TRAVAUX 2ème SEMESTRE 2013 {{At Saint-Julien-en-Genevois - from September 16th to October 4th}}<br/> {{Between Etrembières and Scientrier - from October 7th to 31st}}<br/> . {{Type of work}}: Installation of 11 security shelters accessible for people with reduced mobility.<br/> . {{Traffic conditions}}: occasional closing of the right lane. - {{Bridges in Scionzier - from August 26th to October 25th}}<br/> . {{Type of work}}: impermeability of the 4 bridges located by Scionzier.<br/> . {{Traffic conditions}}: <br/> 1 lane in both directions. <br/> Speed limit is 90 km/h. - {{Archamps - Bossey - from September 2nd to 13th}}<br/> . {{Type of work}}: Road coating onto 3 km in the Switzerland/France direction<br/> . {{Traffic conditions}}: <br/> contraflow from 7 pm to 6 am<br/> 1 lane closed from 6 am to 4 pm in the Switzerland/France direction.<br/> Speed limit is 50 km/h at merging point and 90 km/h onto the rest of the roadworks area. - {{Bonneville Est and Bonneville Ouest interchanges - from September 16th to 27th}}<br/> . {{Type of work}}: Road coating<br/> . {{Traffic conditions}}: <br/> Bonneville-ouest closed at night from September 16th to 20th. <br/> Bonneville-est : closed at night from September 23rd to 27th. - {{Nangy and Viry toll - from October to November}}<br/> . {{Type of work}}: Installation of 3 new display devices.<br/> . {{Traffic conditions}}: occasional lane closing. - {{Vuache tunnel - from October 21st to 25th}}<br/> . {{Type of work}}: Maintenance of security équipements.<br/> . {{Traffic conditions}}: A40 closed between Eloise and Saint-Julien-en-Genevois from 10 pm to 6 am.