Engineering Change (EC) Form

EC T RACKING I NFORMATION (Blue fields to be completed by CableLabs only)

Project PacketCable Status N Identifier MM-N-07.0467-1

Affected Specification

ECR Date

ECO Date

ECN Date

PKT-SP-MM-I03-051221

6/11/200

7

6/25/200

7

3/10/200

8

Comment Period End Date

Comment Period End Date

Cert Wave No

6/25/2007

7/9/2007

62

S EVERITY

Non-Critical

Critical

Overall Type of Spec Change (Tech/Edit/Both) Technical

Version

Minor

Major

1

TO OBTAIN LATEST ISSUED VERSION #, CLICK HERE :

http://www.packetcable.com/specifications/

TO SUBMIT EC , EMAIL COMPLETED FORM TO :

packetcable-ec@cablelabs.com

SPECIFICATION DOCUMENT DETAILS

Document EC is written against: PKT-SP-MM Issued Version # I03

Primary Author

AUTHOR INFORMATION

First Kevin Last Johns Country USA

Email

Company k.johns@cablelabs.com

CableLabs

Phone 303-661-3303

Additional Contributors

Title of EC

ENGINEERING CHANGE DOCUMENT DETAILS

CMTS Usage of Application Type

Date sent to CableLabs 6/11/2007

EC REVISION HISTORY

Date of revised EC

Brief description of revision

DETAILED PROPOSED CHANGES

Sections Affected 6.4.2.2

PICs Affected

Verified By

Unknown Test Plans Affected

Verified By

No

OTHER RELATED ENGINEERING CHANGES (List all ECs that apply )

The following Engineering Change(s) are recommended to be processed in conjunction with this document:

EC# Title of EC Affected Document

NOTE TO AUTHORS INSTRUCTIONS FOR COMPLETING PROPOSED CHANGES IN THE SECTIONS BELOW:

For ease in reviewing and editing, please use the following formatting on changes. For modified and/or deleted text in the “original spec text”, use red strike through; for modified and/or new inserted text in the “new text section” by using blue underscore.

Use the

ECForm1.02

1 of 3

In submitting the Engineering Change Request ("ECR"), the Author, individually and as an authorized representative of the

Company, agrees that if CableLabs incorporates this ECR in whole or in part into the relevant Specification, all intellectual property in the ECR shall be licensed royalty free, and without confidentiality, under the terms of the "Contribution and License

Agreement for Intellectual Property" ("Contribution Agreement"). CableLabs may disclose the content of this ECR to CableLabs' members and such others as is necessary for the development of CableLabs' specifications. The 30 day IPR review period begins with the publication of an ECR and ends with the publication of an ECN. Please work with your legal departments to ensure that only the intellectual property your company wants to contribute to the specification is contained in the specification.

Questions about the Authors' licensing of intellectual property in this ECR submission may be directed to legal@cablelabs.com.

726849689 customized toolbar attached to the EC template. (“Track Change” feature is not available in this Word form.) For major text changes or large new sections, separate Word files may be submitted with this form. P LEASE ALWAYS INCLUDE THE SECTION

NUMBER , TITLE , AND PARAGRAPH THAT EACH CHANGE AFFECTS .

Detailed instructions to the document editor are always welcome.

D ETAILED P ROBLEM D ESCRIPTION

I03 split the Application Manger ID into two sub-fields, an Application Type and Application Manager Tag. The Application

Type is meant to convey information about the type of application for which the gate is associated. Currently the specification allows the Policy Server to use this as part of its policy rule definition. However, the spec is silent on whether this can be used by the CMTS as part of the admission control process. Several different CMTS uses have been identified by various MSOs and

CMTS vendors. This EC clarifies that the CMTS may use this information as part of its admission control process.

P ROPOSED S PECIFICATION C HANGES (Please include section number, title, and paragraph)

Please note Engineering Changes may only address one technical issue in one specification, although it may require changes to multiple sections in the specification. Please itemize each change as follows. If you have multiple changes and some are technical and some are editorial (but all address the same issue), please indicate which is which in addition to selecting “both” under the type of change above. Note: Technical changes may require a vendor to change the design of the product. Editorial changes are points of clarification or clean-up but would not generally require a change to the product.

S PEC C HANGE #1

S ECTION #

6.4.2.2

T YPE OF C HANGE

T ITLE

AMID

TECHNICAL : X EDITORIAL :

2 nd

BOTH :

P ARAGRAPH / T ABLE # / G RAPHIC #

ORIGINAL SPEC TEXT:

Application Type is used by an Application Manager to identify the application that a gate is associated with. There is only one reserved value, zero, which indicates that there is "no defined application association". An Application Manager MAY pass a non-zero value to the Policy Server to indicate the particular application that a gate is associated with. The Policy

Server MAY use this value when applying policies to this gate. The Application Type values are configured by the service provider in the Application Managers and Policy Servers. These values are unique within the domain of the service provider, and have context only within this domain. Therefore a single Application Manager that is servicing multiple service providers may be configured with a different Application Type for each service provider, for the same application.

NEW SPEC TEXT:

Application Type is used by an Application Manager to identify the application that a gate is associated with. There is only one reserved value, zero, which indicates that there is "no defined application association". An Application Manager MAY pass a non-zero value to the Policy Server to indicate the particular application that a gate is associated with. The Policy

Server MAY use this value when applying policies to this gate. The CMTS MAY use this value when performing admission control for this gate. The Application Type values are configured by the service provider in the Application Managers and

Policy Servers. In order for the CMTS to utilize the Application Type in its admission control logic, the service provider would need to configure the CMTS with the allowed Application Types and their associated meaning.

These values are unique within the domain of the service provider, and have context only within this domain. Therefore a single Application Manager that is servicing multiple service providers may be configured with a different Application Type for each service provider, for the same application.

2 of 3

In submitting the Engineering Change Request ("ECR"), the Author, individually and as an authorized representative of the

Company, agrees that if CableLabs incorporates this ECR in whole or in part into the relevant Specification, all intellectual property in the ECR shall be licensed royalty free, and without confidentiality, under the terms of the "Contribution and License

Agreement for Intellectual Property" ("Contribution Agreement"). CableLabs may disclose the content of this ECR to CableLabs' members and such others as is necessary for the development of CableLabs' specifications. The 30 day IPR review period begins with the publication of an ECR and ends with the publication of an ECN. Please work with your legal departments to ensure that only the intellectual property your company wants to contribute to the specification is contained in the specification.

Questions about the Authors' licensing of intellectual property in this ECR submission may be directed to legal@cablelabs.com.

TEST C HANGE D ETAILS

(R EQUIRED

for advancing to ECO

)

Test Case(s) affected None

CTPs or ATPs affected None

Device(s) affected

(select all that apply)

NONE

CMS

MG

MTA

RKS

CMTS

MGC

E-MTA

MP

KDC

SG

S-MTA

MPC

P ROPOSED T EST C HANGES

C HANGE #1

ORIGINAL TEST CASE TEXT:

NEW TEST CASE TEXT:

C HANGE #2

ORIGINAL TEST CASE TEXT:

NEW TEST CASE TEXT:

End of Request

Policy Server

Provisioning Server

Delivery Function

Application Manager

726849689

3 of 3

In submitting the Engineering Change Request ("ECR"), the Author, individually and as an authorized representative of the

Company, agrees that if CableLabs incorporates this ECR in whole or in part into the relevant Specification, all intellectual property in the ECR shall be licensed royalty free, and without confidentiality, under the terms of the "Contribution and License

Agreement for Intellectual Property" ("Contribution Agreement"). CableLabs may disclose the content of this ECR to CableLabs' members and such others as is necessary for the development of CableLabs' specifications. The 30 day IPR review period begins with the publication of an ECR and ends with the publication of an ECN. Please work with your legal departments to ensure that only the intellectual property your company wants to contribute to the specification is contained in the specification.

Questions about the Authors' licensing of intellectual property in this ECR submission may be directed to legal@cablelabs.com.