National Urban Search and Rescue Response System Structure Collapse Technician Training MODULE 1b. (Safety) 1. One of the most important attributes a search and rescue specialist can have is a ____________ attitude toward safety. a. b. c. d. 2. A minimum of ___ personnel should be sent on all driving assessment missions. a. b. c. d. 3. Before leaving the work site As soon as they return to the base of operations In the canine relief area during transport back to the base of operations Area security during domestic disasters is the responsibility of: a. b. c. d. 6. Gloves Gloves and mask Gloves and eye protection Gloves, eye protection, and mask Personnel should decontaminate: a. b. c. d. 5. One Two Module 1b. page 11 Three Four The minimum level of protection for rescuers performing patient care or working around body fluids is: a. b. c. d. 4. Disinterested Positive Module 1b, page 2 Non-committal Cautious FEMA task force security specialists state/local governments U. S. military The multi-hazard safety plan employs the acronym_______________ to remind safety officers of the basic elements of safety. a. b. c. d. “LCES” “STOP” “SLED” “FEMA” June 2009 SCT Written Exam Answers -1 National Urban Search and Rescue Response System Structure Collapse Technician Training 7. Preestablished safe zones are designated areas a. b. c. d. 8. Atmospheres of less than 19.5% oxygen require the use of __________________. a. b. c. d. 9. will to survive , plentiful supplies fear of wild animals , defeatist attitude dry clothes , hot food will to survive, positive attitude To improve chances of rescue if you become lost a. b. c. d. 11. dust masks respirators breathing apparatus no respiratory protection The most important components to survival are the ____________________ and _________________. a. b. c. d. 10. Always outside the hot zone Always in the hot zone Outside the hot zone or an agreed upon safe areas within the hot zone At the Base of Operations Stay put travel in ever widening circles build smoky fires at night yell rather than use other signaling devices What is/are the possible hazards associated with rescue and support operations? a. b. c. d. 12. Armed thieves and looters Confined space rescue operations Heavy lifting All the above When using rescue tools you should use adequate hearing protection when noise levels exceed a. b. c. d. June 2009 70 decibels 90 decibels 120 decibels 140 decibels SCT Written Exam Answers -2 National Urban Search and Rescue Response System Structure Collapse Technician Training 13. The term L.C.E.S. is the multi-hazard safety plan which stands for a. b. c. d. Logistics and Coordination in Emergency Situations Lookouts, Communications, Escape routes, and Safe zones Lock Concrete in place in Every situation Logistical Considerations for Essential support MODULE 1c. (Structural Engineering Systems) 14. Brittle types of material behavior can be best described as a. b. c. d. 15. Ductile type material behavior can best be described as a. b. c. d. 16. Bend but don't break Sudden failure Very high strength All of the above Steel bars (rebar), enclosing type steel ties and stirrups are cast into concrete to provide a. b. c. d. 17. Bend but don't break Sudden failure Very high strength All of the above Longitudinal tension stress Confinement Shear resistance All the above Based on damage and collapse patterns seen in previous earthquakes, buildings can usually be divided into which of the following five general categories: a. Wood, tilt-up, steel, concrete, URM b. Light frame, heavy wall, heavy floor, precast concrete, diagonally braced steel frame c. URM, Tilt-up, concrete, precast concrete, Post-tensioned concrete d. Light frame, light steel, mobile homes, unengineered building 18. Following a damaging earthquake, the hazard that is most likely to be found in a heavy floor building with a brittle concrete frame. a. b. c. d. June 2009 Badly cracked columns Broken/cracked parapets Badly cracked chimneys A crawl space where the first floor is offsett SCT Written Exam Answers -3 National Urban Search and Rescue Response System Structure Collapse Technician Training 19. Parapets, walls falling off buildings and multi thickness walls splitting are common earthquake problems most associated with which type of building category? a. b. c. d. 20. Wood frame / W Light metal building / S3 Concrete frame Build /C1 Unreinforced masonry / URM A mark on a building (made by a US&R Task Force member or other qualified agent) showing a two-foot square box with one diagonal line means that: a. Searchers have entered the building b. Structure is safe for occupancy c. Structure is is a Moderate Risk for US&R Ops, and the structure is significantly damaged. It may require shoring, bracing or other mitigation. d. Structure is a High Risk for US&R Operations, and may be subject to sudden collapse. 21. A mark on a building (made by a US&R Task Force member or other qualified agent) showing an “X” inside a two-foot square box means that: a. The structure is a Low Risk for US&R Ops with low probably of further collapse. b. The structure is currently is a High Risk for US&R Ops and may be subject to sudden collapse. c. The structure is a Moderate Risk for US&R Ops, and the structure is significantly damaged. It may require shoring, bracing or other mitigation. d. There are Hazardous Materials (HAZMAT) in the structure MODULE 1d. (Tool Lab) 22. Always treat the nail gun as a loaded weapon a. True b. False 23. A clogged air filter can a. b. c. d. 24. Prevent starting Increase Engine efficiency Can result in a loss of power Both a and c The chain oil reservoir should be refilled a. b. c. d. June 2009 Once a day Twice a day With every tank of fuel After every two tanks of fuel SCT Written Exam Answers -4 National Urban Search and Rescue Response System Structure Collapse Technician Training 25. Kickback occurs when a. b. c. d. 26. When replacing air filters on 2-cycle engines the choke should be a. b. c. d. 27. The upper tip of the guide bar comes in contact with a solid object. The bottom of the bar gets pinched. When making relief cuts At the end of the day Open Closed It doesn't matter It does not have a choke The diamond wheel's matrix may vary in hardness according to the material they are designed to cut a. True b. False 28. Cracked or missing carbide tip saw segments can occur from a. b. c. d. 29. From twisting From jamming From overheating All of the above Glazing will appear as a. b. c. d. You will not be able to notice when glazing has occurred. As a dull finish on the segment As a shiny smooth surface on the segment As a blue discoloration under the segment MODULE 2. (Shoring) 30. To be complete a shoring system should include the following: a. Header beam, post or other load carrying element, sole plate, lateral bracing, built-in forgiveness. b. Wood, concrete, steel and masonry c. Posts with adequate bracing d. A system for adjustability June 2009 SCT Written Exam Answers -5 National Urban Search and Rescue Response System Structure Collapse Technician Training 31. The weight of a normal reinforced concrete slab is approximately: a. b. c. d. 32. Lateral bracing of shoring systems are used to: a. b. c. d. 33. May be used in a system with a spreader beams, sills and bracing. Can have a maximum load capacity as high as 20,000 lbs. Don't need locking nut/pin to be set in order to safely support structure. May use 50psi air pressure to raise them into place Raker shores are most efficient a. b. c. d. 36. There is no limit Four feet when using 4x4 lumber and 6 feet when using 6x6 lumber Six feet Eight feet Which is an incorrect statement regarding Pneumatic shores used in structure collapse shoring operations a. b. c. d. 35. Prevent the system from racking and moving sideways Improve access to victims Provide better adjustability None of the above Cribbing will support loads in a damaged structure, but significantly deflects under heavy loads. Therefore the height of a crib should be limited to? a. b. c. d. 34. 100 pounds per cubic feet (PCF) 124 PCF 150 PCF 175 PCF When raker angle is 45 degrees or less More then 45 degrees When used to stabilize URM walls When friction is developed between wall and wall plate How can a structural hazard be safely mitigated? a. b. c. d. June 2009 Avoid it Remove it Shore it All the above SCT Written Exam Answers -6 National Urban Search and Rescue Response System Structure Collapse Technician Training 37. _______________ are the most important vertical support, structural elements in unframed structures. a. b. c. d. 38. Signs of possible imminent secondary collapse are a. b. c. d. 39. Columns Bearing walls Beams Floors and roof Shifting debris Sliding plaster Creaking, cracking and groaning sounds All of the above Which of the following statements is correct? a. Shoring must start at least one floor below the level at which damage has occurred in wood structures b. Shoring should bear against primary structural elements to maximize shoring effectiveness c. Shoring systems should be located where they will not interfere with victim removal d. All the statements are correct 40. Which of the following statements is correct? a. A single rescue squad can usually fill all six individual Shoring Team positions. b. The cutting team “feeder” position moves or feeds measured and marked material from the layout to the cutters. c. Complicated or extensive shoring operations may require two complete rescue squads with one squad assigned to the shore assembly team and the other assigned to the cutting team. d. All statements are correct. 41. Which of the following statements concerning vertical shores is correct? a. The main purpose of the vertical shore is to stabilize damaged floors, ceilings and roofs. b. The estimated weight of the floor and its contents will help determine the size of the shoring materials and their spacing. c. The most commonly used materials for vertical shore are the header, posts, sole plate and braces. d. All of the statements are correct. June 2009 SCT Written Exam Answers -7 National Urban Search and Rescue Response System Structure Collapse Technician Training 42. Which of the following statements conserning laced post shores is incorrect? a. Laced post systems are the strongest type of FEMA Shore b. Diagonal braces must always be configured as K braces. c. To increase the bearing capacity of posts, there needs to be three tiers of diagonal bracing for laced posts over 11 feet high. d. The maximum spacing of 6x6 posts is five feet . 43. Which of the following statements concerning raker shores is incorrect? a. To determine the length of a raker at 45 degrees, multiply the height of the support point in feet by 17 to determine the length of the raker in inches. b. To determine the length of a raker at 60 degrees, multiply the height to support point in feet by 14 to determine the length of the raker in inches. c. Horizontal and "X" OR "V" braces decrease lateral movement and increase raker shore stability. d. Wall plates should never be anchored to the wall because this action may precipitate a secondary collapse. 44. When using standard 2x6 bracing, what is the maximum spacing of raker shores? a. b. c. d. 45. When your raker shoring is place higher than ____________degrees you must use a thirty-inch cleat. a. b. c. d. 46. 10 ft 12 ft 8 ft 9 ft 60 45 53 90 What size lumber do we utilize for our diagonal bracing and our horizontal bracing between raker shores? a. b. c. d. June 2009 2x4 2x6 1x6 2x8 SCT Written Exam Answers -8 National Urban Search and Rescue Response System Structure Collapse Technician Training 47. To get a 45 degree angle cut on a 4x4, without using a framing square how far back from the end of the lumber would you measure? _______ inches. a. b. c. d. 48. When horizontal bracing between raker shores to make them a complete system at greater than what insertion height do we switch from 2 cross members to 3? a. b. c. d. 49. officer shoring support measuring In the door & vertical shores, where are the wedges for the posts installed. a. b. c. d. 52. wedges blocking posts clamps Which firefighter relays the proper shoring information and numbers to the layout firefighter? a. b. c. d. 51. 6’ 10’ 8’ 12’ When erecting any type of rescue shoring between two solid points, what must we have in place to properly adjust our shores? a. b. c. d. 50. 4 3 3½ 4½ top bottom side top & bottom The rule of thumb for the header thickness for the door & window shore is how many inches per foot? _____inch a. b. c. d. June 2009 4 2 3 1 SCT Written Exam Answers -9 National Urban Search and Rescue Response System Structure Collapse Technician Training MODULE 3 (Breaking, Breaching, Cutting and Burning) 53. Cement and concrete are the same thing? a. True b. False 54. Concrete is strong in compression strength and inherently weak in shear and tensile strength. a. True b. False 55. Concrete can be nondurable if these conditions exists: a. b. c. d. 56. Exposure to sulfates in alkali soils. Repeated cycles of freezing and thawing. A harmful reaction between minerals in the aggregates. All of the above are correct. Generally, reinforcing steel in concrete walls, will have one layer of rebar in the center of the wall for thickness up to 8 inches, and for walls over 8 inches thick, they should have two layers of rebar, each about 1 inch clear of the surface. a. True b. False 57. Cast in place concrete can best be described as a. Concrete which is molded in the location in which is expected to remain. b. High tensile strength steel strands or bars are encased in tubing or wrapped to prevent any adhesion between steel and concrete. Steel is stretched and anchored. c. Concrete that has been cast at a location other than the place it is to remain. d. A composite material of steel and concrete. 58. Precast concrete can best be described as a. Concrete which is molded in the location in which is expected to remain. b. High tensile strength steel strands or bars are encased in tubing or wrapped to prevent any adhesion between steel and concrete. Steel is stretched and anchored. c. Concrete that has been cast at a location other than the place it is to remain. d. A composite material of steel and concrete. June 2009 10 SCT Written Exam Answers - National Urban Search and Rescue Response System Structure Collapse Technician Training 59. Reinforced concrete can best be described as a. Concrete which is molded in the location in which is expected to remain. b. High tensile strength steel strands or bars are encased in tubing or wrapped to prevent any adhesion between steel and concrete. Steel is stretched and anchored. c. Concrete that has been cast at a location other than the place it is to remain. d. A material with good compression strength to which steel bars are added that provide tension strength, improve shear strengh, and tie columns. 60. Post tensioned concrete can best be described as a. Concrete which is molded in the location in which is expected to remain. b. High tensile strength steel strands or bars are encased in a casing or wrapped to prevent any adhesion between steel and concrete. After concrete is sufficiently curred, steel is stretched and anchored. c. Concrete that has been cast at a location other than the place it is to remain. d. A composite material of steel and concrete. 61. Tools that can be used to cut, break or breach concrete are a. b. c. d. 62. All of the listed tools can be used to cut rebar except: a. b. c. d. 63. Torches Plasma Cutter Etrier tool Hacksaw Closely spaced bore holes drilled in a line drilled partially or completely through concrete are called a. b. c. d. 64. Rotary hammer Power saw with diamond blade Hydraulically driven chain saw with diamond blade All of the above Vent holes Stitch Drills Expansion holes None of the above Atmospheric monitoring is not necessary before and during torch operations. a. True b. False June 2009 11 SCT Written Exam Answers - National Urban Search and Rescue Response System Structure Collapse Technician Training 65. The weight of a 6 inch, normal, reinforced concrete slab is a. b. c. d. 150 lbs. per square foot 100 lbs. per square foot 75 lbs. per square foot 50 lbs. per cubic foot 66. Columns, beams and girders are easily breached and cut a. True b. False 67. When breaching pre-tensioned slabs rescue team members should remember that a. The steel cable/tendon might pop out of either end of the slab and potentially cause the member to fail b. Tendons can be easily identified from rebar by cutting them with a torch c. There is no concern in a pre-tensioned slab since the tendons are anchored into the concrete d. Pre-tensioned slabs have rebar and therefore create no problems when breaching or breaking. 68. Which of the following cuts might be used to perform a clean “lift out” a. b. c. d. 69. Wetting of the concrete is often required when using a. b. c. d. 70. Step cut Line cut Clean cut Piercing cut Pneumatic hammers Diamond blades Wizzer saws Oxy-acetylene torches Oxy-acetylene hoses can be identified as follows. a. Green is always oxygen and has left handed threads, Red is always fuel and has right handed threads b. Red is always oxygen and has right handed threads, green is always oxygen and has left handed threads c. Green is always oxygen and has right handed threads and smooth surface. Red is always fuel and has left handed threads and has a notch for identification d. Color of hoses does not matter as long as you hook them up consistently June 2009 12 SCT Written Exam Answers - National Urban Search and Rescue Response System Structure Collapse Technician Training 71. Which of the following is true about exothermic torches a. Exothermic torches require air to operate b. Exothermic torches require constant cleaning of the operating tip c. Exothermic torches are easier to learn to use than oxy-acetylene but are not as precise d. Exothermic torches create very little slag or molten metal 72. If necessary, the process for cutting tensioned tendons in post-tension construction is as follows. a. Clear the ends of the slab and cut the cable with an exothermic torch completely through b. Clear the ends of the slab, cut the cable strand by strand with an oxyacetylene or mapp torch c. Never cut tensioned tendons regardless of the situation d. Clear both ends of the slab and use a rebar cutter to slowly cut the tendons 73. The three basic forces that rescue team members must understand and manipulate when breaching and breaking concrete are. a. b. c. d. 74. Tension, compression and gravity Tension, shear and compression Tension, shear and pressure Tension, compression and vector Pre and Post Tensioned Cables, instead of rebar, are placed in some concrete structures to overcome concrete’s weakness in resisting tension and shear forces. Which answer below is most correct: a. b. c. d. All cables used are placed with a casing around them and do not bond to concrete Cables generally are made for much higher strength steel than rebar All cables are intended to bond to the concrete Slabs with post tensioned may have openings cut in them without much concern. June 2009 13 SCT Written Exam Answers - National Urban Search and Rescue Response System Structure Collapse Technician Training 75. You are about to make entry into a void space to perform a breaching operation. Along with the necessary breaching, breaking or cutting tools you need you will need certain support equipment. Which of the following items will you need to use? 76. 1. 2. 3. 4. 5. Atmospheric Monitor Ventilation fan Lighting Fire extinguisher Torque wrench a. b. c. d. 1, 3 and 5 1, 2 and 3 1, 2, 3, 4 All of the above Which of the following most correctly outlines the steps associated with a “Clean” or “Lift out” breach. a. Core drill slab, set depth for saw blade, step cut or bevel cut slab, place bolts and place cribbing, remove first step cut, anchor slab, complete step cut, remove slab. b. Core drill slab, plunge cut slab with chainsaw, place bolts, finish plunge cuts, remove slab c. Set depth of saw blade, complete bevel cut, remove slab, Stitch drill slab, bolt slab, finish stitch drill process, anchor slab, remove slab Module 4. (Lifting and Moving) 77. The fulcrum changes position in class 1,2, and 3 levers. In a class 1 lever the fulcrum is located? a. b. c. d. 78. Between the load and input power At the end past the load At the end past the input power None of the above The best control of a load during a vertical lift is obtained by making the load attachment points a. b. c. d. June 2009 14 Above the center of gravity Parallel to the center of gravity Below the center of gravity In line with crane hook SCT Written Exam Answers - National Urban Search and Rescue Response System Structure Collapse Technician Training 79. You need a crane to be set up quickly, for a time critical lifting operation. Which type of crane would you call? a. b. c. d. 80. What is the strongest and most durable sling for the collapse structure environment? a. b. c. d. 81. Basket Double basket Choker Bridle The maximum number of air bags that can be stacked on top of each other is: a. b. c. d. 83. Chain Wire rope Synthetic webbing All of the above Which sling arrangement creates a vise-like grip on the load? a. b. c. d. 82. Conventional /Lattice Boom Crawler Hydraulic Mobile with out riggers 2 3 4 None of the above As an air bag lifts and “pillows” surface contact is reduced and the lifting capacity is reduced. a. True b. False 84. Wedge anchor expansion bolts and 3/8” concrete screws may both be used to fasten a swivel hoist ring to concrete. a. True b. False June 2009 15 SCT Written Exam Answers - National Urban Search and Rescue Response System Structure Collapse Technician Training 85. Calculating the lifting capability of an air bag can be determined if the following information is known: a. The size of the contact area between air bag and the object to be lifted b. The pressure in the SCBA cylinder c. The operating pressure of the air bag d. Both (a) and (c) 86. Discounting friction, what percentage of a load’s weight is needed to slide it up a 30 degree slope / grade? a. b. c. d. 87. If the size of the surface, contact area for a 2000lb block of concrete resting on a concrete slab is changed from 3 square feet to 1.5 square feet, which of the following is correct? a. b. c. d. 88. Stretching or pulling force Pressure applied to an object; smashing force Cutting or lateral force Bending or pushing force A wheelbarrow is what Class of lever? a. b. c. d. 90. The force required to slide the 2000lb block will be reduced The force required to slide the 2000lb block will be increased The force required to slide the 2000lb block will stay the same You will not be able to slide the 2000lb block Tension stress is best described as: a. b. c. d. 89. 20% 60% 50% 30% Class one Class two Class Three Not a lever Maximum capacity lift on an air bag is calculated at ______ of lift? a. b. c. d. June 2009 16 1” 6” 12” Fully inflated SCT Written Exam Answers - National Urban Search and Rescue Response System Structure Collapse Technician Training 91. A 10” x 10” air bag lifting at maximum capacity with a working pressure of 118 psi will lift approximately? a. b. c. d. 92. If one builds cribbing using douglas fir or southern pine the design load is calculated as _______ psi on each bearing surface a. b. c. d. 93. 100 250 500 1000 A 4”x 4” box crib will support what design load? a. b. c. d. 94. 1.8 tons 4.4 tons 5.9 tons 11.8 tons 48,000 lbs. 24,000 lbs. 12,000 lbs. 6,000 lbs. Structural steel weighs approximately ________ lbs. / cubic foot: a. b. c. d. 500 350 250 150 95. Undercut Anchor Bolts are considered to be one of the easiest anchor systems to use. a. True b. False 96. When placing anchor bolts, what is the minimum distance to the concrete edge? a. b. c. d. June 2009 17 2 times the anchor diameter 4 times the anchor diameter 6 times the anchor diameter 12 times the anchor diameter SCT Written Exam Answers - National Urban Search and Rescue Response System Structure Collapse Technician Training 97. All shackle pins are interchangeable. a. True b. False 98. When giving crane hand signals, always stand to the left-rear of the crane. a. True b. False 99. When using an angle anchoring system, a minimum of _______ bolts must be used to assure that the material will not spin and de-torque the expansion bolt. a. 2 b. 4 c. 6 d. 8 100. Mechanical advantage defines how efficient and effective a machine is. a. True b. False June 2009 18 SCT Written Exam Answers -