GENERAL NOTES TELECOMS WATER GAS CABLE TV ELEC HV ELEC LV ALT POSN OUTSIDE STOP VALVE CARRIAGEWAY 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS DRAWINGS AS APPROPRIATE. 2. ALL SETTING OUT COORDINATES AND LEVELS ARE BASED ON THE ORDNANCE SURVEY GPS DATUM AS INDICATED. 3. ALL SETTING OUT DETAILS SHALL BE VERIFIED ON SITE WITH THE ENGINEER. THE ENGINEER MAY REQUIRE MINOR AMENDMENT TO THE SETTING OUT AND/OR LEVEL DETAILS TO ENSURE PROPER TIE IN TO THE EXISTING CARRIAGEWAY AND/OR FOOTWAYS. 4. NO PRIVATE SURFACE WATER RUN OFF SHALL DISCHARGE ONTO THE PUBLIC HIGHWAY. 5. PRIVATE DRAINAGE AND EXTERNAL WORKS SHALL COMPLY WITH PART H OF THE BUILDING REGULATIONS AND ALL ASSOCIATED BRITISH STANDARDS (BSEN WHERE APPLICABLE) AND NHBC GUIDELINES. 6. ALL WORK WITHIN THE PUBLIC HIGHWAY WILL BE CARRIED OUT IN ACCORDANCE WITH THE REQUIREMENTS AND SPECIFICATION OF NORFOLK COUNTY COUNCIL. NO WORK SHALL BE UNDERTAKEN WITHIN THE PUBLIC HIGHWAY UNTIL A LICENSE HAS BEEN ISSUED BY NORFOLK COUNTY COUNCIL. 7. ALL PROPOSED ADOPTABLE SEWERS (EXCLUDING HIGHWAY DRAINS) AND ALL WORKS TO THE EXISTING PUBLIC SEWERS SHALL BE CARRIED OUT STRICTLY IN ACCORDANCE WITH THE WATER AUTHORITIES ASSOCIATION SPECIFICATION "SEWERS FOR ADOPTION 6TH EDITION" AND THE REQUIREMENTS OF THE WATER AUTHORITY . 8. ALL GULLIES, GULLY CONNECTIONS AND HIGHWAY DRAINS TO BE CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF NORFOLK COUNTY COUNCIL HIGHWAY AUTHORITY. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATIONS OF ANY EXISTING STATUTORY UTILITIES, ALONG WITH ANY ADOPTABLE AND PRIVATE DRAINAGE THAT MAY BE AFFECTED BY THE PROPOSED WORKS. IDENTIFICATION SHOULD SHOULD BE CARRIED OUT BY MEANS OF EITHER A CAT SCAN OR HAND DUG TRIAL HOLES. ANY DAMAGE TO EXISTING PLANT OR EQUIPMENT SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE. PUBLIC UTILITIES - PREFERRED LAYOUT IN FOOTWAY NOT TO SCALE NOTES 2.75m MINIMUM EXTENT OF VEHICLE ENTRANCE EXTENT OF CROSSING CONSTRUCTION 50x150 PRECAST CONCRETE EDGING TO BSEN 1340:2003. (TYPE EF) 1. PREFERRED LAYOUT FOR MAINS IN AN 2000mm MINIMUM WIDTH FOOTWAY FOR NEW WORKS, (WHERE THIS WIDTH IS TO BE PROVIDED AS PART OF THE APPROVED LAYOUT). 2. ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH NJUG GUIDELINES. 3. THE CONTRACTOR'S ATTENTION IS DRAWN TO THE ECONOMIC ADVANTAGES OF UTILISING "COMMON-TRENCHING" TECHNIQUES FOR INSTALLATION OF SERVICES IN FOOTWAYS WHEREVER PRACTICABLE. 4. THE MINIMUM DEPTH OF ANY SERVICE UNDER THE LOCATION OF A PROPOSED NEW ACCESS SHALL BE 850mm TO THE CROWN OF THE DUCT/PIPE. 5. THE CONTRACTOR WILL ENSURE THAT THE SERVICE BOXES TO THE PUBLIC UTILITIES PLANT ARE ORIENTATED SO THAT THEY ARE IN LINE WITH ANY BLOCKWORK AREAS, AVOID DROPPED KERBS (OF ANY TYPE) AND ARE IN GENERAL STRAIGHT TO THE KERB LINE. 6. SERVICES ARE TO BE PROTECTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE RELEVANT STATUTORY AUTHORITIES. 10. SITE CLEARANCE. EXISTING TREES, BUSHES AND SHRUBS SHALL ONLY BE REMOVED, INCLUDING GRUBBING UP OF ALL ROOTS, WITH THE PRIOR AGREEMENT OF THE ENGINEER. TRIMMING AND LOPPING OF EXISTING TREES SHALL ONLY BE CARRIED OUT BY AN EXPERIENCED TREE SURGEON AND APPROVED BY THE ENGINEER. 11. PRIOR TO COMMENCEMENT OF WORKS PLEASE REFER TO THE PRE-TENDER & CONSTRUCTION PHASE HEALTH AND SAFETY PLANS FOR FURTHER INFORMATION. 300 EXISTING PAVING 150 CONSTRUCTION AS TYPICAL SECTION PRECAST CONCRETE DROPPER KERBS TO BS EN 1340:2003 CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2007 PRECAST CONCRETE DROPPER KERBS TO BS EN 1340:2003 125x255 PRECAST CONCRETE KERB TO BSEN 1340:2003. (TYPE HB2) HOT POURED 50 PENETRATION BITUMEN PAINTED TO SURFACE OF JOINT PRIOR TO LAYING SURFACING 125x255 PRECAST CONCRETE KERB TO BSEN 1340:2003. DESIGNERS HAZARD INFORMATION FOR CONSTRUCTION IF YOU DO NOT UNDERSTAND THE RISKS INVOLVED DURING THE CONSTRUCTION OF ITEMS INDICATED ON THIS DRAWING PLEASE CONSULT YOUR MANAGER, SAFETY ADVISOR CDM COORDINATOR OF A MEMBER OF THE DESIGN TEAM. UNDER NO CIRCUMSTANCE SHOULD YOU PROCEED UNTIL YOU FULLY UNDERSTAND THE RISKS INVOLVED. UTILITY SERVICES TO BE LOCATED LIVE TRAFFIC FLOW CONSTRUCTION TRAFFIC DEEP EXCAVATION - COLLAPSE / FALLING LIVE SEWERS - FLOWS / LEPTOSPIROSIS MANUAL LIFTING / HANDLING HOT MATERIAL WORKING CUTTING / DUST 40mm MIN. DEEP SAW CUT THROUGH EXISTING CONSTRUCTION TO FORM NEAT JOINT 3.66m MINIMUM WIDTH AT KERB 4 No. 125x150 PRECAST CONCRETE KERB TO BSEN 1340:2003. (TYPE BN) TYPICAL DETAIL TIE-IN BETWEEN NEW & EXISTING BITUMINOUS CONSTRUCTION SCALE 1:10 PLAN SEE HIGHWAY GENERAL ARRANGEMENT FOR ENTRANCES ELEVATION CL CL TYPICAL KERB ARRANGEMENT OF VEHICULAR CROSSING SCALE 1:20 BITUMINOUS DETAIL AROUND CARRIAGEWAY MANHOLE CL IL DROPPED KERB DETAIL FULL HEIGHT KERB DETAIL SCALE 1:10 SCALE 1:10 EDGING DETAIL SCALE 1:10 KERB DETAIL TIE-IN TO EXISTING CARRIAGEWAY BL SCALE 1:10 BLOCKWORK DETAIL AROUND CARRIAGEWAY MANHOLE 150 400 6 Create Consulting Engineers accept no responsibility for any unauthorised amendments 380 REV DATE INCLUDED DETAILS AROUND MANHOLES TH AMENDMENT DETAILS 40 D. RA 16 24 Nov 2014 TYPICAL SECTION THROUGH DROPPED CROSSING SCALE 1:10 20141935 TACTILE SLAB DETAIL SCALE 1:10 DRAWN APPROVED ROAD GULLY DETAIL (NTS) HIGHWAY DRAINAGE CATCHPIT SCALE 1:20 PROJECT DATE LAND OFF SIRE WILLIAM'S LANE AYLSHAM NORFOLK SCALE(S) DRAWING STATUS 10.07.14 TENDER DESIGNED DRAWING TITLE ADOPTABLE HIGHWAY STANDARD DETAILS SHEET 1 OF 2 JOB No CLIENT DRAWING No DAVID WILSON HOMES GH DRAWN GH TH CHECKED APPROVED GH GH 633 500/060 REVISION A DO NOT SCALE 12.09.14 50 SEE BELOW A ORIGINAL SHEET SIZE - A0 Landscape 400