: (A) it is of an appropriate design and does not adversely affect the landscape; and (B) in the case of an agricultural or horticultural worker: (i) there is an overriding need to live on the holding and no other suitable dwelling is available in the vicinity; (ii) an existing dwelling serving or closely connected with the holding has not been sold separately or in some other way separated from the holding; and (iii) the dwelling is not unusually large in relation to the agricultural needs of the unit nor unusually expensive to construct in relation to the income it can sustain in the long term; and (C) in the case of the conversion of an existing building, the proposal is in accordance with Policy H12; or (D) it replaces an existing permanent dwellinghouse with one, which by appropriate siting, size and design, would not result in increased visual intrusion; or (E) in the case of the an extension to an existing dwelling, the proposal is in accordance with Policy H13; or (F) in the case of the frontage infilling, the proposal is in accordance with Policy H14. H12: Conversion of Existing Buildings in the Countryside to Residential Use The policy will be reviewed in the LDF. The policy will be reviewed in the LDF. 39 Conversions of existing buildings in the countryside to residential uses will not be permitted unless: (A) no other suitable use in accordance with the other policies of the Plan can be found; and (B) residential use is necessary to protect and retain the character of the building particularly a feature of architectural or historic interest, or its setting; or (C) it would provide agricultural workers accommodation in accordance with Policy H11; or (D) it would provide a residential unit as a subordinate part of a scheme for the reuse of a building or buildings for employment purposes. Provided that: (i) the building is of permanent and FBLPR Policy substantial construction and capable of conversion without major or complete reconstruction; (ii) where appropriate, the design retains the intrinsic qualities of the building and avoid inappropriate external alterations; (iii) the proposal takes the form of a selfcontained conversion and it does not include large extensions or the raising of the height of the building; (iv) any new domestic features are located within the curtilage of the building and, where possible, within or close to an existing group of buildings or a walled yard; and (v) it would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implications. H13: Extensions to Dwellings and Ancillary Buildings in the Countryside Achievement Comment The policy will be reviewed in the LDF. A residential extension or the erection of an ancillary building be permitted in the countryside, provided that:(A) in the case of an extension, it is of an appropriate size and design and does not adversely affect the character of the area or the wider landscape; or (B) in the case of the erection of an ancillary building, it is of appropriate design and located within or close to an existing group of buildings so that it does not adversely affect the landscape; and (C) in the case of an extension to an agricultural worker’s dwelling, it does not result in a dwelling larger than the unit can sustain in the long term. H14: Frontage Infill in the Countryside 40 Residential development for one or two new dwellings on infill sites within the countryside will be permitted, provided that: (A) it occupies a gap between existing dwellings in an otherwise continuously built-up frontage and would not harm the character of the area; (B) the new dwellings and plots are similar in size and character to adjoining properties; (C) it does not result in the extension of a frontage or the consolidation of an isolated group of dwellings; and (D) it does not involve The policy will be reviewed in the LDF. FBLPR Policy the siting of dwellings at the rear of existing dwellings. H15: Sites for Gypsies and Travelling Showpeople Achievement Sites for gypsies and travelling showpeople will be permitted, provided that: (A) there is a genuine need for a site in the locality; (B) the site is located within a reasonable distance of local facilities and services; (C) the site is capable of accommodating the number of caravans/mobile homes proposed together with any proposed equipment for business activities; (D) local agricultural operations and the amenity of existing businesses and residents in the locality would not be adversely affected; and (E) the proposal would not adversely affect the character of the area and the wider landscape or have unacceptable amenity, traffic or other environmental implications. Comment The policy will be reviewed in the LDF. FS1: Community Facility Allocations The following sites are allocated for community purposes and they will be safeguarded from development in order that they are available for implementation during the plan period: (A) a new community centre, south of Gull Coppice, Whiteley; (B) an extension to the Fareham Youth Centre, Park Lane, Fareham; (C) community uses, Hunts Pond Road, Titchfield Common, as part of a larger scheme to include education uses and open space; and (D) a community hall, Coldeast Hospital. A. Whiteley Community Centre now constructed. B. Fareham Youth Centre has not been extended. The youth centre is owned by the County Council. To date there is no funding or timescale for implementation. This part of the policy will be reviewed as part of the Site Allocations DPD. C. No community uses provided at Hunts Pond Road The site is owned by the County Council and leased by the Borough Council for playing fields. Development for community uses will be dependent on any future development of the site for education. This part of the policy will be reviewed as part of the Site Allocations DPD. 41 D. The existing health service community hall will be passed to the Council as part FBLPR Policy Achievement of the approval of the residential development (see Policy DG10 above) and be available for public use. Comment FS2: Education Allocations The following sites are allocated for education purposes and they will be safeguarded from permanent development in order that they are available for implementation during the plan period: (A) a new primary school, Heath Road/Centre Way, Locks Heath (2.8 hectares); and (B) educational uses, Hunts Pond Road, Titchfield Common, as part of a larger scheme to include community uses and open space (7.5 hectares). A. A new primary school has not been developed This site has been declared surplus to requirements by the education authority. It is identified in the Fareham Urban Capacity Study for residential use. No planning applications have been received. B. No educational uses have been developed. This policy will be reviewed as part of the Site Allocations DPD. FS3: Educational Establishments and Institutions in the Countryside Proposals for additional buildings or extensions to existing institutions for educational purposes at existing schools or colleges in the countryside, outside the defined urban area, will be permitted provided they are in accordance with relevant policies of the Plan, particularly Policy C3. FS4: Health Facility Allocations, Coldeast Hospital Land is allocated at Coldeast Hospital for the following health facilities and they will be safeguarded from development in order that they are available for implementation during the plan period: (A) a community hospital; and (B) learning disability homes. FS5: Garden of Rest, Portchester Crematorium Land north of Portchester Crematorium is proposed as an extension to the Garden of Rest and it will be safeguarded from development in order that it is available for implementation during the plan period. This policy has been taken into account during pre-application discussions and in the determination of applications. A. See Policy DG10 above B. No consents granted for development The garden of rest has been implemented This policy will be reviewed as part of the Local Development Framework. See Policy DG10 above 42 FBLPR Policy Achievement Comment Core Output Indicator 9 Renewable energy capacity installed by type. This data is not available for this AMR. This policy will be reviewed as part of the Core Strategy DPD. FS6: Renewable Energy Proposals for the production of energy from renewable sources will be permitted provided that, either by itself or cumulatively with other such proposals: (A) it is of an appropriate design in keeping with the character of the surrounding area; (B) it would not adversely affect areas or features of landscape, ecological, archaeological or historical importance; and (C) it would not pollute the environment or have unacceptable environmental, amenity or traffic implications. This policy has been taken into account during pre-application discussions and in the determination of applications. A small scale domestic wind-turbine has been developed at Hill Head FS7: Telecommunications New telecommunications equipment will be permitted, provided that: (A) it is located where it will have minimal visual impact; (B) the possibility of sharing an existing mast or erecting antennae on an existing building or other structure has been fully explored; (C) where appropriate, landscaping measures are included; (D) irremediable radio interference will not arise; and (E) where appropriate, provision is made for the removal of the equipment and restoration of the land following the cessation of its use. In determining applications, the Council will have regard to the technical, operational and legal constraints faced by operators. R1: Recreation, Leisure and Tourism in the Urban Area 43 New or improved recreation, leisure and tourist facilities, including hotels, other serviced accommodation and conference facilities, will be permitted in the urban area, provided that: (A) where appropriate, the sequential approach has been applied and suitable sites and buildings in the town centre are considered first, followed by edge-of-centre, district This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. Numerous telecommunication masts and antennae have been developed. Core Output Indicator 4a Amount of completed retail, office and leisure development This data is not available for this AMR. full survey was not completed by Hampshire County Council this year for the monitoring of retail and leisure completions. A full survey will be carried out at the beginning of 2006 and therefore information will be available for the 2006 AMR. This policy is continuing to achieve its objectives and the assumptions behind it are still relevant. FBLPR Policy and local centre sites; (B) there is good access to a range of means of transport, particularly public transport; (C) they do not require buildings of a type or quantity which would be harmful to the character of the area; (D) they do not result in the loss of public open space; and (E) they do not have unacceptable traffic, environmental or amenity implications. R2: Cams Alders Sports Ground Proposals which improve the range and quality of outdoor and indoor sports provision at Cams Alders Sports Ground will be permitted, provided that: (A) they include redevelopment of the stadium to provide a football pitch and other sporting and ancillary facilities; (B) the existing rugby and cricket pitches are relocated Achievement Comment Since local plan adoption in 2000, there have been a number of major recreation, leisure and tourism permissions and developments in the urban area, including; The Market Quay development in Fareham Town Centre has been completed and almost fully occupied. It includes a new cinema and a new health and fitness centre. Outline planning permission has been granted for a new swimming pool and fitness facility on land north of Lockswood Centre, Locks Heath (P/03/1308/D3). An Indoor Children’s Play Centre has been completed and occupied at Fielder Drive, Fareham (03/1680/CU) Permission has been granted for an 18 bed hotel at Newgate Lane, Fareham (02/0207/CU). Permission has been granted for a new beauty salon and gymnasium on Stubbington Green (02/1425/CU) A new amusement arcade has opened at 110-112 West Street, Fareham. Permission has been granted for expanded hotel accommodation at the Village Inn, Botley Road, Park Gate. There have been no significant improvements to the range of sports provision at Cams Alders site over the course of the plan period, although discussions are continuing with Fareham Town Football Club. An outline planning permission which was mentioned in the adopted Local Plan (2000) paragraph 8.22 and to which the policy largely refers, has now expired. The publication in the last year of Planning Policy Statement 6 ‘Planning for Town Centres’ has widened the uses to which the sequential test should apply so that it now includes ‘the more intensive sport and recreation uses’, including ‘health & fitness centres’ and ‘indoor bowling centres’ 44 FBLPR Policy within the site; (C) access is provided from Palmerston Business Park and the existing access from Highfield Avenue is closed except for emergency purposes; (D) if necessary, additional parking is provided on-site to an appropriate standard; (E) the nature conservation interest of the site is respected and the existing trees and hedgerows are retained together with an area of public open space; and (F) further landscape screening is provided along boundaries with residential areas. Achievement Comment Recent developer interest in developing a Permission (P/02/1549/FP) has been granted Health & Fitness Centre on the site, will for the ‘Rainbow Centre’ on land adjacent to the therefore need to be considered in this rugby club. Once complete, the Rainbow Centre light. As a result of PPS6, sport and will provide conductive education to help recreation facilities will now only be children with motor impairment learn to appropriate on this site if they can be overcome their difficulties. Although a departure considered the sort of ‘less intensive’ uses from local plan policy R2, paragraph 8.32 of the that would not be suitable for a town local plan explains that redevelopment of a centre location. Future policies for this site small part of a site may be acceptable to will need to reflect this change in central provide an appropriate community or recreation government emphasis. use which is important to the quality of life of local people. Future provision of outdoor and indoor sports facilities at sites within the Borough will be usefully informed by recent government guidance (see comment) and a number of subsequent relevant LDF evidence studies that are either complete or in progress, including; Playing Pitch Study Greenspace Study Indoor Sport Study All three studies will make informed recommendations of what facilities are needed in the location based upon the most recent evidence and informed by extensive community consultation. R3: Protection of Existing Open Space Development which would result in the loss of or reduce the recreational value of open space, including public and private playing fields, allotments and informal open space, will not be permitted unless a replacement site is provided which is equivalent in terms of accessibility, size and quality. 45 Core Output Indicator 4c Amount of eligible open spaces managed to Green Flag Award standard: Fareham Borough Council has undertaken a Greenspaces Study as part of the LDF evidence gathering process. As part of this work, residents were consulted and asked to assess the Borough’s larger parks and open spaces according to Green-Flag assessment criteria. The pass mark for achieving GreenFlag status is 66%. Therefore, if the score This policy will probably need amending in the future Local Development Framework, as it is debatable whether the assumptions and objectives behind policies are still relevant. To this end, the completion of LDF evidence studies will be of fundamental importance, in particular; (i) The Greenspace Study FBLPR Policy Achievement derived from the community consultation averages 66% or more, than the site is deemed to be eligible for Green-Flag status for the purposes of this AMR. The Greenspaces Study recognises 5 areas eligible for Green-Flag status, namely Warsash Common, Warsash; The Gillies, Cams Alders, Fareham; Sweethills Crescent, Whiteley; Portchester Park, Portchester South; and Swanwick Nature Reserve, Whiteley. Comment (ii) The Playing Pitch Study Together these two studies will assess the Borough’s open spaces for quantity, quality and accessibility. Together they will inform site by site recommendations to be made through the LDF process. This policy seeks to apply a blanket protection to all open spaces within the Borough. In practice, there have been unforeseen issues with this application. Namely; (i) The definition of ‘open space’, as distinct from amenity open space, incidental land, highway verge, etc. (ii) The appropriateness of applying a blanket protection policy when open spaces may be poorly located and in surplus in a neighbourhood, whilst there is an urgent community need for other uses, particularly residential. R4: Public Open Space Allocations 46 The following sites are allocated for new public open space and they will be safeguarded from development in order that they can be implemented during the plan period: (A) Informal open space at the Former Orchard Land, north west of Yew Tree Drive, Whiteley (2.8 hectares); (B) Informal open space at Quaveys Copse, Whiteley (4.4 hectares); (C) Sports pitches and informal open space at Hunts Pond Road, Titchfield Common as part of a larger scheme to include Community and Education Uses (5.5 hectares); (D) Sports pitches and informal open space at the Core Output Indicator 4c Amount of eligible open spaces managed to Green Flag Award standard. See achievements and comments for Policy R3 above. All allocated sites have been successfully safeguarded from development. Seafield Park (Site E) is the subject of a bid for funding to the football for: changing rooms two large football pitches The final Greenspace Study will give a clearer picture on the extent to which these allocations are still valid and viable, and provide a basis for future LDF policy. FBLPR Policy Coldeast Hospital Site (30.5 hectares); (E) Sports pitches and informal open space at Seafield Park (10 hectares); (F) Extension to Stroud Green Allotments (0.9 hectares). Achievement R5: Open Space in New Residential Development Core Output Indicator 4c Amount of eligible open spaces managed to Green Flag Award standard. Please see achievements and comments above for Policy R3. Proposals for new residential development in accordance with the other policies of this Plan will be permitted provided that, where appropriate, public open space is provided to the standard of 2.8 hectares per 1000 population. two mini- soccer pitches a football training grid The policy, and the SPG which accompanies it, are achieving their intended objectives. The term ‘where appropriate’ is clarified in the adopted Open Space Supplementary Planning Guidance (March 2002). The SPG was published subsequent to the local plan and is therefore not directly mentioned. Interpretation of this policy requires a detailed understanding of the SPG. R6: Recreation, Leisure and Tourism in the Countryside New or improved recreation, leisure and tourist facilities, including hotels, other serviced accommodation and conference facilities, will be permitted in the countryside provided that: (A) where appropriate, the sequential approach has been applied and suitable sites and buildings in the urban area have been considered first, followed by sites adjacent to the urban area; (B) there is good access to a range of means of transport, particularly public transport; (C) they maintain and safeguard the open and undeveloped nature of the countryside, and do not adversely affect the character of the area; (D) wherever possible, suitable existing buildings are used Since local plan adoption in 2000, there have been just two major recreation, leisure and tourism permissions under this policy; Comment A new putting, mini-golf and mountain bike course has been permitted (02/1017/CU) built and occupied at Mill Lane, Titchfield. Permission (00/0984/FR) for a tennis centre, driving range and club-house at Newlands Farm, Fareham. Development. New government guidance in the form of PPG17 – Planning for Open Space, Sport and Recreation was published in 2003. PPG17 suggests local authorities should be moving towards locally set standards and away from nationally set standards. Fareham Borough Council’s standard of 2.8 hectares per 1000 population is derived from standards established by the National Playing Fields Association (NPFA) as well as advice in the Structure Plan Review. It is the intention of the Council to create suitable locally set standards and adopt them in the future LDF. In this regard, the forthcoming Greenspace Study will provide useful advice and recommendations. This policy is continuing to achieve its objectives and the assumptions behind it are still relevant. 47 FBLPR Policy and any new buildings or structures which are required are small in scale and located close to any existing buildings; (E) they do not result in traffic volumes which exceed the capacity of the surrounding roads; (F) they do not adversely affect the amenity of residents or other users of the countryside and coast; and (G) where appropriate, noise reduction measures are incorporated into the scheme. Where appropriate, a legal agreement will be sought to control the future use and management of the site or building. R7: New Footpaths Achievement Comment Neither footpath has been completed. In both cases, their development is dependent to a large degree on enabling development and the coming forward of schemes on adjacent land. Completion of the Portchester coastal footpath is largely dependent on development of the category B employment land to the north. In the case of Fleet End Road, Warsash, the housing allocation to the north is not wholly built out, so the footpath remains possible. The seaborne aggregate depot remains operational, so the detail of this policy is not relevant. This policy remains relevant. Development will be permitted provided that the proposal incorporates the provision of any relevant sections of the following footpaths: (A) the final section of the Portchester Coastal Footpath from the southern end of Wicor Mill Lane; and (B) south-east of Fleet End Road, Warsash. R8: Upper Quay, Fareham In the event of the seaborne aggregate depot at Upper Quay, Fareham closing or relocating, development of the site for appropriate leisure uses will be permitted, provided that: (A) any additional moorings or waterside uses are limited to the area currently used by waterside vessels; (B) there is no adverse impact on the Town Quay Conservation Area or buildings of special architectural or historical interest; (C) there is no adverse impact on nature conservation interests; and (D) it would not have unacceptable environmental, amenity or traffic implications. R9: Camping and Caravanning 48 Proposals for new camping and caravanning sites in the countryside and extensions to existing sites will be permitted, provided that: (A) the development would There have been no applications or permissions This policy remains relevant. for camping or caravanning sites during the plan period. FBLPR Policy not be visible from the River Hamble, Fareham Lake, Portsmouth Harbour or the Solent Way Coastal Footpath (B) the development is not located in a Strategic or Local Gap; (C) the site is screened from vantage points and public highways; (D) there is no direct access to principal roads; and(E) the site is located near to services and facilities. E1: Existing Employment Areas in the Urban Area Achievement 49 Core Output Indicator 1a Amount of floorspace developed for employment by type Category 'A' Areas. Within Category 'A' employment B1 – 3307m2 areas, listed in Appendix 7 and shown on the B8 – 1618 m2 Proposals Map, the expansion of existing premises Source: HCC SEERA Commercial and Leisure within their curtilages or the redevelopment of existing Survey 2004-2005 premises for development within Use Classes B1 (Business), B2 (General Industrial) or Class B8 Core Output Indicator 1b Amount of floorspace (Storage or Distribution) will be permitted, provided developed for employment by type, in that: (A) the development includes, where appropriate, employment or regeneration areas a range of sizes and types of premises; (B) where Core Output Indicator 1c Amount of floorspace appropriate, sites or accommodation suitable for by type which is on previously developed land starter and small businesses constitute at least 10% of This data is not available for this AMR. A full the net developable area; (C) only uses within Classes survey was not completed by Hampshire B1 and B8 are located near boundaries with residential County Council this year for the monitoring of areas; and (D) it would not adversely affect the retail and leisure completions. A full survey will character of the area or have unacceptable amenity or be carried out at the beginning of 2006 and traffic implications. Changes of use or redevelopment therefore information will be available for the of Category ‘A’ employment areas which would result 2006 AMR. Also an Employment Land Survey in their loss from employment uses will not be will be completed as an evidence for the LDF and due for completion the end of December permitted. 2005. This be utilised for the 2006 AMR. Category 'B' Areas. Within Category 'B' employment Core Output Indicator 1d Employment land areas, listed in Appendix 7 and shown on the available by type Proposals Map, the intensification of existing uses will B1-B8 – 6.48ha not be permitted if it would result in the over-intensive Source: HCC SEERA Commercial and Leisure use of the site. Where appropriate, any permission Survey 2004-2005 may be conditioned or a legal agreement sought to prevent the future intensification of development on the Policy E1A generally continues to achieve its site. Within Category ‘B’ employment areas, the intended objectives. However, there has been expansion of existing premises within their curtilages development pressure for other uses, or the redevelopment of existing premises will be Comment The release of employment land for other uses where it can be demonstrated that a building has been vacant for some time raises difficult issues for the planning authority. Unscrupulous agents may choose to leave a building empty whilst conducting a ‘window-dressing’ marketing exercise in order to achieve a long-term and profit-generating aim of a change of use from employment uses. On the other hand, a genuine difficulty that appears to have emerged over the plan period appears to be the difficulty of finding sites for uses that do not fall within use classes B1-B8, but nonetheless often choose to locate within the vicinity of industrial estates. Examples of such uses include crèches, childcare facilities, vehicle hire operators and health & fitness centres. To some extent, the recent government publication of PPS6 resolved the issue by making it clear that more intensive leisure and entertainment uses should be located within centres. However, the extent to which employment areas should accommodate some of the other uses is a debate to be had during LDF creation. With E1B sites, the challenge for the FBLPR Policy permitted for either Class B1 (Business) uses or for mixed-use development, including Class B1 (Business) uses, provided that the development would not adversely affect residential amenity, the character of the area or have unacceptable environmental or traffic implications. Achievement such as health & fitness facilities, over the course of the plan period. Whilst policy E1A does not allow for non B1-B8 uses, in situations where units have remained vacant for a period of time, there have in practice been permissions for other uses. An issue particularly relevant to sites covered by Policy E1B is that high residential land values have made it advantageous for developers to seek higher residential proportions within schemes, at the expense of the employment generating component of a scheme. In two cases, Old Turnpike and the Polybond site south of Warsash Road, E1B sites have been released for wholly residential schemes. The release of the site in the early years of the plan came after more detailed site assessment work, but also partially justified by the imperative of providing new housing on brownfield sites as stressed in government housing guidance (PPG3). Comment planning authority and the future LDF is to ensure that where applicable, new schemes adhere to the principles of mixed use without further reducing the level of employment within our urban areas. This wider issue will also be heavily informed by PUSH. Within the next few months, the sub-regional agenda will become clearer and as a result the extent to which Fareham needs to hold onto existing employment sites or provide new ones will become clearer. However, the question of whether Fareham can afford the loss of further employment sites is debatable, particularly in the light of a dwindling supply of employment land Borough wide. An evidence study for the LDF that is currently underway is the ‘Employment Sites Quality Assessment’. The final results if this will inform future LDF land use decisions regarding employment sites. E2: Employment Allocations 50 Development for employment uses (Classes B1, B2 and B8) will be permitted on the following sites: (A) Kites Croft; (B) Segensworth South; (C) Area 1, Segensworth West; (D) Area 4a, Segensworth West; (E) Little Park Farm Road, Park Gate. Provided that: (i) Core Output Indicator 1e: Losses of employment land in (i) employment/regeneration areas (ii) local authority area 0.37ha Little Park Farm is subject to ongoing investigation and discussion between the Borough Council, Hampshire County Council and the site owners. FBLPR Policy the development includes, where appropriate, a range of sizes and types of premises; (ii) that sites or accommodation suitable for starter and small businesses constitute at least 10% of the net developable area; (iii) only uses within Classes B1 and B8 are located near boundaries with residential areas; and (iv) it would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implications. Change of use or redevelopment of the above sites, which would result in the loss of these areas for employment uses, will not be permitted. Achievement Source: HCC SEERA Commercial and Leisure Survey 2004-2005 Comment Core Output Indicator 1f: Amount of employment land lost to residential development 0.75ha Source: HCC SEERA Commercial and Leisure Survey 2004-2005 Development has taken place on most of the Borough’s employment allocations. The only notable exception is Little Park Farm, which suffers from serious accessibility problems. E3: Solent Business Park - Phase 2 Development of 11 hectares for business uses (Class B1) as part of Phase 2 of the Solent Business Park will be permitted, provided that: (A) at least 40% of the development area is parkland; (B) the development is of a high standard of design; (C) it would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implications; and (D) the applicants enter into a legal agreement to secure the long term management of the parkland. E4: Fareham Business Park – Phase 2 51 In the event of the railhead aggregate depot closing or relocating n no suitable alternative rail freight uses coming forward, comprehensive development of the area to the east of Fareham Railway Station for Class b! (Business) uses or for mixed-use development, including Class B1 ( Business) uses, will be permitted, provided that: (A) the development is part of a comprehensive scheme for the whole site, including the provision of additional station car parking; (B) the scheme includes improved access to the station roundabout; (C) the scheme includes the landscaping of the eastern boundary with adjoining residential Outstanding permission a business park. Development has not yet started. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. Aggregates depot still operating so policy has not come into affect. Fareham officers are having ongoing discussions with Hampshire County Council and through the Partnership of Urban South Hampshire regarding the future of this site. FBLPR Policy areas; (D) the proposal does not prejudice the implementation of the South Hampshire Rapid Transit Scheme; and (E) it would not adversely affect the character of the area or have unacceptable amenity or traffic implications. E5: Open Storage Uses The following sites will be safeguarded of open storage uses: (A) land at Segensworth (approx. 1.2 hectares); and (B) land at Clapgate, Wallington (approx. 0.5 hectare). Provided that: (i) no buildings are located on the site other than ancillary offices or workshops; (ii) the stacking heights of materials and the heights of buildings do not adversely affect the character of the area; and (iii) at Segensworth, screening is provided in the form of mounding and planting belts. E6: Employment Development in the Urban Area Within the urban area, outside existing or proposed employment areas, the change of use of existing buildings or the redevelopment of underused or vacant land for Class B1 (Business) uses will be permitted, provided the development: (A) is of appropriate scale and nature to the surrounding area, particularly residential areas; (B) is capable of being served by public transport and will not lead to excessive traffic generation; (C) does not result in the loss of residential accommodation; and (D) would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implications. Within the urban area, excluding areas covered by Policies E1-5, proposals for the change of use or the redevelopment of existing buildings for Class B2 (General Industrial) or Class B8 (Storage or Distribution) will not be permitted. E7: Business Development in Fareham Town Centre. Achievement Comment Segensworth has permission (01/0182/FP for open storage and is partly completed. Clapgate is built out for a mixture of uses including warehousing and office (P/99/1214/FP) and replacement warehousing (P/00/0617). This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. Core Output Indicator 4a Amount of completed retail, office and leisure development This data is no available for this AMR. A full survey was not completed by Hampshire County Council this year for the monitoring of retail and leisure completions. A full survey will be carried out at the beginning of 2006 and therefore information will be available for the 2006 AMR. Also an Employment Land Survey will be completed as an evidence for the LDF and due for completion the end of December 2005. This will be utilised for the 2006 AMR. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. This policy continues to serve its intended purpose. Core Output Indicator 4a Amount of completed This policy will be reviewed as part of the 52 FBLPR Policy Development for Business Uses (Class B1) in Fareham town centre, outside the High Street Conservation Area, will be permitted, provided that: (A) it is not located in the ground floor shop unit within the Primary Shopping Area; (B) it does not harm the shopping character and function of the centre; and (C) it does not result in the loss of residential accommodation. Achievement retail, office and leisure development Comment Core Strategy and Site Allocations DPD. Core Output Indicator 4b Amount of completed retail, office and leisure development in town centres This data is not available for this AMR. A full survey was not completed by Hampshire County Council this year for monitoring of retail and leisure completions. A full survey will be carried out at the beginning of 2006 and therefore information will be available for the 2006 AMR. Also an Employment Land Survey will be completed as an evidence for the LDF and due for completion the end of December 2005. This will be utilised for the 2006 AMR. This policy continues to serve its intended purpose. E8: Business Development in the District and Local Centres Development for business Uses (Class B1) in the District and Local Centres will be permitted provided that there is no loss of ground floor shop or unit of residential accommodation. Core Output Indicator 4a Amount of completed retail, office and leisure development This data is not available for this AMR. A full survey was not completed by Hampshire County Council this year for monitoring of retail and leisure completions. A full survey will be carried out at the beginning of 2006 and therefore information will be available for the 2006 AMR. Also an Employment Land Survey will be completed as an evidence for the LDF and due for completion the end of December 2005. This will be utilised for the 2006 AMR. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. This policy continues to serve its intended purpose. E9: Hazardous Substances 53 The storage of hazardous substances will not be permitted in close proximity to housing, sensitive water This policy continues to serve it intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. FBLPR Policy sources, or other sensitive areas where it would significantly increase risk to the life or health of members of the public. E10: Employment in the Countryside Employment development in the countryside will not be permitted unless: (A) in the case of the conversion of an existing building, the proposal is in accordance with Policy C2; or (B) in the case of an existing boatyard, the proposal is in accordance with Policy E11; or (C) in the case of an existing employment use: (i) the reuse of existing buildings has been considered and that where new buildings are required they are located within the cartilage of the existing site and meet the criteria in Policy C3; and (ii) the development and any extra activity it would create would not result in the over-intensive use of the site. Where appropriate, any permission may be conditioned or a legal agreement sought to prevent the future intensification of development on the site. Provided that: (i) it will not lead to excessive traffic generation; (ii) it will not result in the loss of residential accommodation; and (iii) it would not adversely affect the character of the area or have unacceptable environmental or amenity implications. E11: Boatyards 54 Marine-related development will be permitted at the following boatyards: (A) Eastlands Boatyard, Coal Park Lane, Swanick; (B) RK Marine, north of Bridge Road, Swanwick; (C) Swanwick Marina, South Of Bridge Road, Swanwick; (D) Universal Shipyard, Crableck Lane, Sarisbury Green; (E) Stone Pier Yard, Shore Road, Warsash; (F) Wicor Marine, Cranleigh Road, Portchester; and (G) Lower Quay, Fareham. Provided that: (i) it relates to boat building, repair, maintenance, fitting out and other ancillary uses; (ii) it does not extend beyond the defined cartilage of the boatyard onto undeveloped land; (iii) it would not adversely Achievement Comment Core Output Indicator 4a Amount of completed retail, office and leisure development This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. This data is not available for this AMR. A full survey was not completed by Hampshire County Council this year for monitoring of retail and leisure completions. A full survey will be carried out at the beginning of 2006 and therefore information will be available for the 2006 AMR. Also an Employment Land Survey will be completed as an evidence for the LDF and due for completion the end of December 2005. This will be utilised for the 2006 AMR. This policy continues to serve its intended purpose. This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. FBLPR Policy affect the character of the area or have unacceptable environmental, amenity or traffic implications; and (iv) waterside sites are safeguarded for boatyard uses. S1: Fareham Town Centre Strategy Within the town centre boundary, proposals for one or a mix of the following uses will be permitted: (A) residential (see Policy H”); (B) employment (see Policy E7); (C) leisure (see Policy R1); and (D) other uses which will maintain or enhance the vitality and viability of the town centre, for example, financial and professional, food and drink, educational, cultural or community uses. Provided that: (i) they do not undermine the primary retail function of the Retail Core (see Policy S3); (ii) they do not adversely affect the character of the area or have adverse amenity, environmental or traffic implications; and (iii) they do no conflict with the other policies of the Plan, particularly those relating to the High Street Conservation Area (HE3-HE8), the loss of residential uses (Policy H4) and the South Hampshire Rapid Transit scheme (Policy T3). Proposals for the new retail development (Class A1) within the town centre boundary will be assessed against Policy S10. S2: Shopping in the Retail Core, Fareham Town Centre Proposals within the retail core of Fareham town centre for shopping uses (Class A1), including changes of use and redevelopment, will be permitted, subject to Policy S4 (Market Quay). Proposals for shopping uses (Class A1) outside the retail core will be assessed against Policy S10. S3: Non-Retail Uses in the Retail Core, Fareham Town Centre In the Primary Shopping Area, the change of use of a ground floor shop from Class A1 to a non- Achievement Comment This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. This policy continues to serve its intended purpose. This policy will be reviewed as part of th e Coare Strategy and Site Allocations DPD. This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. 55 FBLPR Policy Achievement Comment retail use will not be permitted other than the limited introduction of Class A3 (Food and Drink) uses as part of the refurbishment of the Fareham Shopping Centre. In the Secondary Shopping Area, the change of use of a ground floor shop from Class A1 to a non-retail use will be permitted, provided that: (A) the use would not extend or consolidate existing non-retail uses so that they would harm the vitality and viability of the area and discourage shoppers from using the centre; (B) the use provides a service appropriate to the shopping centre; and (C) a shop window display will be maintained. Proposals within the part of the Secondary Shopping Area which lies within the High Street Conservation Area will also be subject to Policy HE5. S4: Market Quay, Fareham Permission will be granted for the comprehensive Market Quay is now complete and almost fully occupied. development of the Market Quay site, Fareham which includes the following uses: (A) leisure (Class 56 D2); (B) shopping (Class A1); (C) food and drink (Class A3); (D) a multi-storey car park; and (E) other appropriate uses which will maintain or enhance the vitality and viability of the town centre. Provided that: (i) the development is in accordance with the brief prepared for the site; (ii) it is of a high standard of design which complements the existing town centre; (iii) it incorporates a ‘town square’ of 0.33 hectares which includes seating and planting; (iv) it incorporates the relocation of Fareham Market within the pedestrian area of the ‘town square’ and West Street; (v) vehicular access to the multi-storey car park and servicing areas is from Hartlands Road/Portland Street and Quay Street; (vi) appropriate highway improvements are made to Portland Street, Quay Street and Quay Street Roundabout; and (vii) it would not prejudice the implementation of the South Hampshire Rapid Transit scheme (Policy T3). The The completion of Market Quay is a major boost to the town centre and the area in general and the culmination of many years work by Council officers and members. The opening of the cinema has greatly improved the leisure offer of the town centre and enriched the local evening economy. FBLPR Policy listed buildings, namely The Crown Public House, the United Reformed Church (including the Sunday School) and Portland Chambers (66 West Street) together with the buildings of significant townscape interest, including 30/32, 42/44, and 52/54 West Street, should be retained and incorporated with the new development. S5: Quay Street, Fareham Development of 1.7 hectares of land for retail warehousing and/or other uses appropriate to the town centre will be permitted at Quay Street, Fareham, provided that: (A) it is of a high standard of design which complements the town centre; (B) appropriate provision is made for pedestrian links to the Market Quay site/West Street; (C) where appropriate, highway improvements are made to Quay Street and Quay Street Roundabout; and (D) it would not adversely affect the character of the area or have unacceptable environmental, amenity or traffic implications. Appropriate conditions may be attached to any retail warehouse permission, or a legal agreement sought, to restrict the range of goods sold and to control the number and size of units. S6: Shopping Development in District and Local Centres Achievement Comment The Council is involved in ongoing discussions with developers regarding this site for development for a major foodstore combined with residential development. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. New shops will be permitted in the District and Local Centres provided that the development is appropriate to local needs and does not result in an unacceptable extension of the centre. S7: Non-Retail Uses in District and Local Centres and Parades In the District and Local Centres and Parades, with the exception of Middle Road, Park Gate, changes of use of the ground floor from Class A1 retail to non-retail will be permitted, provided that: (A) the use would not 57 FBLPR Policy extend or consolidate existing non-retail uses so that they would dominate the character of the area and shoppers would be discouraged from using the centre or parade; (B) the non-retail use provides a service appropriate to a shopping centre, such as financial and professional services, a launderette, café or restaurant; and (C) a shop window display will be maintained. In Middle Road, Park Gate the change of use of any shop to a non-retail use at ground floor level will not be permitted. S8: Retention of Local Shops Outside centres and parades, the change of use of local shops from retail to non-retail use will not be permitted unless: (A) there is an alternative local shop which can conveniently serve the area; or (B) the unit is vacant and there have been reasonable attempts to let it for retail use. S9: New Local Shops The provision of local shops within the urban area and in areas of new development to meet the day-to-day shopping needs of the immediate locality will be permitted provided that such development is of a scale and character appropriate to its surroundings and local function. A site of 0.5 hectares (1.25 acres) is safeguarded for a new local shopping centre adjoining the Whiteley Primary School south-west of Gull Coppice, Whiteley. S10: Out-of-Centre Shopping 58 Outside the retail core of Fareham town centre, proposals for new shopping development (Class A1) will be permitted, provided that: (A) the scheme would not damage the viability or vitality of a nearby shopping centre, a planned expansion of a centre or planned new centre, either by itself or having regard to the cumulative effect of other such proposals; (B) the need for the development has been demonstrated and the Achievement Comment This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. This policy continues to serve its intended purpose. The new local shopping centre is being developed in Whiteley. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. FBLPR Policy sequential test has been applied, that is, no suitable sites or buildings are available in the retail core of the town centre, then edge of the retail core or in the district or local centres; (C) the scheme would not encroach upon the countryside, coast or a Strategic Gap; (D) the site is located where good access, particularly by public transport, can be provided; (E) the development would not result in the loss of land designated for other uses, particularly for residential, employment or open space purposes; and (F) the scale and design of the buildings and the standard of landscaping are appropriate to their surroundings. Where appropriate, conditions may be attached to a permission, or a legal agreement sought, to restrict the range of goods sold and to control the number and size of units. S11: Retail Warehouses The following changes in relation to existing retail warehouses will not be permitted: (A) the sub-division of existing retail warehouse units to units of less than 930 square metres (10,000 square feet) gross floor area; or (B) the sale of food (other than confectionery), clothing, shoes, toys or fashion goods or other goods more appropriately sold in a town centre. S12: Hot Food Shops 59 Proposals for shops for the sale of hot food (Class A3) will be permitted provided that either by themselves or cumulatively they would not: (A) damage the vitality and viability of the centre or area contrary to Policies S3 and S7; (B) adversely affect the character of the area, particularly within conservation areas; and (C) have unacceptable environmental, amenity or traffic implications, particularly in residential areas. Where proposals involve the cooking of food, the applicants will be required to provide details of odour neutraliser equipment, such details to include the design, location, size and position of the outlet, materials to be used for Achievement Comment This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. FBLPR Policy trunking and pipework and the method of installation. S13: Garden Centres Achievement Comment This policy continues to serve its intended purpose. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. Development of a type likely to attract large numbers of trips of which a significant proportion could be made by public transport will be permitted, provided that it is located where public transport is, or is likely to be made, readily available. T2: Public Transport This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. Public transport systems, new railway stations, bus stations and facilities for ‘park and ride’ will be permitted in appropriate locations. No new transport systems, rail or bus stations or park and ride facilities have been developed. However, this general policy has allowed a number of new facilities and services and improvements to existing facilities and services through new development. This policy will be reviewed as part of the Core Strategy DPD. The SHRT has not been developed To date, a decision is awaited from central government with regard to additional funding to allow commencement of the proposal. This policy has been taken into account during pre-application discussions and in the determination of applications. A cycle strategy has been developed to help promote and provide cycle routes throughout This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. New garden centres will not be permitted where: (A) they are located in open countryside sites; (B) they would impact on the landscape quality; and (C) an unacceptable increase in traffic generation would occur. Extensions to existing garden centres will only be permitted where they would not lead to an unacceptable level of development in the countryside, detrimental to the character of the area. T1: Location of New Development T3: South Hampshire Rapid Transit The line of the proposed South Hampshire Rapid Transit system will be safeguarded from development which would prejudice its use for this purpose. T4: Walking, Cycling and Mobility Impairment 60 Land and routes will be safeguarded, if necessary, for the provision of cycleway and pedestrian networks and for proposals to meet the needs of people with mobility impairments and opportunities for new or improved facilities will be sought through new development (see FBLPR Policy Policy T5). T5: Transport and Development Development will be permitted provided that: (A) it allows the potential for walking and cycling opportunities to be optimised; (B) it ensures a choice of transport modes and maximises the use of existing public transport services and infrastructure; (C) it makes appropriate provision for highway safety, access, internal layout, parking (including cycle parking), landscaping and environmental measures; and (D) it does not adversely affect existing pedestrian, cycling and other transport facilities. Achievement the borough. Numerous routes, some in combination with pedestrian routes, have been implemented. Core Output Indicator 3b Amount of new residential development within 30 minutes public transport time of a GP, hospital, primary school, areas of employment, and a major retail centre. This data is not available for this AMR. It is anticipated to be sought from Hampshire County Council for the AMR 2006. Comment This policy will be reviewed as part of the Core Strategy DPD. The County Council is developing an accessibility model which will allow for the assessment of new development in relation to Core Output Indicator 3b. This policy has been taken into account during pre-application discussions and in the determination of applications. T6: New or Improved Highway Access Development requiring new or improved highway access will be permitted, provided that: (A) it does not interfere with the effectiveness of, or reduce the safety, function and standard of service of, the Strategic Road Network; (B) it does not adversely affect the function, safety and character of the Distributor and Local Road Networks; and (C) it does not have adverse environmental implications, including impact on the character of the area. T7: Improvements to the Strategic Road Network This policy has been taken into account during pre-application discussions and in the determination of applications. This policy will be reviewed as part of the Core Strategy DPD. Land is safeguarded for the following proposals which will improve and maintain the effectiveness of the Strategic Road Network: (A) B3385 Newgate Lane, Fort Fareham - Peel Common; (B) Gosport - Fareham Link Road; and (C) A27/A32 Quay Street Roundabout, Fareham. Development will not be permitted where it would be likely to prejudice future proposals at the following junctions: (i) Segensworth Roundabout; and (ii) A27 west to east flyover, Quay Street, Fareham. This policy has been taken into account during pre-application discussions and in the determination of applications with respect to Segensworth roundabout and the A27 west to east fly-over. This policy will be reviewed as part of the Core Strategy and Site Allocations DPD. A. Newgate Lane works not implemented 61 B. Gosport Fareham Link road not implemented This is dependent on housing development in Gosport Borough FBLPR Policy Achievement C. Quay Street roundabout not implemented Comment To date a scheme design has not been agreed The policy will be reviewed as part of the Site Allocations DPD in conjunction with the Highway Authority’s funding and implementation programme T8: Improvements to the Distributor Road Network Land will be safeguarded for the following improvements to serve development: (A) The remaining stages of the Western Local Distributor Road, Warsash; (B) The remaining sections of the Park Gate Short Bypass; (C) The remaining sections of the Local Distributor Roads linking the Whiteley Area Distributor Road to Botley Road; and (D) A new access road to the Knowle Hospital Site. A. Western local distributor road almost complete. Minor section linking Dibles Road with Lockswood Road subject to land purchase B. Park gate bypass not implemented County Council scheme now only relates to eastern half from Botley Road to Telford Way. Implementation pending scheme design and funding. C. Botley road link (Whiteley Way) not implemented Implementation stalled by land acquisition difficulties and related costs. D. New access to Knowle now complete The policy will be reviewed as part of the Site Allocations DPD in conjunction with the Highway Authority’s funding and implementation programme T9: Access to Whiteley 62 FBLPR Policy (A) Road connections from Whiteley to Botley Road for general traffic will not be permitted until Whiteley Way is complete between Junction 9 on the M27 and the A3051 north of Curbridge; (B) Bus only access from Botley Road to Yew Tree Drive and/or Rookery Avenue will be permitted provided that it can be demonstrated to be safe and that satisfactory arrangements can be made to exclude other vehicular traffic. Achievement A. See T8 C above B. Bus link not implemented Comment See T8 C above Bus link anticipated 2006 The policy will be reviewed as part of the Site Allocations DPD in conjunction with the Highway Authority’s funding and implementation programme T10: Rear Service Roads, Fareham Town Centre Land will be safeguarded for the provision of new and improved rear service roads in Fareham town centre in the following locations: (A) on the north side of West Street: (i) between Osborn Road South and Trinity Street; (ii) west of Trinity Street (as an extension to Russell Place); and (iii) east and west of Grove Road; and (B) on the south side of West Street: (i) between Crescent Road and Trinity Church; (ii) between Hartlands Road and Kings Road; and (iii) west of Kings Road. This policy has been taken into account during pre-application discussions and in the determination of applications. The policy will be reviewed as part of the Site Allocations DPD in the light of the outcome of the decision on additional funding for the South Hampshire Rapid Transit scheme. T11: Public Car Park Allocation, Market Quay, Fareham Land will be safeguarded for the provision of public offstreet parking at Market Quay, Fareham. There is an absence of funding for these service roads. On-street layby servicing along West Street is shown on the approved works for the South Hampshire Rapid Transit. Market Quay development complete along with public car park 63 64 Fareham LDF Annual Monitoring Report December 2005 APPENDIX 5 FAREHAM CONTEXT INFORMATION DEMOGRAPHY At the April 2001 Census Fareham population was 107,977. The mid-2004 population estimate stated a resident population of 108,700 comprising of 53,300 males and 55,500 females. (http://www.hants.gov.uk/factsandfigures/midyrest.html) Population increase between 1982 and 2002 for Fareham Borough was recorded as 24% compared with 10.5% for the South East region as a whole. This reflected the rate of house building in the Borough at that time. (http://neighbourhood.statistics.gov.uk/dissemination/AreaProfile2.do?tab=2) Small Area Population Forecasts These Hampshire County Council produced forecasts provide population projections incorporating births, deaths, forecast dwelling completions and the in and out flows of migrants. The model deals with migrant flows as three separate flows - in migrants to the new dwellings completions, and in and out migrants from the existing stock of dwellings. The projected dwelling supply information for the period 2004 to 2011 includes all large and small sites with planning permission, or allocated in local plans as at October 31st 2004. There are two important additional elements. The first is that assessments have been made on the scale, phasing, and likely locations of development on urban capacity and large windfall sites. The second is that development on small sites is assumed to continue at the same rate in the future as the average annual rate over the past 10 years, with a similar geographical distribution as in this decade. For further information on this Document please contact ldf@fareham.gov.uk 65 Fareham LDF Annual Monitoring Report December 2005 Population Forecasts for Fareham 2001 to 2011 Population 109500 109000 108500 Forecast 108000 107500 2011 2010 2009 2008 2007 2006 2005 2004 2001 107000 Year (http://www.hants.gov.uk/factsandfigures/farehampop2004-2011.html) Migration Fareham experienced a small net gain in migrants in 2001 (0.7 per cent of the population). Both in-migration and out-migration rates exceeded the national average (though fell below the regional figures), suggesting a relatively mobile population (Source: Local Futures). Age Groups The 2001 Census data for the Borough provides the following key statistics: The population is 49% male and 51% female. There are more males than females up to the age of 24 years. There are more females than males over the age of 50 years. There are twice as many females than males 85+ age group. The Borough has higher than national average of population in the 65+ age group. The majority of the population is aged between 30 and 59 years. The average age is 40 years (Source: Census 2001). For further information on this Document please contact ldf@fareham.gov.uk 66 Fareham LDF Annual Monitoring Report December 2005 Based upon information from 2001 Census. (http://www.statistics.gov.uk/census2001/pyramids/pages/24UE.asp) 2004 Mid-Year Population Estimates Hampshire County Council recorded mid-year population estimate for Fareham as 108,700. This comprises 54,300 males and 55,500 females. (Hampshire County Council) Ethnic Origins and Religious Beliefs In 2001, 98.3% of the population were white The Chinese population forms the largest ethnic minority at 0.34% The largest religious groups were: Christian Muslim Other religions 78% 0.35% 0.45% ECONOMY Economic Activity Rates The 2001 Census identifies the following key statistics for the Borough: 45.68% are in full-time employment (40.55% in England and Wales) 26.34% are in part-time employment (only 2.70% males work part-time with 23.64% of women in part-time employment) 7.96% are self-employed 2.76% are full-time students For further information on this Document please contact ldf@fareham.gov.uk 67 Fareham LDF Annual Monitoring Report December 2005 16.03% are retired (13.61% England and Wales) There are approximately 57,000 employed residents in Fareham Fareham is a net exporter of commuters to other areas Economic Activity in Fareham Based Upon 2001 Census Employees Full-time Employees Part -time Self-employed Unemployed Full-time student Retired Student Looking after home / family Permanently sick / disabled Economically inactive: Other (Based upon data at http://neighbourhood.statistics.gov.uk/dissemination/AreaProfile2.do?tab=5) Earnings Average gross weekly pay, adult rates Males Females All workers Full time workers Fareham GB £506.50 £310.20 £409.30 £501.20 £525.90 £312.70 £422.20 £508.10 Source: HCC, Annual Survey of Hours and Earnings 2004, National Statistics The average weekly pay for adults in Fareham was recorded just below national averages in 2004. Productivity and Output Fareham’s economy is small by national standards, with low shares of Gross Value Added (GVA) and employment. For further information on this Document please contact ldf@fareham.gov.uk 68 Fareham LDF Annual Monitoring Report December 2005 The economy of the sub-region is dominated by the neighbouring two cities Portsmouth and Southampton. Fareham is ranked 210 out of 408 on the economic scale compared to Portsmouth ranked 61 and Southampton 45. (Local Futures) Productivity in Fareham is broadly in line within the national average, with the district ranked 141 out of 408 in Great Britain. Using indexed gross weekly earnings, GVA per head in the borough is just under £14,000, higher than most of the comparator districts; lower than Portsmouth, Southampton and Winchester; and lower than the regional average of £15,900 (Local Futures). Index of Competitiveness Input factors comprise business density, knowledge based business and unemployment; and output factors comprise average earnings and unemployment. It is not possible to include an output factor such as GDP per head because that information is not available at district level. United Kingdom 100 South East 121 Hampshire 121 Fareham 117 The figures above indicate that Fareham is just above the national average falling just short of the regional norm. Fareham is located in South Hampshire which, in comparison North Hampshire have much higher indices of competitiveness with Hart (149) and Basingstoke & Deane and Winchester (132). Sources: Regional Trends 36, National Statistics 2001 An Index of Competitiveness in the UK, R. Huggins, Cardiff University, 2000 Hampshire County Council, 2001 Business density (measured by the number of firms per 1000 population) in Fareham is on a par with the national average, though is somewhat lower than the regional figure. In 2004 there were 36.2 businesses per 1000 population in Fareham, compared to 43.6 per 1000 population in the South East (Local Futures). BUSINESS AND FINANCE VAT Registered Businesses 2004 Fareham Fareham South East GB (numbers) (%) (%) (%) Registrations 325 10.0 9.9 10.1 Deregistrations 285 8.8 9.8 9.9 Stock (at end of year) 3,250 Source: vat registrations/deregistrations by industry (2004) - http://www.nomisweb.co.uk/reports/lmp/la/2038431783/report.aspx?town=fareham#vat For further information on this Document please contact ldf@fareham.gov.uk 69 Fareham LDF Annual Monitoring Report December 2005 Commercial Floorspace Development A1 Mixed A use classes B1 (B1a, B1b,B1c) B2 B8 Mixed B1-B8 C1 D2 Outstanding Permissions Borough Total (Sq.m)Gross 1105 Completed Development (Sq.m) 0 0 0 0 0 6.48 0 0 0 1000 0 0 31883 0 3759 9344 3307 1618 0 38269 0 5192 8.18 37747 48386 Total Land Available Borough Total (ha) Gross 1.7 Total N.B. ‘Total Land Available’ refers to employment allocations without planning permission. Source: Hampshire County Council SEERA Commercial and Leisure Survey 2004-2005 The above information has been extracted from the Hampshire County Council monitoring return sent to the South East of England Regional Agency this year. The data accounts for the period 1st April 2004 to 31st March 2005. LABOUR MARKET Employment With an employment rate of 80.4% Fareham is above both the national and regional figures (74.2% and 79.5% respectively) (Local Futures). Unemployment Rates Month/Year Apr 2004 May 2004 June 2004 July 2004 Aug 2004 Sept 2004 Oct 2004 Nov 2004 Dec2004 Jan 2005 Feb 2005 Mar 2005 Fareham 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 0.8% 1.0% 1.0% 1.0% South East 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.4% 1.5% UK 2.4% 2.3% 2.3% 2.3% 2.3% 2.3% 2.2% 2.2% 2.2% 2.4% For further information on this Document please contact ldf@fareham.gov.uk 70 Fareham LDF Annual Monitoring Report December 2005 Unemployment rates in Fareham remain consistently low. Within the accounting year April 2004 to March 2005 there was very little change of 0.2% increase. Unemployment rates remain below regional levels and well below national figures. JSA Claimants Number of Job Seeker's Allowance claimants as a percentage of the working age population. South East %age Fareham Fareham %age Apr 2004 579 0.9 1.5 2.4 Jul 2004 525 0.8 1.4 2.2 Oct 2004 507 0.8 1.4 2.2 Jan 2005 631 1.0 1.5 2.3 Apr 2005 636 1.0 1.5 2.3 GB %age http://www.nomisweb.co.uk/reports/lmp/la/2038431783/subreports/jsa_time_series/report.a spx Occupations of the Working Population Fareham Fareham South East GB (employee jobs) (%) (%) (%) Total employee jobs 43,283 - - - Full-time 27,682 64.0 66.6 68.1 Part-time 15,600 36.0 33.4 31.9 Manufacturing 6,160 14.2 9.8 12.6 Construction 2,754 6.4 4.1 4.4 Services 33,674 77.8 84.2 81.4 Distribution, hotels & restaurants 10,631 24.6 26.3 24.7 Transport & communications 2,607 6.0 6.1 6.0 Finance, IT, other business activities 9,591 22.2 22.6 19.8 Public admin, education & health 8,641 20.0 24.0 25.8 Other services 2,203 5.1 5.3 5.2 6.2 8.1 8.1 Tourism-related 2,696 Source: annual business inquiry employee analysis (2003) EDUCATION AND TRAINING Qualifications The proportion of working age people with ‘higher end’ skills in Fareham is marginally higher than in Great Britain as a whole, but is lower than in the South East region. Low proportions of people in Fareham possessed either no qualifications or were qualified to NVQ level 1 equivalent. In 2002-03: Qualified below NVQ Level 2 Fareham 29% For further information on this Document please contact ldf@fareham.gov.uk 71 Fareham LDF Annual Monitoring Report December 2005 Great Britain 35.3% Qualified to NVQ Level 3 Fareham 23.8% South East 19.5% Great Britain 18.8% Qualified to at least NVQ Level 4 (university degree) Fareham 26.6% South East 27.7% Great Britain 24.2% The standard of schools in the district is good by both national and regional standards. In 2002-03, 58.9% of pupils achieved five or more GCSE grades A-C* in Fareham, compared to 54.9% in the South East and 46.5% in Great Britain (Local Futures). HOUSEHOLDS AND HOUSING Household Types At the Census 2001 there were recorded 43,577 households in Fareham The average size of households in Fareham as 2.4 people in line with an average of 2.4 people for England and Wales. The composition of households in Fareham in 2001; 61% married couples 9% cohabiting couples 16% single person households 7% divorced or separated 7% widowed 86% owner occupiers 8% rented Registered Social Landlords, Housing Associations or the Council 6% privately rented Household Income Only 11.4% of households had incomes below £10,000, well below the corresponding UK figure (28.3%). The total proportion in the Borough earning below the approximate national average household income of £27,300 per annum was 48.1%, well below the average for the UK as a whole (63.6%). 46% of the households in the Borough on the basis of the survey data had incomes above £30,000 per annum, well above the UK average (30.0%) (Source: DCA Housing Needs Survey 2004 for Fareham Borough Council). For further information on this Document please contact ldf@fareham.gov.uk 72 Fareham LDF Annual Monitoring Report December 2005 House Prices Residential House Prices Detached Fareham Hampshire South East 287184 342417 362836 SemiDetached 182488 202577 210313 Terraced Flat/Maisonette Overall 169687 173875 175801 141225 143857 148201 202848 224247 220911 Source Land Registry Jan-Mar 2005 House Price Changes House prices have increased by 13% for terraced houses and by 19% for flats and maisonettes between Jan – Mar 2004 to Jan – Mar 2005. However, overall house prices fell by approximately -0.21% between the two periods, in comparison to an increase in overall house prices within England and Wales (10.76%). Affordable Housing The table below illustrates the annual need and supply of affordable housing in Fareham. Even allowing for re-lets and new build there is an annual shortfall of 495 units Table 1: Annual Housing Need Backlog of Existing Need (eliminated over 5 years) 103 Net new formation 377 Net increase in registered need 208 In-migrant need 22 TOTAL ANNUAL NEED 710 Total Supply from re-lets 215 NET ANNUAL OUTSTANDING NEED 495 Source: DCA Housing Needs Survey 2004 for Fareham Borough Council Housing Stock Conditions 91% of households state their accommodation is adequate for their needs. 9% state that it is inadequate. The largest single issue for those reporting an inadequacy is that a dwelling needed improvement / repairs (89%). Those requiring a move 63% indicated that the dwelling was too small. Based on a calculation of existing household occupants to bedroom numbers, under-occupation affects approximately 50% of all households and over-occupation affects 2% (Source: DCA Housing Needs Survey 2004 for Fareham Borough Council). For further information on this Document please contact ldf@fareham.gov.uk 73 Fareham LDF Annual Monitoring Report December 2005 Homelessness 23 applications were accepted by the Borough Council and classed as homeless during the 1st quarter 2004. Accommodation provision for the homeless: 2002/03 112 2003/04 142 Awaiting accommodation: 2002/2003 17 2003/04 13 600 HOMELESSNESS DECISIONS AND ACCEPTANCES 1998/99 - 2002/03 500 400 300 200 100 0 1998/99 1999/00 2000/01 Decisions 2001/02 Acceptances 2002/03 est The provision of accommodation has been increasing in relation to applications and acceptances, whilst those awaiting accommodation has been reduced (Source: FBC Department of Strategic Housing). Gypsies and Travellers No. of unauthorised encampments April 2004-March 2005 April 2003-March 2004 3 public land 8 private land 1 highway land 4 public land 14 private land 0 highway land No. of days occupied by unauthorised encampments 10 public land 21 private land 7 highway land 25 public land 26 private land 0 highway land For further information on this Document please contact ldf@fareham.gov.uk 74 Fareham LDF Annual Monitoring Report December 2005 SOCIETY Deprivation Government’s standard measure of deprivation and inequality in England is the Index of Multiple Deprivation (IMD), recently updated to include data from the 2001 Census. The IMD covers a number of aspects of deprivation including disadvantage in: education; income; employment; health; and housing. th Fareham is one of the least deprived districts in England, ranked 330 out of 354 districts. SOAs (Super Output Areas) are small geographical units used as the building blocks for the IMD. The average SOA score – 7.79 – is lower than the figure for the South East (13.19) and England as a whole (18.88), indicating a very low level of deprivation in the district. Of the comparator areas, only Winchester and Mid Sussex recorded lower levels of deprivation. Inequality within Fareham – measured by the difference in ranking places between the most and least deprived SOAs – is marginally higher than in England as a whole, suggesting the presence of some pockets of less fortunate areas within the district Crime Rates Crime per Thousand Population 8 7 6 5 Apr-Jun 2003 Jul-Sep 2003 Oct-Dec 2003 Jan-Mar 2004 4 3 2 1 0 Burglary Criminal damage Drug offences Fraud & forgery Robbery Sexual offences Vehicle & other theft Violence Other offences Source: Home Office Crime Statistics For further information on this Document please contact ldf@fareham.gov.uk 75 Fareham LDF Annual Monitoring Report December 2005 All Crimes Per 1000 Population 35 30 25 Fareham Hampshire South East Region England and Wales 20 15 10 5 0 Apr-Jun 2003 Jul-Sep 2003 Oct-Dec 2003 Jan-Mar 2004 Source: Home Office Crime Statistics Fareham’s Community Safety Partnership represents a joint commitment to tackling crime and disorder in the Borough. Its mission statement is: “to promote community safety in order to improve the quality of life for residents and ensure Fareham remains a safe place in which to live, work and visit.” Fareham’s current Community Safety Strategy covers the three year period from 2005 to 2008. Fareham’s Community Safety Partnership has been working together to tackle community safety issues since 1998. In this time much has been achieved: The establishment of a multi-agency Domestic Violence Co-ordinator. Purchase of CCTV equipment to enable the Police to carry out surveillance on known drug dealers. The purchase of 8 specially equipped police mountain bikes for use in the Borough. Financial support for community based projects such as the development of a recreational area for young people and the purchase of drug and alcohol resources for schools. Burglary dwelling has continuously reduced over the last three years. Vehicle crime has reduced by twenty percent. There have been installed 37 CCTV cameras throughout the Borough since 1997. ENVIRONMENT Biodiversity The Sustainability Appraisal Scoping Report (incorporating Strategic Environmental Assessment) identifies: A diverse range of habitats including woodlands, grasslands, wetlands and a coatal zone. This variety has resulted in the designation of many areas of nature conservation value including aras of international, national an dlocal importance. For further information on this Document please contact ldf@fareham.gov.uk 76 Fareham LDF Annual Monitoring Report December 2005 There are 6 Sites of Special Scientific Interest in the borough and 4 nature reserves namely Titchfield Haven National, Hook-with-Warsash, Swanwick, and Kites Croft Local nature reserves. Waste The average amount of household waste collected between April 2003 and March 2004 was almost 1 tonne per household. There are 32 local recycling centres through Fareham, with households having recycling blue topped bins collected fortnightly. In 2002/2003 the average recycling rate for households was 20.2%, in 2003/2004 this figure rose to 21.15%, and in 2004/2005 rose further to 21.30%. The target set for 2005/2006 is 40%. In Autumn 2005 the Council introduced a kerbside collection of compostable green garden waste from households; residents are no longer able to dispose of garden waste from households having been provided with a reusable garden waste bag. Air Quality No Air Quality Management Areas have been declared within Fareham in response to reviews carried out to date, indicating that levels of air pollution are relatively low. There has been a reduction in the number of days of moderate air pollution from 39 days in 1993 to 19 days in 2001. Flooding In Fareham there is a risk from coastal and river flooding. Areas susceptible to flooding include Hill Head, Lower Quay, Lower Swanwick, Portchester, Titchfield and Wallington. Water Quality Rivers, canals and fresh water bodies that either lie or run through Fareham have been assessed for their chemical and biological water quality. These include the River Wallington, Hoeford Lake stream, River Meon, Crofton stream, Titchfield Abbey stream, Brownwich stream, and Hook Lake. Water quality ranges from good to fair. In 2003 21.40% of river length in Fareham was as chemically good, with 38.81% recorded as biologically good (Audit Commission http://www.areaprofiles.auditcommission.gov.uk/IndicatorPages). HEALTH Average life expectancy in Fareham was 80.1 years in 2000-02, compared to 79.4 years regionally and 78.1 years nationally. Of comparator local areas, only New Forest and Winchester recorded longer average life expectancies. Recorded mortality by cause in 2001 for Fareham; For further information on this Document please contact ldf@fareham.gov.uk 77 Fareham LDF Annual Monitoring Report Cancers CHD Strokes Other Cardio Accidents Suicides Other December 2005 24% 21% 10% 9% 2% 1% 33% Source: Fareham Borough Council Local Delivery Plan 2003-2006 Age-standardised mortality rates per 100,000 population; South East England Fareham 116.9 125.4 111.4 TRANSPORT AND ACCESSIBILITY Accessibility Car Ownership Based upon the 2001 Census, 86% of households in Fareham own 1+ cars, with the remaining 14% with no car at all. Car Ownership 50 45 40 Percentages 35 30 Fareham England & Wales 25 20 15 10 5 0 None One Two Three For further information on this Document please contact ldf@fareham.gov.uk Four or more 78 Fareham LDF Annual Monitoring Report December 2005 Commuting Based upon the 2001 Census and destinations chosen on the basis of over 500 movements, commuting patterns in and out of Fareham are: 18015 people commute into Fareham to work 24727 residents commute out of Fareham to work 25151 people live and work in Fareham Principle outflow of commuters travel to Portsmouth, Southampton, Winchester and Eastleigh Principle inflow of commuters travel from Gosport and Portsmouth Source: Census 2001, Origin - Destination Statistics For further information on this Document please contact ldf@fareham.gov.uk 79 Fareham LDF Annual Monitoring Report December 2005 APPENDIX 6 LIST OF SOURCES Population Office for National Statistics Neighbourhood Statistics website http://neighbourhood.statistics.gov.uk/dissemination/AreaProfile2.do?tab=2 Small Area Population Forecasts Hampshire County Council, A Profile of Hampshire 2005 website http://www.hants.gov.uk/factsandfigures/farehampop2004-2011.html Age Groups Office for National Statistics website http://www.statistics.gov.uk/census2001/pyramids/pages/24UE.asp 2003 Mid-Year Population Forecasts Hampshire County Council http://www.hants.gov.uk/factsandfigures/midyrest.html Economic Activity Rates Office for National Statistics Neighbourhood Statistics website http://neighbourhood.statistics.gov.uk/dissemination/AreaProfile2.do?tab=5 Earnings Annual Survey of Hours and Earnings 2004, National Statistics Hampshire County Council, A Profile of Hampshire 2005 website http://www.hants.gov.uk/factsandfigures/fareham.html Productivity and Output The State of the Borough – An Economic, Social and Environmental Audit of Fareham, Local Futures, December 2004 Index of Competitiveness Regional Trends 36, National Statistics 2001 An Index of Competitiveness in the UK, R. Huggins, Cardiff University, 2000 Hampshire County Council, 2001 The State of the Borough – An Economic, Social and Environmental Audit of Fareham, Local Futures, December 2004 VAT Registered Businesses Nomis Website http://www.nomisweb.co.uk/reports/lmp/la/2038431783/report.asp?town=fareham#vat For further information on this Document please contact ldf@fareham.gov.uk 80 Fareham LDF Annual Monitoring Report December 2005 Commercial Floorspace Development Hampshire County Council SEERA Commercial and Leisure Survey 2004-2005 Employment The State of the Borough – An Economic, Social and Environmental Audit of Fareham, Local Futures, December 2004 Annual Business Inquiry 2003, National Statistics Hampshire County Council, A Profile of Hampshire 2005 website http://www.hants.gov.uk/factsandfigures/fareham.html Unemployment Rates Hampshire County Council Monthly Reports JSA Claimants Nomis Website http://www.nomisweb.co.uk/reports/lmp/la/2038431783/subreports/jsa_time_series/report.as px Occupations of the Working Population Annual Business Inquiry Employee Analysis (2003) Qualifications The State of the Borough – An Economic, Social and Environmental Audit of Fareham, Local Futures, December 2004 Household Income DCA Housing Needs Survey 2004 for Fareham Borough Council House Prices Land Registry Jan-Mar 2005 Affordable Housing DCA Housing Needs Survey 2004 for Fareham Borough Council Housing Stock Conditions DCA Housing Needs Survey 2004 for Fareham Borough Council Homelessness Fareham Borough Council Department of Strategic Housing Gypsies and Travellers Fareham Borough Council Department of Health and Regulatory Services Deprivation The State of the Borough – An Economic, Social and Environmental Audit of Fareham, Local Futures, December 2004 Crime Rates Home Office Crime Statistics website www.crimestatistics.org.uk Fareham Community Safety Partnership, Community Unit, Fareham Borough Council For further information on this Document please contact ldf@fareham.gov.uk 81 Fareham LDF Annual Monitoring Report December 2005 Biodiversity Fareham Borough Council Department of Environment and Conservation Waste Fareham Borough Council Department of Leisure and Environment Water Quality Audit Commission Area Profiles http://www.areaprofiles.audit-commission.gov.uk/IndicatorPages Health Fareham Borough Council Local Delivery Plan 2003-2006 Commuting Census 2001, Origin - Destination Statistics For further information on this Document please contact ldf@fareham.gov.uk 82