Underlying Cause Analysis Investigation Report <<INCIDENT TITLE>> <<date>> IQMS Incident No: << >> Brief Description of Incident: Background / Interview Information: Investigator Name: Interviewed: Report Prepared By: Last reviewed: December 2010 Hydro Tasmania – UCA Template CAUTION: Printed document is uncontrolled Revision: 1 Page 1 of 3 UCA Analysis STEP 1 WHAT WAS THE RESULT OF THIS INCIDENT STEP 2 WHAT WAS THE TYPE OF INCIDENT? Select one STEP 3 WHAT WERE THE IMMEDIATE CAUSES STEP 4 WHAT WERE THE UNDERLYING CAUSES STEP 5 THE ROOT CAUSES ARE Lost Time Injury (LTI) Medically Treated Injury (MTI) Minor Injury (MI) Near Miss Fire Hazard Environment Damage to Plant Damage to Equipment Loss of Production Struck by / struck against Fall / slip Caught in / on / between Contact with process fluid, electricity, heat Loss of containment Over-exertion Exposure to noise / heat / dust Exposure to gas Overpressure Fire / explosion Flooding UNSAFE ACT Working without authority Failure to follow procedures Not using safety devices Incorrect tools selected Improper lifting / movement Horseplay / inattention Failure to secure Improper position Rushing UNSAFE CONDITION Lack of guards Inadequate equipment Defective tools Congested workplace Inadequate warning system Fire hazard Noise / heat / dust / light Poor housekeeping Poor ventilation PERSONAL FACTORS Inadequate capability of individual Lack of knowledge Lack of skill Motivation (lack of, or too much) Stress - physical Stress - psychological JOB FACTORS Inadequate leadership / supervision Inadequate engineering Inadequate purchasing Inadequate maintenance Abuse or misuse Poor process design Inadequate work standards SYSTEMS FAILURE i.e. inadequate Leadership & accountability Customers and products Risk assessment & management Communications People, training & behaviours Emergency management Engaging & working with contractors Incidents analysis & prevention Design, construction & change Health and hygiene Safe work practices & rules Hiring & placement Reward & recognition Measurement & evaluation Information & documentation Planning & scheduling N.B. – for each box that you ticked please expand on information in sections below Last reviewed: December 2010 Hydro Tasmania – UCA Template CAUTION: Printed document is uncontrolled Revision: 1 Page 2 of 3 Incident result Type of Incident Immediate Causes Underlying Cause Root cause Other findings Recommendations Actions entered into IQMS RECOMMENDATIONS 1. 2. 3. 4. 5. 6. 7. Last reviewed: December 2010 BY WHO Hydro Tasmania – UCA Template CAUTION: Printed document is uncontrolled BY WHEN Revision: 1 Page 3 of 3