MM-N-07.0431-2

advertisement
CableLabs Engineering Change (EC) Form
Project
EC TRACKING INFORMATION (Blue fields to be completed by CableLabs only)
PacketCable
N Identifier MM-N-07.0431-2
Status
Version
PKT-SP-MM-I03-051221
5/14/200 Comment Period End Date
5/29/2007
SEVERITY
7
5/29/200 Comment Period End Date
6/11/2007
Non-Critical
Minor
7
3/10/200 Cert Wave No
62
Critical
Major
8
Overall Type of Spec Change (Tech/Edit/Both) Editorial
Affected Specification
ECR Date
ECO Date
ECN Date
http://www.packetcable.com/specifications/
packetcable-ec@cablelabs.com
TO OBTAIN LATEST ISSUED VERSION #, CLICK HERE:
TO SUBMIT EC, EMAIL COMPLETED FORM TO:
SPECIFICATION DOCUMENT DETAILS
Document EC is written against: PKT-SP-MM Issued Version # I03
AUTHOR INFORMATION
Primary Author
Email
Company
Additional Contributors
First Kevin Last Johns
k.johns@cablelabs.com
CableLabs
Country USA
303-661-3303
Phone
Title of EC
Date sent to CableLabs
Update of Major/Minor version for I04
5/11/2007
ENGINEERING CHANGE DOCUMENT DETAILS
EC REVISION HISTORY
5/25/2007
Date of revised EC
Brief description of revision Added Test Case impacts
DETAILED PROPOSED CHANGES
Sections Affected
PICs Affected
6.5.1
No
Verified By
Test Plans Affected
Yes
Verified By
OTHER RELATED ENGINEERING CHANGES (List all ECs that apply)
The following Engineering Change(s) are recommended to be processed in conjunction with this document:
EC#
Title of EC
Affected Document
NOTE TO AUTHORS - INSTRUCTIONS FOR COMPLETING PROPOSED CHANGES IN THE SECTIONS BELOW:
For ease in reviewing and editing, please use the following formatting on changes. For modified and/or deleted text in the “original
spec text”, use red strike through; for modified and/or new inserted text in the “new text section” by using blue underscore. Use the
ECForm1.02
1 of 4
In submitting the Engineering Change Request ("ECR"), the Author, individually and as an authorized representative of the
Company, agrees that if CableLabs incorporates this ECR in whole or in part into the relevant Specification, all intellectual
property in the ECR shall be licensed royalty free, and without confidentiality, under the terms of the "Contribution and License
Agreement for Intellectual Property" ("Contribution Agreement"). CableLabs may disclose the content of this ECR to CableLabs'
members and such others as is necessary for the development of CableLabs' specifications. The 30 day IPR review period
begins with the publication of an ECR and ends with the publication of an ECN. Please work with your legal departments to
ensure that only the intellectual property your company wants to contribute to the specification is contained in the specification.
Questions about the Authors' licensing of intellectual property in this ECR submission may be directed to legal@cablelabs.com.
2
533568629
customized toolbar attached to the EC template. (“Track Change” feature is not available in this Word form.) For major text
changes or large new sections, separate Word files may be submitted with this form. PLEASE ALWAYS INCLUDE THE SECTION
NUMBER, TITLE, AND PARAGRAPH THAT EACH CHANGE AFFECTS. Detailed instructions to the document editor are always welcome.
2 of 4
In submitting the Engineering Change Request ("ECR"), the Author, individually and as an authorized representative of the
Company, agrees that if CableLabs incorporates this ECR in whole or in part into the relevant Specification, all intellectual
property in the ECR shall be licensed royalty free, and without confidentiality, under the terms of the "Contribution and License
Agreement for Intellectual Property" ("Contribution Agreement"). CableLabs may disclose the content of this ECR to CableLabs'
members and such others as is necessary for the development of CableLabs' specifications. The 30 day IPR review period
begins with the publication of an ECR and ends with the publication of an ECN. Please work with your legal departments to
ensure that only the intellectual property your company wants to contribute to the specification is contained in the specification.
Questions about the Authors' licensing of intellectual property in this ECR submission may be directed to legal@cablelabs.com.
533568629
DETAILED PROBLEM DESCRIPTION
This ECR increments the major protocol version for 2 to 3 for the I04 PacketCable Multimedia specification. This is done per
the guidelines for version number assignment provided in appendix A of the PacketCable Multimedia specification. The
primary driver for the change in major version are the guidelines which state the change in format of a given object or addition
of a new optional object which when included in a message introduces new mandatory functional requirements on the network
element receiving the message such that the new object could not be safely ignored would be grounds for a major version
change. Given that several object formats are being changed to accommodate DOCSIS 3.0 as well as the introduction of a new
object (upstream drop) which when included presents new functionality, a major version change is warranted.
PROPOSED SPECIFICATION CHANGES (Please include section number, title, and paragraph)
Please note Engineering Changes may only address one technical issue in one specification, although it may require changes to
multiple sections in the specification. Please itemize each change as follows. If you have multiple changes and some are
technical and some are editorial (but all address the same issue), please indicate which is which in addition to selecting “both”
under the type of change above. Note: Technical changes may require a vendor to change the design of the product. Editorial
changes are points of clarification or clean-up but would not generally require a change to the product.
SPEC CHANGE #1
TYPE OF CHANGE
SECTION #
6.5.1
TECHNICAL:
EDITORIAL: X
TITLE
BOTH:
PARAGRAPH / TABLE # / GRAPHIC #
6.5.1
4
Initialization Sequence
ORIGINAL SPEC TEXT:
Devices compliant with this specification MUST use a version of 2.0, i.e. a Version Info Object with a Major Version Number
of 2 and a Minor Version Number of 0.
NEW SPEC TEXT:
Devices compliant with this specification MUST use a version of 3.0, i.e. a Version Info Object with a Major Version Number
of 3 and a Minor Version Number of 0.
TEST CHANGE DETAILS
(REQUIRED for advancing to ECO)
Test Case(s) affected
MMTC15002, MMTC15005, MMTC15125, MMTC15127
CTPs or ATPs affected
PKT-TP-Multimedia-CMTS-CTPMM-D07-060911, PKT-TP-Multimedia-Policy Server-CTP-D06060505.DOC
Device(s) affected
(select all that apply)
NONE
CMS
CMTS
KDC
Policy Server
MG
MGC
SG
Provisioning Server
MTA
E-MTA
S-MTA
Delivery Function
RKS
MP
MPC
Application Manager
PROPOSED TEST CHANGES
CHANGE #1
ORIGINAL TEST CASE TEXT:
3 of 4
In submitting the Engineering Change Request ("ECR"), the Author, individually and as an authorized representative of the
Company, agrees that if CableLabs incorporates this ECR in whole or in part into the relevant Specification, all intellectual
property in the ECR shall be licensed royalty free, and without confidentiality, under the terms of the "Contribution and License
Agreement for Intellectual Property" ("Contribution Agreement"). CableLabs may disclose the content of this ECR to CableLabs'
members and such others as is necessary for the development of CableLabs' specifications. The 30 day IPR review period
begins with the publication of an ECR and ends with the publication of an ECN. Please work with your legal departments to
ensure that only the intellectual property your company wants to contribute to the specification is contained in the specification.
Questions about the Authors' licensing of intellectual property in this ECR submission may be directed to legal@cablelabs.com.
533568629
NEW TEST CASE TEXT:
CHANGE #2
ORIGINAL TEST CASE TEXT:
NEW TEST CASE TEXT:
End of Request
4 of 4
In submitting the Engineering Change Request ("ECR"), the Author, individually and as an authorized representative of the
Company, agrees that if CableLabs incorporates this ECR in whole or in part into the relevant Specification, all intellectual
property in the ECR shall be licensed royalty free, and without confidentiality, under the terms of the "Contribution and License
Agreement for Intellectual Property" ("Contribution Agreement"). CableLabs may disclose the content of this ECR to CableLabs'
members and such others as is necessary for the development of CableLabs' specifications. The 30 day IPR review period
begins with the publication of an ECR and ends with the publication of an ECN. Please work with your legal departments to
ensure that only the intellectual property your company wants to contribute to the specification is contained in the specification.
Questions about the Authors' licensing of intellectual property in this ECR submission may be directed to legal@cablelabs.com.