Seminar in Minho University, Guimarães, Portugal Hybrid Simulations: Theory and Applications in Earthquake Engineering Khalid M. Mosalam, Professor Director of nees@berkeley Structural Engineering, Mechanics, and Materials Department of Civil and Environmental Engineering University of California, Berkeley 1 Acknowledgements Dr. Selim Günay, UCB Dr. Shakhzod Takhirov, UCB Mr. Mohamed Moustafa, UCB Mr. Ahmed Bakhaty, UCB Mr. Eric Fujisaki, PG&E Sponsors: • California Institute for Energy and Environment (CIEE) • US-DoE • PG&E • National Science Foundation (NSF) [PEER; NEES] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 2 Introduction 10th 15 sites http://nees.org http://nees.berkeley.edu All our presentation from Oct. 1-4, 2012 will be made available in this site Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 3 http://nees.berkeley.edu Introduction Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 4 Introduction Seattle, WA Portland, Oregon Stanford, CA Kassel, Germany Ankara, Turkey Buffalo, NY Groznii, Russia Kyoto, Japan Davis, CA Taipei, Taiwan UCB, CA nees@berkeley PEER & CEE Bolder, CO Guimarães, Portugal Port au Prince, Haiti Santiago, Chile Atlanta, Georgia Casablanca, Morocco Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 5 Mini-Symposium on Hybrid Simulation: Theory and Applications [Tomorrow] 1. Hybrid simulation fundamentals [3.0 hours] 1. Substructuring 2. Integration methods 3. Simulation errors 2. Hybrid simulation applications [2.5 hours] 1. 2. 3. 4. Introduction to OpenSees Introduction to OpenFresco Application I: Hybrid simulation of structural insulated panels Application II: Real-time hybrid simulation of high voltage electric disconnect switches 3. Seismic testing of lifelines related to the electric grid [1.5 hours] 1. Shaking table and static tests and finite element simulations of high voltage electric disconnect switches 2. Fragility tests of concrete duct-banks for high voltage distribution lines 4. Use of advanced monitoring (e.g. Laser scanning in Haiti) and measurement systems in structural testing [1.0 hour] We would like your feedback via the electronic form set especially for this workshop on the link below: https://peercenter.wufoo.com/forms/hybrid-simulation-workshop-evaluation-portugal/ Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 6 Short Course on Probabilistic Performance-based Earthquake Engineering (PBEE) [Oct. 3-4] Pacific Earthquake Engineering Research (PEER) Center Mission Courtesy of Prof. S. Mahin Advance and apply PBEE tools to meet the needs of various stakeholders Problem-focused, multidisciplinary research built upon foundation of engineering and scientific fundamentals Close partnerships with government, industry and engineering professionals Strong national and global research collaborations Commitment to education at all levels Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 7 Short Course on Probabilistic Performance-based Earthquake Engineering (PBEE) [Oct. 3-4] 1. PBEE assessment methods [2.0 hours] 1. 2. Conditional probability approaches such as PEER and SAC/FEMA formulations Unconditional probabilistic approach 1. 2. Optimization-based methods Non-optimization-based methods 1. 2. 3. 4. 5. Hazard analysis Structural analysis Damage analysis Loss analysis Combination of analyses 2. PBEE design methods [2.0 hours] 3. PEER PBEE formulation [4.0 hours] 4. Application 1: Evaluation of the effect of unreinforced masonry infill wall on reinforced concrete frames with probabilistic PBEE [1.0 hour] 5. Application 2: Evaluation of the seismic response of structural insulated panels with probabilistic PBEE [1.0 hours] 6. Application 3: PEER PBEE assessment of a shear-wall building located on the University of California, Berkeley campus [1.0 hours] 7. Future extension to multi-objective performance-based sustainable design [0.5 hour] 8. Recapitulation [0.5 hour] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 8 Seminar in Minho University, Guimarães, Portugal Hybrid Simulations: Theory and Applications in Earthquake Engineering Khalid M. Mosalam, Professor Director of nees@berkeley Structural Engineering, Mechanics, and Materials Department of Civil and Environmental Engineering University of California, Berkeley 9 Outline 1. Motivation 2. Theory a) b) c) d) e) f) Background Substructuring Integration Methods Simulation Errors Geographically Distributed HS Real-time HS 3. Application I: HS of Structural Insulated Panels (SIPs) 4. Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table 5. Future Directions Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 10 Acceleration [g] Motivation 6 6 4 4 2 2 0 0 -2 -2 -4 Acceleration [g] -4 Top of support structure: Real-time HS -6 6 4 4 2 2 0 0 -2 -2 Top of support structure: Conventional shaking table -6 0 10 20 30 Time [sec] 40 Top of insulator: Real-time HS -6 6 -4 $ $$$ -4 Top of insulator: Conventional shaking table -6 50 0 10 20 30 Time [sec] 40 50 We will see this again today and in tomorrow’s HS workshop! Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 11 Motivation Qualitative justification of Hybrid Simulation with an Optimization Technique Accuracy Shaking table HS Static Test cost Hypothetical Pareto-front We will discuss this further during the PBEE course on 3-4 October! Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 12 Theory: Background Physical models of structural resistance Computer models of structural damping and inertia m a + c v + k d = -m ag m a + c v + R = -m ag m a + m ag + c v = -R c f(t) cv kd ma m m: mass k: spring constant c: damping coefficient k d Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 f(t)=-mag 13 Theory: Background m1 m2 m3 Need to assemble: a) Restoring forces (Geometric stiffness may be considered, R R K G d ) b) Damping forces from physical dampers c) Inertia forces from the mass of the physical specimens Desired d(t) + - Error in current position Physical model, e.g. 3dof Force value Dynamics of the system Current position d(t) Feedback dynamics Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 14 Theory: Background By definition, a hybrid model is sub-structured Multiple sub-structures can be used Many analytical sub-structures (Soft models) Many physical sub-structures (Hard model) Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 15 Theory: Background Testing infrastructure must enable: 1. Simulation of individual sub-structures 2. Integration of equations of motion Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 16 Theory: Background Advantages: 1. Physical model resistance of sub-structures whose computer models are not good enough. 2. Model the inertia forces (and damping, and second-order effects) in the computer. Disadvantages: 1. Substructures are connected and interact at their boundaries. 2. Specimens have inertia and damping, too. Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 17 Theory: Background m pp m cp m pc a p c pp mcc ac ccp c pc v p R p m pp ccc vc Rc mcp m pc a pg mcc acg Subscript c computed sub-structure Subscript p physical sub-structure Restoring forces can be assembled Also the following can be assembled: 1. Damping forces from physical dampers 2. Inertia forces from the mass of the physical specimens Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 18 Theory: Background Damping and inertia: 1. Explicit consideration of physical dampers and physical masses, based on measured velocities and accelerations. 2. DOF condensation must be performed carefully. 3. Coordinate transformations must be propagated to velocities and accelerations. Second-order effects: Geometric stiffness may be assembled into the resistance: R R KG d Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 19 Theory: Background Interface between Sub-Structures Equilibrium and compatibility must be satisfied Deformations and forces 1. Displacement (relatively easy) 2. Rotation (very difficult) Opportunity to do: DOF condensation Coordinate transformations Physical to computational DOF’s: dp=Tdc Geometry corrections Actuator movements Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 20 Theory: Background Distributed Hybrid Simulation T. Yang, B. Stojadinovic, & J. Moehle Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 21 Theory: Background Pan, P., Tomofuji, H., Wang, T., Nakashima, M., Ohsaki, M., & Mosalam, K.M., “Development of Peer-to-Peer (P2P) Internet Online Hybrid Test System,” EESD, 35: 867-890, 2006. Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 22 Theory: Background Computed or measured reactions Pan, P., Tomofuji, H., Wang, T., Nakashima, M., Ohsaki, M., & Mosalam, K.M., “Development of Peer-to-Peer (P2P) Internet Online Hybrid Test System,” EESD, 35: 867-890, 2006. Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 23 Theory: Background Pan, P., Tomofuji, H., Wang, T., Nakashima, M., Ohsaki, M., & Mosalam, K.M., “Development of Peer-to-Peer (P2P) Internet Online Hybrid Test System,” EESD, 35: 867-890, 2006. Proxy Server: a computer system acts as an intermediary for requests from clients seeking resources from other servers. TCP/IP: Transmission Control Protocol and Internet Protocol, networking communications protocols for the Internet. Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 24 Theory: Substructuring m2 u2 Analytical substructure (-) m1 u1 Experimental substructure Computed Measured m1 0 0 u1 c11 m 2 u 2 c 21 c12 u 1 f a f e m1 u g c 22 u 2 f a m 2 Nature of the problem requires substructuring Presence of experimental substructures requires the use of special integration methods Presence of a transfer system introduces simulation errors Rate dependent materials require real-time hybrid simulation (RTHS) Making use of multiple labs extends the method to geographically distributed testing Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 25 Theory: Substructuring Dermitzakis and Mahin (1985) Nakashima, Kaminosono, Ishida, and Ando (1990) Schneider and Roeder (1994) Nakashima and Masaoka (1999) Mosqueda, Cortes-Delgado, Wang, and Nakashima (2010) Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 26 Theory: Substructuring CASE 1: CANTILEVER COLUMN with MASS [No MASS MOMENT of INERTIA or ANALYTICAL SUBSTRUCTURE] m1 u1 m1 u1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 27 Theory: Substructuring CASE 2: CANTILEVER COLUMN with MASS and MASS MOMENT of INERTIA [No ANALYTICAL SUBSTRUCTURE] u2 u2 u1 m1, Im1 u1 m1, Im1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 28 Theory: Substructuring CASE 3: TWO COLUMNS without ANALYTICAL SUBSTRUCTURE m2 u2 m2 u2 m1 u1 m1 u1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 29 Theory: Substructuring CASE 4: TWO COLUMNS with an EXPERIMENTAL and an ANALYTICAL SUBSTRUCTURE u4 m2 u2 u4 m2 u2 u3 u3 m1 u1 m1 u1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 30 Theory: Substructuring CASE 4-1: TWO COLUMNS with an EXPERIMENTAL and an ANALYTICAL SUBSTRUCTURE m2 u2 u3 u3 m1 m2 u2 - u 1 u1 m1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 31 Theory: Substructuring CASE 4-2: TWO COLUMNS with an EXPERIMENTAL and an ANALYTICAL SUBSTRUCTURE m2 Spring with a lateral force-deformation relationship m1 u2 u1 m2 u2 - u 1 m1 Spring with a lateral force-deformation relationship Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 32 Theory: Substructuring CASE 5: PORTAL FRAME with one of the COLUMNS and BEAM as ANALYTICAL SUBSTRUCTURE m1 u2 u1 m1 u2 u1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 33 Theory: Substructuring CASE 6: MULTI-BAY MULTI-STORY FRAME with ANALYTICAL SUBSTRUCTURING m2 m1 u2 u1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 34 Theory: Substructuring CASE 6: MULTI-BAY MULTI-STORY FRAME with ANALYTICAL SUBSTRUCTURING m2 u2 m1 u1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 35 Theory: Substructuring CASE 6-1: MULTI-BAY MULTI-STORY FRAME with ANALYTICAL SUBSTRUCTURING m2 m1 u4 u3 u2 u1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 36 Theory: Substructuring CASE 6-1: MULTI-BAY MULTI-STORY FRAME with ANALYTICAL SUBSTRUCTURING m2 m1 u4 u3 u2 u1 Red : Experimental Blue: Analytical Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 37 Theory: Integration Methods A straightforward integration application: Explicit Newmark Integration m2 u2 m1 u1 Analytical substructure 0 u1 c11 c12 u 1 f a f e m1 m u g m 2 u 2 c 21 c 22 u 2 f a 2 m1 0 Experimental substructure m u c u f p c u f p mu 0 1. Determine the initial values of response variables: u 0 , u 0 , u 2. Calculate the effective mass: m eff m Δt γ c Δt: integration time step, : integration parameter 3. For each time step i; 1 ≤ i ≤ N, N: total number of steps i-1 a. Compute the displacement: u i u i-1 Δt u i-1 Δt 2 2 u b1. Compute the force f a ,i corresponding to the displacement u 2,i u 1,i from the constitutive relationship of the analytical spring b2. Apply the displacement u 1,i to the experimental spring and measure the corresponding force f e,i b3. Determine f i from f e,i and f a ,i by using the equation for f in Eq. 3 ~ u Δt 1 γ u c. Compute the predicted velocity: u i i-1 i-1 ~ d. Compute the effective force: p eff p i f i c u i i p eff e. Compute the acceleration by solving the linear system of equations: m eff u ~ Δt γ u i f. Compute the velocity: u i u i g. Increment i and go to step a Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 38 Theory: Integration Methods The most common integration for pure numerical case: Implicit Newmark Not suitable for hybrid simulation Nonuniform displacement increments: velocity and acceleration oscillations within the step F F ti+1 ti A B k=1 ti+1 B k=2 ti A δ δ Displacement overshoot: artificial unloading k=1 F F ti+1 ti A B ti+1 B ti δ A k=2 δ Iterations may not converge ! Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 39 Theory: Integration Methods The most common integration for pure numerical case: Implicit Newmark HS compatible alternatives: Implicit Newmark Integration with Fixed Number of Iterations Uniform displacement increments Number of iterations constant No convergence problems Number of iterations should be determined with prior analyses Very suitable for slow hybrid simulation with restricted use in real-time hybrid simulation Alpha-Operator Splitting (OS) Method Tangential stiffness matrix not required Iterations are not required (one predictor & one corrector) No convergence problems Computationally efficient Numerical damping present Very suitable for slow and real-time hybrid simulation for softening systems Explicit Newmark Integration Initial and tangential stiffness matrices not required Iterations are not required No convergence problems Computationally very efficient No numerical damping Conditionally stable Very suitable for slow and real-time hybrid simulation when stability criterion is met Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 40 Theory: Simulation Errors ERROR SOURCES Errors due to Structural Modeling Errors due to Numerical Methods Errors due to numerical solution nature of HS Experimental Errors: 1) Random or 2) Systematic Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 41 Theory: Simulation Errors Random errors: No distinguishable pattern & generally no specific physical effects are anticipated Random electrical noise in wires and electronic systems Random rounding-off or truncation in the A/D conversion of electrical signals Random noise in measured forces is problematic excites spurious response in higher modes Systematic errors: Measurement errors (Errors in load cells & displacement transducers of actuators) Calibration Friction or slippage (gaps) in the attachments A/D and D/A conversion (Digital controllers & digital transducers for improved accuracy) Hybrid simulation technique (ramp and hold, continuous, real-time) Servo-hydraulic closed control loop Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 42 Theory: Simulation Errors Errors due to HS technique (Systematic) Ramp and Hold Method Measure Forces Disp. Hold Computation duration Ramp Hold Ramp Computation duration Time Force relaxation during hold phase Discontinuity in velocity Not applicable in real-time HS Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 43 Theory: Simulation Errors Errors due to HS technique (Systematic) Continuous Testing (Predictor-Corrector Algorithms) Disp. Correct Predict Ramp Hold Computation duration Time Continuous movement of actuators Preferred HS technique Indispensable for real-time HS and geographically distributed HS Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 44 Theory: Simulation Errors Control loop errors (Systematic) Actuator dynamics Servo-valve Hydraulic power-supply Control-loop dynamics Inherent lag in the displacement response PIDF gains Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 45 Theory: Simulation Errors Control loop errors (Systematic) • • Integration: Command displacement & measured force True behavior: Measured displacement & measured force Restoring Force Restoring Force Overshooting Increased Damping Measured force Displacement Displacement Command Overshoot Restoring Force Undershooting or delay Negative Damping & Instability Displacement Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 46 Theory: Simulation Errors Control loop errors (Systematic) • • Integration: Command displacement & measured force True behavior: Measured displacement & measured force Restoring Force higher mode Cumulative errors increase with ωΔt (Shing and Mahin, 1983) ΔF (higher mode) lower mode ΔF (lower mode) Displacement Undershoot Command • Integration methods which introduce numerical damping to suppress the excitation of higher modes can be used to overcome the effects of these errors • Adaptive minimal control synthesis (MCS) algorithm which provides adaptive gain settings as the test specimen properties change can be used instead of PID control algorithm Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 47 Theory: Simulation Errors Control loop errors (Systematic) Error Identification: Free vibration Stage 1: Push the hybrid structure, generally in the first mode, to a displacement within the linear range Stage 2: Run the free vibration hybrid simulation test from the displaced configuration Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 48 Theory: Simulation Errors Control loop errors (Systematic) Error Identification: Free vibration Computed displacement [in.] No error Overshoot Undershoot or lag Pushover Free Vibration Time [sec] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 49 Theory: Geographically Distributed HS Lab 1 in The Americas Lab 3 in Europe Lab 2 in Asia Lab 4 in Australia Pan, P., Tomofuji, H., Wang, T., Nakashima, M., Ohsaki, M., & Mosalam, K.M., “Development of Peerto-Peer (P2P) Internet Online Hybrid Test System,” EESD, 35: 867-890, 2006. Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 50 Theory: Real-time HS Requirement for real time: Loading rate = computed velocity Slow HS sufficient for most cases when rate effects are not important Real-time HS essential for rate-dependent materials and devices, e.g. viscous dampers or triple friction pendulum isolators RTHS classified into two groups: RTHS conducted in a discrete actuator configuration RTHS conducted in a shaking table configuration (Application II) Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 51 Application I: HS of Structural Insulated Panels (SIPs) Motivation for Hybrid Simulation Structural Insulated Panels (SIPs) are composite panels for energy efficient construction Composed of an energy-efficient core placed in between facing materials Their application in seismically hazardous regions is limited due to somewhat unacceptable performance as demonstrated by cyclic testing Limited number of tests with more realistic dynamic loading regimes Hybrid simulation is ideal to test SIPs with a variety of structural configurations and ground motion excitations Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 52 Application I: HS of Structural Insulated Panels (SIPs) Test Setup Loading Steel Tube Actuator Reconfigurable Reaction Wall Specimen Support beam Gravity Loading Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 53 Application I: HS of Structural Insulated Panels (SIPs) Test Setup Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 54 Application I: HS of Structural Insulated Panels (SIPs) 7/16” OSB Skins (~11 mm) 3-5/8” EPS Insulating Foam (~92 mm) Test Specimen Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 55 Application I: HS of Structural Insulated Panels (SIPs) Test Setup and Specimen Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 56 Application I: HS of Structural Insulated Panels (SIPs) Tube sliding Instrumentation Top gap opening Top vertical sliding Bottom gap opening Bottom vertical sliding Left Uplift Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 Right Uplift 57 Application I: HS of Structural Insulated Panels (SIPs) Test Matrix Specimen Protocol Gravity Nail spacing [in] Remarks S1 CUREE No 6 Conventional wood panel S2 CUREE No 6 - S3 CUREE Yes 6 - S4 HS Yes 6 Near-fault pulse-type GM S5 HS Yes 3 Near-fault pulse-type GM S6 CUREE Yes 3 - S7 HS Yes 3 S8 HS Yes 3 Long duration, harmonic GM Near-fault GM; 3 stories computational substructure Investigate the effects of: Lateral loading: CUREE protocol vs HS Type of ground motion (Pulse type vs Long duration, harmonic) Presence of an analytical substructure Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 58 Application I: HS of Structural Insulated Panels (SIPs) c Hybrid Simulation m Specimens S4, S5, S7 Specimen m (kip-sec2/in) ξ k (kip/in) c (kip-sec/in) T (sec) S4 0.0325 0.05 18 0.0076 0.27 S5 0.0325 0.05 32 0.0102 0.20 S7 0.0325 0.05 32 0.0102 0.20 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 59 Application I: HS of Structural Insulated Panels (SIPs) Hybrid Simulation m m Specimen S8 m u4 c=αm c=αm u3 c=αm Analytical DOF u2 u1 m c=αm Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 Experimental DOF 60 Application I: HS of Structural Insulated Panels (SIPs) Hybrid Simulation: Numerical Integration Explicit Newmark Integration with γ=0.5 Does not require iterations Does not require knowledge of initial experimental stiffness Specimen m k T (sec) dt (sec) dt/T S4 0.0325 18 0.27 0.0050 0.0180 ≤ 1/π S5 0.0325 32 0.20 0.0050 0.0250 ≤ 1/π S7 0.0325 32 0.20 0.0125 0.0625 ≤ 1/π S8 - - T4=0.10 0.0050 0.0500 ≤ 1/π Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 61 Application I: HS of Structural Insulated Panels (SIPs) Hybrid Simulation: Ground Motions Los Gatos, Loma Prieta, 1989 Vinadel Mar, Chile, 1985 0 0 -0.4 -0.5 -0.8 0 10 20 30 Vel (in/sec) 20 0 25 75 100 0 -10 -10 0 10 20 PGV = 11.9 in/s 10 0 30 -20 0 25 50 75 100 5 5 PGD = 3.87 in PGD = 4.53 in 0 -5 50 20 PGV = 20.0 in/s 10 -20 PGA = 0.54 g 0.5 0 0 10 20 Time (sec) 30 -5 0 25 50 75 Time (sec) Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 Long duration, harmonic GM PGA = 0.61 g 0.4 Disp (in/sec) Near fault, pulse-type GM Acc (g) 0.8 100 62 Application I: HS of Structural Insulated Panels (SIPs) Test Results: Global Parameters 10 10 Full-History Envelope 6 6 4 4 2 0 -4 -4 -6 -6 -3 -2 -1 0 1 2 Displacement [inch] Initial stiffness =fi /di Force capacity = fc Ductility =du/dy Hysteretic energy = fdx 3 4 5 dc, fc di, fi du, 0.75fc dp, fp 0 -2 -4 dy, fy 2 -2 -8 -5 8 Force [kip] Force [kip] 8 envelope -8 -5 dn, fn -4 -3 -2 -1 0 1 2 Displacement [inch] 3 4 5 Positive peak displacement = dp Negative peak displacement = dn Residual displacement Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 63 Application I: HS of Structural Insulated Panels (SIPs) Test Results: Peaks of local responses Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 64 Application I: HS of Structural Insulated Panels (SIPs) HS Results: Effect of Lateral Loading (S6 vs S7) Cyclic Testing with CUREE Protocol for Ordinary GM (S6) Hybrid Simulation with Long Duration, Harmonic GM (S7) Vinadel Mar, Chile, 1985 0 00.5 5 Acc (g) 4 2 0 -0-0.5 -0 1 Vel (in/sec) 0 -1 -2 25 50 75 100 0 - -10 - -20 -4 5 0 500 1000 1500 2000 Time [sec] 2500 3000 3500 Nail spacing: 3” PGV = 11.9 in/s 10 -3 -5 0 20 Disp (in/sec) Displacement [inch] 3 PGA = 0.54 g 0 25 50 75 100 PGD = 3.87 in 0 -5 0 25 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 50 75 Time (sec) 100 65 Application I: HS of Structural Insulated Panels (SIPs) HS Results: Effect of Lateral Loading (S6 vs S7) 20 15 Force [kips] 10 5 Specimen S6 S7 0 Initial Stiffness [kip/in] 32.7 33.2 -5 Force Capacity [kip] 16.2 15.5 Ductility 4.8 3.4 Hysteretic Energy [kip-in] 309.9 1077.8 -10 S6 (CUREE) S7 (HS) -15 -20 -6 -3 0 3 Displacement [inch] Specimen 6 Peak Disp. (+) S6 4.7 S7 3.3 Peak Disp. (-) -4.7 -4.2 Residual Disp. 0.0 0.3 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 66 Application I: HS of Structural Insulated Panels (SIPs) HS Results: Effect of Ground Motion Type (S5 vs S7) Hybrid Simulation with Pulse-Type GM (S5) Hybrid Simulation with Long Duration, Harmonic GM (S7) Los Gatos, Loma Prieta, 1989 Vinadel Mar, Chile, 1985 Acc (g) 0.8 PGA = 0.61 g 0.4 0 0 -0.4 -0.5 -0.8 0 10 20 30 0 Vel (in/sec) 20 0 0 -10 -10 0 10 20 -20 30 0 25 75 100 50 75 100 5 PGD = 3.87 in PGD = 4.53 in 0 -5 50 PGV = 11.9 in/s 10 5 Disp (in/sec) 25 20 PGV = 20.0 in/s 10 -20 PGA = 0.54 g 0.5 0 0 10 20 Time (sec) 30 Nail spacing: 3” -5 0 25 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 50 75 Time (sec) 100 67 Application I: HS of Structural Insulated Panels (SIPs) HS Results: Effect of Ground Motion Type (S5 vs S7) 20 Force [kips] 15 10 Specimen S5 S7 5 Initial Stiffness [kip/in] 35.5 33.2 0 Force Capacity [kip] 15.6 15.5 -5 Ductility 3.7 3.4 Hysteretic Energy [kip-in] 363.1 1077.8 -10 S5 (Pulse-type) S7 (Harmonic) -15 -20 -6 -3 0 3 Displacement [inch] Specimen 6 DE MCE 1.5MCE Peak Disp. (+) S5 1.3 S7 1.1 S5 3.5 S7 2.2 S5 5.8 S7 3.3 Peak Disp. (-) -1.0 -1.0 -3.2 -2.0 - -4.2 Residual Disp. 0.1 0.0 0.8 0.0 - 0.3 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 68 Application I: HS of Structural Insulated Panels (SIPs) HS Results: Effect of Ground Motion Type (S5 vs S7) 20 15 Force [kips] 10 Specimen 5 DE MCE 1.5MCE 0 Peak Disp. (+) S5 1.3 -5 Peak Disp. (-) -1.0 -1.0 -3.2 -2.0 - -4.2 -10 Residual Disp. 0.1 0.0 0.8 0.0 - 0.3 -20 -6 -3 Specimen MCE S5 3.5 S7 2.2 S5 5.8 S7 3.3 S5 (Pulse-type) S7 (Harmonic) -15 DE S7 1.1 S5 S7 S5 S7 0 3 Displacement [inch] Bottom ver. sliding 0.26 0.23 0.63 0.45 Bottom gap opening 0.02 0.02 0.05 0.03 6 Top ver. sliding 0.27 0.21 0.64 0.43 Top gap opening 0.03 0.02 0.09 0.04 Uplift right 0.08 0.15 0.14 0.53 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 Uplift left 0.07 0.04 0.12 0.09 Tube sliding 0.18 0.02 0.19 0.06 69 Application I: HS of Structural Insulated Panels (SIPs) HS Results: Effect of Analytical Substructuring (S5 vs S8) Hybrid Simulation with no Analytical Substructure (S5) Hybrid Simulation with Analytical Substructure (S8) Pulse-Type GM Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 70 Application I: HS of Structural Insulated Panels (SIPs) HS Results: Effect of Analytical Substructuring (S5 vs S8) 6 S5 (No analytical substructure) S8 (Analytical substructure) 20 15 Force [kips] 10 Specimen S5 S8 Initial Stiffness [kip/in] 35.5 38.3 Force Capacity [kip] 15.6 16.0 Ductility 3.7 4.0 5 0 -5 -10 Specimen -15 -20 -6 -3 Specimen DE MCE S5 S8 S5 S8 0 3 Displacement [inch] Bottom ver. sliding 0.26 0.37 0.63 0.65 Bottom gap opening 0.02 0.03 0.05 0.03 6 DE MCE Peak Disp. (+) S5 1.3 S8 1.2 S5 3.5 S8 2.4 Peak Disp. (-) -1.0 -1.7 -3.2 -3.1 Residual Disp. 0.1 0.0 0.8 0.4 Top ver. sliding 0.27 0.37 0.64 0.55 Top gap opening 0.03 0.04 0.09 0.05 Uplift right 0.08 0.09 0.14 0.16 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 Uplift left 0.07 0.11 0.12 0.27 Tube sliding 0.18 0.13 0.19 0.14 71 Application I: HS of Structural Insulated Panels (SIPs) Concluding Remarks HS provides the force-deformation envelope that can also be obtained from a cyclic test. But it also provides response values, where the cyclic test would require complimentary analytical simulations for these values. HS with harmonic ground motion provides a slightly more degraded postyield response than the CUREE protocol due to the large number of cycles demanded by the harmonic ground motion. Based on global and local displacements, near-fault pulse-type GM is more critical & damaging for SIPs compared to long duration GM with many cycles. Although the global and local responses of SIPs with and without analytical substructuring are not dramatically different, there is a need for analytical substructuring for a more realistic dynamic representation. Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 72 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table : Primary power lines : Secondary power lines * Courtesy of Wikipedia Disconnect switches are key components of power transmission and distribution systems. 1. Primary power lines 2. Ground wire 3. Overhead lines 4. Transformer 5. Disconnect switch 6. Circuit breaker 7. Current transformer 8. Lightning arrester 9. Main transformer 10. Control building 11. Security fence 12. Secondary power lines Major elements of an electrical substation (distribution substation shown) Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 73 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table 1. Disconnect switches: Key components of power transmission & distribution systems to control flow of electricity between substation equipment & to isolate them for maintenance. 2. Seismic qualification tests in typical field installation according to IEEE 693 (Recommended Practices for Seismic Design of Substations) requirements. Typical field installation of vertical‐break 500‐kV disconnect 3‐phase switch Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 74 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Motivation for Hybrid Simulation Ertaishan Substation (220kV) Destruction, Yingxiu Town Wenchuan Earthquake, May 12, 2008 [Q. Xie, Tongji Univ.] EQ damage to 500 kV vertical disconnect switch [E. Fujisaki, PG&E] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 75 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Motivation for Hybrid Simulation 500 kV switch 230 kV switch IEEE693 requires seismic qualification of disconnect switches by shaking table tests A disconnect switch & its support structure should be mounted to a shaking table & tested Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 76 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Several tested configurations Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 77 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table 500-kV switch testing Support structure identification tests (stiffness & frequency) with two typical installation: a) Leveling bolts, no grout b) Leveling bolts with space packed with grout Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 78 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Sub-structuring tests w/o support structure in different configurations Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 79 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Test w/ support structure B Vertical Disp. [in.] Horizontal Disp. [in.] A Y Z X B Test w/o support structure A 5 A: Trans. in Y dir. 0 -5 0 10 20 30 40 50 60 B: Rot. @ X dir. 0.5 0 -0.5 0 10 20 30 Time [sec] 40 50 60 Time [sec.] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 80 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Y-direction Input (Signal A only) Jaw Insulator Bottom Strain [strain] Strain at Jaw Insulator Bottom East Side - Open/Open Conf. 300 w/o support w/ support 200 100 0 -100 -200 -300 0 10 20 30 Time [sec] 300 200 200 100 0 -100 A 0 -100 -200 -300 -300 0 200 East SG#2 [ strain] 60 100 -200 -200 50 Strains at Jaw Insulator Bottom w/ support structure 300 West SG#4 [ strain] West SG#4 [ strain] Strains at Jaw Insulator Bottom w/o support structure 40 WEST SG#4 -200 EAST SG#2 0 200 East SG#2 [ strain] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 81 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Y-direction + Rotation Input (Signals A + B) Jaw Insulator Bottom Strain [strain] Strain at Jaw Insulator Bottom East Side - Open/Open Conf. 300 w/o support w/ support 200 100 0 -100 -200 -300 0 10 20 30 Time [sec] 300 200 200 100 0 -100 60 B A 100 0 -100 -200 -200 -300 -300 -200 0 200 East SG#2 [ strain] 50 Strains at Jaw Insulator Bottom w/ support structure 300 West SG#4 [ strain] West SG#4 [ strain] Strains at Jaw Insulator Bottom w/o support structure 40 WEST SG#4 EAST SG#2 -200 0 200 East SG#2 [ strain] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 82 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Motivation for Hybrid Simulation Hybrid simulation: a cost effective and efficient alternative to the conventional shaking table testing of the disconnect switches Requirement for real-time: Rate-dependency of some types of insulator posts, e.g. polymer composite insulators, mandates use of RTHS Requirement for a shaking table configuration: Distributed mass of insulator posts prevents practical use of actuators at discrete locations along the height & requires RTHS conducted on shaking table configurations. A RTHS system is developed for testing insulator posts of high voltage disconnect switches on a “smart” shaking table Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 83 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Jaw Post Braced frame support structure Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 84 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Insulator post Disconnect switch Insulator post Disconnect switch 2D Support structure 3D Support structure For benefits of HS: Support structures computational substructures & insulator posts physical substructures Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 85 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table A method of analysis where a structure is split into physical and numerical substructures Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 86 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table RTHS: Real Time Dynamic Actuator & Load Cell Physical Insulator Substructure (assumed 1D) Hybrid simulation Movable platform Fixed tracks Calculated support structure response applied to movable platform Force feedback Displacement command Dynamic DOF Computational Substructure Earthquake motion Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 87 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Comparison RTHS vs. Shaking Table tests VS. RTHS test (UC Berkeley, 2011) Full switch shaking table test (PEER, 2008) Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 88 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System m, c F, u k=F/u c k ug m m, k, & c: mass, spring, & damping constant for SDOF system representing support frame Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 89 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System ma cv ku f mug f c k ug m Force f includes inertia & damping forces acting on the insulator since HS is conducted in real time Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 90 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System Insulator DAQ & Computational platform (DSP) Controller Uniaxial shaking table Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 91 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System Computational Algorithm: Explicit Newmark Integration Initialize u 0 , u 0 , u0 , meff m Δt γ c, i 1 1) ~ u i u i-1 Δt 1 γ ui-1 2) u i u i-1 Δt u i-1 Δt 2 2 ui-1 3) Apply u i & Measure f i 4) peff m ug i k u i f c ~ u i 5) ui peff meff m table 6) u i ~ u i Δt γ ui One simulation step completed in one milisecond! 7) Set i i 1 8) Go to Step 1 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 92 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System Implementation of Computational Algorithm Digital signal processor (DSP) I/O module of Pacific Instruments (PI) DAQ system Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 93 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System PIDF Feed-forward error compensation Add the error to the command 1.2 1 Command Feedback 1 0.6 0.4 0.4 Error (e) [inch] Displacement(inch) 0.6 0.2 0 -0.2 -0.4 0.2 0 -0.2 e = 0.0174v -0.4 -0.6 -0.6 -0.8 e = 0.042v+0.513 -0.8 -1 -1.2 10 e=0.042v-0.513 0.8 0.8 10.2 10.4 10.6 Time(sec) 10.8 11 -1 -40 -30 -20 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 -10 0 10 20 Velocity (v) [inch/sec] 30 40 94 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System Feed-forward error compensation 1.2 Command Feedback 0.8 0.8 0.6 0.6 0.4 0.2 0 -0.2 -0.4 0.4 0.2 0 -0.2 -0.4 -0.6 -0.6 -0.8 -0.8 -1 -1 -1.2 10 10.2 10.4 10.6 Time(sec) No correction 10.8 Command Feedback 1 Displacement(inch) Displacement(inch) 1 11 10 10.2 10.4 10.6 Time(sec) 10.8 11 Feed-forward error correction Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 95 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation Framework Verification of algorithm implementation and measurements Analytical Substructure Test # Stiffness, k, [kip/in] Mass, m, slug Period, T=2π(m/k)0.5, sec Damping ratio Excitation Scale 1 4.4 150 0.37 1% 15% 2 4.4 150 0.37 1% 20% 3 4.4 150 0.37 1% 25% Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System Verification of algorithm implementation and measurements 25% scale 2 0 F Displacement [inch] -2 2 Scale 10% 20% … Disp. 1 in. 2 in. 20% scale *25/20 0 -2 2 15% scale *25/15 d 0 -2 0 10 20 30 Time [sec] 40 50 60 c k m Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 97 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table 300 Comparison RTHS vs. Shaking Table tests A c c eleration [g] HS Test 100 0 -100 100 0 -100 -200 -200 -300 -300 0 -200 0 200 SG#3 [ strain] -200 0 200 SG#16 [ strain] -5 0 A c c eleration [g] PEER test 200 SG#17 [ strain] SG#4 [strain] 200 Accelerations at top Strains at bottom 5 300 HS test 10 20 30 Time [sec] 40 50 SG#3 60 Strains measured at insulator bottom SG#4 PEER test 5 0 Acceleration measured at insulator top -5 0 10 20 30 Time [sec] 40 50 60 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 98 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table 6 HS Test Disp. [inch] 4 Comparison RTHS vs. Shaking Table tests 2 0 -2 -4 Total and Relative Displacements at top -6 0 10 20 30 Time [sec] 40 50 60 PEER Test 4 HS Test 2 Disp. [inch] Rel. Disp. [inch] 6 0 2 0 -2 -4 -2 -6 0 10 20 30 Time [sec] 40 50 60 0 10 20 30 Time [sec] 40 50 60 2 HS Test PEER Test 4 Disp. [inch] Rel. Disp. [inch] 6 PEER Test 0 -2 2 0 -2 -4 0 10 20 30 Time [sec] 40 Relative Displacements 50 60 -6 9 10 11 12 13 14 15 Time [sec] 16 17 18 19 20 Total Displacements Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 99 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System Comparison with conventional shaking table tests Acceleration [g] Accelerations at Insulator Top 6 6 4 4 2 2 0 0 -2 -2 -4 Acceleration [g] -4 Top of support structure: Real-time HS -6 6 4 4 2 2 0 0 -2 -2 Top of support structure: Conventional shaking table -6 0 10 20 30 Time [sec] 40 Top of insulator: Real-time HS -6 6 -4 $ $$$ -4 Top of insulator: Conventional shaking table -6 50 0 10 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 20 30 Time [sec] 40 50 100 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System Comparison with conventional shaking table tests Strains at Insulator Bottom $ Strain [strain] 400 200 0 -200 West: Real-time HS East: Real-time HS -400 $$$ Strain [strain] 400 200 0 -200 -400 East: Conventional shaking table West: Conventional shaking table 0 10 20 30 Time [sec] 40 50 0 10 20 30 Time [sec] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 40 50 101 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Real-time Hybrid Simulation System Comparison with conventional shaking table tests Relative displacement of insulator top w.r.t. top of support structure 3 2 1 Real-time hybrid simulation $ Displacement [inch] 0 -1 -2 -3 3 2 1 Conventional shaking table $$$ 0 -1 -2 -3 0 5 10 15 20 25 Time [sec] 30 35 40 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 45 50 102 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Parametric Study Polymer Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 Porcelain 103 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Parametric Study 13 support structure stiffness, k, values between 2.2 kips/in and 60 kips/in 3 damping ratios for support structure: ξ= 1%, 3% , 5% Tests with 10%-scale IEEE motion to ensure linear insulator behavior Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 104 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Parametric Study: Natural Frequencies k [kip/in] fss [Hz] fss / fins (polymer) 60.0 10.0 1.6 55.0 9.6 1.6 50.0 9.2 1.5 44.0 8.6 1.4 40.0 8.2 1.3 35.0 7.7 1.2 30.0 7.1 1.1 22.0 6.1 1.0 16.0 5.2 0.8 11.0 4.3 0.7 7.0 3.4 0.6 4.4 2.7 0.4 2.2 1.9 0.3 fss / fins (porcelain) 2.0 1.9 1.8 1.7 1.6 1.5 1.4 1.2 1.0 0.8 0.7 0.5 0.4 f ss 1 / 2 k m m = 150 slug 16 25 Polymer 14 Spectral Acceleration SA [g] f = 6.20 Hz f = 5.13 Hz Porcelain 20 12 10 15 8 10 6 4 5 2 0 0 2 4 6 Frequency [Hz] 8 10 0 0 0 2 4 6 Frequency [Hz] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 8 10 105 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Parametric Study: Effect of Insulator Type Failure strains from fragility tests: Polymer 4800 μstrain Porcelain 1130 μstrain Peak strain / Failure strain (DCR) 0.1 Polymer Porcelain 0.08 0.06 0.04 0.02 0 0 0 1 1 2 3 4 5 6 7 8 2 3 4 5 6 7 8 9 Support structure uncoupled frequency fss [Hz] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 9 10 10 11 11 106 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Parametric Study: Effect of Support Structure Ratio of uncoupled frequencies fss / fins 80 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 1% Damping 3% Damping 5% Damping 70 0.07 0.06 60 Peak strain [ strain] 0.05 50 0.04 40 0.03 30 0.02 20 0.01 10 0 Peak strain / Failure strain Strains: Porcelain Insulator 0 1 2 3 4 5 6 7 8 9 Support structure uncoupled frequency fss [Hz] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 10 0 11 107 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Parametric Study: Effect of Support Structure Displacements: Porcelain Insulator Ratio of uncoupled frequencies fss / fins 2 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 Relative displacement of insulator w.r.t. ground 1.75 Displacement [in.] 1.5 1.25 1 0.75 0.5 1% damping 3% damping 5% damping 0.25 0 0 1 2 3 4 5 6 7 8 9 Analytical substructure uncoupled frequency fss Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 10 11 108 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Parametric Study: Effect of Support Structure Ratio of uncoupled frequencies fss / fins 450 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 0.09 1% Damping 5% Damping 400 0.08 Peak strain [ strain] 350 0.07 300 0.06 250 0.05 200 0.04 150 0.03 100 0.02 50 0.01 0 0 1 2 3 4 5 6 7 8 9 Analytical substructure uncoupled frequency fss [Hz] Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 10 Peak strain / Failure strain Strains: Polymer Insulator 0 11 109 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Parametric Study: Effect of Support Structure Insulator top wrt ground [in.] Displacements: Polymer Insulator Ratio of uncoupled frequencies fss / fins 1.5 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 Relative displacement of insulator w.r.t. ground 1.25 1% damping 3% damping 5% damping 1 0.75 0.5 0.25 0 0 1 2 3 4 5 6 7 8 9 Analytical substructure uncoupled frequency fss Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 10 11 110 Application II: RTHS of Electrical Insulator Posts on a Smart Shaking Table Concluding Remarks Good match of the results with a benchmark shaking table test is a strong verification of HS Economically and time efficiently conducted 78 RTHS tests and results regarding the design of disconnect switches related to the selection of both the insulators and support structures are a proof of the usefulness of HS Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 111 Future Directions Direct consideration of transfer system and analytical-experimental boundary in the HS solution control applied Ru, u Fa t Fc t Governing PDE : M u Boundary Conditions : G(u, u ) 0 Set of DifferentialAlgebraic Equations (DAE) PID Control : H Fc , u, u , udt 0 Solution affected more from the errors as # of DOF increases Need to reduce the computation duration (parallel computing) [OpenSees-SP, OpenSees-MP] C omp u ta tion T ime pe r T ime Step [ms ] HS of analytical substructures with large # of DOF: 40 35 30 MATLAB Old OpenSees New OpenSees FORTRAN 25 20 15 450 DOF 10 5 0 0 1000 2000 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 3000 4000 # of DOF 5000 6000 7000 112 Future Directions Acceleraation [g] Optimize design of support structure to improve the switch seismic response 1 0 -1 0 0.5 1 1.5 2 2.5 Time [sec] 3 3.5 4 4.5 ? Computational or experimental Acceleraation [g] Accelerations at Insulator Top 1 0 -1 0 0.5 1 1.5 2 2.5 Time [sec] 3 3.5 4 4.5 Accelerations at Switch Base (Ground Motion) Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 113 Future Directions Displacement (inches) Need for a mixed control as a combination of acceleration control for higher frequencies and displacement control for lower frequencies in RTHS on smart shaking table configurations 2 Cmd fbk Feedback 1 0 -1 Command -2 0 5 10 15 20 25 Time (sec) 30 35 40 45 4 Measured Target Measured Sa (g) 3 2 1 Target 0 0 0.5 1 1.5 period (sec) 2 2.5 Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 3 114 Future Directions Need for a mixed control as a combination of acceleration control for higher frequencies and displacement control for lower frequencies in RTHS on smart shaking table configurations Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 115 Future Directions Need for a mixed control as a combination of acceleration control for higher frequencies and displacement control for lower frequencies in RTHS on smart shaking table configurations Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 116 Thank You! Questions? Comments? Seminar on Recent Advances & Directions in Earthquake Eng., Minho Univ., Portugal, Oct. 2012 117