Rev Date Rev Description Date Description Existing Asphalt / Concrete Surface Existing Stone Sub-Base Existing Edging Kerb on Concrete Bed & Surround Kerb to be primed prior to laying KBI Flexi-Pave with XFP75 Binding Agent. Section Of existing Path Saw Cut & Break Out to Form tie in to existing Kerb. KBI Flexi-Pave HD 25mm Overlay onto existing surface cleaned & primed with XFP75 Binding Agent Do not scale from drawings, use figured dimensions 3rd floor, Stoker Hall, 16 only. Any discrepancies to be reported to the Harcourt Street, Dublin 2, architect immediately. All materials & workmanship to Republic of Ireland. comply with all current building regulations & building standards & codes of practice. Drawings to be read E -Mail: in conjunction with Architects specification, along olan.crowley@live.ie with all relevant consultants drawings & specifications. Mobile: +353 (0)878272686 C COPYRIGHT OF ARCHITECTS WORKSHOP LTD. ALL RIGHTS RESERVED. Drawing Title Tie in detail for overlay to existing surface Project Typical Details Client KBI Scale 1:10 @A4 Date 16/01/2013 Drawing No. - Drawn By RD Checked By OC Revision B