GENERAL REQUIREMENTS SOLID WASTE MANAGEMENT AND RECYCLING PLAN Section 01515 Page 1 of __ SECTION 01515 SOLID WASTE MANAGEMENT AND RECYCLING PLAN PART 1 - GENERAL 1.01 SUMMARY .A This Section includes: .1 Part 1 – General .a 1.01 – Summary .b 1.02 – Related Sections .c 1.03 - Definitions .d 1.04 - Intent .e 1.05 - Submittals .f 1.06 - Recycling Requirements .2 Part 2 – Products (Not Used) .3 Part 3 – Execution (Not Used) .4 Part 4 – Forms .a Form 01515-F1 “Summary of Solid Waste Disposal and Diversion” 1.02 RELATED SECTIONS .A Division 1 Section 01330, “Submittal Procedures” .B Division 1 Section 01500, “Temporary Facilities and Controls” .C Division 1 Section 01740, “Cleaning” 1.03 DEFINITIONS .A Inert Fill - A permitted facility that accepts inert waste such as asphalt and concrete exclusively. .1 Inert Solids/Inert Waste: Non-liquid solid waste including, but not limited to, soil and concrete that does not contain hazardous waste or soluble pollutants at concentrations in excess of water-quality objectives established by a regional water board and does not contain significant quantities of decomposable solid waste. .B Class III Landfill - A landfill that accepts non-hazardous waste such as household, commercial and industrial waste, including construction, remodeling, repair and demolition operations. .C Construction and Demolition Waste - Includes solid wastes, such as building materials, packaging, rubbish, debris and rubble resulting from construction, remodeling, repair and demolition operations. .1 Rubbish: Includes both combustible and noncombustible wastes, such as paper, boxes, glass, crockery, metal and lumber scrap, tin cans, and bones. .2 Debris: Includes both combustible and noncombustible wastes, such as leaves and tree trimmings that result from construction or maintenance and repair work. .D Chemical Waste - Includes petroleum products, bituminous materials, salts, acids, alkalis, herbicides, pesticides, organic chemicals and inorganic wastes. .E Sanitary Wastes – Includes: .1 Garbage: Refuse and scraps resulting from preparation, cooking, distribution or consumption of food. .2 Sewage: Domestic sanitary sewage. 01515-1 FAF MASTER Project Manual Version 6.2 – February, 2006 GENERAL REQUIREMENTS SOLID WASTE MANAGEMENT AND RECYCLING PLAN Section 01515 Page 2 of __ 1.04 INTENT .A Owner is committed to promoting efforts to have the Work performed in an environmentally sensitive manner. .B To promote this effort the Contractor is required to: .1 Make reasonable efforts to affect optimum control of solid wastes. .2 Prepare and comply with a Project specific Solid Waste Management Plan. 1.05 SUBMITTALS .A Submit the following according to the requirements of the Contract Documents: .1 Solid Waste Management and Recycling Plan .a No later than twenty-eight (28) Days after the start date for the Work stated in the Notice to Proceed, Contractor must schedule and conduct a meeting with Owner to discuss Contractor’s proposed Solid Waste Management and Recycling Plan. .b No later than forty-five (45) Days after the start date for the Work stated in the Notice to Proceed, prepare and submit three (3) copies of a written and/or graphic Solid Waste Management and Recycling Plan including, but not limited to, the following: .c .1 Permit or license and the location of the solid waste disposal area(s). .2 Procedures for Recycling/Re-Use Program. Revise and resubmit Solid Waste Management and Recycling Plan as required by Owner. .2 Review of the Contractor’s Solid Waste Management and Recycling Plan will not relieve the Contractor of responsibility for adequate and continuing control of pollutants and other environmental protection measures. .B Prior to Owner’s recommendation to the Board of Supervisors for final Acceptance of the Work, Contractor must submit two (2) copies of a summary of solid waste generated by the Contractor’s operations. .1 Submit on Form 01515-F1 or other form acceptable to Owner. .2 Include manifests, weight tickets, receipts, and invoices specifically identifying the Project and waste material from: .a Recycling Centers. .b Class III Landfills. .c Inert Fills. 1.06 RECYCLING REQUIREMENTS .A Recycling: Implement a recycling program that includes separate collection of waste materials of the following types: .1 Concrete. .2 Metal: .a Ferrous. .b Non-ferrous. .3 Wood. .4 Debris. .5 Glass. .6 Fluorescent light tubes 01515-2 FAF MASTER Project Manual Version 6.2 – February, 2006 GENERAL REQUIREMENTS SOLID WASTE MANAGEMENT AND RECYCLING PLAN Section 01515 Page 3 of __ .7 Paper: .a Bond. .b Newsprint. .c Cardboard and paper packaging materials. .8 Others as appropriate. PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) PART 4 - FORMS Form 01515-F1 SUMMARY OF SOLID WASTE DISPOSAL AND DIVERSION Project Name: Project Number: Contractor Name: Address: License Number: Enter the weight and cubic yardage of each Type of Material diverted or disposed of in the appropriate column. Disposed in Class III Disposed in Inert Fill Diverted from Landfill by Landfill Recycling Type of Material Asphalt Concrete Porcelain Ferrous metal Non-ferrous metal Wood Debris Glass Red clay brick Bond paper Newsprint Cardboard Others END OF SECTION 0151 01515-3 FAF MASTER Project Manual Version 6.2 – February, 2006