2012 BUDGET REQUEST PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER ISSUED NOVEMBER 2011 Table of Contents Introduction ................................................................................................................................ 4 Program Changes ...................................................................................................................... 4 Regionalism ........................................................................................................................... 4 Improving Communication with Townships............................................................................. 5 Fund Stabilization Policies ......................................................................................................... 5 Budget Formulation Policy ..................................................................................................... 5 Minimum Fund Balance Policy ............................................................................................... 5 Debt Management Policy ....................................................................................................... 6 Summit County Engineer: Divisions and Sections ...................................................................... 6 Budget Process ...................................................................................................................... 6 Performance Measures .......................................................................................................... 7 Administration Division ............................................................................................................... 7 Administration Section............................................................................................................ 8 Finance/Budget Section ......................................................................................................... 9 Information Technology Section ............................................................................................10 Personnel/Records/Training Section .....................................................................................12 Human Resource Group....................................................................................................12 Records Group ..................................................................................................................12 Training Group ..................................................................................................................12 GIS Section ...........................................................................................................................14 Engineering Division .................................................................................................................16 Administration Section...........................................................................................................16 Construction Section .............................................................................................................17 Utility Coordination Group .................................................................................................17 Right-of-Way Coordination Group .....................................................................................17 533561607 -2- Project Inspection Group ...................................................................................................18 Engineering Services Section................................................................................................19 Highway and Drainage Section .............................................................................................22 Highway Group .................................................................................................................22 Allotment Group ................................................................................................................22 Drainage Group .................................................................................................................22 Survey Section ......................................................................................................................24 Public Services Division ............................................................................................................26 Administration Section...........................................................................................................26 Bridge and Ditch Section .......................................................................................................27 Fleet Maintenance Section ....................................................................................................28 North Station Section and South Station Section...................................................................30 Specialized Services Section ................................................................................................33 Infrastructure Measures ............................................................................................................34 Bridge Inspections.................................................................................................................34 Pavement Condition Index ....................................................................................................34 2012 Capital Budget .................................................................................................................37 Revenue Projections .................................................................................................................41 Financial Overview/Expenditure Projections .............................................................................43 Summit County Engineer Organization Chart ............................................................................44 MVGT Special Capital Project Fund Summary ..........................................................................45 Assessed Subdivision Fund Summaries ...................................................................................46 District 1 – Northern District...................................................................................................46 District 2 – Southern District ..................................................................................................47 Acknowledgements ...................................................................................................................47 533561607 -3- Introduction The Summit County Engineer’s office respectfully submits this budget proposal for the review of County Council and the Executive. Along with the budget worksheets, this document is designed to detail the steps this office has taken to create the budget, provide the reasoning behind our budget requests and explain various program and budget changes instituted by the Engineer. This year our office continued its commitment to zero based budgeting. This budget has been completely rebuilt starting directly from the people who perform the public services we provide. Each section leader details their annual expenditures and revenue. Expenditures are then reviewed by the division leaders and department head before being submitted to the budget division for inclusion in the final budget worksheets for the approval of the Engineer. Instead of simply increasing the previous year’s budget by a certain percent, we analyzed all expenditures to ensure the efficiency and cost effectiveness of this office. In addition, each section was asked to provide performance measures for their section to determine that our goals were being met on a quantitative basis. This budget continues the effort to maintain an historical record of performance data to objectively show Council and Summit County citizens how we are doing. Program Changes The current administration is dedicated to improving the efficiency, responsiveness, and transparency of our operations. The following programs represent changes we made to improve the functions of the Engineer’s office and provide accountability to those we serve. Regionalism In this economy, governments must find ways to do more with less. A main goal of this office is to identify ways in which to regionalize the services we provide. Over the last two years, we have implemented several new ideas that are mutually beneficial to our office and the communities in Summit County. In 2009 we updated our contract with the City of New Franklin to continue to perform their snow and ice control. We were also able to perform roadside mowing for the Village of Boston Heights. In the City of Norton, we provide engineering services. This is a win-win situation for both our office and Norton. Norton will have a dedicated City Engineer at a lower cost for them and our office will save money in personnel. In 2011, we signed agreements with the Village of Lakemore to provide general maintenance services for their village using county employees and equipment. 533561607 -4- Finally, in 2011 we opened our pavement maintenance program to all municipalities and townships in Summit County, a goal listed in last year’s budget document presented to Council. This increases the amount of material needed to perform the pavement repairs, lowering the per-unit cost to both this office and to the townships. The response to the initial program was better than expected and we are hopeful the program will be expanded in the future. This budget includes the continued improvements for the 2012 construction season. Improving Communication with Townships Beginning in 2010, the Engineer assigned staff representatives to work directly with each township. The assigned employees attend township meetings and are available to township trustees, staff, and residents for any questions they may have regarding transportation projects in their area. By assigning staff members to become experts in the needs and concerns of each township, we hope to improve cooperation and foster better working relationships with all of the townships we represent. Fund Stabilization Policies Proper management of the Engineer’s office requires keeping the office in good fiscal order. The policies listed here provide the basis for making future financial decisions. They also assist the office in determining whether immediate spending reductions are needed as well as the issues that need to be resolved in future budget cycles. Budget Formulation Policy This budget continues the practice of tracking gross revenue from other major funding sources. These sources include money that is regularly received from the state and federal government for highway funding that may be paid directly to contractors. This practice more accurately represents the value and/or cost of the improvements administered by the Engineer. Accounting for all costs and funding sources provides a complete picture of available financial resources and actual project costs to the County Council and the public. Minimum Fund Balance Policy The Motor Vehicle Gas Tax fund is managed by the County Engineer to assure that maintenance and road improvements are properly funded. The financial integrity of the fund is paramount to our continued ability to provide services. Maintaining a reasonable fund balance is required to ensure that we are not spending beyond our means, but we are also planning to fully utilize the tax dollars we collect on the improvements for which they are intended. The Engineer uses the budget process and continued monitoring of expenditure levels throughout the year to maintain an unencumbered fund balance of 10% to 15% of net fund expenditures with 12.5% being the target level. 533561607 -5- Debt Management Policy This administration controls its use of debt financing for capital projects and instead opts to fund projects on a pay-as-you-go basis. Although debt financing can have significant advantages and needs to be considered on certain projects, this office's reliance on road taxes pre-supposes a commitment to regular road maintenance and improvements. Therefore, our improvement program does not require unusually high or unanticipated expenditures in any given year. Debt financing will be reserved for construction of new highways rather than maintenance or normal improvements to existing roadways and for such cases as where a new revenue source may be provided to fund a project such that this revenue source would carry the cost of the debt service. Overall debt service levels are monitored and will be maintained at a level not to exceed 6% of the SCE’s total operating budget. Future debt service requirements will be a primary consideration in the issuance of any new debt. To the extent possible, existing debt service will be reduced through refinancing and payment alternatives to restore a debt service level that is within the 6% cap. Summit County Engineer: Divisions and Sections The Engineer’s office is currently organized into three divisions. Within each of these divisions, work and budgets are tracked by sixteen individual sections to improve performance and accountability. Budget Process The Engineer’s Office uses a zero base budget approach to scrutinize every expenditure request. This effort was best accomplished by dividing the budget into component work sections and asking section leaders to provide rationale for all budget requests. Section Leaders prepare the Program Requests. Each section leader is given broad parameters about spending levels but are primarily tasked with creating a budget that will support the activities they believe are essential to running their section. They are encouraged to include all expenditures that they believe are necessary and to prepare their rationale for each item they request. Section leaders are also able to list items they would like to improve their operations, but these are not included in their program requests because they are only reviewed in detail if funding is available. Meetings are then held with each section leader to discuss their program requests in preparation for a division review of the budget. Section leaders also provide capital requests for those programs within their purview. Each division leader is charged with implementing the first round of budget adjustments. In the division review, duplicate items are eliminated and appropriations are adjusted between line-items to match the county’s accounting system. Some additional adjustments may be made at this time due to financial constraints at the division level. However, the emphasis is still on requesting all funds needed to perform division operations. 533561607 -6- The final review phase occurs when the Engineer and the division leaders meet to discuss the overall budget for the department. At this point, adjustments are made based upon financial constraints. Cuts are implemented after discussion of the funding that is expected to be available. If additional funds are available, then the discretionary requests of the section leaders are considered for funding as well. Each division is responsible for making the necessary arguments in support of their requests, but decisions are made with the objectives and priorities of the whole department in mind. In addition, the capital requests are discussed during this final review phase. Once the budget is completed, it is distributed internally for review by the section leaders as a final quality control review. Upon Council approval of the budget, the budget is discussed with each section leader and all adjustments are explained and the overall spending constraints for their section are discussed. Each division and section leader is then charged with making their own management decisions during the course of the budget year and they are given authority to make adjustments as needed to fulfill their obligations so long as they stay within the overall appropriation limits set by Council. Performance Measures The creation and implementation of performance measures to the Engineer’s office started in 2010. Each section was asked to list their goals and objectives and provide a way to numerically track each objective. Performance measures were first included in the 2011 budget. In most instances, it is still too early to fully report on progress until a full year of data is compiled. The purpose of implementing performance measures is to ensure that this office is fulfilling its mission statement and providing services to the public in the most efficient and cost effective manner. Performance measure tables are provided below for each section. Figures included for 2011 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. Likewise, 2012 figures represent the targeted level of performance unless additional data is available. Administration Division The administrative division is responsible for all the basic administrative function of the Engineer’s office essential to maintaining the day-to-day operation of the Engineer’s office including budgeting and finance, information technology and computer programming, personnel and human resources, inventory and supplies, government affairs, and record retention. Beginning with the 2012 Budget, the GIS Section will be moved from the Engineering Division to the Administration Division. This move will consolidate non-engineering and non-maintenance functions with the Administration Division. 533561607 -7- Administration Section The administration section provides oversight to the entire division. It is responsible for managing division operations to ensure that individual sections are meeting their stated objectives and those division operations are consistent with overall departmental goals and objectives. 2012 Operating Budget Request Program Request Acct # Description 2012 Budget 20501 Salaries - Employees $ 380,889.24 20525 Overtime $ 25501 Fringe Benefits $ 132,168.57 30401 Internal Services $ 24,900.00 30501 Supplies / Prof. Svcs. $ 37,900.00 37501 Travel/Cont.Ed. $ 4,250.00 45501 Contract Services $ 107,200.00 50501 Utilities $ 189,500.00 54501 Rentals/Leases $ 58501 Advertising $ 60501 Other $ 22,700.00 70501 Equipment $ 80501 Debt Service $ 975,400.00 $ 1,874,907.81 Division Changes Division Request 2012 Budget $ - $ 380,889.24 $ - $ $ - $ 132,168.57 $ (1,400.00) $ 23,500.00 $ - $ 37,900.00 $ - $ 4,250.00 $ (105,000.00) $ 2,200.00 $ 500.00 $ 190,000.00 $ - $ $ - $ $ 2,000.00 $ 24,700.00 $ - $ $ - $ 975,400.00 $ (103,900.00) $ 1,771,007.81 Department Changes $ $ $ $ $ $ $ $ $ $ $ $ $ $ (400.00) (900.00) 1,300.00 - $ $ $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 380,900.00 131,800.00 23,500.00 37,000.00 4,300.00 2,200.00 190,000.00 24,700.00 976,700.00 1,771,100.00 Major Budgetary Changes: The $105,000 reduction in contract services represents the elimination of a contract with the sheriff’s office for vehicle weight enforcement. This program had to be cut due to insufficient funds and will be reinstated once funding is available. Individual requests for weight enforcement will need to be funded by the requesting jurisdiction. Personnel: Elected Official, Director of Administration, Executive Assistant 2, Government Affairs Liaison, Administrative Staff Advisor 1, Assistant Prosecutor (20% of base salary and benefits only) Proposed Personnel Changes: The position of Administrative Staff Advisor 1 will be changed to Administrative Staff Advisor 2. The position is assuming additional duties to implement a regional surface water management program and coordinating surface water management in various subdivisions within the townships. 533561607 -8- Performance Measures Goal: Ensure the financial stability of the Engineer's Motor Vehicle/Gas Tax Fund Measure Objective 2008 Ending Maintain an ending unencumbered fund balance Unencumbered Fund between 10% and 15% of total annual expenditures Balance with a target level of 12.5%. 14.2% Debt Service Maintain a debt service level of less than 6% of total Expenditures operating expenditures 10.8% Operating Maintain operating expenditure level at less than Expenditures 75% of total MVGT direct expenditures 81.4% 2009 2010 2011 2012 13.7% 12.5% 12.5% 12.5% 11.0% 9.0% 7.7% 7.8% 83.3% 76.0% 75.0% 75.0% Performance Measure Discussion: Since 2008, MVGT fund revenue has declined by nearly 3.5%. In order to meet the fund balance performance objectives stated above, the office reduced operating costs by 6.3% over the same period. Current projections for 2011 year-end fund balance are below the policy minimum balance. However, the office is continuing with cost cutting measures to restore fund balance levels prior to year-end. The 2012 budget is balanced with projected expenditures that are within the projected fund revenue and will therefore restore fund balances to the required level by the end of 2012. Debt service expenditures have been reduced by 32% since 2008 in order to meet the debt service performance objectives. Unfortunately, these reductions have not proved sufficient to meet performance objectives due to the high level of debt service existing prior to creating the measure. In 2011, several task order contracts budgeted as capital items in the past were moved to the operating budget of the office. This has permitted more money to be available for project oriented capital needs. It has also adversely impacted the office’s ability to meet the operating expenditure performance measure. Finance/Budget Section The Finance Section provides oversight, control and management of all budgetary functions for the Summit County Engineer’s Office. In addition to the typical accounting functions, the Finance Section manages inventory control, asset accounting, cost accounting, budget management and finance planning. 533561607 -9- 2012 Operating Budget Request Program Request Acct # Description 2012 Budget 20501 Salaries - Employees $ 145,558.40 20525 Overtime $ 25501 Fringe Benefits $ 50,508.76 30401 Internal Services $ 10,500.00 30501 Supplies / Prof. Svcs. $ 175.00 37501 Travel/Cont.Ed. $ 300.00 45501 Contract Services $ 54501 Rentals/Leases $ 58501 Advertising $ 60501 Other $ 165.00 70501 Equipment $ $ 207,207.16 Division Changes Division Request 2012 Budget $ $ 145,558.40 $ $ $ $ 50,508.76 $ $ 10,500.00 $ $ 175.00 $ $ 300.00 $ $ $ $ $ $ $ $ 165.00 $ $ $ 207,207.16 Department Changes $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 145,600.00 50,600.00 10,500.00 200.00 300.00 200.00 207,400.00 Personnel: Budget/Management Director, Fiscal Officer 2, Computer Operator 2/Advanced Fiscal Operations Proposed Personnel Changes: No personnel changes are anticipated for 2012. Performance Measures Goal: Effectively implement departmental purchases. Measure Objective Payments Made 90% of payments to be processed within 23 days in Within Terms order to meet vendor payment terms of 30 days Goal: Monitor receivables Measure Objective Payment received within 30 days 90% of all receivables should be paid within 30 days. 95% of all receivables should be collected within 60 days. 2008 2009 2010 2011 2012 90% 2008 2009 2010 2011 90% 2012 90% 90% 90% 95% Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. Information Technology Section The Information Technology (IT) Section plans, implements, and supports all hardware, software, and network infrastructure for the Engineer’s Office. The IT Section also 533561607 - 10 - advances the Office’s efforts to incorporate cost-effective technology into our operations to improve our delivery of services and information to the citizens of Summit County. 2012 Operating Budget Request Program Request Acct # Description 2012 Budget 20501 Salaries - Employees $ 111,716.80 20525 Overtime $ 25501 Fringe Benefits $ 38,765.73 30401 Internal Services $ 30,000.00 30501 Supplies / Prof. Svcs. $ 55,636.00 37501 Travel/Cont.Ed. $ 4,750.00 45501 Contract Services $ 56,000.00 54501 Rentals/Leases $ 32,000.00 58501 Advertising $ 60501 Other $ 100.00 70501 Equipment $ 21,600.00 $ 350,568.53 Division Changes Division Request 2012 Budget $ $ 111,716.80 $ $ $ $ 38,765.73 $ $ 30,000.00 $ $ 55,636.00 $ (3,950.00) $ 800.00 $ $ 56,000.00 $ $ 32,000.00 $ $ $ $ 100.00 $ 1,000.00 $ 22,600.00 $ (2,950.00) $ 347,618.53 Department Changes $ $ $ $ $ $ $ $ $ $ $ $ (3,000.00) (3,000.00) $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 111,800.00 38,800.00 27,000.00 55,700.00 800.00 56,000.00 32,000.00 100.00 22,600.00 344,800.00 Personnel: Network Administrator, Software Engineer Proposed Personnel Changes: No personnel changes are anticipated for 2012. Performance Measures Goal: Provide a reliable computer network to support departmental functions. Measure Objective 2008 Maintain network operations at 98% during normal Network Availability business hours. Software Application Maintain software applications at 98% during normal Availability business hours. Goal: Maintain Confidentiality, Integrity, and Availability of information Measure Objective Backup / Daily incremental, weekly full backup of data, Recoverability quarterly archive of full data set Business Continuity Objective Recover critical IT services in one week of incident Business Continuity Recover full IT systems and services within 3 weeks Objective of incident Goal: Provide prompt user assistance and notification. Measure Objective Assignmen of requests Assign requests within 24 hours Resolution of requests Resolve requests within 5 days Resolve service requests Resolve service requests within 5 business days 533561607 2008 2008 2009 2009 2009 2010 2010 2010 2011 2012 98% 98% 98% 98% 2011 2012 Yes Yes Yes Yes Yes Yes 2011 2012 Yes Yes Yes Yes Yes Yes - 11 - Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. Personnel/Records/Training Section This Section oversees several components of the Administration Division. This section works with the county’s Central Human Resources Department to implement county policies within the Engineer’s Department and provide mandated training. It is also responsible for most public records needs of the office. Its functions are performed through three primary workgroups. Human Resource Group The Human Resource (HR) Group coordinates the human resource functions of the Summit County Engineer’s Office, acting as a source of information and support for employees and managers in all aspects of employment, including policy, procedure, compensation, and employee benefits. The HR Group is also responsible for labor relations, labor contract negotiations and Equal Employment Opportunity Compliance for the Engineer’s Office. The HR Group assures compliance with federal and state labor and workplace safety laws, County Human Resource Commission Rules, and the County’s Classification/Compensation Plan. The section maintains an employee database for the Office’s regular staff. Records Group The Records Group is responsible for maintaining the public records of the office in a manner that ensures records are available to fulfill public records requests. It provides document scanning services, to ensure digital storage of information generated by the Engineer’s Office is properly cataloged and maintained. This group also prepares and updates the office’s record retention schedules and monitors document storage and destruction. Training Group The Training Group provides mandatory and supplemental training programs for the entire department. This group works in conjunction with the County’s Personnel Department to provide training to employees in our office. In addition, the training officer participates on the county’s training development team to provide training for offices throughout the Summit County government. Training programs administered by Engineer Department staff include equipment and worksite safety training, certification requirement training, and other programs related to personnel and office functions. The training group works with the human resource group to ensure that all employees are updated on current office, county, state and federal policies and procedures. 533561607 - 12 - 2012 Operating Budget Request Program Request Acct # Description 2012 Budget 20501 Salaries - Employees $ 304,978.00 20525 Overtime $ 25501 Fringe Benefits $ 105,827.37 30401 Internal Services $ 1,700.00 30501 Supplies / Prof. Svcs. $ 2,695.00 37501 Travel/Cont.Ed. $ 4,395.00 45501 Contract Services $ 54501 Rentals/Leases $ 58501 Advertising $ 60501 Other $ 1,025.00 70501 Equipment $ $ 420,620.37 Division Changes Division Request 2012 Budget $ $ 304,978.00 $ $ $ $ 105,827.37 $ $ 1,700.00 $ $ 2,695.00 $ $ 4,395.00 $ $ $ $ $ $ $ $ 1,025.00 $ $ $ $ 420,620.37 Department Changes $ $ $ $ $ $ $ $ $ $ $ $ (55,952.00) (19,415.34) (75,367.34) $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 249,100.00 86,500.00 1,700.00 2,700.00 4,400.00 1,100.00 345,500.00 Major Budgetary Changes: The $75,367.34 reduction in personnel expenses is due to the unfunded position of Public Records Coordinator and overestimates on personnel increases due to changes discussed below. The position of Public Records Coordinator will appear in the final staffing report but is unfunded at this time. Personnel: Deputy Director of Administration, Office Manager, Safety Coordinator, Receptionist 2, Public Records Coordinator (open) Proposed Personnel Changes: The position of Staff Development Specialist is being upgraded to Safety Coordinator. Currently the Road Maintenance Manager for the South District fills the role of safety officer for the County Engineer’s Office. Placing those safety duties under the new position of Safety Coordinator has several expected benefits for the organization. First, it will give the Road Maintenance Manager more time to focus on his core duties of maintaining the county roads in the southern district. Second, it will put the safety functions under a position with a county-wide job assignment. Third, it will provide for a more independent review of safety precautions. Finally, it will consolidate the training function with the safety enforcement function to provide for more efficient job management in both areas. The position of Clerk 3 is being upgraded to a Public Records Coordinator. The position will remain vacant at this time due to budgetary issues. 533561607 - 13 - Performance Measures Goal: Provide for employee training and development. Measure Objective Number of Professional Development Training Opportunities Provided Number of Safety Training Opportunities Provided 2011 2012 Provide 5 or more professional development training programs on premises. 5 5 Provide 8 or more safety training programs on premises. 12 8 Goal: Foster productive labor relations. Measure Objective Union Grievances Reduce total number of grievances filed to less than Filed 12 per year Grievance Resolution Resolve 50% of grievances by Step 3. Goal: Efficiently manage worker's compensation program Measure Objective Decrease loss of work accidents to less than 5 per year Accidents Return to Work/Light 100% of eligible employees will participate in the Duty transitional work program 2008 2008 2008 2009 2010 2009 2010 2011 2012 15 Yes 12 Yes 8 Yes 12 Yes 2009 2010 2011 2012 4 0 0 Yes 2 Yes 0 Yes Performance Measure Discussion: Figures for the training and development goal included for 2011 and 2012 indicate the performance targets established by the section leader due to the fact that a full year’s data is currently unavailable on this new measure. Substantial improvement is being made in the other areas as policies and procedures established by the current administration are being implemented. GIS Section The G.I.S. section is a complement to each section in our Engineering Department, including the mapping of infrastructure features using handheld G.P.S. equipment to determine fixed asset locations. Creation of design drawings and as-builts, assigning house numbers, miscellaneous mapping, and creating display boards for public meetings are just a few of the support services provided by this section. They also provide updates for the Summit County maps that are distributed to the public. 533561607 - 14 - 2012 Operating Budget Request Program Request Acct # Description 2012 Budget 20501 Salaries - Employees $ 199,409.60 20525 Overtime $ 200.00 25501 Fringe Benefits $ 69,264.53 30501 Supplies / Prof. Svcs. $ 8,500.00 37501 Travel/Cont.Ed. $ 9,300.00 45501 Contract Services $ 18,226.00 54501 Rentals/Leases $ 58501 Advertising $ 60501 Other $ 725.00 70501 Equipment $ 2,000.00 $ 307,625.13 Division Changes Division Request 2012 Budget $ - $ 199,409.60 $ - $ 200.00 $ - $ 69,264.53 $ - $ 8,500.00 $ (4,350.00) $ 4,950.00 $ (9,500.00) $ 8,726.00 $ - $ $ - $ $ - $ 725.00 $ (2,000.00) $ $ (15,850.00) $ 291,775.13 Department Changes $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 199,500.00 200.00 69,300.00 8,500.00 5,000.00 8,800.00 800.00 292,100.00 Personnel: GIS Technical Application Administrator, Engineering Technician 3, Engineering Technician 4/GIS Operations, Survey CAD GIS Technician Proposed Personnel Changes: No personnel changes are anticipated for 2012. Performance Measures Goal: Create ArcGis online account to distribute coutywide basemap data. Measure Objective 2008 Create base maps that will allow section managers Create ArcGis web and staff the ability to manage county infrastructure applications and design projects. Goal: Finalize civil3D drafting standards for use on county design projects. Measure Objective 2008 Complete design templates using current AutoCAD Implementation of Civil3D technology that are accessible from Engineer Design templates website Goal: Increase community outreach. Measure Objective Complete 8 Community Outreach events per year Number of Community with local schools, scout packs or community Outreach Events organizations. 2008 2009 2010 25% 2009 2010 2011 2012 35% 2011 90% 2012 60% 2009 2010 11 2011 100% 2012 8 8 Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. 533561607 - 15 - Engineering Division The Engineering Division is active in the development of plans for highway, drainage, and bridge improvements and new construction on Summit County roads. The engineers and technicians prepare improvement plans for federal, state and locally funded projects on county highways. They also assist townships by preparing plans for township roads and drainage systems. Engineering project managers are responsible for overseeing large projects from initial scoping through the design phase and into construction. Beginning in 2012, the GIS section has been shifted to the Administration Division. Administration Section The administration section provides oversight to the Engineering division. It is responsible for managing division operations to ensure that individual sections are meeting their stated objectives and those division operations are consistent with overall departmental goals and objectives. The section is headed by the Chief Deputy Engineer. The directors in charge of both the Administration and Public Service divisions report directly to the Chief Deputy Engineer for the day-to-day operations of their divisions and he has input into their overall management. As a result, this section is indirectly involved in the operations of all divisions and sections within the Engineer’s Office. 2012 Operating Budget Request Acct # 20501 20525 25501 30501 37501 45501 54501 58501 60501 70501 Description Salaries - Employees Overtime Fringe Benefits Supplies / Prof. Svcs. Travel/Cont.Ed. Contract Services Rentals/Leases Advertising Other Equipment Program Request 2012 Budget $ 218,566.40 $ $ 85,678.03 $ $ 7,725.00 $ 47,800.00 $ $ 500.00 $ 1,000.00 $ $ 361,269.43 Division Changes Division Request 2012 Budget $ - $ 218,566.40 $ - $ $ - $ 85,678.03 $ - $ $ (2,225.00) $ 5,500.00 $ (47,800.00) $ $ - $ $ - $ 500.00 $ - $ 1,000.00 $ - $ $ (50,025.00) $ 311,244.43 Department Changes $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 218,600.00 85,700.00 5,500.00 500.00 1,000.00 311,300.00 Major Budgetary Changes: The $47,800 reduction in contract services is due to a duplicate request for the USGS stream monitoring contract which is funded through the general fund storm water allocation. Personnel: Chief Deputy Engineer, Design Engineer 2, Office Manager 533561607 - 16 - Proposed Personnel Changes: The Administrative Assistant position was reclassified as Office Manager in 2011. No personnel changes are anticipated for 2012. Performance Measures Goal: Monitor Division performance objectives. Measure Objective Quarterly Performance Updates Meet with section leaders quarterly. 2008 2009 2010 2011 2012 YES YES Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. Construction Section The Construction Section ensures the quality, cost and timeliness of improvements to the County’s highways and bridges. This includes all activities from obtaining legislative approval to project bidding to construction inspection to completion of final project documents. The Construction Section provides assistance as requested by townships and various other municipalities, which may include review of construction documents and plans, preparation of cost estimates and bid documents, inspection of construction activities and contract administration. This Section also performs annual inspection of bridges, culverts and roads. In addition the Construction section administers permits for road openings and closings, special hauling, ditch enclosures, and driveway culverts. Utility Coordination Group The Utility Coordinator maintains communications with utility companies that have facilities in Summit County. The Coordinator works with the utility owners to ensure safe and efficient planning, construction and operation of utilities in the County’s rightof-way. Right-of-Way Coordination Group The Right-of-Way Coordinator works with the Ohio Department of Transportation (ODOT) and local agencies to ensure proper procedures are followed in the evaluation, appraisal and procurement of property, right-of-way and easements required for construction of County bridge and highway projects. 533561607 - 17 - Project Inspection Group In-house inspectors monitor progress and performance on county managed construction projects. They ensure that contractors are meeting the project specifications in all areas of construction. 2012 Operating Budget Request Acct # 20501 20525 25501 30501 37501 45501 54501 58501 60501 70501 Description Salaries - Employees Overtime Fringe Benefits Supplies / Prof. Svcs. Travel/Cont.Ed. Contract Services Rentals/Leases Advertising Other Equipment Program Request 2012 Budget $ 548,891.20 $ 18,100.00 $ 222,260.55 $ 2,500.00 $ 7,965.00 $ 190,880.00 $ $ 7,000.00 $ 550.00 $ $ 998,146.75 Division Changes Division Request 2012 Budget $ - $ 548,891.20 $ - $ 18,100.00 $ - $ 222,260.55 $ - $ 2,500.00 $ (4,000.00) $ 3,965.00 $ 16,800.00 $ 207,680.00 $ 111.54 $ 111.54 $ - $ 7,000.00 $ - $ 550.00 $ - $ $ 12,911.54 $ 1,011,058.29 Department Changes $ $ $ $ $ $ $ $ $ $ $ (5,000.00) (5,000.00) $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 548,900.00 18,100.00 222,300.00 2,500.00 4,000.00 202,700.00 200.00 7,000.00 600.00 1,006,300.00 Personnel: (2) Design Engineer 2, Construction Projects Coordinator, (2) Construction Team Managers, (4) Inspectors 3, Engineering Technician Supervisor Proposed Personnel Changes: One Construction Project Coordinator retired during 2011 and was not replaced. The position is unfunded in the 2012 budget request. 533561607 - 18 - Performance Measures Goal: Maintain county roads. Measure Objective 2008 Pavement Condition Maintain an average Pavement Condition Index of 65 Index for all County roadways. Goal: Efficiently respond to the public. Measure Objective 2008 Complete 95% of requests for ditch enclosures within Requests for Service 28 days. Complete 85% of plan and estimate reviews within 28 Requests for Service days. Goal: Maintain accurate county mapping. Measure Objective Providing Data to GIS Submit 95% of as-built drawings to the GIS Section Section within 6 months of completing project work. 2008 Goal: Ensure stability of the Engineer's Motor Vehicle Gas Tax Fund Measure Objective 2008 Send 90% of Invoices for Construction Section Invoice Processing services within 30 days of completing work. Submit 75% of Federal and OPWC cost Reimbursement reimbursement requests within 60 days of completing Processing qualified project work. 2009 2009 2009 2010 2011 60 61 2010 2011 2010 2012 60 2012 95% 95% 85% 85% 2011 2012 95% 2009 2010 2011 95% 2012 90% 90% 75% 75% Performance Measure Discussion: The overall pavement condition index for the county continues to fall. A recent analysis indicates that in order to maintain the current level of pavement condition, the county must find $2 million in pavement maintenance funding. The current budget only provides $1.6 million to the pavement maintenance program which is 7.4% more than the 2011 funding. However, in addition to the pavement maintenance budget, the county has also received $1.95 million in federal grants through the Public Lands Highway Discretionary (PLHD) program. These funds will be used to upgrade several miles of county roads within the Cuyahoga Valley National Park and will impact the pavement maintenance index. Figures for all other performance measures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. Engineering Services Section The Engineering Services section oversees several components of the Engineering Division. This section is responsible for most engineering plans, designs, and reviews in addition to overseeing all bridge improvements and maintenance work. They are 533561607 - 19 - responsible for monitoring bridge inspections and seek to improve the overall condition of Summit County’s bridges. 2012 Operating Budget Request Program Request Acct # Description 2012 Budget 20501 Salaries - Employees $ 250,502.40 20525 Overtime $ 25501 Fringe Benefits $ 98,196.94 30501 Supplies / Prof. Svcs. $ 8,150.00 37501 Travel/Cont.Ed. $ 6,950.00 45501 Contract Services $ 401,800.00 54501 Rentals/Leases $ 1,650.00 58501 Advertising $ 500.00 60501 Other $ 52,600.00 70501 Equipment $ $ 820,349.34 Division Changes Division Request 2012 Budget $ - $ 250,502.40 $ - $ $ - $ 98,196.94 $ (8,000.00) $ 150.00 $ (2,450.00) $ 4,500.00 $ (136,800.00) $ 265,000.00 $ - $ 1,650.00 $ - $ 500.00 $ (52,000.00) $ 600.00 $ - $ $ (199,250.00) $ 621,099.34 Department Changes $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 250,600.00 98,200.00 200.00 4,500.00 265,000.00 1,700.00 500.00 600.00 621,300.00 Major Budgetary Changes: The $136,800 reduction in contract services was the result of duplicate requests within the Engineering Division. The $52,000 reduction in other expenses was the result of duplicate requests for bridge maintenance supplies that are included in the Public Service Division. Personnel: Deputy Director for Engineering Services, Public Works Manager, Engineer Project Manager Proposed Personnel Changes: The Engineer Project Manager position was created in 2011 to replace the Bridge Engineer position. The position is currently in the process of being filled prior to yearend 2011. 533561607 - 20 - Performance Measures Goal: Improve the condition of County owned bridges. Measure Objective Bridge Sufficiency Maintain average SR >75 on 60% of the County's Rating bridges Bridge GA Rating Maintain 95% of bridges at GA > 5A Load Limit Reduce % of load limited bridges < 1.00% Bridge load Ratings Meet FHWA/ODOT/CEAO Mandate Goal: Monitor condition of County owned and partnered bridges. Measure Objective Percent of Bridges Inspected Inspect 100% of County owned bridges Percent of Bridges Inspected Inspect 100% of Metroparks owned bridges Goal: Promote education in bridge engineering. Measure Objective Sponsor Educational Programs Sponsor MBBC Goal: Improve Efficency of Plan Development Measure Objective Complete 85% of the reviews of each Plan Stage Reduce Plan Review Submission within the Commitetd Review Time Schedule as detailed in individual consultant Time contracts. 2008 78% 94% 1% 2009 79% 94% 0% 24% 2010 81% 94% 0% 40% 2011 2012 NA NA 0.3% 60% NA NA NA 80% 2008 2009 2010 2011 2012 100% 100% 100% 100% 100% 100% 100% 100% 100% 2008 2009 2010 2011 2012 YES YES YES YES YES 2008 2009 2010 2011 2012 NA NA NA NA 15% 85% Performance Measure Discussion: The performance of the Engineering Services Section is excellent in 7 of the 8 categories. All bridges continue to be inspected on time and individual bridge ratings continue to exceed expectations. Two structures in the county were required to have reduced load limits posted on them in 2011. The first structure, the Vanderhoof Road Bridge over the Tuscarawas River in New Franklin was both posted and repaired in the same year. The Knox Blvd. bridge over Pigeon Creek in Copley Township, is a pair of large metal culverts that are ranked as a bridge because the over-all span of the combined structures under the pavement is greater than 10 feet. This bridge is required to have a minimum of one foot of earthen embankment on top of the culverts to ensure that the traffic loads are safely transferred into the underlying soils. The depth of cover is less than 1 foot thus the twin culverts require a load limit. To correct this deficiency will require the construction of a hump in the roadway to satisfy the cover requirements or the total replacement of the entire structure with a large box culvert at a cost of approximately $80,000. This issue will be addressed in 2012. The single unsatisfactory measure is the effort to Reduce Plan Review Time. All other goals were met in 2011. This section experienced a 50% staff reduction that started in mid-January. We adjusted our operation with the addition of a consultant task order contract to mitigate this deficiency and we anticipate improved ratings in 2012. 533561607 - 21 - Highway and Drainage Section Highway Group The Highway Group is responsible for highway design, installation and maintenance of traffic control devices such as signs, pavement markings, guardrail and traffic signal systems/warning flashers. These functions are integral parts of all improvements made to Summit County highways. In addition to the group’s primary function of preparing plans for roadway improvements, the Highway Group also conducts studies and/or evaluations of roadway traffic, geometrics, physical features and access. The Highway Group determines the need for signage, guardrail, lane assignments/construction, speed limit revisions, traffic control devices and other safety capacity improvements. This group also reviews and coordinates construction projects to ensure that alternate routes for traffic detours are free of major obstructions and available during the construction season. Allotment Group The Allotment Group works with developers, engineers, contractors, governmental agencies and the public to regulate the design, construction and acceptance of subdivisions. This group also coordinates inspections under the Engineer’s annual storm water maintenance program. This consists of inspecting detention/retention ponds, catch basins, headwalls and storm sewers in subdivisions throughout the County. When required, corrective measures are taken to update the storm water facilities to assure that storm water is appropriately managed in allotments. The expenses related to storm sewer and surface water issues are funded by the county’s general fund or the through maintenance assessments paid by property owners for the purpose of inspecting and maintaining storm sewer infrastructure. Drainage Group The Drainage Group coordinates requests, reviews, inspects, designs and schedules improvements to ditches, culverts, storm sewers and other drainage-related items for landowners, townships and/or County maintenance. Site plan reviews are also coordinated by the Drainage Group. The expenses related to storm sewer and surface water issues are funded by the county’s general fund or the through maintenance assessments paid by property owners for the purpose of inspecting and maintaining storm sewer infrastructure. 533561607 - 22 - 2012 Operating Budget Request Program Request Acct # Description 2012 Budget 20501 Salaries - Employees $ 312,270.40 20525 Overtime $ 25501 Fringe Benefits $ 122,410.00 30501 Supplies / Prof. Svcs. $ 600.00 37501 Travel/Cont.Ed. $ 6,900.00 45501 Contract Services $ 109,500.00 54501 Rentals/Leases $ 58501 Advertising $ 60501 Other $ 2,340.00 70501 Equipment $ 4,100.00 $ 558,120.40 Division Changes Division Request 2012 Budget $ - $ 312,270.40 $ - $ $ - $ 122,410.00 $ - $ 600.00 $ - $ 6,900.00 $ (29,500.00) $ 80,000.00 $ - $ $ - $ $ - $ 2,340.00 $ (1,900.00) $ 2,200.00 $ (31,400.00) $ 526,720.40 Department Changes $ $ $ $ $ $ $ $ $ $ $ (200.00) (200.00) $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 312,100.00 122,500.00 600.00 6,900.00 80,000.00 2,400.00 2,200.00 526,700.00 Major Budgetary Changes: The reduction of $29,500 in contract services is due to drainage task order contracts that are funded through the general fund storm water allocation and the assessed subdivision storm water maintenance funds. Personnel: 3 Design Engineer 2, Design Engineer 1, Construction Projects Coordinator Proposed Personnel Changes: Reclassification of 1 Design Engineer 1 to a Design Engineer 2 Performance Measures Goal: Maintain county roads, bridges and culverts. Measure Objective Percent of unrated Reduce percentage of culverts that cannot be rated culverts to less than 10% Goal: Improve intersection safety. Measure Objective Percent of Traffic Signals upgraded Upgrade 5% of traffic signal controllers per year. Percent of Traffic Increase percent of signal controllers with battery Signals with backup systems by 5% annually (until 100% have functioning battery functioning battery backup systems, then maintain at backup systems 100%). Goal: Assure compliance with county subdivision regulations. Measure Objective Reduce the percentage of subdivision construction Percent of Subdivision bonds that are older than 2 years (until 0% exceed 2 Bonds over 2 years years, then maintain at 0%). 533561607 2008 2009 2010 22% 2008 2008 2009 2009 2010 2011 2012 22% 2011 10% 2012 0% 10% 5% 23% 28% 33% 2010 93% 2011 2012 81% - 23 - 60% Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. Survey Section The Survey Section provides surveys, survey data and data management for the Summit County Engineer’s office. The survey section also conducts plan reviews of major road and bridge projects as well as road dedications, road vacations, annexations and land subdivisions. The Survey Section continues to perpetuate the integrity of the road surfaces by surveying for the installation of Monument Boxes. Since a portion of everyone’s property borders a road, private surveyors need to dig holes in the pavement to find old survey pins that define the centerline of that road. The holes can be more than a foot deep and soon turn into “pot holes”. Surveys are conducted to determine the centerline of road right of way in coordination with a pavement resurfacing project. Monument Boxes containing survey pins marking the centerline can then be installed at the surface of the pavement during the paving project. This allows private surveyors to simply lift the lid of the monument box to access the pins they need to perform surveys for the general public and other improvement projects. This helps to eliminate unnecessary pot holes and extend the life of the pavement. This section is essential in providing online data to the public. Scanned images of surveys, subdivisions and subdivision improvement plans from our records can be found through the “ONLINE TOOLS” section on the Summit County Engineer website: http://www.summitengineer.net/resources/tools. 2012 Operating Budget Request Program Request Acct # Description 2012 Budget 20501 Salaries - Employees $ 258,252.80 20525 Overtime $ 100.00 25501 Fringe Benefits $ 101,274.30 30501 Supplies / Prof. Svcs. $ 2,500.00 37501 Travel/Cont.Ed. $ 5,400.00 45501 Contract Services $ 400.00 54501 Rentals/Leases $ 32,016.34 58501 Advertising $ 60501 Other $ 810.00 70501 Equipment $ 7,300.00 $ 408,053.44 533561607 Division Changes Division Request 2012 Budget $ - $ 258,252.80 $ - $ 100.00 $ - $ 101,274.30 $ - $ 2,500.00 $ (1,400.00) $ 4,000.00 $ - $ 400.00 $ (10,008.00) $ 22,008.34 $ - $ $ - $ 810.00 $ (2,000.00) $ 5,300.00 $ (13,408.00) $ 394,645.44 Department Changes $ $ $ $ $ $ $ $ $ $ $ (6,164.34) (6,164.34) $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 258,300.00 100.00 101,300.00 2,500.00 4,000.00 400.00 15,900.00 900.00 5,300.00 388,700.00 - 24 - Major Budgetary Changes: The $16,172.34 reduction in rentals and leases is due to the selection of one of two duplicate requests for survey equipment leasing options that were proposed in the original section request. Personnel: (2) Surveyors, (2) Survey Coordinators, Survey Technician 2 Proposed Personnel Changes: No personnel changes are anticipated for 2012. Performance Measures Goal: Provide survey services in a timely manner. Measure Objective 2008 Response to Survey Complete requested surveys by agreed upon date for Services Requests 75% of the projects. Goal: Perpetuate survey monumentation defining road centerlines. Measure Objective Set centerline and/or right of way survey monumentation on Summit County Engineer 448 paving projects and highway paving projects Centerline designed in-house prior to the end of the project year Monumentation for 75% of the projects 2008 Goal: Make all Summit County Engineer road records available to the public. Measure Objective 2008 Availability of Summit Create scanned images of 75% of approved surveys, County Road and recorded plats and improvement plans within 2 Survey Records weeks of receiving them 2009 2010 2011 2012 75% 2009 2010 2011 75% 2012 75% 2009 2010 2011 75% 2012 75% 75% Goal: Make recent Summit County Engineer county highway centerline information available to the public. Measure Objective 2008 2009 2010 2011 2012 Availability of Summit Create and file centerline drawings from recent County Engineer survey information 75% of the time within 12 weeks Survey records of survey completion 75% 75% Goal: Ensure good operational condition of survey equipment. Measure Objective 2008 Survey Total Station Calibrate and clean primary survey total station within Maintenance 12-month intervals. 2009 2010 2011 2012 YES YES Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. 533561607 - 25 - Public Services Division The Public Services Department is responsible for maintaining over 360 lane miles of county roadway, 315 bridges, 1,200 culverts, guardrail, berms, vegetation control, ditches, pavement markings, traffic signals, tree trimming and removal, deceased animal removal, driveway culvert pipes, fleet maintenance, maintenance of retention and detention ponds, roadside mowing, snow and ice control on township roads and some State Highways. Administration Section The Public Services Administration Section provides support to the Public Services Division employees, orders and tracks materials, oversees the Division budget and processes all requests for services on county roads, bridges and ditches. 2012 Operating Budget Request Program Request Acct # Description 2012 Budget 20501 Salaries - Employees $ 179,878.40 20525 Overtime $ 25501 Fringe Benefits $ 76,628.20 30501 Supplies / Prof. Svcs. $ 1,000.00 35501 Materials $ 37501 Travel/Cont.Ed. $ 4,000.00 45501 Contract Services $ 11,000.00 54501 Rentals/Leases $ 9,000.00 58501 Advertising $ 500.00 60501 Other $ 89,500.00 70501 Equipment $ $ 371,506.60 Division Changes Division Request 2012 Budget $ - $ 179,878.40 $ - $ $ - $ 76,628.20 $ (1,000.00) $ $ - $ $ - $ 4,000.00 $ (10,000.00) $ 1,000.00 $ - $ 9,000.00 $ - $ 500.00 $ 500.00 $ 90,000.00 $ - $ $ (10,500.00) $ 361,006.60 Department Changes $ $ $ $ $ $ $ $ $ $ $ $ (100.00) (1,100.00) (1,200.00) $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 179,800.00 75,600.00 4,000.00 1,000.00 9,000.00 500.00 90,000.00 359,900.00 Major Budgetary Changes: The $10,000 reduction in contract services is due to duplicate requests for IT services that were included in the Administrative Division budget. Personnel: Director of Public Services, Office Manager, Receptionist Secretary Proposed Personnel Changes: No personnel changes are anticipated for 2012. 533561607 - 26 - Performance Measures Goal: Improve operation of the Public Service Division Measure Objective 2008 2009 2010 Response time to RFS Reduce annual carry-overs to less than 10 Goal: Safely Provide Public Services to Summit County Measure Objective Number of work Maintain number of work related injuries at less than related injuries 15 per year. 2011 10 2008 2009 15 9 2010 15 2012 2011 10 9 2012 5 5 Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. Bridge and Ditch Section The Bridge and Ditch section handles the maintenance and upkeep of Summit County’s 315 bridges that can be performed with maintenance crews. In addition they handle ditch clean up. Summit County inspects all 315 bridges annually and as a result of those inspections, if necessary, the Bridge Engineer issues Requests for Service to the bridge crews who then perform the maintenance work needed to keep our bridges safe and secure. 2012 Operating Budget Request Acct # 20501 20525 25501 30501 35501 37501 45501 54501 58501 60501 70501 Description Salaries - Employees Overtime Fringe Benefits Supplies / Prof. Svcs. Materials Travel/Cont.Ed. Contract Services Rentals/Leases Advertising Other Equipment Program Request 2012 Budget $ 464,713.60 $ 10,000.00 $ 202,227.99 $ 5,800.00 $ 71,800.00 $ 1,000.00 $ 32,569.00 $ 8,896.00 $ $ $ $ 797,006.59 Division Changes Division Request 2012 Budget $ - $ 464,713.60 $ - $ 10,000.00 $ - $ 202,227.99 $ (5,800.00) $ $ (5,000.00) $ 66,800.00 $ - $ 1,000.00 $ (28,000.00) $ 4,569.00 $ - $ 8,896.00 $ - $ $ 5,800.00 $ 5,800.00 $ - $ $ (33,000.00) $ 764,006.59 Department Changes $ $ $ $ $ $ $ $ $ $ $ $ (46,051.20) (19,617.81) 6,800.00 (72,469.01) $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 418,700.00 10,000.00 182,700.00 60,000.00 1,000.00 4,600.00 8,900.00 5,800.00 691,700.00 Major Budgetary Changes: The $65,669.01 reduction in the personnel request is due to the elimination of an additional heavy equipment operator requested by the section. 533561607 - 27 - The $28,000 reduction in contract services is due to duplicate requests funded through the Engineering Division budget. Personnel: Ditch Maintenance Supervisor, 2 Highway Maintenance Crew Leaders, 3 Bridge Worker 2, 3 Ditch Maintenance Workers Proposed Personnel Changes: The position of Ditch Maintenance Supervisor is to be changed to Highway Maintenance Supervisor. This move more accurately identifies the role of this position which matches the organizational responsibilities of the Highway Maintenance Supervisor in the North District Section. The number of Bridge Workers has been reduced to 3. The position currently remains unfilled due to lack of work and is not funded in the 2012 budget request. Performance Measures Goal: Inspect and appraise ditch functionality Measure Objective Prevent County ditches from accumulating debris Capacity of ditch for and causing runoff backups that would cause flood drainage damages to private properties Goal: Increase Bridge safety Measure Objective Identify, plan for, and complete all necessary repairs Review inspectors to bring the subject bridge to a more secure rating, reports and extend its useful life. 2008 2008 2009 2009 2010 2010 2011 2012 YES YES 2011 2012 YES YES Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. Fleet Maintenance Section The Fleet Maintenance section handles the maintenance and upkeep of the SCE’s fleet of vehicles ranging from cars to snow plow trucks. 533561607 - 28 - 2012 Operating Budget Request Acct # 20501 20525 25501 30501 35501 37501 45501 54501 58501 60501 70501 Description Salaries - Employees Overtime Fringe Benefits Supplies / Prof. Svcs. Materials Travel/Cont.Ed. Contract Services Rentals/Leases Advertising Other Equipment Program Request 2012 Budget $ 571,792.00 $ 10,000.00 $ 247,843.39 $ 313,785.00 $ 10,000.00 $ $ 8,000.00 $ $ $ 11,456.00 $ $ 1,172,876.39 Division Changes Division Request 2012 Budget $ - $ 571,792.00 $ - $ 10,000.00 $ - $ 247,843.39 $ (313,785.00) $ $ - $ 10,000.00 $ - $ $ - $ 8,000.00 $ - $ $ - $ $ 313,485.00 $ 324,941.00 $ - $ $ (300.00) $ 1,172,576.39 Department Changes $ $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 571,800.00 10,000.00 247,900.00 10,000.00 8,000.00 325,000.00 1,172,700.00 Major Budgetary Changes: The shift in funding between the supplies and other expenses line item was done to more accurately reflect where the various charges are posted in the County’s financial reporting system. Personnel: Fleet Facility Maintenance Manager, Auto Service Worker 2, Auto Service Worker 2 Tire and Brake, Custodial Worker, Equipment Operator 3, (4) Mechanics, Messenger, Stores Keeper, Welder, Inventory Control Specialist 2 Proposed Personnel Changes: No personnel changes are anticipated for 2012. Performance Measures Goal: Improve Snow/Ice removal efficiency Measure Objective Ensure that snow trucks down time is no more than Snow Truck availability 48 hours (mechanical) 2008 2009 2010 90% 2011 2012 90% 90% Goal; Reduce the number of repairs required through the implementations of an effective preventative maintenance program. Measure Objective 2008 2009 2010 2011 2012 Assure that all vehicles receive timely recommended service as scheduled, and are properly cleaned on a regular basis to increase their life cycle and maximize Frequency of repairs cost/benefit 95% 95% 90% 533561607 - 29 - Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. North Station Section and South Station Section Our North Station is responsible for the snow and ice control and road maintenance in northern Summit County. Similarly, South Station is responsible for the snow and ice control and road maintenance in southern Summit County. North Station also handles all signage, signalization and safety measures on Summit County roads, including guardrail and pavement markings. 2012 Operating Budget Request – North Station Acct # 20501 20525 25501 30501 35501 37501 45501 54501 58501 60501 70501 Description Salaries - Employees Overtime Fringe Benefits Supplies / Prof. Svcs. Materials Travel/Cont.Ed. Contract Services Rentals/Leases Advertising Other Equipment Program Request 2012 Budget $ 1,057,056.00 $ 60,000.00 $ 475,865.86 $ 107,000.00 $ 568,000.00 $ 1,200.00 $ 12,900.00 $ 3,500.00 $ $ 11,700.00 $ $ 2,297,221.86 Division Changes Division Request 2012 Budget $ - $ 1,057,056.00 $ - $ 60,000.00 $ - $ 475,865.86 $ - $ 107,000.00 $ (40,000.00) $ 528,000.00 $ 500.00 $ 1,700.00 $ 620.00 $ 13,520.00 $ - $ 3,500.00 $ - $ $ 7,500.00 $ 19,200.00 $ - $ $ (31,380.00) $ 2,265,841.86 Department Changes $ $ $ $ $ $ $ $ $ $ $ $ (43,638.40) (18,589.96) (23,000.00) (5,000.00) (90,228.36) $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 1,013,500.00 60,000.00 457,300.00 107,000.00 505,000.00 1,700.00 13,600.00 3,500.00 14,200.00 2,175,800.00 Major Budgetary Changes: The $62,228.36 reduction in personnel expenses is the result of leaving the equipment operator 2 position vacant. The $63,000 reduction in materials is due to budgetary constraints. Personnel: Roads Maintenance Manager, Highway Maintenance Supervisor, Heavy Equipment Operator, (14) Equipment Operator 2, (3) Highway Maintenance Crew Leaders, (2) Safety Workers Proposed Personnel Changes: The Highway Safety workgroup was moved into the North Station Section in last year’s organization chart but was not fully integrated in the budget. This budget completes the process of moving the Highway Safety workgroup into the North Station Section. One Safety Worker left employment recently. There is no plan to re-fill the vacant position and it has not been funded in the 2012 budget. 533561607 - 30 - One Equipment Operator was reduced through layoff at the end of 2010 and was not reinstated in 2011 due to lack of work. That position remains vacant and is unfunded in the 2012 budget. At the end of 2010, the Laborer/Highway Worker for the North Section retired and was not replaced in 2011. That position remains vacant and is unfunded in the 2012 budget. Performance Measures Goal: Efficiently respond to Requests For Service (RFS) Measure Objective Reponse time to complete RFS Complete 90% of RFS within 4 weeks of receipt Goal: Provide Efficient and Effective Snow and Ice Removal Services Measure Objective Response time to Have appropriate forces mobilized no longer than 60 snow events minutes from the onset of the snow event Goal: Maintain road safety and informational markings Measure Objective 2008 2009 2010 2011 2012 90% 2008 2009 2010 2011 60 2008 2009 90% 2012 42 2010 2011 Repainted road Complete 90% of all informational markings each informational markings year 60 2012 90% 90% Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. 2012 Operating Budget Request – South Station Acct # 20501 20525 25501 30501 35501 37501 45501 54501 58501 60501 70501 Description Salaries - Employees Overtime Fringe Benefits Supplies / Prof. Svcs. Materials Travel/Cont.Ed. Contract Services Rentals/Leases Advertising Other Equipment 533561607 Program Request 2012 Budget $ 636,896.00 $ 60,000.00 $ 296,877.70 $ 243,000.00 $ 564,000.00 $ 600.00 $ 3,000.00 $ 1,500.00 $ $ 1,900.00 $ 900.00 $ 1,808,673.70 Division Changes Division Request 2012 Budget $ - $ 636,896.00 $ - $ 60,000.00 $ - $ 296,877.70 $ - $ 243,000.00 $ (75,000.00) $ 489,000.00 $ - $ 600.00 $ 1,500.00 $ 4,500.00 $ - $ 1,500.00 $ - $ $ (400.00) $ 1,500.00 $ - $ 900.00 $ (73,900.00) $ 1,734,773.70 Department Changes $ $ $ $ $ $ $ $ $ $ $ $ (20,500.00) (20,500.00) $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 636,900.00 60,000.00 296,900.00 243,000.00 468,500.00 600.00 4,500.00 1,500.00 1,500.00 900.00 1,714,300.00 - 31 - Major Budgetary Changes: The $95,500 reduction in materials is due to budgetary constraints. Personnel: Roads Maintenance Manager, Heavy Equipment Operator, (11) Equipment Operator 2 (1 open), Highway Maintenance Crew Leader, Highway Maintenance Worker 2 Proposed Personnel Changes: No personnel changes are anticipated for 2012. Performance Measures Goal: Efficiently respond to Requests For Service (RFS) Measure Objective Reponse time to Maintain an average response time of two weeks for complete RFS the completion of RFS Goal: Provide Efficient and Effective Snow and Ice Removal Services Measure Objective Response time to Have appropriate forces mobilized no longer than 45 snow events minutes from the onset of a call in snow event 2008 2008 2009 2009 2010 2010 0 2011 2012 YES YES 2011 2012 38 45 Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. 533561607 - 32 - Specialized Services Section The Specialized Services Section handles all signage and signalization on Summit County roads, building maintenance, and specialized services like carpentry, masonry, tree trimming and landscaping. 2012 Operating Budget Request Acct # 20501 20525 25501 30501 35501 37501 45501 54501 58501 60501 70501 Description Salaries - Employees Overtime Fringe Benefits Supplies / Prof. Svcs. Materials Travel/Cont.Ed. Contract Services Rentals/Leases Advertising Other Equipment Program Request 2012 Budget $ 330,387.20 $ 9,000.00 $ 144,578.95 $ 104,275.00 $ 97,500.00 $ 2,200.00 $ 7,710.00 $ 2,300.00 $ $ 2,785.00 $ 37,500.00 $ 738,236.15 Division Changes Division Request 2012 Budget $ - $ 330,387.20 $ - $ 9,000.00 $ - $ 144,578.95 $ (104,275.00) $ $ (75,000.00) $ 22,500.00 $ - $ 2,200.00 $ (2,000.00) $ 5,710.00 $ - $ 2,300.00 $ - $ $ 38,275.00 $ 41,060.00 $ (6,000.00) $ 31,500.00 $ (149,000.00) $ 589,236.15 Department Changes $ $ $ $ $ $ $ $ $ $ $ $ - $ $ $ $ $ $ $ $ $ $ $ $ Department Request 2012 Budget 330,400.00 9,000.00 144,600.00 22,500.00 2,200.00 5,800.00 2,300.00 41,100.00 31,500.00 589,400.00 Major Budgetary Changes: The $104,275 reduction in supplies is the result of a transfer to the other expenses line item. The net reduction of $66,000 is due to the completion in 2011 of several projects that were included in the original request. The $75,000 reduction in materials is due to inclusion of signage upgrades that were included in the original request. The original request anticipated that the federal mandate for sign reflectivity would require major upgrades in 2012. Since the original request was submitted, the federal government eased the upgrade deadline and the funding was reduced accordingly. Personnel: Deputy Director of Maintenance Administration, Carpenter, Mason, Maintenance Repairer, Sign Maker, Signal Technician Proposed Personnel Changes: The Highway Safety workgroup was moved into the North Station Section in last year’s organization chart but was not fully integrated in the budget. This budget completes the process of moving the Highway Safety workgroup into the North Station Section. 533561607 - 33 - Performance Measures Goal: Efficiently respond to Requests for Service Measure Objective Response time to Complete 95% of requests within 2 weeks of date of complete RFS request Goal: Efficiently respond to interdepartmental Service Requests Measure Objective Response time to Complete 90% of requests within 2 weeks of date of complete requests request Goal: Increase life of existing facilities Measure Objective Timely complete building maintenance Complete 95% of requests within 1 week of date of requests request Goal: Improve Intersection Safety Measure Objective Traffic Signal Replacement/ Upgrade Six Traffic Signals By Adding Battery Back Upgrades Ups & New Controllers Traffic Signal Annually Inspect 100% Of County Owned Traffic Inspections Signals 2008 2009 2010 95% 2008 2009 2010 90% 2008 2009 2010 95% 2008 2009 2010 2011 2012 95% 2011 95% 2012 90% 2011 90% 2012 95% 95% 2011 2012 100% 100% 100% 100% Performance Measure Discussion: Figures included for 2011 and 2012 indicate the performance targets established by the section leaders due to the fact that a full year’s data is currently unavailable. Infrastructure Measures Bridge Inspections All 315 Summit County owned bridges are fully inspected annually. In 2011 our bridge inspections began in January. As of April 2011, 98% of the bridges on our inventory had been inspected. Bridge consultants will be reviewing the inspection reports ensuring that Summit County bridges are constantly monitored and maintained for safety. In addition, the Federal Highway Administration required that 60% of bridges with a span larger than 20 feet be “load rated” by October of 2011. We have reached this goal by completing 63.1% of our 176 large bridge load ratings. Pavement Condition Index The Pavement Condition Index is a simple, convenient and inexpensive way to monitor the condition of the surface of roads, identify maintenance and rehabilitation needs, and ensure that road maintenance budgets are spent wisely. The PCI rates the condition of the surface of a road using a numerical scale of 0-100. Every two years the Summit 533561607 - 34 - County Engineer’s office contracts with a company to perform this analysis on the county roadways. The data collected is then used to determine our pavement maintenance program, ensuring that our office repairs the roadways in an efficient and cost effective manner. The Summit County Engineer’s office has set in place a five year plan regarding our Pavement Condition Index. The goal is to maintain an average Pavement Condition Index rating of 65. We have determined, using budget and pavement condition analysis, that we need a pavement maintenance budget of $2 million to remain stable at the current PCI and a budget of $2.5 million to begin restoring the County roads to a PCI of 65. See the charts below comparing differing pavement maintenance budgets and the projected PCI’s as a result. The current budget only provides $1.6 million to the pavement maintenance program which is 7.4% more than the 2011 funding, though additional Public Lands Highway Discretionary funds received by the County will impact PCI in 2012. Current Funding Level The proposed budget attempts to divert as much as is fiscally possible to pavement maintenance. Despite increased funding levels for pavement maintenance in each of the last two years, the following graph shows that current funding levels will not be sufficient to maintain the County’s roads in their current condition. This is the primary funding challenge for the Engineer’s Office at this time. $1.6 MIL 5 YEAR PLAN RESULT 70 65 PCI 60 61 60 59 58 57 55 50 2011 2012 2013 2014 2015 PLAN YEAR Stable Condition Funding Level In order to maintain the County’s roads at their current state of repair, the County needs to spend approximately $2 million per year on pavement maintenance as can be seen in the next graph. Unfortunately, the MVGT fund does not have sufficient resources to meet the funding level required for pavement condition stabilization. 533561607 - 35 - $2 MIL 5 YEAR PLAN RESULT 70 65 PCI 60 61 61 61 61 61 55 50 2011 2012 2013 2014 2015 PLAN YEAR Performance Measure Funding Requirement A reasonable goal for the condition of County roads is to maintain a minimum average PCI of 65. In order to return to this level, we currently project that funding of approximately $2.5 million per year is required. This figure, however, is likely to increase in the future because we are not currently able to provide enough funding to stabilize the pavement condition on County roads. As a result, the County needs to address potential funding options to increase the amount of money available for pavement maintenance or accept the progressive deterioration of the pavement condition on County roads. $2.5 MIL 5 YEAR PLAN RESULT 70 65 63 PCI 60 62 64 64 62 55 50 2011 2012 2013 2014 2015 PLAN YEAR 533561607 - 36 - 2012 Capital Budget New to this year’s budget document is the discussion of the 2012 Summit County Engineer’s Capital Budget. Summit County Engineer Internal Budget Request 2012 Budget Capital Funding Summary (2012 portion only) Project Title Landslide Mitigation Railroad Crossing Intersection Improvements Arlington Rd South Main 4 Survey Pins Traffic Access Management Akron-Peninsula Road CVNP Landslide Repair and Resurfacing CVNP Spot Paving Bank St. Bridge Cleveland-Mass. (VanHyning) Harrington Rd Medina Line Rd. Bridge Ravenna Rd (Tinkers Creek) TTWP Aerial Mapping (Surface Water) USGS Stream Monitoring (Surface Water) County Ditches (Surface Water) Regional Stormwater (Surface Water) Pavement Maint. MVGT Allocation SC General Fund Federal Funds State/Local Funds Total 2012 Budget $20,000 $0 $0 $0 $20,000 $20,000 $0 $0 $0 $20,000 $20,000 $0 $0 $0 $20,000 $140,000 $0 $0 $0 $140,000 $15,000 $0 $0 $0 $15,000 $150,000 $0 $0 $0 $150,000 $0 $0 $700,000 $0 $700,000 $0 $0 $830,000 $0 $830,000 $0 $0 $420,000 $0 $420,000 $220,000 $0 $0 $0 $220,000 $1,000 $0 $0 $9,000 $10,000 $130,000 $0 $0 $0 $130,000 $115,000 $0 $0 $0 $115,000 $100,000 $0 $0 $0 $100,000 $0 $133,000 $0 $0 $133,000 $0 $47,800 $0 $0 $47,800 $0 $150,000 $0 $0 $150,000 $0 $150,000 $0 $0 $150,000 $1,600,000 $0 $0 $0 $1,600,000 $2,531,000 $480,800 $1,950,000 $9,000 $4,970,800 Landslide Mitigation This project will provide an inventory and assessment of current landslide hazards and repair landslide damage. The County will develop a comprehensive and efficient strategy for reducing risks, damage and losses from landslides and slope movements at designated locations throughout Summit County. Railroad Crossing Project This program is to design gates and signals at various unprotected crossing throughout the County. The County has fourteen unguarded at-grade crossing including crossing on Killian Road, Pickle Road and Munroe Falls Road. We are currently in the process of applying for a TIGER III Grant to fund some of this project. Intersection Improvement Project This program will fund the design of safety and signalization improvements at existing intersections throughout Summit County. 533561607 - 37 - Arlington Road AMATS programmed $1,040,000.00 in Federal MPO CMAQ funds for the Arlington Road Improvement project. Improvements will include a construction of an inter connected traffic signal system, ADA compliant ramps and sidewalks, a northbound left turn lane at Warner Road and resurfacing from Killian Road to Krumroy Road. The local share is $260,000.00. South Main Street Phase IV Survey Pins S Main St. Phase IV was performed in 2008 and 2009. Setting survey pins for the rightof-way acquired for the project was not authorized and the design contract (with McCoy) has since been closed. Bob Warren, our Chief Surveyor, indicates that the best way to have this work performed would be by hiring KCI (FKA McCoy) to set the pins since they developed, signed, and stamped the right-of-way plans and legal descriptions. Traffic Access Management This is a continuation of the Traffic Access Management program. Phase 1 was the kick-off, data collection, building support and some education portion of the program. Phase 2 will be the development of the Traffic Access management Manual, submitting the manual through a committee of stakeholders and producing and submission of the final manual suitable for adoption by the County Council. Akron-Peninsula Road Resurface Akron Peninsula Road from Cuyahoga Falls North Corporation Limit to the recently resurfaced portion of Akron-Peninsula Road south of Truxell Road. Work is to include pavement repairs, shoulder restoration and resurfacing and pavement markings. The funding source is a federal Public Lands Highway Discretionary (PLHD) grant and is restricted to projects within the Cuyahoga Valley National Park. A total of $1.97 million was made available to this office and is restricted by the grant application requirements. Cuyahoga Valley National Park Landslide Repair and Resurfacing Repair of an existing landslide along Everett Road and resurface the pavement from Farmstead Road to Everett Connector. Work is to include landslide stabilization pavement repairs, shoulder restoration and resurfacing and pavement markings. The funding source is a federal PLHD grant and is restricted to projects within the Cuyahoga Valley National Park. A total of $1.97 million was made available to this office and is restricted by the grant application requirements. Cuyahoga Valley National Park Spot Paving At various locations located within the Cuyahoga Valley National Park provide spot resurfacing to portions of the county highway system including shoulders, repair/replace and upgrade sections of damaged or deficient guardrails replace worn out, damaged or 533561607 - 38 - missing signs, including park entrance signs, resurface parking areas and trailheads at yet to be determined locations and providing pavement markings as required. Spot paving work shall also include repairs to culverts passing under the county highways and resurfacing over the repair/replacement. The funding source is a federal PLHD grant and is restricted to projects within the Cuyahoga Valley National Park. A total of $1.97 million was made available to this office and is restricted by the grant application requirements. Bank Street Bridge This project involves the replacement of the bridge superstructure, the repair of the bridge substructures, and the reconstruction of roadway approach slabs, pavement and guardrails. Construction is expected in 2014. Cleveland Massillon Road Bridge over Van Hyning This is a complete bridge replacement project. Plans call for the bridge to be widened and to include a sidewalk on the west side. Our office is partnering with the City of Norton on this project. The Ohio Public Works Commission will fund 80% of the project, City of Norton will provide 10% and we will provide 10%. The project is currently in the design phase. Harrington Road Bridge In cooperation with the Ohio Department of Natural Resources' project to reconstruct the Harrington Road Dam, the County will fund repairs to the bridge deck. As part of a plan prepared by the ODNR to reconstruct the dam, our office will develop a set of plan notes and details to mill off the existing wearing surface, make both partial depth and full depth deck repairs and place a new wearing course on the deck. The ODNR will bid and administer the project. Summit County Engineer would inspect the bridge portion of the ODNR project. Medina Line Road Bridge over Yellow Creek This is a bridge replacement project currently nearing the end of the design phase. The bridge currently has a sufficiency rating of 59.4 out of 100. SCE has received OPWC funds for this project and we are partnering with the Medina County Engineer. SCE will administer the project. Ravenna Road Bridge over Tinker’s Creek This project involves the reconstruction of the Ravenna Road Bridge (No. HUT-0120005) over Tinkers Creek. The bridge will maintain a similar alignment and profile with minimal approach work. The project also includes application of new pavement markings and traffic control devices. Temporary pavement will be required for maintenance of traffic. Construction is expected in 2013. The project is funded with 80% CEAO LBR funds. 533561607 - 39 - Aerial Mapping This oblique (angled view) imagery will be an update to our 2008 imagery. It will allow the user to see high-resolution images from multiple directions of any area in the county. LIDAR (LIGHT Detection and Ranging) will generate highly accurate modeling surfaces for storm water, terrain modeling and contour creation. These data sets will be made available to all County offices and the general public, on the existing Summit County ArcIms site. USGS Stream Monitoring SCE partners with the United State Geological Survey to monitor streams, perform stream modeling, and flood plain mapping for Summit County. County Ditches SCE has received money from the general fund in order to repair and maintain non petitioned County ditches that cannot be paid for out of the Motor Vehicle and Gas Tax Fund. Regional Storm Water A regional storm water program is critical in order for Summit County to prevent large scale floods such as we have seen in 2011. However, there is a large cost to be able to identify and implement such a program. In the past, this office has received money from the general fund in order to address the design, construction, planning, and administration of regional storm water detention basins and we wish to continue that effort in 2012. Pavement Maintenance Our pavement maintenance program includes hot mix resurfacing, asphalt rejuvenation, crack sealing, micro resurfacing, motor paving resurfacing, pavement marking, seal coating, and spot paving. 533561607 - 40 - Revenue Projections Summit County Engineer Internal Budget Request 2012 Budget Revenue Summary Acct # 11302 11303 13230 13676 13691 1600 17022 17042 17202 17402 Description Permissive Auto Tax County Permissive Tax - HB419 FEMA Reimbursement Gasoline Taxes Vehicle License Taxes Municipal Courts Other Non-Operating Revenue Other Receipts Refunds Reimbursements Special Assessments 17562 Sales - Personal Property 18006 Interest Income Norton Contract New Franklin Contract 19999 Transfers-in Subtotal MVGT Fund 13241 Federal Direct Pay 13271 State Direct Pay Total Engineer Revenues $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 2011 Budget 400,000.00 3,500,000.00 2,500,000.00 7,800,000.00 247,000.00 16,950.00 548,160.00 10,000.00 5,000.00 74,500.00 95,800.00 255,000.00 15,452,410.00 401,600.00 2,098,600.00 17,952,610.00 $ $ $ $ $ $ $ $ 2012 Budget 400,000.00 3,500,000.00 2,500,000.00 7,700,000.00 240,000.00 - $ $ $ $ $ $ $ $ $ $ $ 520,000.00 10,000.00 3,000.00 50,000.00 120,000.00 480,800.00 15,523,800.00 1,950,000.00 9,000.00 17,482,800.00 The Engineer’s office supports its road and highway related operations exclusively through the Motor Vehicle Gas Tax (MVGT) fund. Other operations related to storm water management are currently supported by either special assessments or the County’s General fund capital budget. Portions of the Ohio vehicle registration, gasoline and permissive taxes fund the Engineer’s office. Approximately 12 cents out of the current 28 cent State gasoline tax goes to Ohio County Engineers. Permissive taxes now account for our second largest share of revenue to the MVGT fund. Our county permissive tax is $15 per vehicle. By state law, the dollars collected from these taxes must be used for expenses related to planning, constructing, maintaining and repairing public roadways. Storm water operations are financed through separate funds because of the restricted use of MVGT fund dollars. Two special assessment funds are maintained with revenue from storm water assessments levied on subdivisions. These funds essentially operate as insurance pools for member subdivisions and provide for the on-going maintenance of storm water facilities within the assessed subdivisions. The funds are not designed to cover complete replacement of existing facilities or the addition of new facilities. General maintenance of the County’s storm water system outside these assessed subdivisions is currently paid for out of the General fund’s capital appropriation. Since 533561607 - 41 - the maintenance work on these storm water systems is provided by employees of the Engineer’s office, the office invoices these other funds to reimburse the MVGT fund for the cost of providing these services. 533561607 - 42 - Financial Overview/Expenditure Projections Summit County Engineer Internal Budget Request 2012 Budget Summit County Engineer Combined Budget Acct # 20501 20525 25501 30401 30501 35501 37501 45501 50501 54501 58501 60501 70501 80501 Description Salaries - Employees Overtime Fringe Benefits Internal Services Supplies / Prof. Svcs. Materials Travel/Cont.Ed. Contract Services Utilities Rentals/Leases Advertising Other Equipment Debt Service 2009 Actual $ 6,706,771.00 90,915.95 $ $ 2,517,657.92 71,500.00 $ 350,556.00 $ 731,016.00 $ 25,873.34 $ 101,384.00 $ 139,100.00 $ 36,918.00 $ 6,425.04 $ 491,923.00 $ 44,497.00 $ $ 1,393,191.00 $12,707,728.25 2010 Actual $ 6,133,923.46 116,000.00 $ $ 2,664,562.66 66,500.00 $ 544,300.00 $ $ 1,098,500.00 35,000.01 $ 108,800.00 $ 201,800.00 $ 33,100.00 $ 13,000.00 $ 578,500.00 $ 72,800.00 $ $ 1,395,900.00 $13,062,686.13 2011 Budget $ 6,007,800.00 86,300.00 $ $ 2,430,700.00 77,200.00 $ 501,300.00 $ $ 1,171,000.00 36,800.00 $ 832,700.00 $ 189,500.00 $ 65,100.00 $ 13,000.00 $ 469,400.00 $ 60,800.00 $ 975,400.00 $ $12,917,000.00 Program Request 2012 Budget $ 5,971,758.44 167,400.00 $ $ 2,470,376.86 75,600.00 $ 893,516.00 $ $ 1,311,300.00 66,935.00 $ $ 1,006,985.00 189,500.00 $ 90,862.34 $ 8,500.00 $ 199,356.00 $ 71,400.00 $ 975,400.00 $ $13,498,889.64 Division Changes $ $ $ $ (1,400.00) $ (432,860.00) $ (195,000.00) $ (17,875.00) $ (349,680.00) 500.00 $ $ (9,896.46) $ $ 315,160.00 $ (8,900.00) $ $(699,951.46) Division Request 2012 Budget $ 5,971,758.44 167,400.00 $ $ 2,470,376.86 74,200.00 $ 460,656.00 $ $ 1,116,300.00 49,060.00 $ 657,305.00 $ 190,000.00 $ 80,965.88 $ 8,500.00 $ 514,516.00 $ 62,500.00 $ 975,400.00 $ $12,798,938.18 Department Changes $ (145,424.84) $ $ (58,662.54) $ (11,500.00) (756.00) $ $ (50,300.00) 140.00 $ $ (4,906.00) $ $ (5,969.88) $ $ (4,615.00) $ 1,300.00 $ $(280,694.26) Department Request 2012 Budget $ 5,826,500.00 167,400.00 $ $ 2,412,000.00 62,700.00 $ 459,900.00 $ $ 1,066,000.00 49,200.00 $ 652,600.00 $ 190,000.00 $ 75,000.00 $ 8,500.00 $ 510,000.00 $ 62,500.00 $ 976,700.00 $ $12,519,000.00 Capital Program $ 4,970,800.00 Total Appropriation Request $ 17,489,800.00 Projected Revenue $ 17,482,800.00 Projected Change in Fund Balance $ 533561607 - 43 - (7,000.00) Summit County Engineer Organization Chart October 2011 for 2012 Budget Alan Brubaker, P.E.,P.S. Summit County Engineer Gus Kabbara Public Services Division Larry Fulton Chief Deputy Engineer Engineering Division Laurie Connell Office Manager Inventory Control Brown – Inv. Ctrl. Spec Cook – Storekeeper Watters - Messenger John Cavileer Special Services Duane Hawk Fleet/Facilities Simmonds Receptionist / Secretary Patrick Dobbins South Station Equipment Repair Burden - Mechanic Doyle – Mechanic Sosnosky – Mechanic Sabo – Mechanic Quinn – Welder Daily – Aut Ser Wkr 2 Estes – Aut Ser Wkr 2 Barclay – Custodial Wkr Trego – Equip Op 3 South Station Cook – Crew Ldr. Estes – Equip Op. 2 Ross – Equip Op. 2 Ketron – Equip Op 2 Cole – Equip Op. 2 Blaurock – Equip Op. 2 Jacoby – Equip Op. 2 Barnett – Equip Op. 2 Homan – Equip Op. 2 Fessler – Equip Op. 2 Sarlouis – Equip Op. 2 Bill Diesch North Station Schaffer – Lbr Hwy Wkr McCausland – Heavy Equip Op Bridge Maintenance Richards – Crew Ldr Fessler – Bridge Wkr Lee – Bridge Wkr Stonestreet – Bridge Wkr Ditch Maintenance Gulgas – Crew Ldr Hagat – Ditch Maint Wkr Smith – Ditch Maint Wkr Salyer – Ditch Maint Wkr Vacant – Heavy Equipment Op Deborah Obendorfer Office Manager Geordie Kissos Major Projects Vacant Engineer Project Manager Heidi Swindell Government Affairs Liaison David White Planning Rob Sobnosky Construct Tony Chiancone Highway Maintenance Highway Safety Cook – Crew Ldr Cerasuolo – Safety Wkr Kovacs – Safety Wkr North Station Jaye – Crew Ldr Hall – Equip Op 2 Healy – Equip Op 2 Hummel – Equip Op 2 Winters – Equip Op 2 Lardas – Equip Op 2 Rauch – Equip Op 2 Melito – Equip Op 2 Wagner – Crew Ldr Simmons – Equip Op 2 Lee – Equip Op 2 Delaney – Equip Op 2 Brunamonti – Equip Op 2 Means – Equip Op 2 Magazine – Equip Op 2 Davis – Equip Op 2 Collins – Const Team Mgr Ross – Design Eng 2 Right of Way Acquisition Burgess – Const Proj Coord Permits Starosta – Eng Tech Supervisor Inspection Smith – Const Team Mgr Kamvouris – Inspector 3 Topougis – Inspector 3 Conley – Inspector 3 Deneen – Inspector 3 Temporary Seasonal Student Helpers (assigned as needed) - 44 - David Kelly Staff Advisor Dawn Butts Deputy Director Tim Boley Highway/Drainage Bob Warren Survey Fatkins – Heavy Equip Op 533561607 Steven Brunot Administration Division Joe Paradise Engineering Services Kurt Koerber Highway Maintenance Spec. Services Lapidakis – Carpenter Tomayko – Maint Rep Burns – Sign Maker Sabo – Signal Tech Clardy – Mason Hennon – Equip Op 2 Denise Longstreth Executive Assistant 2 Schostak – Surveyor Mendiola – Survey Coord Bell – Survey Coord Sturm – Survey Tech 2 Marie Newlove Budget/Finance Dennis Tubbs GIS Dunchuck – Design Eng 2 Lupica – Design Eng1 Knapp – Design Eng 1 Wilson – Const Proj Coord DeGroff – Eng Tech 4 Smith – Eng Tech 3 Young – Survey, CAD, GIS Tech Personnel Laura S – Office Mgr HR Carole A – Admin Asst / Payroll Training Lisa M –Safety Coordinator Information Technology Kevin H – Network Admin Ron P – Software Engineer Records Public Records Coordinator Vacant Reception Kristin K - Receptionist Newsome – Fiscal Officer 2 Harpster – Comp 2 Adv Fin MVGT Special Capital Project Fund Summary Special Capital Projects Fund No Waterloo Rd Widening & Resurfacing ARRA Federal Local Bridge Load Rating #02 Federal Local Bridge Load Rating #03 Federal Local Encumbered Available 43230 $ $ $ 218,097.00 $ $ $ 26,548.00 1,992.15 - $ 1,695,852.00 $ 1,449,214.85 $ 218,097.00 $ 28,540.15 $ $ $ 557,600.00 107,000.00 50,000.00 $ $ $ 531,676.00 149,891.00 - $ $ $ - $ $ $ 25,924.00 (42,891.00) 50,000.00 $ 714,600.00 $ 681,567.00 $ - $ 33,033.00 $ $ $ 663,695.00 635,860.00 396,297.00 $ $ $ $ $ Program Sub total $ 132,930.40 33,232.60 166,163.00 $ $ $ 101,686.80 25,422.20 127,109.00 $ $ $ $ $ $ 31,243.60 31,243.60 $ $ Program Sub total $ 30,463.20 7,615.80 38,079.00 $ $ $ 30,463.20 7,615.80 38,079.00 $ $ $ $ $ Program Sub total $ 68,256.00 17,064.00 85,320.00 $ $ $ 51,094.40 12,773.60 63,868.00 $ $ $ 4,290.40 4,290.40 $ $ $ 17,161.60 17,161.60 Fund 43232 Total $ 289,562.00 $ 229,056.00 $ 12,100.80 $ 48,405.20 $ $ 51,300.00 5,797.00 $ $ 7,695.49 855.06 $ $ 4,941.94 $ $ 43,604.51 - $ 57,097.00 $ 8,550.55 $ 4,941.94 $ 43,604.51 $ $ $ 453,252.65 453,252.65 $ $ $ 452,904.85 452,904.85 $ $ $ $ $ $ 347.80 347.80 $ $ 401,600.00 140,816.00 $ $ 109,627.88 27,406.97 $ $ 113,409.03 $ $ 291,972.12 - $ 542,416.00 $ 137,034.85 $ 113,409.03 $ 291,972.12 $ $ $ 128,282.00 14,253.60 142,535.60 $ $ $ - $ $ $ 14,253.60 14,253.60 $ $ $ 128,282.00 128,282.00 $ $ $ 540,000.00 24,000.00 404,734.00 $ $ $ - $ $ $ 404,734.00 $ $ $ 540,000.00 24,000.00 - $ 968,734.00 $ - $ 404,734.00 $ 564,000.00 $ 767,536.37 $ 1,138,184.78 43231 43232 Canton/Springfield Signalization Federal Local 7,810.40 7,810.40 - $ $ $ - 43233 Akron-Peninsula Road Resurfacing Federal Local 43234 Northampton Rd Bridge Replacement Federal Local 43235 Canton Rd Modification 15004-2 Federal Local 43236 Van Buren Rd Bridge OPWC Local (Other) Local (SCE) 43203 Combined Total All Special Capital Project Funds $ 4,864,049.25 533561607 Expended 637,147.00 633,867.85 178,200.00 Hazel Street Bridge Replacement Federal State-OPWC Local-Akron Bridge Load Rating #01 Federal Local Appropriations $ 2,958,328.10 - - 45 - Capital projects that receive state and federal money are tracked in separate funds designated for the given project. There are eight special project funds open for current projects. The figures on the previous page represent the projected status of each fund as of the beginning of 2012. Encumbered Local funds are transferred from the MVGT fund and become the cash balance for each of the funds. State and federal money is paid directly to the contractors and therefore only shows as expended funds once a payment has been processed. Assessed Subdivision Fund Summaries Section 6137 of the Ohio Revised Code provides the general legislative authority that allows the County to improve and/or maintain storm water facilities on private lands. Specifically, Section 6137.02 of the Ohio Revised Code provides for the establishment of a county ditch maintenance fund. Summit County enacted subdivision regulations which stipulate that developers are required to submit a final plat which provides that all fee holders and all receiving title to the fee through them are subject to payment of drainage maintenance fees assessed or to be assessed by the County pursuant to Chapter 6137 of the Ohio Revised Code. The maintenance fee obligation is required to pass with the title to the property. The drainage maintenance assessments are the method used by the County to fund ongoing maintenance of the drainage system. The unencumbered balance of the fund through which these maintenance operations are paid cannot exceed the 20% of the construction costs of the drainage improvements. In order to assure compliance with this requirement, the drainage assessment is calculated based on the county receiving 20% of the original construction cost of the improvement over a period of 8 years. In other words, 2.5% of the construction cost is assessed on an annual basis. This total assessment for each phase of a subdivision is then divided into an assessment per acre and this amount is multiplied by the total acreage of the individual homeowner to compute a final assessment figure for each property owner. The County is divided into two districts based upon community boundaries that approximate the two major drainage basins in the County. The northern district includes those townships located in the Cuyahoga River watershed and the southern district includes those townships in the Muskingum River watershed. The balance for each District at the end of the 3rd quarter supports the following year’s appropriation. Normal practice is to appropriate the entire balance for each district in order to provide flexibility in handling surface water issues in the assessed subdivisions. District 1 – Northern District District 1 includes 103 subdivisions spread over 5 townships. Bath Township includes 31 assessed subdivisions. Northfield Center Township includes 10 assessed subdivisions. Richfield Township includes 17 assessed subdivisions. Sagamore Hills Township includes 33 assessed subdivisions. Twinsburg Township includes 12 assessed subdivisions. 533561607 - 46 - In 2011, the County collected $45,599 from the subdivisions in District 1. The year-todate expenditures through October 31, 2011 were $88,504. The total appropriation for 2011 was $458,500. The total appropriation for 2012 is $450,000. District 2 – Southern District District 2 includes 72 subdivisions spread over three townships. Copley Township includes 55 assessed subdivisions. Coventry Township includes 1 assessed subdivision. Springfield Township includes 16 assessed subdivisions. In 2011, the County collected $146,665 from the subdivisions in District 2. The year-todate expenditures through October 31, 2011 were $41,521. The total appropriation for 2011 was $106,100. The total appropriation for 2012 is $220,000. Acknowledgements Preparation of the 2012 budget report to Council takes the effort of many employees in the Engineer’s Office. It required the time and dedication of all of our section leaders and division leaders. Marie Newlove provided a herculean effort to compile and consolidate all of the data into one comprehensive document. In addition, the accomplished copyediting work of Heidi Swindell and Kristin Kovacs contributed to completing this document. The effort of all our staff is greatly appreciated. 533561607 - 47 -