Capstone items and estimates 8-22-11.xlsx

advertisement
Suggested Extra Work Rehabilitation items
Location
Front Entry
Item #
1
Contract
Estimated
Value
Existing
Existing
$
$
6,000
11,000
New
New
New
$
$
$
12,000
1,000
2,000
Patch and/or repair damaged marble walls & stairs
New
$
5,000
Repair plaster, repaint all painted walls/ceilings
New
$
12,000
Repair failing plaster (cornice, dentil, flatwork)
9 Restore "faux travertine" plaster block walls - clean
if possible, paint as a last resort or other type
coating such as opaque stain
10 Clean/polish all marble surfaces throughout doorways, window sills, walls at stairs
11 Refinish wood doors and door frames throughout
(7)
12
Remove and clean all metal grating and radiators
13 Clean and paint all window frames - interior
14 Paint all plaster surfaces following repairs
15 Enhanced lighting - uplights at cornice and/or inside
skylight enclosure
New
$
25,000
New
$
23,000
New
$
14,000
New
$
14,000
New
New
New
$
$
$
2,000
1,000
11,000
New
$
13,000
New
New
New
New
$
$
$
$
22,000
22,000
20,000
20,000
New
$
5,000
2
3
Foyer/Main Stairs
Task Description
Additional landscaping - large pots or tree pits
directly in front of bldg
Enhanced building lighting (uplights/floods)
Repair/refinish existing wood main entry doors and
frames
Clean/paint handrail posts
Modify handrails to make ADA compliant
4
5
6
7
Main Waiting
Room
8
16
17
18
19
20
Modify three ticket windows for ADA compliance
Refinish wood benches - entire station
Rehab elevator cab and entry
Convert existing light to emergency lights
Provide framed artwork, such as historic station
photos, city photos, Amish life, etc
Restrooms
Concourse Bridge
21
44
22
23
24
25
26
27
28
29
30
31
32
33
34
Platforms
Exterior
foyer only - Paint restoration (strip peeling paint,
new paint, clean marble, add seating/décor
paint all plastered surfaces
Upgrade to ADA compliance
Clean and restore marble dividers and walls
New fixtures and accessories
New lighting
Strip walls, repair plaster throughout, repaint
Repair/replace broken doors
New
New
New
New
New
New
New
New
$
$
$
$
$
$
$
$
3,000
4,000
9,000
10,000
17,000
4,000
15,000
15,000
New
New
New
$
$
$
16,000
2,000
3,000
New
New
New
$
$
$
14,000
48,200
20,000
$
59,000
$
$
24,000
25,000
$
1,000
$
$
$
2,000
6,000
7,000
$
$
6,000
36,000
$
6,000
ESTIMATED COST
Deducts from existing contract
SubTotal
Contingency at 30%
Design Fees
Management Fees
$
$
$
$
$
$
593,200
25,600
567,600
170,280
30,000
35,000
TOTAL ESTIMATED COST
$
802,880
Enhance lighting - add cove lights and/or, doorway
lights, convert existing lights to emergency
Add artwork or other décor as in main room
Refinish benches (6)
Exterior - cap wood window frames/mullions 17
windows
Install new EPDM roof with new metal coping
Convert existing light to emergency lights
Long term consideration - air condition concourse,
replace all windows with non-sash windows
New
35 Rehab metal stair entirely (treads, risers, stringers,
handrails)
New
New
36 Rehab stairway wood enclosure
37
Modify existing handrails to make ADA compliant
New
38
Repair all concrete platform surfaces in pubic areas New
New
39 Repair missing/defective tactile tiles
New
40 Inspect/repair wood canopy components
41
Repair/paint freight elevators/ convert to storage
New
New
42 Visual Screening for HVAC Roof Top Units
43
Pedestrian Protection for Basement Window Wells
New