Energy Trust New Homes Verifier call April 1, 2015 Audio Call line 888-450-5996. Login using 961819#. Energy Trust Verifier Call The purpose of this call is to provide a forum for New Homes verifiers to ask questions and receive program updates. • Typically occurs 8AM on the first Wednesday of the month • Topic submissions are due to Mike Lillesand mike.lillesand@clearesult.com by the previous Monday Agenda Welcome New Homes Program Updates & Reminders • Verifier Website - Username: verifier - PW: energy • “Parking Lot” Q&A Document - Will be posted on Verifier Website 3 Keynote Speakers •Michael Crooke – Former CEO Patagonia, Inc •Todd Britsch, Metrostudy •CR Herro, Meritage Homes 16 Breakout Sessions (Series A and B CEUs!) •Sales and Marketing for Today’s Homebuilder •Advanced Home Performance •Home Building in 2015 (including infill and multigenerational building sessions) •Remodeling and Retrofits Agenda Welcome Agenda Welcome AXIS Updates Axis Updates Energy Trust Oregon - 2015 Axis Version 3.5 Training and Support Axis Version 3.5 Goal Improve a user’s ability to create and edit homes, subdivisions, and communities. The release also provides minor layout changes to better use page space, enhances document handling, updates widgets and caching methodologies, adds file type validation, and includes other performance improvements. Axis Version 3.5 Approach The concept behind the changes in v3.5 is to cut the page up into logical sections and allow a user to enter an edit mode on any given section in an on-demand fashion — no loading to another page. • Top “home” section with basic home information (i.e. the address), and a • Bottom section divided up into tabs for Programs, Companies, Incentive Payments, QA, Documents, Users, and History – each of which • Each tab is a different form and allows edit and input of the respective data within that tab on the page, • For the most part the apparent layout of the page has not changed significantly, but the interaction has changed. Axis Version 3.5 • Revised creation and edit capabilities for communities, subdivisions, and homes • Integration of better caching methodology to reduce page-load times • Consolidated document handling across all applications • Home Documents now show all related checklist answer documents as well. • Home Detail View • Independent program support. Ability to lock a home after certification and yet • • • • • allow new programs to be added. • Ability to delete a program from a home. • Ability to override an address that has been geocoded Ability to validate file types (i.e. BLG file validation is in place) Home Checklist has been reworked for better performance Better use of page space Updated all external css and js widgets including the problematic date/time widget Over 3500 code commits Axis Version 3.5 Axis Version 3.5 Top of the page contains home information like the address Axis Version 3.5 Click to open home edit mode Axis Version 3.5 This edit mode allows you to edit the basic home info without reloading the entire page, unlike in the past Select “Override address” checkbox if an address has previously been incorrectly normalized by geocoder Save your changes or Cancel the Click to open home mode editedit mode The bottom portion of the page remains in view mode Axis Version 3.5 The bottom portion of the page in view mode has familiar tabs that run horizontally, each of which can now be edited independently Location statistics have ben moved from right column allowing more horizontal room for program info Axis Version 3.5 The program summary view displays program status, green completion indicator, and reporting and edit features within this single view Axis Version 3.5 Clicking program name toggles expanded view In this expanded view you can view and edit annotations Axis Version 3.5 Click to edit program (add floorplan) directly from this view In this expanded view, the program requirement status messages are displayed – click link to address missing requirement Axis Version 3.5 Use program edit to change program and add or change the floorplan on the program Axis Version 3.5 Remove a floorplan from a program on a home, OR add a new floorplan which will become the Active floorplan for that program, OR Edit the floorplan directly in this view Axis Version 3.5 The bottom portion of the page in view mode has familiar tabs that run horizontally, each of which can now be edited independently Location statistics have moved from right column allowing more Click on the tab to view that type of info (in ben this case “Companies”) horizontal for programoninfo – notice the Edit button to editroom the information the tab directly Axis Version 3.5 Edit companies in this section directly without affecting the rest of the page Axis Version 3.5 “Public” means visible to all other companies on home Click “Add new Customer Document” to add a new file to the home Edit allows you to remove or change files attached to the home, but not files attached to program checklist questions (below shows document Edit mode) Axis Version 3.5 Select to make visible to all other companies on home Documents has “badge” indicating whether there are documents, and how many – the tab shows files attached to the home AND ALSO those attached to checklist questions for the home…all documents for the home are available here! Axis Updates Energy Trust Oregon - 2015 Axis Version 3.5 Training and Support Training & Support • Support site • Energy Trust Oregon – 2015 notes • March 5th All Hands presentation • Axis 3.5 notes and guide • Release 3.5 video • Customer Support 1) Via email: support@pivotalenergysolutions.com 2) On-Line Helpdesk • Open tickets with attachments, review status, etc. 3) Via telephone: 480-256-2737 • 8am to 5pm, Monday through Friday AZ time (excluding federal holidays) QUESTIONS? Clinton Heyn cheyn@pivotalenergysolutions.com 602.708.2991 NORTHWEST ENERGY STAR HOMES April 1, 2014 UPCOMING Q1 RATER NEWSLETTER - APRIL 13 NWESH-EPA Alignment H-QUITO Transition Reminder: June 30 Prescriptive Path deadline Recap of RESNET and ACI NW conferences Marketing update Guidance on open web floor truss insulation per Energy Trust of Oregon. To view past Rater Newsletters, CLICK HERE QUESTIONS? info@northwestenergystar.com | 1.800.539.9362 Visit northwestenergystar.com for more resources Northern Climate Qualified Products List Update AirGenerate and Electrolux Tier 2 HPWHs units were de-listed from the NCS QPL on March 17, 2015 AirGenerate failed to comply with a warrantyrelated listing requirement These units no longer qualify for utility rebates or tax credits, in most cases Presented by Smart Water Heat 34 Northern Climate Qualified Products List Update Four new GE GeoSpring models were added to the NCS QPL on February 23, 2015 Available in 50- and 80-gallon sizes Tier 2 qualified products Qualify as Tier 3 when in Cold Climate Efficiency mode Presented by Smart Water Heat 35 Northern Climate Qualified Products List Update 14 A.O. Smith manufactured products were added to the NCS QPL Available in 66- and 80- gallon sizes Tier 1 qualified products Brands include A.O. Smith, State, American, Whirlpool, Reliance, U.S. Craftmaster and Lochinvar Presented by Smart Water Heat 36 New Homes Technical Team Framing – insulated headers • Intermediate framing, including insulated headers • Message to builder at first builder meeting • Some structural exceptions Grade 1 insulation • No compression • Split batt around wires and pipes Grade 1 insulation • No gaps or misalignment • In contact with subfloor • Assure verification of overhangs below conditioned space 4” to 6” gap between subfloor and insulation Fireplace flue air leakage Fireplace flue potential solution • Suggest sheet metal pan • Framers (slight modification), HVAC Shear wall sill sealer TEC 5.2.3 • Seal unconditioned attic/wall interface • Best practice: seal OSB to framing but not in sequence • Spray foam at seam from top (attic side) • Or bottom (backside of OSB) Ducts inside equipment closet • All air handlers and all ducts must be within the continuous thermal and air barriers • Requires insulation under an equipment closet in garage Solar ready requirements • Version 6: http://energytrust.org/library/forms /SLE_RQ_SolarReadyReq.pdf • New solar ready brochure • Removed solar water heating • Edited conduit language from rigid steel to nonflexible metal (includes EMT) • J-box required at both ends of conduit Installer Crew Training Opportunities • • • • • ¿En Español? One-off or regular occurrence Utilize existing team meeting schedule Topical focus, 20-30 minutes Can be tailored to specific work quality concerns Reminder – Modeling Updates Update timelines New modeling tools and protocol announced at Verifier Training on 3/5/15 • Email reminders from Todd on 3/6 and 3/16 • Update deadline was last Monday 3/23/15 • All new and updated/corrected files New tools Modeling Protocol • • Ventilation details for air cyclers and HRVs Ducted mini-split heat pumps UDRH • 2011 Oregon Code UDRH-2015.udr Library Set • REM Rate Library v01.01.15 REM/Rate™ • v14.6* REM/Rate update REM/Rate v14.6 • WARNING messages • Please disregard the messages about square footage • • • Ceiling area greater than floor areas Wall area greater than floor area Known bug/issue as of 3/24 REM/Rate v14.6.1 • Fixes when these warning show up and other program compliance reports • Please update to REM v14.6.1 by Wednesday 4/8/15 • www.remrate.com Questions? Please reach out to Todd or Samantha if you have problems or question: • REM install • Loading new UDRH and libraries • Protocol updates Should be using new tools and protocol going forward. Thank You Samantha Taylor Technical Support Coordinator samantha.taylor@csgrp.com 503.523.4819 Program Questions Thank You energytrust.org 1.877.283.0698 Next Call: May 6th, 2015