Decision after a negative result of a first formal vote on a FprEN,
FprCEN/TS or FprCEN/TR or of a first UAP on a FprEN (for work items
neither mandated nor covered by a Specific Agreement)
DECISION number taken by CEN/TC number on CCYY-MM-DD
Subject:
CEN/TC number - Decision after a negative result of a first formal vote
on FprEN or FprCEN/TS or FprCEN/TR number or a first UAP on
FprEN number which is neither mandated nor covered by a Specific
Agreement
CEN/TC number and title,
 considering the negative result of the first formal vote or UAP on FprEN or
FprCEN/TS or FprCEN/TR number and title
 having checked the consistency of all the negative votes, according to
resolution BT 85/1996;
 considering the resolution BT 60/1996, requesting to determine as soon
as possible a forward strategy upon the failed formal vote or UAP;
 considering the resolution BT 27/1998 delegating the decision for the
follow up after the negative result of a first formal vote or a UAP;
 having considered the comments made during the first formal vote or
UAP which 'do' or 'do not' lead to fundamental changes in the draft
standard;
 confirming that the work item is neither mandated nor covered by a
Specific Agreement;
(Option 1
)
decides to submit a modified version of FprEN number (WI number) to a
second formal vote - Target date for stage 45.99: CCYY-MM.
(Option 2
)
decides to submit a modified version of FprCEN/TS to FprCEN/TR or FprCEN/TR
to FprCEN/TS number (WI number) to a second formal vote,


foreseen to take place by correspondence
Target date for stage 30.99: CCYY-MM.
foreseen to take place during a meeting
Target date for stage 30.99: CCYY-MM.
Continued on next page
(August 2013)
(Option 3
)
decides to submit a modified version of prEN number (WI number) to a UAP
of 5 months - Target date for stage 30.99: CCYY-MM.
(Option 4
)
decides to submit a fundamentally modified version of prEN number (WI
number) to a CEN enquiry followed by a formal vote with the following target
dates:
Stage 30.99: CCYY-MM; Stage 45.99: CCYY-MM.
(Option 5
)
decides to change the deliverable from CEN/TS to CEN/TR for prCEN/TS
number (WI number) with the following target date:
Stage 30.99: CCYY-MM.
(Option 6
)
decides to change the deliverable from CEN/TR to CEN/TS for prCEN/TR
number (WI number) with the following target date:
Stage 30.99: CCYY-MM.
(Option 7
)
- decides to change the deliverable from EN to CEN/TS or CEN/TR for FprEN
number (WI number) with the following target date:
Stage 30.99: CCYY-MM.
The standstill on this work item is released
(Option 8
)
- decides to delete the work item number and title.
- and decides to release the standstill on this work item in case of prEN.
The decision was taken by unanimity or simple majority with N positive votes,
N negative vote(s) and N abstention(s).