Process Audit Checklist 2 – Basic Production Process Checklist Page No. _________ This checklist should be used to evaluate each workstation/activity within the overall process under review. If weaknesses or problems are noted, either as a part of this review or as part of the pre-audit planning, then the more detailed Full Production Process Checklist can be used to more thoroughly investigate the suspect activities. References to related sections on the Full Production Process Checklist are provided. Standard Requirements Reviewer Checks Basic Production Process Audit Questions Have the operator walk you through/discuss the process being performed. During the discussion, verify the following items: 1. Is there a procedure/instruction at the workstation? Is it current (note the rev. # for later comparison to the master list). (5) 2. Is the procedure being followed? Ask the operator if the procedure is adequate. Note any deficiencies or inadequacies. (4) 3. Are material and parts properly identified? Can everything be identified? How? (9) 4. Is the inspection status for materials and parts identified? Ask the operator how they know their incoming product is good. (9) 5. Are the inspections required by the Control Plan or Inspection Plan being performed? Are they at the right frequency? The right sample size? The right measurement device? (11, 12) 6. Are the measurement devices used at this workstation calibrated? Are they being properly handled and stored when not in use? (14) 7. Is maintenance adequate? Are PM tasks being accomplished as required? Are the PM’s sufficient? Are spare parts available? Review equipment downtime or availability performance and trends, if poor review in detail. (13) 8. Are the operator(s) properly trained? Check training records later. Are operators aware of the importance of their actions to the QMS/EMS? Are they aware of any significant environmental aspects? Competency (7) Awareness (7) 9. If SPC is used at this station, is it being properly conducted? Is it effective? Review the charts for out-of-control conditions. (11) 11. Is nonconforming product control acceptable? Do operators understand how to handle it? (10) 12. Other items (list) Basic Process Information: Name of workstation/activity: _______________________________ Operator(s): _____________________________________________ Procedure/Instructions: _____________________ Rev: __________ Equipment Avail./Downtime Trend: _________________________ Gage/Device Type: __________________ Serial #: _____________ Control/Insp. Plan # ________________________ Rev:___________ Overall evaluation: Conforms. No deficiencies identified. Opportunity for improvement. Detail below. Best Practice. Detail below. Be specific. Nonconformity. Provide details below. Reference the specific requirement violated. Full Description of NC/OFI/BP (use back if necessary)