Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 PROJECT PLAN PROPOSAL SHORT FILM PROJECT “CARMA” Gerry Kanter, Filmaker OTTAWA, ONTARIO Author Gerry Kanter MARCH 1 2006 SYNOPSIS: A narrative story and a series of character monologues are intertwined to explore the question and the meaning of Karma Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 SHORT FILM PROJECT “CARMA” TABLE OF CONTENTS Introduction………………………………………… 3 Project at a Glance…………………………………… 4 Story Summary………………………………………… 5 Project Summary……………………………………… 6 1.1 Objective…………………………………….. 1.2 Format and Length………………………….. 6 1.3 Equipment……………………………………. 6 1.4 Labour…………………………………………. 6 1.5 Locations and Sets…………………………… 6 1.6 Project Management…………………………. 6 1.7 Financing………………………………………. 7 1.8 Marketing………………………………………. 7 1.9 Distribution…………………………………….. 7 1.10 Reimbursement……………………………… 7 Budget Summary…………………………………………. 8 Schedule and Milestones ….……………. ……………. 9 Cast & Crew Assignments….…………………………… 10 Procedures …………………………………………. 13 Appendix I– cost estimates table 12, 13 Appendix II – Revenue sources 14 Appendix III– General procedures 15 Appendix IV– Checklist 16 Appendix IV– Contingency 17 Appendix IV– Cast selection 18-19 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 INTRODUCTION DIRECTOR’S STATEMENT I have worked hard to get things done right! I have secured locations, done cast selections, and researched financing; in short I believe I’m on track to creating something that can be broadcasted without licensing issues propping up. I’m doing all the work up front to guarantee I stay within schedule and budget. This process has consumed a lot of my time for the last few months, but I think is worth it because of my belief in the story and the project, but it doesn’t mean I’m incapable of improvising and making a compelling story come out. I have been involved in various film, and television projects, and I am offsetting the risk of unplanned events and inexperience by using a group of very qualified cast and crew. My DOP has several films made, the same with all the other techs and trades. The cast has several backups just in case, and they are all experienced actors and extras, The budget has been thoroughly researched and the schedule planned carefully. Increasing the chances of this film getting done on schedule and on budget. PURPOSE OF THE FILM Some day’s things just don’t seem to go your way. That happened to me last winter when I got a flat tire in my newly purchased car. It was Hell. Temperature was at an all time low of -45, no tow trucks available and a flat spare. To top it all I even broke my car keys trying to pry loose a frozen air nozzle. The whole thing played out like a tragic comedy, almost as if planned by someone else at my expense. On the other hand it could have just been a case of improbability stretched to its limit. It was during this time that I realized this ordeal would make a great movie. The absurdity of my situation and the questions it raises are what I propose to put on film. Everyone at some point in their lives may have believed that life was conspiring against them, but I hope this film will ask the question of who controls our destiny. The simple story of a man’s luck (or lack thereof) may well be an old one, but what makes this one special is the fact that it happened to me. Along with the simplicity of the story, my personal opinion is that the art in filmmaking is found in the composition of the shots and the flow of the story. To use a cliché, a picture holds a thousand words; therefore I will use a combination of camera setups, lighting and mood styles, to tell a compelling story in visual terms. What makes the story structure unique is the way that I plan to combine my narrative with a series of improvised monologues, each of which will argue a point of view related to the meaning of Karma. These talks will be condensed from a series of arguments in order to create the illusion of a intimate conversation. By breaking the story down into this two elements I can raise questions and add an element of surprise to what is a straight forward plot sequence. The characters in each elment would be independent from each other, but the theme itself is what brings them together. While one side talks about a concept, the other one experiences it first hand. I think this is a duplicate of what an audience would be thinking when they ask themselves questions about some of the points explored. Monologues have been used by Shakespeare to explain internal points of view, which is what I’m hoping to accomplish by integrating them with the narrative. 3 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 PROJECT AT A GLANCE Project: CARMA Format: 35 mm film Length: 10 minutes Budget: $3820 Shooting Schedule: 3 days Production Schedule: 6 months TASKS COMPLETE STATUS HAVE NEED CAST 95% 4 cast for narrative 4 cast for monologue 8 standby and extras Draft agreement Schedule scenes & actors LOCATIONS 90% Release from telephone company Found two garage locations Release from gift stores Home location release CREW 70% 1 DOP on board 5 Production assistants 2 Drivers 1 sound technician grip and light person photographer video camera operator GRANT APPLICATIONS 50% IFCO application minor grant complete Research on alternate funding Contact TV network for sponsorship Contact distributor in montreal BUDGET 50% 31% personal financing ($790) 28% from deferrals – labourcost ($1080) 32% grant or sponsor ($ 1250) 20% fundraising ($700) FUNDRAISING 20% Search venues for event Prepare info packages Contact family friends public Collect items for auction Contact bands/ DJ’s RELEASES AGREEMENTS 20% Draft for conditions and terms Review with lawyer Final release forms approved SPONSOR DONATIONS 10% Approach potential stores for services Find a food sponsor for discounts Draft agreements POST PRODUCTION 10% Researched options, resumes Find editor Find composer Secure music rights 4 City of Ottawa permits Car company releases Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 STORY SUMMARY ACT 1 “the chase” A man runs with a package chasing after a bus. The package falls and a box of nails falls onto the street into some water. The man comes back and leans over to reach for the box. A car speeds by over the water completely soaking him. KARMA & DIVINE JUSTICE - MONOLOGUE FOR RELIGION The scene takes place inside a kitchen. A chararcter is washing dishes and preparing for dinner. She talks to the camera as she moves around the room. The discussion centers on the idea of reaping what you sow, and divine retribution. ACT 2 “the flat” the car driver stops to make a phone call. When he returns he finds his car has a flat tire. He checks the trunk but there is no spare he tries to call a tow truck but is unable to get one. His only choice is to head home and grab the spare. KARMA & RECIPROCITY - ARGUMENT FOR NUTURE This scene takes placestage changerooom. An actor removes makeup in front of a mirror; he talks to the camera as if tit was an interview. The discussion focuses on tragedy of life and the grand stage we all perform in. the final act he walks onto stage and the curtain closes ACT 3 “the tow” The driver returns with the spare, but finds his car is gone. Realizing it’s been towed he heads to the impound garage. Instead of paying extra he decides to fix the flat tire himself. In the process he breaks his ignition key while trying to unarm an air hose. KARMA & RATIONALITY - ARGUMENT FOR SCIENCE In this scene takes the character plays chess on a park bench. He ponders the next move and talks to the camera. He focuses on how even the most perplexing questions have a simple explanation ACT 4 “the date” the drives pulls up to a house wher his date for that night awaits. He goes insid e to greet her and waits while she gets ready. Walking into the kitchen he finds a man wearing a bathrobe. It’s the same man he splashed earlier that day. KARMA & COINCIDENCE - ADVOCATE FOR LOGIC In this case the character is dressed in uniform inside a gloomy corridor. He slowly walks and follows the camera as he talks about probability and game theory ACT 5 “Down and Out” The driver gets kicked out of the woman’s house. He sheepishly walks out to the curve, sits down and wonders how things could’ve gone so wrong. He notices a penny lying on the road. As he reaches over to grab it a car speeds by soaking him. KARMA & FATALISM - ADVOCATE FOR DESTINY The last scene takes place inside in a bar with a character of a waiter. He talks about the futility of understanding destiny, how maybe there is no reason for things. He serves a drink and brings a trait to a table where the other four fates are seated. He joins in a game of cards. 5 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 PROJECT SUMMARY 1.1 OBJECTIVE The main goal is to plan and produce a short film ready for distribution for the summer of 2006. Total Budget will be $3465 between deferred and direct cost. 1.2 FORMAT & LENGHT The film will be shot in 16mm colour stock film, with an option to upgrade to 35mm if sufficient funding is secured. Additional backup footage will be shot in HD video to create trailers and behind the scenes material. Total screening length will be 20 minutes with a 3:1 shooting ratio 1.3 EQUIPMENT, SERVICES & SUPPLIES The bulk of the production costs will be the rental of equipment, and film supplies. The remainder will include technical services such as, lab work, craft services and editing. Supplies like film and sound tape will be quoted and purchased according to budget estimates; equipment and services will be procured as required using the budget estimates as a guideline. A 1.4 LABOUR The production relies on an experienced technical crew and professional actors in order to offset problems along the way. Labour cost for cast crew and production will be deferred until sufficient revenues from distribution deals can be obtained to cover the costs. Agreements, releases and one-time fees will be negotiated and signed with everyone involved in the production of the film 1.5 LOCATIONS Many of the shots will be done on public location for which a good weather and daylight conditions are required. Permits from the city of Ottawa will be obtained as required. Any private locations used in the film will require consent and releases agreements signed. Major locations include mechanic’s shop, gift store, home interior, and interior of car. 1.6 PROJECT MANAGEMENT In order to accomplish the goals set out, extensive planning is required in the preproduction stage. A thorough budget and estimates will help keep track of cost issues. Difficult shots and scenes have been broken down into detailed storyboards. A set of casting call sheets will be completed to ensure shooting stays within schedule. Backup equipment and material will be on stand by to offset any shortcomings. 6 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 1.7 FINANCING A financial strategy has been developed in order to break down the process and source of funding for this movie. A major portion of the funding will be covered by a grant or a deal with a distributor. Loans savings and a fundraising event will be held to obtain the remainder amount. The breakdown is as follows: - Grant - 32% Covers film supplies and equipment - Deferrals - 28% used to cover the actors an crew labour costs - Personal - 20% money coming from my own finances including savings and loans - Fundraising - 20% funds raised through family and friends and investors 1.8 ADVERTISING AND MARKETING The objective is to ensure that different promotional avenues are identified and used to spead word about the film. The following are some of the potential sectors to target the promotional campaign and the method needed - Personal. DVD copies for cast crew and sponsors - General Public. Movie website, posters and flyers. - Investors. Proposal package, budget estimates and royalty agreements - Film Distributors. Copies of film, proposals, presee releases - Film Festivals. Media package, including a letter, pictures and trailer - Media Outlets. Media package behind the scenes footage, and stills photos. 1.9 DISTRIBUTION The goal is to reach distribution agreements with a television broadcaster or a short film distributor. By ensuring the project releases and rights acquisitions are secured it would make for a more appealing product ready for commercial distribution - Local Screening Local exhibition to be done at events that cater to digital video. Organized within a month of film’s competition. - Film Festivals 1st run targeted mainly to North American film festivals that caters to digital Film. Submission To Be Made For Spring Of 2006 Exhibition. - Network Television Exclusive 1st and 2nd window distribution rights to be negotiated with arts, comedy, independent film, channel for a term contract of less than 6 months. 1.10 REIMBURSEMENT STRATEGY* In order to cover labour costs, the movie will first have to generate revenues from distribution deals. For the time being payments will be deferred. Any money made will be distributed as a one time fee set out on signed agreements as follows: - Direct Investors - includes any repayment of loans and royalty agreements - Production Staff - official cast and crew used at time of production - Pre-Production - producers, assistants, writer, director. - Post Production Staff - editor, post-sound and composer. *The following guideline will only be used in the event that this film project generates revenue as a result of distribution and/or exhibition agreements. All amounts paid out will be based on a one time fee determined by the cost sheets used to create the budget 7 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 BUDGET SUMMARY* ABOVE THE LINE A B C D Story / writer (1) Director fee (1) Producer fees (2) Development Costs $200 + $100 + = $300 deferred deferred deferred direct $50 $50 $100 $100 TOT $300 deferred deferred direct direct direct $300 $480 $835 $500 $1005 TOT $3120 Direct Direct $200 $200 BELOW THE LINE E F G H E Cast (4) Crew (12) Supplies / Equipment Expenses Professional services $780 + $2340 = $3120 BOTTOM LINE G F Taxes (14% sum) Contingency** $200 + $200 = $400 TOT $400 (Differed = $1500) + (direct = $2385) = TOTAL EXPENSES $3820 FUNDRAISING A B C E G Labour, cast and crew Writer fee / director / Producer fees Fundraising Event ($10 x 60) Equipment and services donations Personal investment deferred deferred pending pending secured $780 $300 $500 $100 $390 TOT $2190 pending secured $100 $400 INVESTORS / LOANS J K Stockholders ($50 x 2) Line of credit TOT $580 GRANTS M N pending pending IFCO grant TV network distributor $1250 $1000 TOT $1250 * assume only one (Deferred = $1080) + (Pending = $1950) + (Secured = $790) = TOTAL REVENUE $3820 * All amounts paid out will be based on a single one time payment determined by the cost sheets used to create this budget. See additional appendix details for information on cost estimates and accounts. **Contingency calculated using direct cost only at 15% rounded up to nearest figure 8 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 SCHEDULE & MILESTONES Preliminary Schedule** 1 month + before Feb 23 to march 23 Planning, scheduling and budgeting complete Casting call, reviewed and selected 2 weeks before March 24 to April 6 Locations, researched and secured Storyboards and shot list ready Fundraising completed April 7 to April 13 Hiring remainder support crew Order stock film material Equipment / supplies list + contingency Major crew interviewed and selected April 14 to April 18 Rehearsals & FX trials Equipment list rental prepared Final production schedule Final Agreements signed. April 19 Verify contingency plan, changes to schedule Pick up supplies and equipment, Prepare/test equipment and special effects Day 1 April 20 Act 1 “the Chase” Act 2 “the Flat” Act 3 “tow garage” Day 2 April 21 Act 4 “the date” “flashback to garage” Act 5 “down and out” 5 Monologues Day 3 April 22 Contingency day – film extra footage as required April 23 to April 31 Send film for processing Compile stills and shots Prepare Music and score Organize raw sound and film material Begin website and promo design 3 weeks after May 1 to May 15 Obtain work print/transfer to DV Begin film editing Begin arrangements for first screening 1 month after May 16 to may 23 Complete sound and film editing, Prepare final print and copies Assemble promo material 2 months after May 24 to June 24 Opening Screening Organize release event party 3 months & after June 24 to July 24 Prepare copies to be sent out to cast and crew Assemble and prepare promo packages as required 1 weeks before Pre Production 4 days before 1 day before Shooting* 1 week after Post Production *This is a preliminary version of the production schedule. It shows some of the major stages of the project and the sequence that they will be completed in. A more detailed schedule will be used once the technical details and final dates have been set. ** All shown dates are subject to change as required by final production schedule 9 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 2 CAST AND CREW ASSIGNMENTS Table 2 Production Credits* GROUP HEAD (4) CAST (6) CREW (9) POST (3) TITLE ASSIGNED TO TASK DESCRIPTION 1 Producer Gerry Kanter Planning, Scheduling, Budget, Financing. 1 Writer Gerry Kanter Script, scene changes, character dialogue. 1 Director Gerry Kanter Cast call & scheduling, scene setup, lighting camera set up,. 1 Production Assistance Angela Thompson Jason Daley Crew call & scheduling. Manage crew and production assistants 1 Lead Jason Daley Corry Burke (backup) Protagonist, 25-30yrs, driving, running, stunts, dialogue 1 Support 1 (man) Ron Tarrant Gillian S (backup) 40-50yrs, running, stunts 1 Support 2 (mech) Matt Miller Corry B (backup) 25-30yrs, dialogue 1 Support 3 (girl) Caitlin Delaney Eugenia Teoflovik (backup) 25-30yrs, dialogue 2 Driver/ Extras Pending Driving, traffic control 1 Camera Operator Sean Mcveit DOP, Light scene, focus and effects 1 Sound & Boom Pascal Aka Operate recorder and boom 1 Gaffer Pending Set Up lights, stands, clamps, etc. 1 Production Asst. #1 1 Production Asst #2 1 Production Asst #3 Eugenia Teoflovik Nicholas Burton Runners, special effects, scene dressing wardrobe, dolly pull 1 Hair & Makeup Pending Prepare cast appearance as required. 1 Photos / Video Kevin Wong Document behind the scenes, record and interview 1 Food Services Pending Purchase, prepare meals, re-stock, clean up 1 Film Editor Pending Add film together, mix sound and sync dialogue 1 Sound Editor Steve Macleod Edit sound effects, add folly sound, mix dialogue and music 1 Composer Steve Macleod Compose and record original music score Gillian Street Sammy Osman Caitlin Edmond Colleen Sutton Assist gaffer, sound & camera operator Script, release forms, continuity *This is a preliminary version of the assignment schedule. It shows some of the major tasks of the project and who is responsible for their completion. A more detailed schedule will be used once the technical details and final dates have been set. 10 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 SUPPORT MATERIAL SHORT FILM PROJECT “CARMA” APPENDIX I TO VII PROCEDURES SECTION A NARRATIVE SCRIPT SECTION B MONOLOGUES SECTION C STORY BOARDS SECTION D LOCATION SCOUT SECTION E RESUMES Gerry Kanter, Filmaker OTTAWA, ONTARIO Authors: Gerry Kanter MARCH 1 2006 11 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 APPENDIX I COST ESTIMATES ABOVE THE LINE COSTS Role / Task Description Qty Unit Rate (fee) TOT A Director fee One time fee (deferred) 1 Fee $50 $50 B Producer fee One time fee (deferred) 2 Fee $100 $100 C Story / writer One time fee (deferred) 1 Fee $50 $50 D Development advertising copies gas etc 1 Fee $100 $100 TOTAL $300 Rate TOT BELOW THE LINE COSTS E F G Role / Task CAST Lead Actor Support Actors Extras Stunts / Drivers Description Qty Unit One time fee (deferred) One time fee (deferred) One time fee (deferred) One time fee (deferred) 1 3 2 2 Fee Fee Fee Fee $60 $60 $30 $30 $60 $180 $30 $30 $300 CREW DOP / Camera Sound & Boom Film Editor Gaffer Production Assistant Hair & Makeup Sound Editor Special Effects Photos / Video Food Services One time fee (deferred) One time fee (deferred) One time fee (deferred) One time fee (deferred) One time fee (deferred) One time fee (deferred) One time fee (deferred) One time fee (deferred) One time fee (deferred) One time fee (deferred) 1 2 1 1 5 1 1 1 1 1 Fee Fee Fee Fee Fee Fee Fee Fee Fee Fee $60 $30 $30 $30 $30 $30 $30 $30 $30 $30 $60 $60 $30 $30 $150 $30 $30 $30 $30 $30 $480 EQUIPMENT / SUPPLIES Camera 16 mm film Stock Field monitor Light Kit Incidentals Track and Dolly 8mm Movie Stock Video Film tape Sound Kit Sound Stills camera Digital Editing Suite Recording Studio FILM camera (wknd) 400 ft rolls x 3 @ $ 200 1 total (wknd rate) Arri light kit Extras (slate, bulbs etc) 1 total (rent) Super 8 film in 50ft rolls 2 tapes 240 min DAT, boom, mike, etc DAT 60 min long tapes 35mm still Camera film Rental eve rate (6pm) Rental eve rate (6pm) 3 3 3 2 3 2 3 2 3 2 3 1 1 $25/wknd $150 $15/wknd $30/wknd $10/day $15/day $12 $12 $15/day $10 $20 $25 $50 $35 $450 $25 $30 $40 $30 $36 $24 $45 $20 $20 $30 $50 day rolls day day day day rolls tapes day tapes roll day day $835 12 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 BELOW THE LINE COSTS H Role / Task EXPENSES Description Qty Unit Rate TOT Meals (Shoot) 15crew @ $5/each = $90day 2 days $90 $180 Hair & Makeup Transport Kit with supplies, incidentals 1 Runner cars, parking + gas 1 2 Kit Cars $30 $20 $30 $40 Office Supplies Props & Effects Copies, Prints, Pencil Tablets Lump sum 1 1 Set set $50 $200 $50 $200 $500 I PROF. SERCIVES 16mm Processing 16mm Transfer $0.14/foot x 1000 Transfer to HD 3 Hours $10 $450 $400 Still film development 8mm Transfer (digital) 3 rolls w/ enlargemnts Transfer to HD ($5) 3 1 rolls fees $5 $50 $15 $50 Videographer CD Burn Copies 2 roll of tape @$10.00 Multiple DVD and/or VHS copies 2 50 roll Copies $10 $1.00 $20 $50 $1005 13 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 APPENDIX II REVENUE SOURCES REVENUE MIX - Arts Grant - 32% Covers film supplies and equipment - Deferrals - 28% used to cover the actors an crew labour costs - Personal - 20% money coming from my own finances including savings and loans - Fundraising - 20% used to raise funds and awareness of local filmmaking. COST ACCOUNTS Above the Line Cast Crew Supplies & Equipment Grants $1250 Investors $100 Deferred $1080 Donations $100 Loans $400 $100 Personal $390 $110 Fundraiser $500 TOTAL $3820 Expenses $625 Professional Services Contingency Taxes $100 $100 $100 $100 $200 $200 $625 $100 $300 $300 $480 $100 $300 $300 $480 $835 14 $80 $100 $300 $200 $500 $1005 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 APPENDIX III PROCEDURES Table 1 General Procedures MAIN OBJECTIVE To successfully organize, plan, and implement the production of a short film to be completed and ready for Canadian distribution by the spring of 2006. Direct cost will be kept under $1500 and a running length of no more than 10 minutes DELIVERABLES Production Plan Including schedule, budget, cast sheets, storyboard, locations, releases Working Print Film version for theatrical release. Broadcast Copy. Finished ape meant for distribution to festivals and television broadcast. Distribution Agreement. Complete method of screening film TECHINICAL REQUIREMNTS Movie will be shot in 16mm stock with some segments done with 8mm film. The movie will be upgraded to 35mm if enough money can be raised Shooting ratio for film of 5:1 also filmed on digital video as back up strategy. Still shots and behind the scenes footage to be used for behind the scenes outtakes Production equipment to be rented from IFCO and saw cable as required. PRODCUTION CREW Daily crew minimum of 5 people, maximum of 15. Minimal experience for lighting gripping and production assist. Hire highly experienced DOP, sound person and editor. Schedule crew rotations in 6-8 hour time slots. Able to provide own transportation and parking to and from location. 1.5 SET PROCEDURES The final length of the short will be under 20 minutes Production from beginning to end will be approximately 6 months 2 shooting days, one for contingency, mostly on weekends Normal production day to run from 6am to 6pm. Two half hour breaks provided for lunch and dinner All labor cost will be deferred by cast and crew for the production of the film. 1.6 CAST AND ACTORS Hire local actors with lots of experience in theatre or film. Obtained signed release form for all cast, crew and stakeholders. Able to commit for entire shooting schedule, and at least one post session. 1.7 PRODUCTION ASSITANCE Use Production manager to find locations and secure rights and agreements Assistants used as drivers, runner’s extras & stand-ins. 1.8 FOOD SERVICES Food supplier to work independently from technical film crew. Lunch and snacks supplied for each day of shooting. Most meals to be home made to save on costs. 1.9 LOCATIONS AND SET Locations and sets to be found within City of Ottawa core. For driving scenes find locations with low traffic flow. Level streets. Try to find nearby access to water and washroom facilities. Obtain prior consent from property owners to shoot inside locations. 1.10 MEETINGS AND REHERSALS Set up one Start up meeting to brief cast and crew on production details. Daily production meeting to brief directing staff before shooting begins. Ensure a dry run rehearsal to be completed for both cast and crew a few days. Produce e-mail letter to report back to principal investors on progress every 4 months. 1.1 1.2 1.3 1.4 *The following guideline will only be used to highlight the tasks at hand and be used to draft any documents or agreements regarding roles and responsibilities of individuals involved in production 15 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 APPENDIX IV CHECKLISTS Table 2 Task Checklists Pre Production Check Prepare overall project document to serve as basis of contract Schedule of milestones, events, Gantt chart and work breakdown Estimate cost and sources of revenue, documents and research Contact potential actors and smaller crew members, arrange space book schedules Request and Contact potential DOP, sound, FX’s and editing staff Request and Contact videographer to do behind the scenes option Prepare, score sheets, questionnaire and other evaluation documents Set up casting space and volunteers, facilitate audition, pick up supplies Collect, organize, evaluate information, prepare cast sheet, contact selections 2.1 PROJECT PLAN 2.2 CASTING & CREW SELECTION 2.3 BUDGET AND REVENUE Finalize cost estimations & accounts, risk analysis and constraints Prepare documentation to approach investors, donors and grant committees Approach and finalize applications, contracts and agreements for funding. Schedule to collect, donations and loans and grants, prepare cash flow 2.4 LOCATIONS AND RELEASES Prepare documentation letter to approach businesses Determine required permits, list of businesses and locations required Approach and finalize release forms for cast, crew, location owners and incidentals Determine required permits, list of businesses and locations required Production Check 2.5 2.6 SETUP Day before shoot, pick up equipment, supplies, arrange for parking and storage Check contingency plan, verify location, weather and traffic Hold production meeting, confirm schedule last minute rehearsal and equipment checks. Ensure all release forms are complete SHOOTING Set up camera sound & lights, special FX, makeup and crew Record scenes, review video and sound, write production notes, record set photos and behind the scenes footage. Redo scene as required, collect audio background and folly sound backups. Wrap up & move to next location, collect equipment, catalogue footage, sound, verify production notes, record scene & dialogue changes. Final check of footage and sound, determine re-shoots and changes. adjust schedule, Record costs for the day, production notes, accounts and receipts. Post Production Check 2.7 CREATE FINAL COPY 2.8 MARKETING AND PUBLICITY 2.9 DISTRIBUTION 2.10 WRAP UP & CLOSING Review and organize footage and sound, incorporate production notes Begin editing rough copy, mix time code and notes Prepare music score, Master mix of video and sound, re-record dialogue, and folly Copies ready for distribution. Prepare documentation and press releases Create list of media organizations, festivals and events to showcase film Approach and finalize applications and exhibition arrangements Organize local screening, create and distribute publicity material. Plan promotional strategy for festival screenings. Costs, travel, press releases etc Create final list of interested networks, private distributors, and public organizations Prepare applications, legal documents and organize release forms. Approach and finalize distribution agreements Implement reimbursement of any revenue as set out in strategy. Implement reimbursement strategy as required, balance cost and revenue sheets Compile all notes and information to create project report Include lessons learned, evaluate risk analysis estimates with actual results Bind information and make copies for future reference. 16 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 APPENDIX V CONTINGENCY Table 3 Production Contingency Plans 3.1 Risk type Prob. Cost Trigger Response Side Effect 3.2 Rainy Day 70% $200 1day Forecast day before = rain Extra day Interior shots on standby $140 risk amount gas, food 3.3 Missing cast or crew 60% $200 1day Night before Backup list cast Re-schedule of shots $120 risk amount Backup list Confirm day before 3.4 Location not available 50% $200 1 day Day before Check days before Backup locations $100 risk amount pay to find location 3.5 Fundraising insufficient 50% 50% funding line of credit $1200 missing week approach new financiers 1 week before cost cutting 3.6 No water for FX 50% $200 1 day No close access 3.7 Crucial equipment not available 50% $200 1 day Standby list of suppliers 2 days before Change in schedule Change in script 3.8 Permits or releases not 35% secured on time $400 2 day Day before Cover trademarks New camera shots list Ask Permission after $100 risk amount Changes to shots - editing Changes to script 3.9 Major Car malfunction 30% $200 1 day Unable or unsafe to drive Second car in standby Money to fix car $60 risk amount pay for repairs 3.10 Daylight insufficient or overcast 30% $200 1 day Forecast for rain Additional lighting Power generator $60 risk amount pay for equipment 3.11 Film stock not available 30% Or not in budget $200 1day No stock 1 week before Find new supplier Change stock Change format $60 risk amount Proposal changes 3.12 Heavy Traffic on location 25% $200 1 day Traffic control Alternate location $50 risk amount pay for equipment 3.13 Film camera misses crucial shot 20% $200 1 day Review of prints Use Second camera 2 takes ratio 3:1 $40 risk amount pay for camera and tape 3.14 Injury of personnel 10% $500 1 day Significant injury First aid kit Release form - insurance Trained stunt person $50 risk amount Purchase policy Buy fist aid 3.15 Equipment failure or damage 10% $1000 1 day Significant injury Release form - insurance Stand by replacement $100 risk amount Purchase policy Shooting angles & makeup New location Container & pump $ 600 loan to keep shooting Change in format New plan, revisions $100 risk amount pay for hose-pump $100 risk amount pay for replacement *the risk amount is the result of probability time impact and should be less than the entire amount for contingency funds which is $200. the solutions are suggested strategies for the problem 17 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 APPENDIX VI CAST SELECTION 18 Film Proposal Gerry Kanter gkanter2@hotmail.com 613 730-3072 19