FACT SHEET CONCEPT MASTER PLAN ASF Consortium Proposal for the Broadwater Gold Coast, Queensland ASF Consortium has developed a waterfront eco-park and development master plan for the proposed Broadwater Marine Project, located on The Spit and Wave Break Island in the Broadwater, Gold Coast. In addition to these benefits, the creation of a new EcoMarine Park will provide opportunities to enhance land and marine ecosystems and generate awareness of the natural habitat: This proposal is the result of a joint initiative of the Queensland Government and City of Gold Coast to seek private sector investment to deliver a cruise ship terminal and multi-billion dollar integrated tourism project. It represents potentially the largest piece of integrated tourism infrastructure in Queensland’s history. •Re-vegetation and planting is proposed within this designated park that aims to both conserve and enhance one of the great assets of the Broadwater through ecological restoration PROJECT OVERVIEW •An area between the current sand bars is also proposed as an additional anchoring site for recreational boats. ASF Consortium has enlisted a team of over 100 of the world’s most experienced designers, planners, architects, engineers and economists to contribute to the development of a concept master plan. It includes: •Design ideas include simple boardwalks, bird hides and minimal structures to provide educational opportunities • An international cruise ship terminal to be operational by the 2018 Commonwealth Games • An integrated tourism hub, including luxury hotels, marinas, extensive waterfront parklands and world-class retail, residential and entertainment experiences • Central focus around the creation of a new island community on Wave Break Island and consolidating the role of Southport as the city’s CBD • Extensive rejuvenation of The Spit, ensuring public parklands, beaches and water activities are enhanced for now and future generations, in the same way the Southport-Broadwater Parklands have been redeveloped over recent years • Creation of a new Eco-Marine Park to generate new awareness of the natural habitat and marine life. COMMUNITY BENEFITS Central to this master plan is the provision of community benefits, including a significant increase in community green space and publicly accessible waterfront, enhanced existing open space, considerable new recreational activities, new roads and infrastructure, hospitality schools and much more. CRUISE SHIP TERMINAL LOCATION ASF Consortium is exploring two options for the location of the cruise ship terminal, as assessed by its team of Gold Coast and international leaders in design and engineering. These options consider City of Gold Coast feedback around maintaining Doug Jennings Park, together with environmental and dredging considerations and the ability to deliver a cruise ship terminal by 2018. PAGE 1/2 www.goldcoastevolution.com.au This fact sheet has been produced by ASF Consortium Pty Ltd. Whilst all care has been taken to ensure statements and representations are accurate at the time of publication, ASF Consortium Pty Ltd, its related entities and consultants do not warrant their completeness or accuracy. Any plans, projections, graphics and related information are indicative only, based o n the studies and analysis undertaken to date and are subject to change without notice. FACT SHEET CONCEPT MASTER PLAN 1: Cruise Ship Terminal located on the waterfront of Doug Jennings Park Proposed concept master plan only, to be refined through detailed engineering, design development and community consultation to meet government planning and environmental development approvals. CONCEPT MASTER PLAN 2: Cruise Ship Terminal located on the Eastern side of Wave Break Island Proposed concept master plan only, to be refined through detailed engineering, design development and community consultation to meet government planning and environmental development approvals. Feedback on preliminary concepts is welcomed by ASF Consortium and can be provided via the project website www.goldcoastevolution.com.au or calling 1800 483 261 (9am-5pm weekdays). It should be noted that concepts are preliminary only and subject to refinement through detailed engineering, design development and ongoing community consultation to meet City of Gold Coast, Queensland and Federal Government master planning and environmental development approvals. PAGE 2/2 www.goldcoastevolution.com.au This fact sheet has been produced by ASF Consortium Pty Ltd. Whilst all care has been taken to ensure statements and representations are accurate at the time of publication, ASF Consortium Pty Ltd, its related entities and consultants do not warrant their completeness or accuracy. Any plans, projections, graphics and related information are indicative only, based o n the studies and analysis undertaken to date and are subject to change without notice.