Tie in detail

Rev
Date
Rev
Description
Date
Description
Existing Asphalt / Concrete Surface
Existing Stone Sub-Base
Existing Edging Kerb on Concrete Bed & Surround
Kerb to be primed prior to laying
KBI Flexi-Pave with XFP75 Binding Agent.
Section Of existing Path Saw Cut &
Break Out to Form tie in to existing Kerb.
KBI Flexi-Pave HD 25mm Overlay onto existing
surface cleaned & primed with XFP75 Binding Agent
Do not scale from drawings, use figured dimensions
3rd floor, Stoker Hall, 16
only. Any discrepancies to be reported to the
Harcourt Street, Dublin 2, architect immediately. All materials & workmanship to
Republic of Ireland.
comply with all current building regulations & building
standards & codes of practice. Drawings to be read
E -Mail:
in conjunction with Architects specification, along
olan.crowley@live.ie
with all relevant consultants drawings & specifications.
Mobile:
+353 (0)878272686
C COPYRIGHT OF ARCHITECTS WORKSHOP LTD. ALL RIGHTS RESERVED.
Drawing Title
Tie in detail for overlay to existing surface
Project
Typical Details
Client
KBI
Scale
1:10 @A4
Date
16/01/2013
Drawing No.
-
Drawn By
RD
Checked By
OC
Revision
B