Quality Audit of Diesel Loco POH Workshops CHECK SHEET Item Description Reference Documents, Annexures, Further details on check sheet etc. Compliance of POH Schedule: General Safety items Schedule of standard examinations: MP-Misc-140/141 (for Alco locos). -doLoad Test MI No MP.MI-10 (Rev 0.02), Aug 2003. (for Alco locos). Quality of POH: Load Test records: HP SFC EGT Peak Firing Pressure Methodology of collection of failures on locos turned out by shops, failure investigation, analysis and preventive action. Display of work instructions on shop floor Training of staff Status of record keeping Calibration of gauges/ instruments a. Speed recorder/Indicator Section b. Wheel (Wear adapted profile) profile & other defects. c. Brake adjustment, release & and application timings. d. Headlight focus adjustment e. Horn maintenance f. Undergear safety brackets g. Gauging of Couplers h. Vertical offset between Side bearer and centre pivot a. OEM’s maintenance manual. b. Drg No SKDL-2561 Alt 8. c. Standard test scheme as per MP.TP-029/87 (Rev 02) Oct 2008 for Air Brake, and, as per MP.TP-019/81 (Rev 02) Nov 08 for dual brake locos. d. IB No MP.IB.EC.01.08.06 (Rev 0) December 06. f. MI No MP.IB.BD.02.16.01 (Rev 01) December 09. g. CBC Manual No G 76 Sept 87. h. MI No MP.IB.VL.02.11.10 (Rev 00) February 10. Page 1 of 104 Quality Audit of Diesel Loco POH Workshop Quality of Subassembly repairs (important items) Implementation of modifications Material Any other item a. Expressor/Compressor b. Air Brake Section c. Bogie section d. Rotating Machines Section e. Turbo section f. Engine Block, Crankshaft and Main bearings g. Cylinder Head , Piston and Valve section h. Radiator section. i. FIP/Injector Section j. Governor Section k. Electrical Control Section l. Battery Section m. Under-frame, side buffers, cow catcher, couplers, superstructure/Upper-frame, roof, driver cabin, hand rails, fuel tank, loco painting/marking/stencilling etc. a. b. c. d. e. f. g. h. i. j. k. l. m. Further details of check sheet covered in Annexure 1. -doFurther details of check sheet covered in Annexure 2. Further details of check sheet covered in Annexure 3. Further details of check sheet covered in Annexure 4. -do-do-doFurther details of check sheet covered in Annexure 5. -do-doFurther details of check sheet covered in Annexure 6. As per modification sheets/Instruction Bulletin’s issued by RDSO/DLW/HQ. Availability of critical items Procurement from unapproved sources, if any. As decided by the auditing authority Page 2 of 104 Quality Audit of Diesel Loco POH Workshop Annexure-1 CHECK LIST FOR TECHNICAL AUDIT AT POH WORKSHOPS (BRAKE ITEMS) S.No. Item 1. Whether all the items prescribed in the schedule is being followed for brake equipment, compressor /Expressor & air dryer or not 2. Functioning of VCD 3. Test benches and rigs 4. Test on Loco after POH 5. Infrastructure facilities Parameter As per Schedule of standard examinations ` (No. MP.Misc.-140 & 141, Rev-01, September’2006) 1. Whether maintenance is done as per RDSO MIs or manufacturers MI mentioned in MP.Misc.-140 & 141. 2. Maintenance facilities are available or not. Whether functioning of VCD is being checked in every POH schedule. 1. Whether the required test bench and rigs are available or not viz. AB test rack for brake valves, air dryer test bench, compressor/ Expressor test bench etc. 2. Whether, testing is done on above test benches. 3. Calibration of test benches and rigs is being done periodically or not. Whether brake system check is done on loco as per test programme no. MP.TP-029 (for air brake loco) & MP.TP-019 (For dual brake loco). (a) Whether dust proof and controlled temperature environment for maintenance, assembly and testing of brake valves is available. (b) Availability of compressed air (in test benches. (c) Availability of compressor in air lines. (d) Whether air dryer provided in test benches/ air lines. (e) Reservoir pressure is being checked or not (f) Washing facilities Page 3 of 104 Quality Audit of Diesel Loco POH Workshop Observations 6. Storage of material 7. Availability of Material 8. Human Resource development 9. Any other observation (g) Painting facilities (h) Technical Cell (i) Metrology lab (j) Store (k) Tool room (l) Fire extinguishers (m)Material handling facilities for movement of material and components. Whether dust/damp proof environment with controlled temperature is available for storage of brake equipment and rubber components. Whether rubber components are being stored as per guidelines mentioned in this office letter no. SD.DEV.RBC dated 28.02/07.03.2007 circulated to all Zonal Railways. Any Chromic shortage of material for maintenance Whether periodic training is being imparted to maintenance staff to make them conversant with the maintenance practices. Page 4 of 104 Quality Audit of Diesel Loco POH Workshop Annexure-2 CHECK SHEET FOR CONDUCTING TECHNICAL AUDIT OF BOGIE AT POH WORKSHOP (ALCO LOCOMOTIVE) SN Activity 1. Overhauling/Inspection Alco Series Cleaning of bogie frame Alignment of bogie frame (including tramming) a) Wheel base spacing b) Transverse pedestal spacing c) Longitudinal pedestal spacing d) Pedestal bottom alignment e) Motor nose suspension lug squareness & spacing Crack detection, repair & heat treatment (Stress relieving) Replacement of manganese liners and brake rigging bushes Axle box & journal bearings Cleaning of Axle box & bearings Inspection bearing components Overhauling as per the referred MP.MI Suspension Springs ( As per MI ) Cleaning of springs Free height of springs Working height of springs Grouping / colour code of springs 100% replace of spring pads ( Happy Pads) Friction Snubber Assembly Disassemble snubber (See SK.DL- 1505 for instructions) Check the inside diameter of the friction sleeve with a “No Go” gauge Figure SK.DL- 3127 WDM2, WDM3A, WDG3A, & WDM3D/E/F 2. 3. 4. Loco Type Reference Details RDSO report Misc. No. Misc-164, MP.MI-71/78 and SK.DL-3370 to be followed MP.MI-04.004 WDM2, WDM3A, WDG3A, & WDM3D/E/F Page 5 of 104 As per relevant drawing, MP.IB.VL- 04.19.01 (Rev.01), MP.IB.VL- 04.19.01 (Rev.01) for WDG3A & MP.MI-31 for WDM3D/E/F Details as per Drawing SK.DL2089A, SK.DL- 1505, SK.DL- 3127, SK.DL-3126, SK.DL- 1512 , SK.DL1513 Quality Audit of Diesel Loco POH Workshop Observations 5. 6. 7. 8. Check the dimensions of the shoes as indicated in figure SK.DL-3126 Replace worn or broken parts. For assembly refer SK.DL- 1512 &1513 Re-assembly of snubber Height measurement and checking for damping characteristics Hydraulic damper Check the Capacity / Rating of dampers Damper overhauling Testing Side Bearer (Rubber spring) WDG3A, & WDM3D/E/F Free Height of rubber spring Working height of rubber spring Permanent set of rubber spring Rubber crack length/ de-bonding Equaliser Beams WDM2, WDM3A, Checking for cracks Reclamation of hard face as per MC-43 and 92 WDM2, WDM3A,WDG3A, & Wheel & Axle Assembly Wheel wear measurement i.e. Root WDM3D/E/F wear, Tread wear, Flange wear, wheel flat, visual inspection for any defect like crack, wheel flat, shelling, spaling etc. ,wheel reprofiling. Wheel gauge (1596+3/-0.5 mm) Deference in tread diameter of wheels on same axle, same bogie & same loco Ultrasonic testing of axles Page 6 of 104 As per drawings No. SK.VL-295, SK.VL-328 and SK.VL-387 & overhauling as per MP.IB.VL. 05.39.10 (Rev.00) As per drawings No. SK.Vl-127 & 133 & MP.IB.VL. 04.30.08 (Rev.01) M&C document no. MC – 43 & MC92 Wheel wear management Instruction Bulletin no.MP.IB.BD.0216.01 (Rev-1) & MP MI71/78 & MP.MI-31 RDSO procedure MC-71 Quality Audit of Diesel Loco POH Workshop 9. Brake rigging Abnormal wear of brake hangers Replacement of Brake blocks, Pins & Bushes Replace brake head, tie rod, brake shoe key, top & bottom slack adjusters (condition basis) and friction arm spring, if found damaged. 1. Centre Pivot & Loading Pads WDM2, WDM3A Load Pad to Centre Pivot Height Difference to be maintained. WDG3A, & WDM3D/E/F 2. Floating type Pivot assembly: Dismantle complete assembly Clean of the metal component except rubber bush Inspect for wear, tear and cracks Reassemble pivot block assembly with change centre pivot bush. In case non-metallic pivot block, 100% replacement may be carried out. MP.MISC – 141 MP.IB.VL.02.11.10 SK.VL-128 SK.VL-501, RDSO Modification sheet no. 03.10.09 10. Lateral Stopper, lifting chain and other fasteners and brackets are to be 100% replaced. WDG3A, & WDM3D/E/F SK.VL-134 11. Re-assembly of bogie Maintain all running gear clearance as per the MI’s Maintain the Lateral clearances between Axle Box and Pedestals WDM2, WDM3A WDG3A, & WDM3D/E/F MP.MI-71/78, VL.Mi-02/96 & MP.MI-31 MP.IB.VL.03.04.06 (WDM2 & WDM3A) (Ensure attention to wheel and axle assembly as per S.N. 8) MP.IB.VL.01.02.06 (WDG3A) Page 7 of 104 Quality Audit of Diesel Loco POH Workshop 12. Availability of Tools And Test Stands Over head Crane Hydraulic Jacks Cleaning vat Bogie frame manipulator Crack reclamation facility like gouging, grinding & welding facility etc. Stress relieving furnace DPT, MPT & UT testing facilities Surface table for measurement Spring load-deflection testing machine Hydraulic damper testing machine Torque wrench, Go/No Go Gauges Height gauges Inside and Outside Calliper, Vernier Caliper, Height Gauge, Cleaning Tank, Painting facilities Wheel wear measuring gauge Elecrode heating oven WDM2, WDM3A,WDG3A, & WDM3D/E/F SK.DL-3592 Facility to measure pre-heat temperature 13. Availability Of Instructions Etc Availability of WI including critical dimensions Training of staff including qualification of welders Maintenance manual and check sheets Record keeping of tools and measuring instruments Calibration of measuring instruments 14. Record Keeping For Traceability Page 8 of 104 Quality Audit of Diesel Loco POH Workshop Annexure-3 CHECK SHEET FOR QUALITY AUDIT OF TRACTION MOTOR PINION & GEAR ASSLY. AT POH WORKSHOPS During the audit, activities should be checked with regard to the Clause/Para/Item of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded: S.N REQUIREMENTS 1 MEASUREMENT 1.1 LOCO TYPE MAKE OF SUBASSEMBLY REFERENCE DETAILS TRACTION GEAR & PINION Gear Ratio 18 : 65 Pinion Drg. No. Pinion Bedding Condition Pinion Advance 18 teeth, SKDP3624 In Cold Not less than 95 % 2.25 TO 2.45MM Heating Temperature 190ºC + AMB TEMP. Span Size On New Pinion Over 3 teeth 88.595 /88.722MM Over 3 teeth 86.995MM 65 teeth SKDP3623 & SKDP3775 Over 7 teeth 223.989/223.798MM Over 7 teeth 220.800MM 0.266 - 0.664MM Condmning Limit On Span Size Of Pinion Gear Drg. No. Basis Of Span Size On New Gear Condmning Limit On Basis Of Span Size Of Gear Permissible Backlsh With New Set Condemning Limit On Basis Of Backlash Crack detection Alco (WDM2, WDM3A, WDM3D) 1.04MM MPMI or Zyglo test Page 9 of 104 Quality Audit of Diesel Loco POH Workshop MPIB.EM.10.31.08 dated 24.10.2008 CLAUSE/ PARA/ ITEM DETAILS OBSERVATION 1.2 TRACTION GEAR & PINION Gear Ratio 18 : 74 Pinion Drg. No. Pinion Bedding Condition Pinion Advance 18 teeth, SKDP3443 In Cold Not less than 95 % 2.30 TO 2.45MM Heating Temperature 185ºC + AMB TEP. Span Size On New Pinion Over 3 teeth 81.976 /82.093MM Over 3 teeth 80.366MM 65 teeth SKDP3444 & SKDP3546 Over 8 teeth 231.36/231.177 Over 8 teeth 228.140 Condmning Limit On Span Size Of Pinion Gear Drg. No. Basis Of Span Size On New Gear Condmning Limit On Basis Of Span Size Of Gear Permissible Backlsh With New Set Condemning Limit On Basis Of Backlash Crack detection 1.3 MP-MI 129/86 July ‘1986 Traction Motor Pinion & Gear Assly. of Alco Loco MP-MI 5 0.243 - 0.608MM 1.00MM MPMI or Zyglo test TA FAN ASSEMBLY Outer diameter of TA fan 6.4 WDG3A Bore diameter of TA stator Bore diameter of TA fan Diameter of fan seating area on barrel. Width of fan seating at bore Depth of counter sunk bolts hole Bolt head width Bolt head height above fan plate 6.5 after final assembly should not be more than Circumferentially Fan gap on TA Tightening torque and wire locking process 1387.25/1387mm 1392mm 600.00 / 600.03mm 600.03 / 600.06mm All ALCo locos MPIB.EM.01.02.10 dated 11.01.2010. 9+1 mm 4.5 - 5.5 mm 12.3mm 6- 7mm 2.50 – 2.75mm 28 – 30Kg-m Page 10 of 104 Quality Audit of Diesel Loco POH Workshop Tightening torque of M30 (coupling bolt) Oil catcher thickness (at bottom side) Bolts strength properties grade Sunk type M20 bolts can be used 6.6 M20 & M30 bolts should be replaced Fan bore area should be heated (for shrink fit). Re-used or old bolts and barrel thread condition should be checked by Threaded portion of barrel & bolts should be free from varnish or paint or dust deposits. TA fan should be mounted on the barrel by “shrink fit “ TA fan bolts locking wire ends should not be come out of the bolt head(projected) Proper alignment of TA fan should 6.7 be checked by inserting filler gauge circumferentially After Final assembly of TA fan, visual inspection is required on TA Gear train assembly TA GEAR 102T AG/EG PINION 43T PTU PINION - 43T 170 – 180 kg-m. 53.90 to 54.10mm R8.8. in place of fully threaded M20 bolts After 4 – 5 years service of TA 150 to 170 °С GO & NO GO thread ring or plug gauge Visual inspection is required In place of (bolts) press fit. As shown in photo Clearance between the fan (back side) and barrel of TA (as shown in attached photo) No clearance is allowed. Tightening torque, wire locking & fan back clearance with barrel(by filler gauge (circumferentially) Backlash at Steel plate 0.60mm to 1.40mm 0.05mm to 0.12mm on shaft Page 11 of 104 All ALCo locos MP.IB.EM.02.12.0 0dated 10-4-2000. Quality Audit of Diesel Loco POH Workshop 2 Carbody cables and Traction Motor cables Ensure the following: Control cables should be replaced fully irrespective of the condition after every 8 years. Power cables should be replaced on condition basis. During POH power cables, which are exposed to oil should be critically examined and replaced if any symptoms of bulging, softening or perishing of insulation at the cable terminals are noticed. 3 4 5 6 AVAILABILITY OF TOOLS AND TEST STANDS 2.1 Vernier Callipers 2.2 Disc Mike 2.3 Filler Gauge INSTRUCTION 3.1 Display Chart 3.2 Training of Staff 3.4Record keeping of tools and measuring instruments TRACEABILITY MATERIAL AVAILABILITY 5.1 Vital Spare -NA 5.2 Must change items -NA Page 12 of 104 All ALCo locos MP.IB.EM.02.03.08, dated 24-01-2008 And MP.IB.EM.03.04.08, dated 24-01-2008 All ALCo locos MP.IB.EM.02.03.08, dated 24-01-2008 And MP.IB.EM.03.04.08, dated 24-01-2008 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR QUALITY AUDIT OF TRACTION MOTORS AT POH WORKSHOPS During the audit, activities should be checked with regard to the Clause/Para/Item of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded: SN REQUIREMENTS 1 1.1 i) MEASUREMENT PRE-INSPECTION Record IR of a) Armature (Shall be > 10 MΩ) b) Inter Pole (Shall be > 10 MΩ ) c) Main Pole (Shall be > 10 MΩ) Record ovality of commutator (Limit – 0.001”) AFTER DIS-MANTLING Pinion to be sent for Magna flux test / Zyglo test Visual examination of Armature banding. If found beyond repair, rewind it. Check commutator dia. for condemning size. Replace commutator, if condemning size reached. If commutator is retained, then check millivolt drop to ensure health of tig welding/bar to bar shortening. If required, repair it. Check commutator surface roughness. If found > 0.05 mm or any cut mark is observed, commutator to be grind on machine. Ensure that there is no damage on armature seating area & armature shaft. If any damaged is noticed, re-metalize it to reqd. size. Ensure cleaning of magnet frame with cleaning solvent to RDSO spec. MP.0.8000.01 Rev.02 Oct.’2007. ii) 1.2 i) ii) iii) iv) v) vi) LOCO TYPE Page 13 of 104 Alco Locos MAKE OF SUBASSEMBLY Traction Motors of Alco Loco Quality Audit of Diesel Loco POH Workshop REFERENCE DETAILS MP.MI-2, MP.MI-6 & Maintenance manual issued by OEMs viz. BHEL / CGL. CLAUSE/ PARA/ ITEM DETAILS OBSERVATI ON vii) viii) ix) x) xi) xii) xiii) xiv) xv) xvi) xvii) xviii) xix) xx) Bake the magnet frame in oven at 120 + 10 °C & record it. Apply insulation varnish as per RDSO MP.MI 153/92 (latest revision) Check IR after renewal of glass epoxy laminate, GMGS & Nomex insulation for inter poles & main poles (Shall be > 100 MΩ ) Ensure tightening of pole bolts during assembly of magnet frame and maintain IP & MP bores as per OEM manual. Joints may be brazed & insulated, if required with RDSO approved Silicon elastomer tape. Check IR of main pole & inter pole assemblies & record it. (Shall be > 100 MΩ ) High potential test of inter pole & main pole at 1.3 KV for 15 sec. shall pass the test. Ensure spray cleaning of armature with cleaning solvent to RDSO spec. MP.0.8000.01 Rev.02 Oct.’2007. Bake the armature in oven at 120 + 10 °C & record it. Spray varnish paint protecting the shaft & commutator & cure it. Ensure mica cutting. & chamfering as per OEM’s manual Ensure cleaning & baking of brush arms as per OEM’s manual. Measure IR of brush arm (Shall be > 100 MΩ). If less, replace the brush arm Ensure the spring tension. (Lt. 4.5 Kg to 5.5 Kg) Page 14 of 104 Quality Audit of Diesel Loco POH Workshop xxi) xxii) xxiii) 1.3 i) ii) iii) iv) v) vi) vii) viii) ix) x) Ensure the replacement of PTFE sleeve of brush arm. Ensure painting of support arm with red becktol varnish. Conduct high potential test as per OEM’s manual ASSEMBLY Motor assembly as per OEM’s manual Measure the final Insulation Resistance = 10 Mega ohm a) Armature (Shall be > 100 MΩ) b) Inter Pole (Shall be > 100 MΩ ) c) Main Pole (Shall be > 100 MΩ) Measure the end float (Lt. = 0.006” to 0.012”) Check the nose plate condition. If found damaged or wear out, shall be replaced. Conduct the light run test at low, medium & high rpms on assembled motor & observe for unusual sound using listening rod. Check the bearing temperature after stabilisation during light un test. (Shall not be > 60 °C) Apply brush seater on the commutator to seat the carbon brushes on the commutator properly. Ensure tag welding / welding of stays on main pole & compole fixing bolts. Apply recommended sealant to avoid ingress of water etc. Apply a coat of paint on motor. Page 15 of 104 Quality Audit of Diesel Loco POH Workshop 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 AVAILABILITY OF TOOLS AND TEST STANDS 1000V Megger Filler gauge HV tester Dial gauge Tachometer / Speedometer Pyrometer Inside & Outside micrometer /calliper 3 3.1 3.2 3.3 4 5 INSTRUCTION Display Chart Training of Staff Record keeping of tools & measuring instruments TRACEABILITY MATERIAL AVAILABILITY & STORAGE (AC/nonAC) Vital Spares Must change items 5.1 5.2 Page 16 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR QUALITY AUDIT OF TRACTION ALTERNATOR AT POH WORKSHOPS During the audit, activities should be checked with regard to the Clause/Para/Item of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded: SN 1 REQUIREMENTS LOCO TYPE MAKE OF SUBASSEMBLY REFERENCE DETAILS Traction Alternator of Alco loco BHEL’s Maintenance Manual for Electrical Equipment of ALCO loco (Volume-II) MEASUREMENT a)Check tightness of all mechanical and electrical connections. Check slip rings and brushes for sparking. b)BRUSH GEAR Spring pressure- 1.36 to 2.2 kgs (adjustable) to be adjusted to 1.8 kgs. Minimum length of brush at which brush become inoperative – 35mm. Clearance between brush holder & slip ring- 2 to 3 mm. ALCO locos c)SLIP RING Diameter (New) – 520 mm Minimum worn out dia – 510 mm Slip ring run our (max) – 0.1 mm Slip ring ovality (max) – 0.1 mm Page 17 of 104 Quality Audit of Diesel Loco POH Workshop CLAUSE/ PARA/ ITEM DETAILS OBSERVATIO N d)ROTOR Diameter- 1003 mm Air gap at pole center – 6 mm Rotor bearing - NU330 EM/C4/D150mm x65 mm x 320mm O/D Bearing housing dimension – 320-0.005 mm. where outer race sites - 0.025 mm Radial clearance of free bearing when new – 0.165 to 0.215 mm Fit between outer race & bearing housing0.035 mm clearance, 0.025 mm interference Shaft bearing seating dia – 150 + 0.055 mm + 0.035 mm Fit between inner race & shaft – 0.035 to 0.08 mm interference Diametrical slackness of free bearing – 0.15 to 0.18 mm Min. permissible racial clearance when assembled - 0.03 to 0.13 mm Min. diametrical clearance when assembled in the machine – 0.051 mm Bull gear wheel I/D – 149.098 + 0.025 mm + 0.0 mm Shaft bull gear seating dia–149.098 + 0.162 mm + 0.152 mm Gear box oil capacity – 2.6 litres approx. Lubricant type – SAE 40 or equivalent Page 18 of 104 Quality Audit of Diesel Loco POH Workshop e)TIGHTENING TORQUE KG.M Exciter to gear box – 15 Aux-gen to gear box – 15 PTU to gear box – 15 Gear box to end shield – 15 (write locked) Gear box to end shield – 1 (at pads) Fan to rotor shaft – 25/27 (write locked) Rotor shaft extension to barrel – 25 Rotor pole bolts – 170/190 Slip ring to shaft extn. – 15 f) RESISTANCE AT 25°CStator- 0.002156 ohm (Line to Line) Rotor- 0.312 ohm (at slip ring) g) IR TESTS Stator (check with 1000V magger) : 2M Ohms Rotor(check with 1000V magger) : 2M Ohms 2 AVAILABILITY OF TOOLS AND TEST STANDS a. Bearing retaining ring b. Clamping ring c. Shaft adaptor d. Guide sleeve e. Frame lifting fixture f. Extractor for bull gear g. Lifting tackle h. Forcing screws i. Guiding studs j. Spacers k. S.K.F. Oil Pump Page 19 of 104 Quality Audit of Diesel Loco POH Workshop l. m. n. o. 3 4 5 Studs protection sleeves Extractor for bearing inner race Extractor foe bearing outer race from bearing housing INSTRUCTION 3.1 Display Chart 3.2 Training of Staff 3.4Record keeping of tools & measuring instruments TRACEBILITY MATERIAL AVAILABILITY 5.1 Vital Spare 5.2 Must change items Page 20 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR QUALITY AUDIT OF TRACTION MOTOR BEARING & ASSLY. COMPONENTS AT POH WORKSHOPS During the audit, activities should be checked with regard to the Clause/Para/Item of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded: S.N REQUIREMENTS 1 MEASUREMENT 1.1 1.2 1.3 c) d) REFERENCE DETAILS Verticality of Inner race Max. deviations allowed in above cases: Inner race Outer race Pinion End 0.075 mm 0.25 mm Commutator End 0.065 mm 0.20 mm Radial Clearances of bearings For New Bearings Bearing b) MAKE OF SUBASSEMBLY Verticality of Outer race Side 1.4 a) LOCO TYPE NU 330 Radial clearance before mounting (mm) 0.165 - 0.215 0.100 – 0.170 NH 320 0.105 – 0.140 0.060 – 0.100 In addition clearance to above, Radial clearance after mounting (mm) max. service radial NU 330 0.300 mm max. 0.250 mm max. NH 320 0.190 mm max. 0.150 mm max. Flinger - PE Bore Dia. 153.130 to 153.155 mm Total Width 12.65 to 12.70 mm All ALCo locos fitted with TM 4907/C1001 MPIB.EM.14.50.08 dated 20.02.2009 Traction Motor Bearing & Assly. Components of Alco Loco Retaining collar - PE Bore Dia. 146.015 to 146.040 mm Total Width 12.65 to 12.70 mm Outer Dia. 253.225 to 253.290 mm Page 21 of 104 Quality Audit of Diesel Loco POH Workshop CLAUSE/ PARA/ ITEM DETAILS OBSERVATION e) Hub Outer dia. 177.040 to 177.090 mm Outer dia. on 2nd Groove 210.610 to 210.670 mm Groove width 8.00 to 8.05 mm Total width 44.4 to 44.6 mm End shield - PE Bore dia. f) 319.975 to 319.995 mm End shield - CE Bore dia. g) h) 214.980 to 215.00 mm Seat diameter on armature shaft For brg.-PE, Bore dia. 150.035 to 150.055 mm For brg.-CE, Bore dia. 100.025 to 100.040 mm For retaining collar PE 146.130 to 146.150 mm For bearing sleeve PE 153.220 to 153.240 mm For inner brg. wiper CE 101.600 to 101.620 mm End Float on Traction motor (TM 4907) CE Limit – 0.50 mm 1.5 i) Aim – 0.42 mm Fits & Clearances (BG TM) Pinion end bearing Interferences (Diametrical) Brg. Sleeve 0.020 to to shaft 0.065 mm Flinger shaft to 0.065 to 0.110 mm Inner race to shaft Retaining collar to shaft 0.035 to 0.080 mm 0.090 to 0.135 mm Clearances (Diametrical Brg. 0.635 to Sleeve to 0.750 mm inner brg. cap Retaining 0.25 mm collar to (min.) outer brg. cap --------------- --------------------------- -------------- Page 22 of 104 Quality Audit of Diesel Loco POH Workshop ii) Commutator end bearing Interferences (Diametrical) Brg. Sleeve 0.020 to to shaft 0.065 mm Flinger to shaft Inner brg. Race to shaft 1.6 2 3 4 5 0.065 to 0.110 mm 0.025 to 0.060 mm Clearances (Diametrical Inner brg. 0.635 to Cap to 0.750 mm sleeve --------------- --------------------------- -------------- Heating temp. of brg. & assly. components Item Heating temp. Bearing inner race PE 100 - 110 ºC Bearing inner race CE 100 -110 ºC Sleeve (PE) 100 -130 ºC Sleeve (CE) 100 -130 ºC Flinger (PE) 100 -120 ºC End shield (PE) 120 -130 ºC End shield (CE) 120 -130 ºC Retaining collar (wiper) 120 -130 ºC AVAILABILITY OF TOOLS AND TEST STANDS 2.1 Dial gauge INSTRUCTION 3.1 Display Chart 3.2 Training of Staff 3.3Record keeping of tools and measuring instruments TRACEABILITY MATERIAL AVAILABILITY 5.1 Vital Spare - NA 5.2 Must change items - NA Page 23 of 104 Quality Audit of Diesel Loco POH Workshop Annexure-4 CHECK SHEET FOR QUALITY AUDITOF TURBO SECTION (POH) During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN 1. Audited by: Requirements Loco Type Balancing, measurementsetc Balancing: 1.1 Bladed shaft, range 31-257 gmm. 1.2 Rotor, range 157-470 gmm. Rotor Shaft Dimensions: 1.3 Bearing position OD A 39.98 – 40.00 mm 1.4 Bearing position OD B 50.987--51.000 mm 1.5 Bearing position OD C 56.10-56.20 mm 1.6 Piston ring recess S 2.58-2.85 mm Wheel Bush 1.7 Compressor wheel set OD A 56.10 -56.20 mm 1.8 Piston ring recess S 2.58-2.85 mm 1.9 Plain bearing (CE) 1.10 Bearing housing bore ID A 54.00-54.06 mm ID A 65.00-65.07 mm Page 24 of 104 Alco Date of audit: Make Of Subassembly ABB VTC 304 Turbocharger Reference Details ABB-Exhaust Gas Turbocharge r VTC 304 A Comprehensi ve Manual for Indian Railways issued by M/s ABB Quality Audit of Diesel Loco POH Workshop Clause/Para/It em Details 5.6 5.6.2.5 5.6.2.5 Para 5.2.4.13 & details in 5.4.2.1 Para 5.2.4.13 & details in 5.4.2.2 Para 5.2.4.13 & details in 5.4.2.3 Para 5.2.4.13 & details in 5.4.2.4 Observations 1.11 Floating bush ID (CE) 40.011-40.05 mm Floating bush OD (CE) 53.80-53.86 mm 1.12 Floating bush OD (TE) 64.82-64.84 mm 1.13 Floating bush ID (TE) 51.022-51.07 mm 1.14 Thrust bearing width 10.39-10.50 mm Para 5.2.4.13 & details in 5.4.2.5 Para 5.2.4.13 & details in 5.4.2.6 Para 5.2.4.13 & details in 5.4.2.7 Para 5.2.4.13 & details in 5.4.2.8 Para 5.2.4.13 & details in 5.4.2.9 Para 5.2.4.13 & details in 5.7 1.15 Axial bearing width 16.76-16.88 mm 1.16 Piston ring width 2.00-2.49 mm 1.17 Thrust bearing press fit measure(K) 170.5-170.63 1.18 Axial clearance 1.19 Radial clearance 2. 3 A 0.11-0.32 mm B 0.47-0.93 mm Availability of Tools, Test Stands etc. 2.1 Balancing machine 2.2 Zyglo testing machine 2.3 Casing hydraulic test stand 2.4 Bearing puller (CE & TE) 2.5 Torque wrench up to 250 psi 2.6 micrometer 2”-3” & 0-4” 2.7 Go-NoGo gauge for checking fix nozzle ring Availability of instructions etc. 3.1 Display Chart 3.2 Training of staff 3.3 Maintenance manual and check sheets 3.4 Record keeping of tools and measuring instruments Page 25 of 104 Alco do Quality Audit of Diesel Loco POH Workshop do 4 5 1 Record Keeping For Traceability Material Availability 5.1 Vital Spares 5.2 Must change items Measurements etc 1.1 Nozzle ring and gas inlet casing 0.022-0.032” DiaClearance (Cl) 1.2 Turbine blade and gas inlet casing 0.060-0.092”Dia CI 1.3 Nozzle ring and turbine disc 0.124” cold CI 1.4 Intermediate casing and impeller 0.017-0.065” longitudinal Clearance (long Cl) 1.5 Impeller and Blower inlet 0.035-0.075” long CI 1.6 Blower casing end blower inlet measure with bolt loose. Scatting with back of diffuser at lease to 80%(This is only in case when we apply a new diffuser) 0.0050.020” Long CI (Gap) 1.7 Turbine disc and intermediate casing 0.008-0.016” Long CI 1.8 Bearing and thrust collar (Blower end) with surface by approx 0.003 less when oil. 0.007-0.018” Thrust CI 1.9 Inducer and blower casing 0.091-0.101”Dia CI 1.10 Thurst collar and oil seal Blower End 0.0140.036”Dia CI 1.11 Interference between bearing and intermediate casing (blower & Turbine end ) 0.0005-0.0015” DiaCl 1.12 Rotor shaft and oil seal (turbine end) 0.006-0.008” Dia CI 1.13 Gas inlet casing and intermediate casing inside measurement 0.090-0.098” Dia CI 1.14 Impeller and intermediate casing 0.125-0.127” Dia CI 1.15 Max allowable clearance between Gas inlet casing & Nozzle ring 0.005” clearance Page 26 of 104 Alco Alco 720 Instruction Manual ALCO Quality Audit of Diesel Loco POH Workshop ALCo MI 11126 2 3 4 5 Availability of tools, Test Stands etc. 2.1 Balancing machine 2.2 Zyglo machine 2.3 Casing hydraulic test stand 2.4 Oil gallery flushing test stand 2.5 Bearing puller (CE & TE) 2.6 Sand blast machine for rotor cleaning 2.7 Torque wrench up to 250 psi 2.8 micrometer 2”-3” & 0-4” 2.9 Go-NoGo gauge for checking fix nozzle ring Availability of instructions etc . 3.1 Display Chart 3.2 Training of staff 3.3 Maintenance manual and check sheets 3.4 Record keeping of tools and measuring instruments Record Keeping For Traceability Material Availability 5.1 Vital Spares 5.2 Must change items Page 27 of 104 Alco Alco 720 Instruction Manual ALCO Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF ENGINE BLOCK, MAIN BEARING (POH) During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN 1 2 Requirements Audited by: Loco Type Make/class Of Subassembly Date of audit: Reference Details Clause/Para/ Item/Chapter Details Removal of Cyl Block a) Removal of Cylinder liner. b) Removal of cylinder liner sleeve. Maintenance and Inspection DPT for cracks/signs of leaks/ other damage, 2.1 Check sizes of Main Brg. Bore. a) New MB bore dia. 9.0355" 9.0370" b) Worn MB bore dia. 9.0350" 9.0385" c) Cyl. Liner bore. 2.2 a)Out of roundness checking at planes A,B,C,D, E & F (max. 0.0035”). b) Check taper i) At vertical planes A and D (0.001”). ii) At 45° from vertical between planes B & F and C & E (0.003”). a) Horizontal misalignment limit – (i) Two adjacent bores – 0.002” (ii) Two non-adjacent bores 0.004” b) Vertical misalignment limit – (i) Three adjacent bores-0.0015” (ii) Two non-adjacent bores0.003”. ALCO MI 11079 D Alco Chapter on Maintenance, Instruction of Cylinder Block . Conventional Page 28 of 104 Quality Audit of Diesel Loco POH Workshop Observations 4. 5. 6. 7. Torque values for Cylinder head stud 100120 ft pound. Availability of tools and test a) Plate, lifting b) Compound, gasket c) Turning plate, free end & gen. end. d) Fixture for checking distortion of Cyl, block and cyl. liner to Cyl. block seat e) Sleeve tool, upper and lower. f) Mandrel g) Magnaflux h) Feeler gauge i) Vernier caliper j) Torque wrench Availability of instruction a) Display chart. b) Training of staff c) Maintenance manual and check sheets. d) Record keeping of tools and measuring instruments. Record keeping traceability . Material availability (i). Vital spares. (ii). Must change item Page 29 of 104 Quality Audit of Diesel Loco POH Workshop TECHNICAL AUDIT OF CRANK SHAFT (POH) During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Requirements 1 2 Removal of Crank Shaft a) Removal of Oil catcher/pipes/engine parts/main brgs caps/shells & split gears. b) Checked Crank shaft thrust (i) Using Main brg shell 0.010”0.017” (ii) Using Thrust collar 0.012”0.021” c) Apply grease and wrap journals and crankpins. Maintenance and Inspection a) Cleaning b) Magnaflux test for cracks/other damage, c) Roughness and burrs (limit 25 RMS max). d) Check M/Brgs saddle bore 2.1 Check Crank shaft. a) MB Journal dia. 8.498" – 8.500" b) Out of roundness limit 0.002” c) Run out for 16 cyl-0.008” max d) MB Journal eccentricity limit 0.001” d) Crank pin dia 5.998”- 6.000” e) Crank pin out of roundness limit 0.002” Audited by: Loco Type Make/class Of Subassembly Date of audit: Reference Details ALCO MI 11069 E Alco Clause/Para/ Item/Chapter Details Chapter on Maintenance, Instruction of Cylinder Block . Conventional Page 30 of 104 Quality Audit of Diesel Loco POH Workshop Observations 4. 5. 6. 7. 2.2 Split Gear a) Removal of gears. b) Inspect gear teeth (ALCo MI 11030). 2.3 Check Split gear a) Key Interference fit- 0.0000”-0.0005” b) Gear side clearance-0.007”-0.023” c) Split line clearance limit- 0.0015” d) Torque for gear cap screw in ft-lbs – i) Preliminary torque- 50 ft-lbs ii) Final torque – 300 ft-lbs. Availability of tools and test a) Lifting block b) Lapping tool c) Deflection guage. d) Feeler gauge e) Soft hammer f) Torque wrench Availability of instruction a) Display chart. b) Training of staff c) Maintenance manual and check sheets. d) Record keeping of tools and measuring instruments. Record keeping traceability. Material availability (i). Vital spares. (ii). Must change item ALCO MI 11067 C ALCO MI 11069 E & 11067C Page 31 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF CYLINDER HEAD SECTION (POH) During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Audited by: Requirements 1 2 3 4 5 Loco Type Cleaning, measurements etc. 1.1 Cleaning of cylinder head 1.2 Cy head leak test at 70 PSI with hot water 1.3 Inspect head for cracks using Magnaflux 1.4 Valve guide to head int 0.002” -0.0005” 1.5 yoke to guide int 0.002” -0.0005” 1.6 Yoke guide ( press in dim) 3.210” -3.272” 1.7 Valve guide ( press in dim) 2.25” 1.8 Valve to guide cl 0.003 – 0.0045” 1.9 Cy head nuts torquing value 550ft/lbs Availability of tools , Test Stands etc. 2.1 Valve seat reconditioning machine 2.2 Hydraulic test stand 2.3 Nozzle hole sleeve tube expander(Bottom & Top) 2.4 Nozzle sleeve extractor 2.5 Nozzle sleeve holder 2.6 Feeler gauge 2.7 Magna flux Availability of instructions etc. 3.1 Display Chart 3.2 Training of staff 3.3 Maintenance manual and check sheets 3.4 Record keeping of tools and measuring instruments Record Keeping For Traceability Material Availability 5.1 Vital Spares 5.2 Must change items Page 32 of 104 ALCo Date of audit: Make Of Subassembly -- Reference Details DLW Maintenance Instruction Manual Quality Audit of Diesel Loco POH Workshop Clause/Para/Item/cha pter Details Chapter on cylinder head Observations CHECK SHEET FOR TECHNICAL AUDIT OF PISTON SECTION (POH) During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: Audited by: SN Requirements Loco Type 1 Cleaning, inspection, measurements etc. 1.1 cleaning of piston 1.2 Inspect visually piston skirt and body for scoring or scuffing 1.3 Inspect piston crack using Magnaflux 1.4 Zyglo test for checking surface crack 1.5 (a) Groove width top ring, 2nd ring and 3rd ring 0.1902”- 0.1950”(conventional) (b) Groove width top ring & 2nd ring 0.1900”-0.195”(3RV) 1.6 (a) Side clearance in above rings 0.0052” -0.012” (conventional) (b) Side clearance in above rings 0.0054” -0.012” (3RV) 1.7 (a) Groove width of oil scraper ring 0.3140” – 0.3165” (conventional) (b)Groove width of oil scraper ring 0.2377” – 0.0.241” (3RV) 1.8 (a) Side clearance in oil ring 0.002”- 0.006” (conventional) (b) Side clearance in oil ring 0.002”- 0.0064” (3RV) 1.9 Piston pin to bushing clearance running 0.003” – 0.0075” 1.10 Piston pin to snap ring total clearance 0.076” – 0.118” Page 33 of 104 ALCo Date of audit: Make Of Subassembly -- Reference Details DLW Maintenance Instruction Manual Quality Audit of Diesel Loco POH Workshop Clause/Para/Item/cha pter Details Chapter on piston and con rod Observations 4 Availability of tools , Test Stands etc. 2.1 Feeler gauge 2.2 Zyglo testing machine 2.3 Magna flux 2.4 Vernier caliper 2.6 Piston ring groove gauge Availability of instructions etc 3.1 Display Chart 3.2 Training of staff 3.3 Maintenance manual and check sheets 3.4 Record keeping of tools and measuring instruments Record Keeping For Traceability 5 Material Availability 5.1 Vital Spares 5.2 Must change items 2. 3 Page 34 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR QUALITY AUDIT OF AIR & EXHAUST VALVE MAINTENANCE (POH) During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference documents. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded: Workshop/Rly: SN 1 2 3 4 5 Audited by: Requirements Loco Type Measurements etc: 1.1 Stem dia. of valves 0.6205-0.6195 (New). 1.2 Groove fillet radii 0.025-0.031R. 1.3 Valve disk thickness: for C and F type valve of 450: (a) 0.1562” (new) and (b) 0.0625” (condemning Limit). 1.4 Valve disk thickness (for E type valve 300) 0.1750” (new). And, 0.0937” (condemning Limit). Availability of tools, test stands etc: 2.1 Depressor, Spring etc 2.2 Grinder Availability of instructions etc: 3.1 Display Chart etc. 3.2 Training of Staff 3.3 Record keeping of tools and measuring instruments Record keeping for traceability: Material Availability: 5.1 Vital Spare 5.2 Must change items Alco Page 35 of 104 Date of audit: Make of Reference Subassembly Details -- Alco Instruction Manual (MI11020G) Clause/Para/ Item details Chapter on Cylinder Heads Quality Audit of Diesel Loco POH Workshop Observations CHECK SHEET FOR TECHNICAL AUDIT OF RADIATOR SECTION (POH) During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Requirements 1 Leakage testing 2 Reconditioning of Radiator Audited by: Loco Type Alco 3 4 Make/class Of Subassembly Conventional Date of audit: Reference Details Clause/Para/ Item/Chapter Details Alco MI Chapter on Maintenance, Radiators. Chapter on LOCOMOTIVE INSPECTION, MAINTENANCE AND LUBRICATION MI 17003 A Chapter on Maintenance, Radiators. Alco MI Chapter on Maintenance, Radiators. 2.1 Dismantling 2.2 Cleaning of the core 2.3 Changing of gaskets 2.4 Assembly 2.5 Testing Cleaning etc 3.1 cleaning details Availability of tools, Test Stands etc. 4.1 Torque wrench up to 140 ft-lb. 4.2 Hydraulic testing machine 0-10 Kg/Cm2 4.3 Radiator stand 4.4 Fin combing tool 4.5 Radiator immersion tank for cleaning Alco Page 36 of 104 Conventional Quality Audit of Diesel Loco POH Workshop Observations 5 6 7. Availability of instructions etc. 5.1 Display board etc 5.2 Training of staff 5.3 maintenance manual and check sheets 5.4 Calibration facility for tools and measuring instruments Record Keeping for Traceability Material Availability: 5.1 Vital spares 5.2 Must change Item Page 37 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR QUALITY AUDIT OF FUEL INJECTION PUMP (POH) During the audit, activities should be checked with regard to the clause/Para/Item of the reference document. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: Audited by: SN Requirements 1. Dis-assembly /Measurement/Assembly etc 1.1 Dis-assembly 1.2 Inspection of parts 1.3 Replace plunger guide cup if the indentation on the Plunger and tappet seating surface is more than 0.125 mm (0.005”) 1.4 Clearance between control rack and bushing within 0.5 mm (0.020”) 1.5 Control rack movement – within 0.38 mm (0.015”). 1.6 Range control bush dia – 18.25 mm (0.7185”) – 18.27 mm (0.7192”) 1.7 BDC Dimension ‘a’ – 6.5 ± 0.05 mm. Availability of Tools ,Test Stands etc. 1.1 Depth gauge for checking of BDC dimension ‘a’ on test bench. 1.2 Nut torque wrench, 450 lbs – 500 lbs. 1.3 Bush reamer. 1.4 Micrometer, 16 – 20 mm. 1.5 Assembly and dis-assembly fixture 1.6 Pump calibration test stand 1.7 Calibration oil – Servo Calib-5 2. Loco type Make of subassembly Date of audit: Reference details Clause/Para/Item details Para on Dis-assembly Para on Inspection of parts Para on Inspection of parts Para on Inspection of parts Para on Inspection of parts Para on assembly Para on Calibration values Alco Page 38 of 104 Bosch 17 mm Bosch repair and testing manual Quality Audit of Diesel Loco POH Workshop Observation 3. 4. 5. Availability of instructions etc. 3.1 Display of charts etc 3.2 Training of staff. 3.3 Maintenance manual and check sheet etc 3.4 Record keeping of tools and measuring instruments. Record keeping for traceability: Material availability: 5.1 Vital Spares 5.2 Must change items Page 39 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR QUALITY AUDIT OF INJECTOR (POH) During the audit, activities should be checked with regard to the clause/Para/Item of the reference document. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Requirements 1. 2. Audited by: Loco Make type /Class/Name of subassembly Dis-assembly /Measurement/Assembly etc: 1.1 Dis-assembly 1.2 Inspection of parts 1.3 Replace Intermediate disc if found cracked or if indentation at the nozzle seating end exceeds 0.125 mm. 1.4 Opening pressure – 3700 to 3800 psi ( 260-270 kgf/cm2) for Overhauled nozzle 1.5 Nozzle cap nut tightening torque 130-150 Nm (13-15 kgf.m or 94-109 lbs-ft) 1.6 Repetition (chatter) and spray pattern test Availability of Tools, Test Stands etc: 2.1 Nozzle needle lift gauge 2.2 Feeler gauge 2.3 Dial gauge 2.4 Nozzle cleaning sleeve 2.5 True running gauge 2.6 Nozzle tester 2.7 Fixture for injector 2.8 Socket wrench 2.9 Test oil Reference details Date of audit: Clause/Para/Item details Observations Para on Dis-assembly Para on Inspection of Parts Para on Inspection of Parts Para on Assembly Para on Assembly Para on Assembly Alco Page 40 of 104 Bosch 17 mm Bosch repair and testing manual List on Service Tools for Injector Quality Audit of Diesel Loco POH Workshop 3. 4. 5. Availability of instructions etc: 3.1 Display of chart 3.2 Training of staff 3.3 Maintenance manual and check sheet 3.4 Record keeping of tools and measuring instruments Record keeping for traceability: Material availability: 5.1 Vital spares 5.2 Must change items Page 41 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF PTLOC SECTION (POH) During the audit, activities should be checked with regard to the Clause/Para/Item/chapter of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Audited by: Requirements Loco Type Dis-assembly /Measurement/Assembly/Test etc. 1.1 Overhauling procedure 1 1.2 Plate Pack Length 1.3 Hydraulic Test 2 3 4 5 Date of audit: Make Of Subassembly Reference Details Plate Type Lube Oil Cooler (PTLOC) MPMI-24, Nov. 2004 & MP.IB.ES.01.07.08 DLW Drawing No. TPL-8515, DLW Part No. 11457260 Availability of tools , Test Stands etc. 2.1 Ratchet spanner Availability of instructions etc. 3.1 Display Chart 3.2 Training of staff 3.3 Maintenance manual and check sheets 3.4 Record keeping of tools and measuring instruments Record Keeping For Traceability Material Availability 5.1 Vital Spares 5.2 Must change items Page 42 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Ite m/chapter Details Para on Overhaul procedure Outline – Lube Oil Cooler Observations Annexure-5 CHECK SHEET FOR TECHNICAL AUDIT OF POH WORKSHOP Item: Electrical control MBCS + MCBG + E type During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN 1. 2. 3. 4. 5. 6. 7. 8. 9. 11.1 11.2 Requirements Loco Type No. of Trained personnel with experience Record keeping practices after the tests in relay control room for E type control Practices for Handling of the electronic cards and storing Availability of crimping tool & connector pin details Maintenance practices of Micro Processor Based Control System MEP 660 Maintenance practices of Micro Controller Based Governor (MCBG) MEG 601 Practices followed for Fault data analysis for identifying the faulty components and failure. Standard (OEM recommended) list of spares, consumable & tools Audited by: Make Of Reference Details Sub assembly MBCS trained personnel Shed doc ALCo ALCo ALCo Doc No:IM 53 for MBCS Medha Doc No. :IM 53 for MBCS Medha DLW/Alco/AMC (micro)/01 Doc No:IM-11 Rev. 0.0 Date Jan 2009 of Medha ALCo Contract agreement no. DLW/ALCO/MCBG/Medha ALCo Contract agreement no. DLW/ALCO/MCBG/Medha Measurement Standards for load box examination of D E locomotives Practices as per BHEL Commissioning Test schedule (Electrical equipment) Page 43 of 104 MP MI -10 (Rev.0.02) August, 2003 BHEL docs: TNE 2/2105/97/DELCTS Date Quality Audit of Diesel Loco POH Workshop Date of audit: Clause/Para/ Item Details Observation 11.3 11.4 11.5 11.6 11.7 11.8 12 for 3100/2750 HP BG DE loco for ‘E’ type control Test procedure for MBCS loco control ALCo system MEP660 for retrofitted D E loco Preventive maintenance schedule Check working of safety and critical items identified as ECS operation check, GR operation check, Eng. Stop button check, OST open check, MUSD stop switch check, LWS check, GFOLR operation check (E type), Governor dry run check, Flasher light lights, Alerter, lamp, alarm and reset, Flasher lights switch panel GR, GRCO1/2, Indication panels, Attendant call bell, Head light, Classification light, Horn, Sanders , Directional check, Cab light and exterior lights, Check set value of engine rpm, transition speed, LOPS, Engine water Temp., 1st notch current, DB parameters (field and armature current), loco over speed through user settable parameters, Check ground circuit leakage current Check mv drop test of WSR (E type) Availability Of Tools And Test Stands 13 Display Chart 13.1 Display of TROUBLE DOS and SHOOTING ALCo DONTS, Chart, Page 44 of 104 Sept 1997 IM-59 DLW/Alco/AMC (micro)/01 Inspection and test report of MEP Preventive Maintenance schedule SF-1405 (0) Schedule inspection of shed and items covered under DLW/Alco/AMC (micro)/01 for MBCS locos User settable parameters as per RDSO MBCS spec.MP.0.2400.26 -doFor MBCS locos- Test stands are not provided by MBCS supplier. Items are covered under AMC. Important instruction for trouble shooting like action to be taken during wheel slip etc to be available on the cab As per OEM manual Quality Audit of Diesel Loco POH Workshop 14 15 DISPLAYCHART & FLOW CHART Maintenance manual and check sheets Instruction Bulletin / Modification sheet /Hand book/ Trouble shooting charts as provided by RDSO/ CAMTECH and implementation by MBCS vendor As provided by the MBCS manufacturer* MBCS spec.MP.0.2400.26, Modification sheet No.MP.MOD.EC.05.27.10 (Rev. 00) Date 26.03.2010, Instruction Bulletin no.MP.IB.EC.04.21.10 Date 30.04.2010. CAMTECH/2010/M/MPBCS/ 1.0 March 2010 (Introduction Hand book on MBCS MP660 fitted on diesel locomotives). CAMTECH/2000/DSL/1.0 (Trouble shooting charts for drivers of WDM2 locomotive) Medha 1. Operational manual for drivers Doc.No.IM-38 Rev 3.0 July 07 2. Maintenance Instruction manual Doc. No.IM-53 Rev 0.0 Sept’2008 3. System Manual Doc. No. IM-08 Rev.3.0 March 2008 4. Troubleshooting Manual Doc.No. IM-51 Rev.2.0 Oct.2008 5. WDG3A Control wiring Drg. no.ED 1035 6. WDG3A Power. ED 1037 7. WDG3A Schematics Drg. no.ED Wiring Drg. no 1034 8. WDG3A TB wiring Drg. no.ED 1036 9. WDM3D Control wiring Drg. no.ED 1031 10. WDM3D Power Wiring Drg. no.ED 1033 11. WDM3D Schematics Drg. no.ED 1030 12. WDM3D TB wiring Drg. no.ED 1032 Siemens 1. KM DIREKT scheme no. DRG. No. 3FZE-00961 2. SIM CONTROL scheme no. DRG. No. 4SIM-200509 3. SIMCONTROL Operator’s Instructions &Guidelines user manual ver.2.00 dated 10.12.09 4. Trouble shooting manual of Siemens WDG3A and fault category of Siemens Page 45 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR GENERATOR FIELD CONTACTOR (ALCo) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Requirements 1. Measurement 1.1 Control voltage 72+1 VDC 1.2 1.3 1.4 1.5 Audited by: Loco Type Make Of Subassembly All Diesel Electric Locomo tives (ALCo) 1.7 1.8 1.9 Max pick up volt 48v , Main contact gap12-14.5mm, Wipe 8-10 mm, Contact pressure( kgf) initial 1.82-2.95,final 5.457.25, Operating coil resistance at 20 deg c 104 -116 ohm, (approx.), Interlock (gpr type : 9-41n, 3no+3nc) Contact gap 9.5-10.5 mm, Interlock contact pressure 220-300g. 1.10 Contact impression (should be min 80%) 1.11 (i) (ii) (iii) IR Value between Main contacts Coil and magnet frame Interlocks and coil shorted together and earth. 1.6 Date of audit: Page 46 of 104 Reference Details Clause/Para/Item Details Drawing No. EL/PT/0640/ Altr R3 Part No 12145439 Technical details given in the drawing Spec No. MP.0.04.00.08 (Rev01),May’10 IEC 60571 3.10.e Quality Audit of Diesel Loco POH Workshop as per clause 10.2.9 Observations SN Requirements Loco Type Make Of Subassembly Reference Details (iv) (v) 2.0 Contacts of interlocks Interlocks and coil shorted together and main contacts shorted together (vi) shorted main contacts and shorted interlocks, coil and earth Availability of tools and stands 2.1 Multimeter with proper calibration 2.2 Vernier calipers with valid calibration 2.3 Go- No gauge suiting to different cantactors 2.4 Dial gauge of different scale and resolution as suited to respective contactor 2.5 Source which can provide minimum current at respective voltage (24 V – 72 V DC) 2.6 Variac 2.7 Meggar 2.8 3. 4. 5. 6 Oscilloscope 2.9 Screw Driver, Plier, Spanner Set, etc. Availability Of Instructions etc. 3.1 Display Chart 3.2 Flow Chart 3.3 Training of staff 3.4 Proper Display of Do’s and Don’t 3.5 Maintenance manual and check sheets 3.6 Record keeping of tools and measuring instruments 3.7 Instruction Bulletin issued by RDSO 3.8 Maintenance Manual of Manufacturer 3.9 Specification Compliance of Instruction Bulletin Follow of Maintenance Manual of Manufacturer Record Keeping For Traceability 4.1 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Page 47 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations SN Requirements Loco Type Make Of Subassembly Reference Details Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.2 7. 8. Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.1 Vital Spares 7.2 Must change items 7.3 Consumables Disposal 8.1 Segregation of Workable and NonWorkable equipments and proper house keeping 8.2 Proper Disposal of Materials including recycling following relevant environmental norms Page 48 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR CRANKING CONTACTOR (ALCo) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Requirements 1. Measurement 1.1 Short time control voltage -72+1v dc, 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 Audited by: Date of audit: Loco Type Make Of Subassembly All Diesel Electric Locomo tives (ALCo) Control voltage -24vdc, Max pick up volt 24v Main contact gap12-14.5 mm, Wipe 8-10 mm,, Contact pressure( kgf) initial 1.82-2.95, final 5.457.25, Operating coil resistance at 20 deg c 18.520.5ohm, Interlock (gpr type : 9-41n, 3no+3nc) Contact gap 9.5-10.5 mm, Interlock contact pressure 220-300 gm , .) Contact impression (should be min 80%) Page 49 of 104 Reference Details Clause/Para/Item Details Drawing No. EL/PT/0641/ Altr R3 Part No 121410510 Technical details given in the drawing Spec No. MP.0.04.00.08 (Rev01),May’10 3.10.e Quality Audit of Diesel Loco POH Workshop Observations 1.13 (i) (ii) (iii) (iv) (v) 2.0 IR Value between mMain contacts Coil and magnet frame Interlocks and coil shorted together and earth. Contacts of interlocks Interlocks and coil shorted together and main contacts shorted together (vi) Shorted main contacts and shorted interlocks, coil and earth Availability of tools and stands 2.10 Multimeter with proper calibration 2.11 Vernier calipers with valid calibration 2.12 Go- No gauge suiting to different contactors 2.13 Dial gauge of different scale and resolution as suited to respective contactor 2.14 Source which can provide minimum current at respective voltage (24 V – 72 V DC) 2.15 Variac 2.16 Megger 2.17 3. as per IEC 60571 Oscilloscope 2.18 Screw Driver, Plier, Spanner Set, etc. Availability Of Instructions etc. 3.10 Display Chart 3.11 Flow Chart 3.12 Training of staff 3.13 Proper Display of Do’s and Don’t 3.14 Maintenance manual and check sheets 3.15 Record keeping of tools and measuring instruments 3.16 Instruction Bulletin issued by RDSO 3.17 Maintenance Manual of Manufacturer 3.18 Specification Page 50 of 104 Quality Audit of Diesel Loco POH Workshop clause 10.2.9 4. 5. 6 Compliance of Instruction Bulletin Follow of Maintenance Manual of Manufacturer Record Keeping For Traceability 4.3 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.4 7. 8. Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.4 Vital Spares 7.5 Must change items 7.6 Consumables Disposal 8.3 Segregation of Workable and NonWorkable equipments and proper house keeping 8.4 Proper Disposal of Materials including recycling following relevant environmental norms Page 51 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR CRANKING CONTROL CONTACTOR (ALCo) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Requirements 1. Measurement 1.1 Short time control voltage 72+1 v dc, 1.2 1.3 1.4 1.5 1.6 Audited by: Loco Type Make Of Subassembly All Diesel Electric Locomo tives (ALCo) 1.8 Control voltage 24vdc, Max pick up volt 24 v Main contact gap 6-7.5mm, Wipe 0.8-1.6 mm, Contact pressure(gmf) initial 80-150, final 180.280, Operating coil resistance at 20 deg c 55+5% ohm(52 to 58 ohms), Contact impression (should be min 80%) 1.9 (i) (ii) IR Value between fixed contact to movable Contacts coil to frame 1.7 Date of audit: Page 52 of 104 Reference Details Clause/Para/Item Details Drawing No. EL/PT/0639/ Altr R3 Part No 12141100 Technical details given in the drawing Spec No. MP.0.04.00.08 (Rev01),May’10 IEC 60571 3.10.e Quality Audit of Diesel Loco POH Workshop clause 10.2.9 Observations 2.0 3. 4. 5. Availability of tools and stands 2.19 Multimeter with proper calibration 2.20 Vernier calipers with valid calibration 2.21 Go- No gauge suiting to different contactors 2.22 Dial gauge of different scale and resolution as suited to respective contactor 2.23 Source which can provide minimum current at respective voltage (24 V – 72 V DC) 2.24 Variac 2.25 Megger 2.26 Oscilloscope 2.27 Screw Driver, Plier, Spanner Set, etc. Availability Of Instructions etc. 3.19 Display Chart 3.20 Flow Chart 3.21 Training of staff 3.22 Proper Display of Do’s and Don’t 3.23 Maintenance manual and check sheets 3.24 Record keeping of tools and measuring instruments 3.25 Instruction Bulletin issued by RDSO 3.26 Maintenance Manual of Manufacturer 3.27 Specification Compliance of Instruction Bulletin Follow of Maintenance Manual of Manufacturer Page 53 of 104 Quality Audit of Diesel Loco POH Workshop 6 Record Keeping For Traceability 4.5 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.6 7. 8. Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.7 Vital Spares 7.8 Must change items 7.9 Consumables Disposal 8.5 Segregation of Workable and NonWorkable equipments and proper house keeping 8.6 Proper Disposal of Materials including recycling following relevant environmental norms Page 54 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR FUEL PUMP CONTACTORS (ALCo LOCO) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Requirements 1. Measurement 1.1 Max pick up volt 48v 1.2 1.3 1.4 Audited by: Date of audit: Loco Type 1.5 Main contact gap 11-13 mm, Wipe 3.5-4.7mm, contact pressure( kgf) initial 0.68-0.9kgf, final 0.91.4kgf., operating coil resistance at 20 deg c 169-195 ohm , 1.6 Contact impression (should be min 80%) 1.7 IR Value as per clause 10.2.9 of IEC 60571 between Make Of Subassembly All Diesel Electric Locomo tives (ALCo) Reference Details Clause/Para/Item Details Drawing No. EL/PT/0629/ Altr R3 Part No 12141033 Technical details given in the drawing Spec No. MP.0.04.00.08 (Rev01),May’10 3.10.e IEC 60571 (i)Main contacts of contactor (ii) Coil and magnet frame 2.0 Availability of tools and stands 2.28 Multimeter with proper calibration 2.29 Vernier calipers with valid calibration 2.30 Go- No gauge suiting to different cantactors Page 55 of 104 Quality Audit of Diesel Loco POH Workshop as per clause 10.2.9 Observations SN Requirements 2.31 2.33 2.34 Dial gauge of different scale and resolution as suited to respective contactor Source which can provide minimum current at respective voltage (24 V – 72 V DC) Variac Meggar 2.35 Oscilloscope 2.32 3. 4. 5. 6 Loco Type Make Of Subassembly Reference Details 2.36 Screw Driver, Plier, Spanner Set, etc. Availability Of Instructions etc. 3.28 Display Chart 3.29 Flow Chart 3.30 Training of staff 3.31 Proper Display of Do’s and Don’t 3.32 Maintenance manual and check sheets 3.33 Record keeping of tools and measuring instruments 3.34 Instruction Bulletin issued by RDSO 3.35 Maintenance Manual of Manufacturer 3.36 Specification Compliance of Instruction Bulletin Follow of Maintenance Manual of Manufacturer Record Keeping For Traceability 4.7 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.8 Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Page 56 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations SN Requirements 7. Material Availability 7.10 Vital Spares 7.11 Must change items 7.12 Consumables Disposal 8.7 Segregation of Workable and NonWorkable equipments and proper house keeping 8.8 Proper Disposal of Materials including recycling following relevant environmental norms 8. Loco Type Page 57 of 104 Make Of Subassembly Reference Details Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR RADIATOR FAN CONTACTOR (ALCo) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Requirements 1. Measurement 1.1 control voltage 72+1v dc, 1.2 Max pick up volt 48 v Audited by: 1.3 Main contact gap 6-7.5mm, 1.4 1.5 Wipe 0.8-1.6 mm, Contact pressure( gmf) initial 80-150, final 180.280, Operating coil resistance at 20 deg c -388 ohm±5% (368 to 408 ohms), 1.6 1.7 Contact impression (should be min 80%) 1.8 2.0 IR Value between (i) fixed contact to movable Contact (ii) coil to frame Availability of tools and stands 2.37 Multimeter with proper calibration 2.38 Vernier calipers with valid calibration 2.39 Go- No gauge suiting to different cantactors Page 58 of 104 Date of audit: Loco Type Make Of Subassembly Reference Details Clause/Para/Item Details All Diesel Electric Locomo tives (ALCo) Radiator Fan contactor Drawing No. EL/PT/0638/ Altr R3 Part No 12140235 Technical details given in the drawing Drawing No. EL/PT/0638/Par t No 12140235 Altr R3 Drawing No. EL/PT/0638/Par t Spec No. MP.0.04.00.08 (Rev01),May’10 IEC 60571 Quality Audit of Diesel Loco POH Workshop 3.10.e clause 10.2.9 Observations SN Requirements 2.40 2.42 2.43 Dial gauge of different scale and resolution as suited to respective contactor Source which can provide minimum current at respective voltage (24 V – 72 V DC) Variac Meggar 2.44 Oscilloscope 2.41 3. 4. 5. 6 Loco Type Make Of Subassembly Reference Details 2.45 Screw Driver, Plier, Spanner Set, etc. Availability Of Instructions etc. 3.37 Display Chart 3.38 Flow Chart 3.39 Training of staff 3.40 Proper Display of Do’s and Don’t 3.41 Maintenance manual and check sheets 3.42 Record keeping of tools and measuring instruments 3.43 Instruction Bulletin issued by RDSO 3.44 Maintenance Manual of Manufacturer 3.45 Specification Compliance of Instruction Bulletin Follow of Maintenance Manual of Manufacturer Record Keeping For Traceability 4.9 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.10 Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Page 59 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations SN Requirements 7. Material Availability 7.13 Vital Spares 7.14 Must change items 7.15 Consumables Disposal 8.9 Segregation of Workable and NonWorkable equipments and proper house keeping 8.10 Proper Disposal of Materials including recycling following relevant environmental norms 8. Loco Type Page 60 of 104 Make Of Subassembly Reference Details Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR FIELD SHUNTING CONTACTOR (ALCo) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Requirements 1. Measurement 1.1 Control voltage 72+1v dc, 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 Audited by: Date of audit: Loco Type Make Of Subassembly All Diesel Electric Locomo tives (ALCo) max pick up volt 48v, Main contact gap12-14.5mm, wipe 8-10 mm, contact pressure( kgf) initial 1.82-2.95,final 5.45-7.25, operating coil resistance at 20 deg c 104 -116 ohms, interlock (GPRelay type- 9-41n, 3no+3nc) contact gap 9.5-10.5 Interlock contact mm pressure -220-300gm., Contact impression (should be min 80%) 1.11 IR Value between (i) Main contacts (ii) Coil and magnet frame (iii) Interlocks and coil shorted together and earth. (iv) Contacts of interlocks (v) Interlocks and coil shorted together and main Page 61 of 104 Reference Details Clause/Para/Item Details Drawing No. EL/PT/0614/ Altr R4 Part No 12140491 Technical details given in the drawing Spec No. MP.0.04.00.08 (Rev01),May’10 as per IEC 60571 3.10.e Quality Audit of Diesel Loco POH Workshop clause 10.2.9 Observations SN 2.0 Requirements 4. 5. Make Of Subassembly Reference Details contacts shorted together (vi) shorted main contacts and shorted interlocks, coil and earth Availability of tools and stands 2.46 Multimeter with proper calibration 2.47 Vernier calipers with valid calibration 2.48 Go- No gauge suiting to different cantactors 2.49 Dial gauge of different scale and resolution as suited to respective contactor 2.50 Source which can provide minimum current at respective voltage (24 V – 72 V DC) 2.51 Variac 2.52 Meggar 2.53 3. Loco Type Oscilloscope 2.54 Screw Driver, Plier, Spanner Set, etc. Availability Of Instructions etc. 3.46 Display Chart 3.47 Flow Chart 3.48 Training of staff 3.49 Proper Display of Do’s and Don’t 3.50 Maintenance manual and check sheets 3.51 Record keeping of tools and measuring instruments 3.52 Instruction Bulletin issued by RDSO 3.53 Maintenance Manual of Manufacturer 3.54 Specification Compliance of Instruction Bulletin Follow of Maintenance Manual of Manufacturer Page 62 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations 6 Record Keeping For Traceability 4.11 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.12 7. 8. Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.16 Vital Spares 7.17 Must change items 7.18 Consumables Disposal 8.11 Segregation of Workable and NonWorkable equipments and proper house keeping 8.12 Proper Disposal of Materials including recycling following relevant environmental norms Page 63 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR EP CONTACTORS (ALCo) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN 1. Audited by: Requirements Measurement 1.1 Contact gap 15-17 mm 1.2 Wipe 25.4-28.6 mm 1.3 Knuckling spring pressure(without lever) initial 4.56.3 kgf, final 12.2-18.2 kgf, 1.4 Normal air pressure 4.9 kg/cm2 1.5 Interlock gap 2.5-3.95mm, 1.6 Interlock pressure 500-900g. 1.7 Interlock rated current 10 A, 1.8 Magnet valve coil resistance at 20degC 615+5% ohm.for BHELTYPE: M5027MV2 1.9 ROTEX TYPE: 3118AV1-3 coil resistance at 20degC 526 to 594 Ohms, 1.10 Contact impression (should be min 80%) 1.11 IR Value between a) main contacts b) interlocks and MV c) interlocks and MV shorted together and earth d) contacts and interlocks e) Interlocks and MV shorted together and main contacts shorted together. f) Main contacts shorted together and earth shorted with MV and interlocks. Page 64 of 104 Date of audit: Loco Type ALCo Make Of Subassembly Reference Details Drawing No. EL/PT/0630/ Altr R4 Part No 12141008 Clause/Para/Item Details Technical details given in the drawing Spec No. MP.0.04.00.08 (Rev-01), May’10 IEC 60571 3.10.e Quality Audit of Diesel Loco POH Workshop as per clause 10.2.9 Observations SN 2.0 Requirements 4. 5. Make Of Subassembly Reference Details Availability of tools and stands 2.55 Multimeter with proper calibration 2.56 Vernier calipers with valid calibration 2.57 Go- No gauge suiting to different cantactors 2.58 Dial gauge of different scale and resolution as suited to respective contactor 2.59 Source which can provide minimum current at respective voltage (24 V – 72 V DC) 2.60 Variac 2.61 Lever of 122.5 mm for measuring initial and final pressure. 2.62 Compresor with air reservoir 2.63 Megger 2.64 3. Loco Type Oscilloscope 2.65 Screw Driver, Plier, Spanner Set, etc. Availability Of Instructions etc. 3.55 Display Chart 3.56 Flow Chart 3.57 Training of staff 3.58 Proper Display of Do’s and Don’t 3.59 Maintenance manual and check sheets 3.60 Record keeping of tools and measuring instruments 3.61 Instruction Bulletin issued by RDSO 3.62 Maintenance Manual of Manufacturer 3.63 Specification Compliance of Instruction Bulletin Follow of Maintenance Manual of Manufacturer Page 65 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations 6 Record Keeping For Traceability 4.13 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.14 7. 8. Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.19 Vital Spares 7.20 Must change items 7.21 Consumables Disposal 8.13 Segregation of Workable and NonWorkable equipments and proper house keeping 8.14 Proper Disposal of Materials including recycling following relevant environmental norms Page 66 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR 6M REVERSER (ALCo) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN 1. Audited by: Requirements Loco Type Measurement 1.1 Auxiliary contacts 4, change over type, 1.2 Control voltage 72+1 V DC, 1.3 Operating air pressure 4.9 kg/cm2, 1.4 Min operating air pressure 3.85 kg/cm2, 1.5 Main contact gap19.05+1.6mm, 1.6 Main contact outside pressure (with lever) 4.04.5kgf, inside pressure 5.8-6.5kgf, 1.7 Contact impression (should be min 80%) 1.8 1.9 1.10 Auxiliary contact pressure 0.68-2.0kgf, Auxiliary contact gap 31.75mm (min), , Magnet valve coil resistance at 20degC 615+5% ohm.for BHEL type: 5027MV2 ROTEX TYPE: 3118AV1-3 coil resistance at 20degC-526 to 594 Ohms. 1.11 1.12 Date of audit: Contact impression (should be min 80%) Page 67 of 104 ALCo Make Of Subassembly Reference Details Clause/Para/Item Details Drawing No. EL/PT/0649/ Altr R5 Part No 12310372 Technical details given in the drawing Spec No. MP.0.04.00.08 (Rev01),May’10 3.10.e Quality Audit of Diesel Loco POH Workshop Observations SN Requirements 1.13 2.0 IR Value between (i) Main contacts and frame (ii) Frame and all live parts connected together (wth main cxontacts closed) (iii) Terminals of both side, terminals shorted together on each side (Main contacts open) (iv) All control and Aux. circuit Make Of Subassembly Reference Details IEC 60571 Availability of tools and stands 2.66 Multimeter with proper calibration 2.67 Vernier calipers with valid calibration 2.68 Go- No gauge suiting to different cantactors 2.69 Dial gauge of different scale and resolution as suited to respective contactor 2.70 Source which can provide minimum current at respective voltage (24 V – 72 V DC) 2.71 Variac 2.72 Lever of 122.5 mm for measuring initial and final pressure. 2.73 Compresor with air reservoir 2.74 Megger 2.75 3. Loco Type Oscilloscope 2.76 Screw Driver, Plier, Spanner Set, etc. Availability Of Instructions etc. 3.64 Display Chart 3.65 Flow Chart 3.66 Training of staff 3.67 Proper Display of Do’s and Don’t 3.68 Maintenance manual and check sheets 3.69 Record keeping of tools and measuring instruments 3.70 Instruction Bulletin issued by RDSO Page 68 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details as per clause 10.2.9 Observations SN Requirements 3.71 3.72 4. 5. 6 Loco Type Maintenance Manual of Manufacturer Specification Make Of Subassembly Reference Details Spec No. MP.0.04.00.08 (Rev01),May’10 Compliance of Instruction Bulletin Follow of Maintenance Manual of Manufacturer Record Keeping For Traceability 4.15 Proper Register is maintained for 6 M Reverser with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.16 7. 8. Proper record should be maintained for each 6 M Reverser with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.22 Vital Spares 7.23 Must change items 7.24 Consumables Disposal 8.15 Segregation of Workable and NonWorkable equipments and proper house keeping 8.16 Proper Disposal of Materials including recycling following relevant environmental norms Page 69 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR 6 M BKT CONTACTORS (ALCo LOCO) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: Audited by: SN Requirements 1. Measurement 1.1 Auxiliary contacts 4 change over type, 1.2 Control voltage 72+1 V DC, 1.3 operating air pressure 4.9 kg/cm2, 1.4 Min operating air pressure 3.85 kg/cm2 , 1.5 Main contact gap19.05+1.6mm, 1.6 Main contact - outside pressure (with lever) 1.7 4.0-4.5kgf, inside pressure 5.8-6.5kgf, 1.8 Auxiliary contact pressure 0.68-2.0 kgf, 1.9 Auxiliary contact gap 31.75mm (min), 1.10 Magnet valve coil resistance at 20degC 1.11 615+5% ohm. for BHELTYPE : M5027MV2 1.12 ROTEX TYPE: 3118AV1-3 coil resistance at 20degC 526 to 594 Ohms 1.13 Contact impression (should be min 80%) 1.14 Date of audit: Loco Type IR value between (i) Main contacts and frame (ii) Frame and all live parts connected together (wth main cxontacts closed) (iii) Terminals of both side, terminals shorted together on each side (Main contacts open) (iv) All control and Aux. circuit Page 70 of 104 Make Of Subassembly All Diesel Electric Locomo tives (ALCo) Reference Details Clause/Para/Item Details Drawing No. EL/PT/0648/ Altr R5 Part No 12310300 Technical details given in the drawing Spec No. MP.0.04.00.08 (Rev-01), May’10 IEC 60571 3.10.e Quality Audit of Diesel Loco POH Workshop as per clause 10.2.9 Observations 2.0 Availability of tools and stands 2.77 Multimeter with proper calibration 2.78 Vernier calipers with valid calibration 2.79 Go- No gauge suiting to different cantactors 2.80 Dial gauge of different scale and resolution as suited to respective contactor 2.81 Source which can provide minimum current at respective voltage (24 V – 72 V DC) 2.82 Variac 2.83 Lever of 122.5 mm for measuring initial and final pressure. 2.84 Compresor with air reservoir 2.85 Meggar 2.86 Oscilloscope 4. 2.87 Screw Driver, Plier, Spanner Set, etc. Availability Of Instructions etc. 3.73 Display Chart 3.74 Flow Chart 3.75 Training of staff 3.76 Proper Display of Do’s and Don’t 3.77 Maintenance manual and check sheets 3.78 Record keeping of tools and measuring instruments 3.79 Instruction Bulletin issued by RDSO 3.80 Maintenance Manual of Manufacturer 3.81 Specification Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer 3. Page 71 of 104 Quality Audit of Diesel Loco POH Workshop 6 Record Keeping For Traceability 4.17 Proper Register is maintained for Contactors with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.18 7. 8. Proper record should be maintained for each contactor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.25 Vital Spares 7.26 Must change items 7.27 Consumables Disposal 8.17 Segregation of Workable and NonWorkable equipments and proper house keeping 8.18 Proper Disposal of Materials including recycling following relevant environmental norms Page 72 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR GENERAL PURPOSE RELAY (ALCo LOCO) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: Audited by: SN Requirements 1. Measurement 1.10 Nominal operating voltage (50-80 V) 1.11 Pick up voltage (Must Operate), max 48V 1.12 Drop out Voltage Min 7.5 V 1.13 Auxiliary make rating 7.5 A at 72 V 1.14 Resistance of the coil at 20 deg C 445±5%, 1.15 Contact Pressure 100-250 g 1.16 Over travel (1.6 mm) with over travel gauge in position 0.0 to 0.1 1.17 Min contact gap 2.7 mm 1.18 Armature gap 4.7 to 6.6 1.19 Ensure that no distortion or corrosion of any components 1.20 IR Value between 1.20.1 Open contacts 1.20.2 Contacts and metal parts 1.20.3 Adjacent contacts 1.20.4 Coil and earth Availability of tools and stands 2.88 Multimeter with proper calibration 2.89 Vernier calipers with valid calibration 2.90 Go- No gauge 2.0 2.91 Date of audit: Loco Type Make Of Subassembly Reference Details Clause/Para/Item Details All Diesel Electric Locomo tives (ALCo) BHEL, AAL and IEI Spec No. MP.0.400.03 (Rev-01) Nov’08 Clause 3.1.1 Clause 3.2 (ii) Clause 3.2 (v) Clause 3.2 (vi) Clause 3.2 (vii) Clause 3.2 (viii) Clause 3.2 (ix) Clause16.1.9.2 as per IEC 60571 Dial gauge Page 73 of 104 Quality Audit of Diesel Loco POH Workshop Clause 10.2.9 Observations SN Requirements 2.92 2.93 2.94 Loco Type Make Of Subassembly Reference Details Source which can provide minimum current at respective voltage (72 V DC) Variac Meggar 2.95 2.96 3. 4. 5. 6 Screw Driver, Plier, Spanner Set, etc. Sufficient set of tool and gauges provided by manufacturer Availability Of Instructions etc. 3.82 Display Chart 3.83 Flow Chart 3.84 Training of staff 3.85 Proper Display of Do’s and Don’t 3.86 Maintenance manual and check sheets 3.87 Record keeping of tools and measuring instruments 3.88 Instruction Bulletin issued by RDSO 3.89 Maintenance Manual of Manufacturer 3.90 Specification Spec No. MP.0.400.03 (Rev-01) Nov’08 Compliance of Instruction Bulletin Follow of Maintenance Manual of Manufacturer Record Keeping For Traceability 4.19 Proper Register is maintained for GP Relay with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.20 Proper record should be maintained for GP Relay with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Page 74 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations SN Requirements 7. Material Availability 7.28 Vital Spares 7.29 Must change items Disposal 8.19 Segregation of Workable and Non-Workable equipments and proper house keeping 8.20 Proper Disposal of Materials including recycling following relevant environmental norms 8. Loco Type Page 75 of 104 Make Of Subassembly Reference Details Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF POH WORKSHOP OF ELECTRICAL CONTROL FOR DC-DC CONVERTER (500 W)TWIN BEAM HEAD LIGHT(ALCo LOCO) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Work shop/Rly: Audited by: SN Requirements Loco Type 1. Measurement : 2.1 Visual Inspection – check finish , material , sound quality of workman ship etc 2.2 Functional Check –ON/OFF properly ALCo 2.3 Available output regulated Voltage 25.5 ± .1% V DC with the variation of input voltage 50-85 V DC 2. Availability Of Tools And Test Stands 3.1 Multimeter with Valid Calibration Make Of Subassembly Date of audit: Reference Details RDSO Clause No.6.3.1 specification No. ELRS/SPEC/DC -DC Converter /0021 ,Rev.01 Sept 2004 RDSO specification No. ELRS/SPEC/DC -DC Converter /0021 ,Rev.01 Sept 2004 RDSO Clause No. 2.2 specification No. and 2.3 ELRS/SPEC/DC -DC Converter /0021 ,Rev.01 Sept 2004 ALCo Page 76 of 104 Clause/Para/Item Details Quality Audit of Diesel Loco POH Workshop Observations SN Requirements Loco Type Make Of Subassembly Reference Details 3.2 Test stand for measurement and testing. 3.3 Screw Driver, Plier, etc. 3.4 Fire Extinguisher of proper class Availability Of Instructions etc. 3 3.91 Display Chart 3.92 Flow Chart 3.93 Training of staff 3.94 Proper Display of Do’s and Don’t 3.95 Maintenance manual and check sheets 3.96 Record keeping of tools and measuring instruments 3.97 Instruction Bulletin issued by RDSO 3.98 Maintenance Manual of Manufacturer 3.99 Specification 4. Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer 6. Record Keeping For Traceability NA 4.21 Proper Register is maintained for DC-DC Converter (500 W) with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Page 77 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations SN Requirements Loco Type Make Of Subassembly Reference Details Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.22 Proper record should be maintained for each DC-DC Converter 4.23 500 W DC-DC Converter with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.30 Vital Spares 7. 8. 7.31 Must change items 7.32 Consumables Disposal 8.1 Segregation of Working and Non-Working equipment and Proper House Keeping 8.2 Safe Disposal including recycling following relevant environmental norms. Page 78 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF POH WORKSHOP ELECTRICAL CONTROL FOR LED FLASHER LIGHT (ALCo LOCO) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop /Rly: Audited by: SN Requirements Loco Type 1. Measurement : 2.1 Visual Inspection – check finish , material , sound quality of workman ship , water tightness etc 2.2 Functional Check –ON/OFF properly 2.3 Lux Value- The lux measured in axial direction shall not be less than 500 lux at 1 meter and 55 lux at 3 meters for amber clour LED of 120 Nos ALCo 2.4 Flashes per Minute (40±5) 2.5 Output regulated Voltage 2.6 Check Repeater indication properly 2. Availability Of Tools And Test Stands Make Of Subassembly Date of audit: Reference Details Clause/Para/It em Details RDSO specification No. ELRS/SPEC/LFL/0 017 Rev 1 Sept 04 RDSO specification No. ELRS/SPEC/LFL/0 017 Rev 1 Sept 04 RDSO specification No. ELRS/SPEC/LFL/0 017 Rev 1 Sept 04 RDSO specification No. ELRS/SPEC/LFL/0 017 Rev 1 Sept 04 RDSO specification No. ELRS/SPEC/LFL/0 017 Rev 1 Sept 04 RDSO specification No. ELRS/SPEC/LFL/0 017 Rev 1 Sept 04 Clause No.6.3. ALCo Page 79 of 104 Quality Audit of Diesel Loco POH Workshop Clause No. 2.3.3 Clause No. 2.4.1 Clause No. 2.4.5 Clause No.2.4.3.1 Observations SN Requirements Loco Type Make Of Subassembly Reference Details 3.1 Voltmeter with Valid Calibration 3.2 Ammeter with Valid Calibration 3.3 Lux Meter with proper Calibration 3.4 Test stand for measurement and testing. 3.5 Stop Watch 3.6 Screw Driver, Plier, etc. 3.7 Fire Extinguisher of proper class Availability Of Instructions etc. 3.1 Display Chart 3.2 Flow Chart 3.3 Training of staff 3.4 Proper Display of Do’s and Don’t 3 3.5 Maintenance manual and check sheets 3.6 Record keeping of tools and measuring instruments 3.7 Instruction Bulletin issued by RDSO 3.8 Maintenance Manual of Manufacturer 3.9 Specification RDSO specification No. ELRS/SPEC/LFL/0 017 Rev 1 Sept 04 Page 80 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/It em Details Observations SN Requirements Loco Type 4. Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer 6. Record Keeping For Traceability Make Of Subassembly Reference Details 4.1 Proper Register is maintained for LED Flasher Light with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.2 Proper record should be maintained for each LED Flasher Light 4.3 LED Flasher Light with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.1 Vital Spares 7. 7.2 Must change items 7.3 Consumables such as fuses , toggle switches etc 8. Disposal 8.1 Segregation of Working and Non-Working equipment and Proper House Keeping 8.2 Safe Disposal including recycling following relevant environmental norms. Page 81 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/It em Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF POH WORKSHOP ELECTRICAL CONTROL FOR LED MARKER LIGHT (ALCo LOCO) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop /Rly: Audited by: SN Requirements Loco Type 1. Measurement : 2.7 Visual Inspection – check finish , material , sound quality of workman ship , water tightness etc. 2.8 Functional Check –ON/OFF properly ALCo 2.9 Lux Value- for all input voltage range 45 V-90 V 2. Lamp Lux level at 1 Lux level Meter Meters RED 75 LUX 7 LUX WHITE 75 LUX 7 LUX at 3.10 Reference Details RDSO specification No. ELRS/Spec/PR/ 0022 (REV-1 Oct -2004) RDSO specification No. ELRS/Spec/PR/ 0022 (REV-1 Oct -2004) RDSO specification No. ELRS/Spec/PR/ 0022 (REV-1 Oct -2004) ALCo Test stand for measurement and testing. Page 82 of 104 Clause/Para/Item Details Clause No.6.3. Clause No. 2.4.3 3 Availability Of Tools And Test Stands 3.8 Multimeter with Valid Calibration 3.9 Lux Meter with proper Calibration Make Of Subassembly Date of audit: Quality Audit of Diesel Loco POH Workshop Observations SN Requirements Loco Type 3.11 Screw Driver, Plier, etc. 3.12 Fire Extinguisher of proper class Make Of Subassembly Reference Details Availability Of Instructions etc. 3 3.10 Display Chart 3.11 Flow Chart 3.12 Training of staff 3.13 Proper Display of Do’s and Don’t 3.14 Maintenance manual and check sheets 3.15 Record keeping of tools and measuring instruments 3.16 Instruction Bulletin issued by RDSO 3.17 Maintenance Manual of Manufacturer 3.18 Specification 4. Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer 6. Record Keeping For Traceability 4.4 Proper Register is maintained for LED Marker Light with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. Page 83 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations SN Requirements Loco Type Make Of Subassembly Reference Details 4.5 Proper record should be maintained for each LED Marker Light 4.6 LED Marker with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.4 Vital Spares 7. 7.5 Must change items 7.6 Consumables such as fuses , toggle switches etc 8. Disposal 8.1 Segregation of Working and Non-Working equipment and Proper House Keeping 8.2 Safe Disposal including recycling following relevant environmental norms. Page 84 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF CONTROL GEAR SECTION FOR STICK TYPE / IMPROVED STICK TYPE MASTER CONTROLLER FOR POH WORKSHOPS IN REFERENCE TO POH OF ALCo DIESEL LOCOMOTIVES During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN A. 1. Audited by: Requirements Loco Type Make Of Subassembly Stick Type / Improved Stick type Master controller Measurement: 1.1 Visual checking ALCo M/s BHEL, Asian Plastic, M/s Kaysons (AMC/R2) Make 1.2 Contact gap, 2. 1.3 Contact pressure, 1.4 Cam sequence and 1.5 Mechanical interlocking 1.6 Working of Throttle handle Test : Date of audit: Reference Details Clause/Para/ Item Details BHEL Test Clause 1.1 programme document no. 865476 dt Drawing of Improved stick type Master Controller EL-PT0633-R3 dt. 29.12.2007. BHEL Test Clause 1.2 programme document no. 865476 dt 24.04.99 and Clause 1.3 2.1 Insulation Resistance test: BHEL Test Clause 5.0 programme document no. 865476 DLW Drg. No. 35900030031Rev. 04 2.2 Continuity Test Page 85 of 104 Quality Audit of Diesel Loco POH Workshop Observations 2. Availability Of Tools And Test Stands 3.13 Voltmeter with Valid Calibration 3.14 Venier Caliper with Valid Calibration 3.15 Megger with Valid Calibration 3.16 Digital Multimeter with Valid Calibration 3.17 Potentiometer with Valid Calibration 3.18 Height gauge with Valid Calibration 3.19 High Voltage Tester with Valid Calibration 3.20 Bore Dial gauge with Valid Calibration 3.21 Ammeter with Valid Calibration 3.22 GO and NO GO Gauge 3.23 Screw Driver, Plier, Required spanner set etc. 3.24 Test stand for measurement and testing. 3.25 Fire Extinguisher of proper class ALCo M/s BHEL, Asian Plastic, M/s Kaysons (AMC/R2) Make Availability Of Instructions etc. 3 3.19 Display Chart 3.20 Flow Chart 3.21 Throttle sequence chart 3.22 Mechanical interlocking Chart 3.23 Training of staff 3.24 Proper Display of Do’s and Don’t 3.25 Maintenance manual and check sheets 3.26 Record keeping of tools and measuring instruments Page 86 of 104 Quality Audit of Diesel Loco POH Workshop 3.27 Instruction Bulletin issued by RDSO 3.28 Maintenance Manual of Manufacturer 3.29 Specification 4. Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer 6. Record Keeping For Traceability 4.7 Proper Register is maintained for EMD Master Controller checking with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.8 Proper record should be maintained for each 4.9 EMD Master Controller with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.7 Vital Spares 7. 7.8 Must change items 7.9 Consumables like OTTO Switches, Reverser Handle), Terminal Lugs, 28-Pin Coupler, M/s. Radiant make cables. etc. 8. Segregation of Working and Non-Working equipment and Proper House Keeping Page 87 of 104 Quality Audit of Diesel Loco POH Workshop CHECK SHEET FOR TECHNICAL AUDIT OF POH WORKSHOP ELECTRICAL CONTROL FOR TWIN BEAM HEAD LIGHT (ALCo LOCO) During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop /Rly: SN 1. Audited by: Requirements Loco Type Measurement : 2.10 Visual Inspection – check finish , material , sound quality of workman ship etc 2.11 Functional Check –ON/OFF properly Make Of Subassembly Date of audit: Reference Details Clause/Para/Item Details RDSO Clause No.6.3.1 specification No. ELRS/SPEC/PR /0024 ( Rev-1, Sept 2004) IB NO. Clause No. 4.A.1 MP.IB.EC. 01.08.06 DATE: 27-12-06 2.12 Type of Bulbs used – H4 P45 T(IR), Twin Filament 2.13 Model of Bulbs –Halonix and AutoPal Only IB NO. MP.IB.EC. 01.08.06 DATE: 27-12-06 Clause No. 4.A.2 2.14 Voltage Rating -24 V IB NO. MP.IB.EC. 01.08.06 DATE: 27-12-06 Clause No. 4.A.3 2.15 Wattage Rating of Bulbs -100/90 W, Bright/Dim filament at 24 V IB NO. MP.IB.EC. 01.08.06 DATE: 27-12-06 Clause No. 4.A.4 ALCo Page 88 of 104 Quality Audit of Diesel Loco POH Workshop Observations SN 2. Requirements Loco Type Make Of Subassembly Reference Details Clause/Para/Item Details 2.16 Lumen Out put -2600/1770 ± 15 % Lumen of Bright/Dim Filament at 24 V IB NO. MP.IB.EC. 01.08.06 DATE: 27-12-06 Clause No. 4.A.5 2.17 Lux output with Twin Beam Head Light for each reflector minimum 2400 Lux at a distance of 8 Mt and 24.5± 0.1 V DC terminal Voltage at Lamp Holder IB NO. MP.IB.EC. 01.08.06 DATE: 27-12-06 Clause No. 4.A.6 2.18 Procedure to check correctness of bulb’s filament in test room IB NO. MP.IB.EC. 01.08.06 DATE: 27-12-06 Clause No. 4 B 2.19 Checking illumination intensity of head light assembly when both bulbs are working IB NO. MP.IB.EC. 01.08.06 DATE: 27-12-06 Clause No.6 Availability Of Tools And Test Stands 3.26 Voltmeter with Valid Calibration 3.27 1.A standard portable lux measuring equipment ‘Lux meter’ like T.E.S. model TES – 1330 shall be used. Lux Meter should be of range 0-20000 lux with least count of 0.01 Lux with valid calibration 3.28 Focusing Stand 3.29 IB NO. MP.IB.EC. 01.08.06 DATE: 27-12-06 Screw Driver, Plier, etc. Page 89 of 104 Quality Audit of Diesel Loco POH Workshop Observations SN Requirements Loco Type 3.30 Test stand for measurement and testing. 3.31 Fire Extinguisher of proper class Make Of Subassembly Reference Details Availability Of Instructions etc. 3 3.30 Display Chart 3.31 Flow Chart 3.32 Training of staff 3.33 Proper Display of Do’s and Don’t 3.34 Maintenance manual and check sheets 3.35 Record keeping of tools and measuring instruments 3.36 Instruction Bulletin issued by RDSO 3.37 Maintenance Manual of Manufacturer 3.38 Specification IB NO. MP.IB.EC. 01.08.06 DATE: 27-12-06 RDSO specification No. ELRS/SPEC/PR /0024 ( Rev-1, Sept 2004) 4. Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer 6. Record Keeping For Traceability Page 90 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations SN Requirements Loco Type Make Of Subassembly Reference Details 4.10 Proper Register is maintained for Twin Beam Head Light with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.11 Proper record should be maintained for each Twin Beam Head Light 4.12 Twin Beam Head Light /Bulbs with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 7.10 Vital Spares 7. 7.11 Must change items 7.12 Consumables like bulbs , Reflector Disposal 8. 8.1 Segregation of Working and Non-Working equipment and Proper House Keeping 8.2 Safe Disposal of Bulbs/reflector including recycling following relevant environmental norms. Page 91 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/Item Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF BATTERY SECTON LEAD ACID BATTERY CHECK SHEET FOR POH WORKSHOPS IN REFERENCE TO POH OF ALCo DIESEL LOCOMOTIVES During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN 1. Audited by: Requirements Loco Type Measurement : 2.20 Physical Examination 2.21 Air Pressure 2. 2.22 Ampere Hour Capacity 2.23 Watt Hour Efficiency 2.24 Ampere Hour Efficiency 2.25 Internal Resistance 2.26 Initial Cranking Current 2.27 Electrolyte Level ALCo 2.28 Polarity and absence of Short Circuit Availability Of Tools And Test Stands 3.32 Battery Room Suitable size with sufficient area for movement of forklift, Storing of Acid Mixing tank, and Suitable battery test benches with sufficient Exhaust fans. 3.33 Electrolyte mixing tank-Motorized type preferred 3.34 Voltmeter with Valid Calibration 3.35 Thermometer with Valid Calibration Page 92 of 104 Date of audit: Make Of Subassembly Reference Details Spec. No. DEL/SPN/193 July’98 Spec. No. DEL/SPN/193 July’98 Spec. No. DEL/SPN/193 July’98 Spec. No. DEL/SPN/193 July’98 Spec. No. DEL/SPN/193 July’98 Spec. No. DEL/SPN/193 July’98 Spec. No. DEL/SPN/193 July’98 ALCo Quality Audit of Diesel Loco POH Workshop Clause/Para/ Item Details Clause 8.5 Clause 8.6 Clause 8.7 Clause 8.7 Clause 8.8 Clause 8.9 Clause 6 Observations SN Requirements 3.36 3.37 3.38 3.39 3.40 3.41 3.42 3.43 3.44 3.45 3.46 Loco Type Make Of Subassembly Reference Details Hydrometer with Valid Calibration Ammeter with Valid Calibration Multi meter with Valid Calibration Clamp Meter Rubber syringe Battery Charger(Preferred Constant Current Chargers) Battery Discharger (Preferred Electronic type) Required Lab for testing of Acid and DM water Screw Driver, Plier, Spanner Set etc. Test stand for measurement and testing (Concrete Platform covered with Acid Resistant FRP sheets/coating for keeping batteries –charge /Discharge.) D.M.Water Plant 3.47 Proper earthing facility for switch gear and Battery charging Panel. 3.48 Fire Extinguisher of proper class 3.49 Fork Lift 3.50 Hand trolley 3.51 Battery lifting crane on test bench 3.52 Plastic Pallet for storing Battery 3.53 Rubber Apron 3.54 Rubber Gloves 3.55 Goggles 3 Availability Of Instructions etc. Page 93 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/ Item Details Observations SN Requirements Loco Type Make Of Subassembly Reference Details 3.39 Display Chart 3.40 Flow Chart 3.41 Training of staff 3.42 Proper Display of Do’s and Don’t 3.43 Maintenance manual and check sheets 3.44 Record keeping of tools and measuring instruments 3.45 Instruction Bulletin issued by RDSO MP. IB. EC.01.02.05 (Rev.01), Dec. 2008 3.46 Maintenance Manual of Manufacturer 3.47 Specification Spec. No. DEL/SPN/193 July’98 4. Compliance of Instruction Bulletin 5. Follow of Maintenance Manual of Manufacturer Record Keeping For Traceability 6. 4.13 Proper Register is maintained for Battery checking with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. 4.14 Proper record should be maintained for each battery with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any Page 94 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/ Item Details Observations SN 7. 8. Requirements Loco Type Make Of Subassembly Reference Details Material Availability 7.13 Vital Spares 7.14 Must change items 7.15 Consumables like Distilled Water, Sulphuric Acid (for Lead Acid Battery), Lugs, Rubber Mat etc. Disposal 8.1 Segregation of Working and Non-Working equipment and Proper House Keeping 8.2 Safe Disposal of Battery including recycling following relevant environmental norms. Page 95 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/ Item Details Observations CHECK SHEET FOR TECHNICAL AUDIT OF GOVERNOR SECTON (ALCo LOCO) FOR POH WORKSHOPS IN REFERENCE TO POH OF ALCo DIESEL LOCOMOTIVES During the audit, activities should be checked with regard to the Clause/Para/Item of the reference document as per applicability. Wherever the activities are not performed correctly, the method adopted should be indicated or the nature of non-compliance should be recorded. Workshop/Rly: SN Audited by: Requirements Loco Type ALCo 1. Dis Assembly and Assembly 2. Measurement : 2.29 Physical Examination 2.30 Barometer Reading 2.31 Pressure Test 2.32 Hydraulic Seals, needle valve seat and buffer piston bypass in both direction 2.33 Needle Valve setting 2.34 Speed Setting 2.35 Normal Shut Down 2.36 Pressure Requirement 2.37 Speed Setting timing 2.38 Lube Oil Shutdown 2.39 Air Box Pressure Fuel Limiting 2.40 Load Control 2.41 Vane Servo Timing 2.42 Excitation Resistor 2.43 General 2.44 Verification with Cover Installed Availability Of Tools And Test Stands 3.56 Test Stand for Wood Ward Governor 3.57 Multimeter with valid Calibration 3.58 Screw Driver, Plier, Allen Key, Spanner, 3. Page 96 of 104 ALCo Date of audit: Make Of Subassembly Reference Details Maintenance manual of Woodward Wood Ward Governor Test Record Format No. TSP/F8572-828 and Maintenance manual of Woodward ALCo Quality Audit of Diesel Loco POH Workshop Clause/Para/It em Details Section 5 of Maintenance Manual Section 6 of Maintenance Manual Observations SN Requirements Loco Type Make Of Subassembly Reference Details Clause/Para/It em Details Maintenance Manual Section 4 etc. 3.59 Fire Extinguisher of proper class Availability Of Instructions etc. 3.48 Display Chart 3.49 Flow Chart 3.50 Training of staff 3.51 Proper Display of Do’s and Don’t 3.52 Display of Trouble Shooting Chart 4. 3.53 Maintenance manual and check sheets 3.54 Record keeping of tools and measuring instruments 3.55 Instruction Bulletin issued by RDSO NA 3.56 Maintenance Manual of Manufacturer 3.57 Specification NA 5. Compliance of Instruction Bulletin NA 6. Follow of Maintenance Manual of Manufacturer 7. Record Keeping For Traceability 4.15 Proper Register is maintained for Governor testing with details of Manufacturer’s Brand Name, Date of Manufacture, Type, Sl. No., Date of Attending, Repair/Overhauling activity details, Loco No. to which fitted. Page 97 of 104 Quality Audit of Diesel Loco POH Workshop Observations SN Requirements Loco Type Make Of Subassembly Reference Details 4.16 Proper record should be maintained for each Governor with the measurement of Parameters as in Sl. No.1 prior to Fitment to Loco after overhauling/maintenance with date and remarks, if any. Material Availability 8. 7.16 7.17 7.18 etc. Disposal 9. Vital Spares Must change items Consumables like Lub Oil, Cotton wool, 9.1 Segregation of Working and Non-Working equipment and Proper House Keeping 9.2 Safe Disposal of scrap and waste including recycling following relevant environmental norms. Page 98 of 104 Quality Audit of Diesel Loco POH Workshop Clause/Para/It em Details Observations Annexure-6 Check sheet for Quality Audit of Railway Workshop (Underframe/cattle guard/ fuel tank/ loco painting/ cab/ battery box/ superstructure/ CBC/ side buffers) Sl.N o. Activity Clause/ Reference Underframe 01 Underframe to be kept on trestle at lifting lugs. 02 Proper cleaning & washing of U/F with detergents & water,. 03 Use of manipulator for carrying out repair work by down hand welding. 04 i. ii. 05 06 Visual inspection of buffer beam, striker block for any crack or damage, accordingly repair/weld properly Check the buffer base bolt holes for size, centers & ovality. Remove the ovality by welding and redrill if necessary i. Check the cattle guard/rail guard by visual inspection, if any crack/ damage found then it should be repaired/replaced accordingly ii. Ensure minimum clearance of cattle guard from R/L to be 178 mm iii. Ensure minimum clearance of rail guard from R/L. to be 115 mm iv. Modify/ change cattle guard and its support arrangements to plate type on WDM3A locomotive Visual inspection of welding of gussets/ stiffeners in back of buffer beam transferring buffing force from buffers to maintain longitudinal box section. If any crack /damage is found, it shall be repaired accordingly. Page 99 of 104 RDSO’s Drg. No. SK.DL-4533/4535 and DMW’s Drg. No. 2DMW/SK-938 Quality Audit of Diesel Loco POH Workshop Observations 07 08 Visual inspection of Footstep for welding crack/damage and shall be repaired by welding properly or replaced. i. ii. Visual inspection of welding of Hand rails to underframe. If there is any crack or damage in weld then reweld it properly. All fasteners are used for securing hand rail, clamp, hand rail support should be properly tighten 09 The coupler pocket shall be examined closely for welding cracks/damage in ribs and inspection of welding with underframe. If any crack or wear is found, shall be repaired or replaced properly. 10 Visual inspection of welding of ECC mounting stool. If there is any welding crack/damage then it should be rewelded or replaced properly. 11 i. ii. 12 iii. i. ii. 13 i. ii. iii. If abnormal vibration noted modify compressor mounting area of WDM3D locomotive under frame Visual inspection of welding of expressor/ compressor mounting stool. If there is any welding crack/damage then it should be rewelded or replaced properly Clean the threads of mounting block on stool by tapping it properly. Visual inspection of welding of engine mounting block. If there is any weld defect carryout required welding or replace it Check/Clean the threads of mounting block by tapping. MP.MOD.LD.01.02.11 dated 09.03.2011 Inspection of air duct gallery for all traction motors cutout for any leakage or cracks Filling water/hydraulic test in the gallery carried out If any leakage is found, shall be repaired accordingly. Page 100 of 104 Quality Audit of Diesel Loco POH Workshop 14 i. ii. iii. iv. v. vi. 15 16 Visual inspection of battery box below side sill/bottom plate for corrosion & welding cracks in wear plate, end plates & support plate. If there is any crack or corrosion then it should be rewelded or replaced it End plate of battery box with fuel tank end shall be modified as per RDSO Drg. no. SK.DL-4436. Mounting block, nut & bolt should be properly secured and tighten Wooden spacer properly placed between the battery All hinges, locks should be in working Cover assly. properly secured & locked with battery box. i. Ensure proper cleaning & washing of fuel tank to remove dirt, sludge deposited inside the tank. ii. Inspection of fuel tank for any leakage or cracks. iii. Inspection of drain valve, glow rod and for any crack repair by welding or replace if found beyond repair. iv. Mounting block, nut & bolt should be properly secured and tighten v. Fuel gauge should not be broken and in working condition vi. Fuel gauge mounting bracket, filler cap, vent pipe should be in good condition Visual inspection of underframe box section and side sill welding. If there is any crack or damage, weld it properly with low hydrogen welding electrode. RDSO’s letter No.SD.DMG.32 Dated 30.07.1996 and SK.DL-4436 RDSO’S Investigation Report No. MP-473/83 February, 1983 RDSO’S Investigation Report No. MP.INV-8 December, 1995 17 18 i. ii. i. ii. Carefully examine the welding around the both center pivots for crack and also check the surface with magnaflux or die-penetrant method to identify cracks, if any, which is not visible to naked eyes. If any crack is found, weld it properly with down hand welding. Carefully examine the welding around side load bearers for crack and also check the surface with magnaflux or die penetrant method to identify cracks, if any, which is not visible to naked eyes. side load bearer shall be repaired RDSO’Drg. No. SK.DL-2069 RDSO’s spec. No. MP.MI140/88, Sep’1988 and RDSO’Drg. No. SK.DL-2069 Page 101 of 104 Quality Audit of Diesel Loco POH Workshop 19 As per extent colour scheme Loco painting, marking, stenciling; Apply epoxy primer and PU paint before stenciling 20 21 Center buffer coupler & Draft Gear Check compliance of RDSO instructions for inspection and maintenance G-80 Modify uncoupling arrangement to make it top operated MP.MOD.LD.05.10.11 dated 18.07.2011 Side Buffers MP.MI-116/82, Rev.02 Check compliance of RDSO instructions for inspection and maintenance 22 Loco Cab 23. 1 Driver/Pilot seat 23. 2 Railway Board’s letter No.2000/M(L)/466/9 dated 05.01.2005 i. ii. Base mounting nut/ bolt and other fasteners should be properly tighten Motion and its adjuster/locking arrangement/ Ver. & rotational motion should be in functioning iii. Cushion & upholstery should be in good condition Side sash / window i. ii. iii. iv. Sliding glass should freely slide and not cracked Locking arrangement properly in fuction Guide rail, weather rubber & glazing rubber should be in good condition Rear view mirror if applied properly secured with frame and its rotational movement checked. Mirror should be in good condition Page 102 of 104 Quality Audit of Diesel Loco POH Workshop 23. 3 23. 4 23. 5 23. 6 23. 7 23. 8 23. 9 23. 10 Cab door i. ii. Lock, hinges should be in function Glass, weather strip should be in good condition and door properly sealed in closed condition iii. Assistant seat properly secured and in good working condition iv. Wiper motors should be in working Cab floor i. Flooring mat & trim should be in good condition ii. Steel structure/ panel sheet of cab should not be corroded or broken Cont. Comp door, short hood door & Cab inner trim i. ii. Lock, hinge and weather sealings should be in working condition Perforated aluminium sheet , insulating material, fasteners should be in good condition Cab light and fan i. Switches, regulators and connections are properly in function Fire Extinguisher i. Mounting bracket should be in good condition and refilling facilities should be available Air condition (if applied) i. Switches, regulator and water drainage properly in function Token pick up arrangement i. Token pickup rod properly joint with cab and should be in function (closing & opening) ii. Cushion pad frame properly welded with cab and cushion mat condition should be good Front look out glass i. ii. Glass & weather strip should be scratches free and properly sealed with front structure Covering grill glass properly cover with hinged grill Page 103 of 104 Quality Audit of Diesel Loco POH Workshop 24 Superstructure i. ii. 25 Check the condition of sheets and repair if possible otherwise change Check hinges and door locks for proper working and repair if possible otherwise change iii. Check for water leakage at various joints and renew weather stripes/ceilings iv. Door panel-sheet should not bend and properly close Radiator compartment & Expansion tank i. ii. iii. Gauge, vent, vacuum valve, low water alarm should function Expansion tank plate should not be corroded Funnel grating, foot step, hand- rail, inspection door properly secured with rad. Comp. Structure. Page 104 of 104 Quality Audit of Diesel Loco POH Workshop