GENERAL REQUIREMENTS
SOLID WASTE MANAGEMENT AND RECYCLING PLAN
Section 01515
Page 1 of __
SECTION 01515
SOLID WASTE MANAGEMENT AND RECYCLING PLAN
PART 1 -
GENERAL
1.01 SUMMARY
.A This Section includes:
.1 Part 1 – General
.a 1.01 – Summary
.b 1.02 – Related Sections
.c 1.03 - Definitions
.d 1.04 - Intent
.e 1.05 - Submittals
.f 1.06 - Recycling Requirements
.2 Part 2 – Products (Not Used)
.3 Part 3 – Execution (Not Used)
.4 Part 4 – Forms
.a Form 01515-F1 “Summary of Solid Waste Disposal and Diversion”
1.02 RELATED SECTIONS
.A Division 1 Section 01330, “Submittal Procedures”
.B Division 1 Section 01500, “Temporary Facilities and Controls”
.C Division 1 Section 01740, “Cleaning”
1.03 DEFINITIONS
.A Inert Fill - A permitted facility that accepts inert waste such as asphalt and concrete exclusively.
.1 Inert Solids/Inert Waste: Non-liquid solid waste including, but not limited to, soil and concrete
that does not contain hazardous waste or soluble pollutants at concentrations in excess of
water-quality objectives established by a regional water board and does not contain significant
quantities of decomposable solid waste.
.B Class III Landfill - A landfill that accepts non-hazardous waste such as household, commercial and
industrial waste, including construction, remodeling, repair and demolition operations.
.C Construction and Demolition Waste - Includes solid wastes, such as building materials, packaging,
rubbish, debris and rubble resulting from construction, remodeling, repair and demolition operations.
.1 Rubbish: Includes both combustible and noncombustible wastes, such as paper, boxes,
glass, crockery, metal and lumber scrap, tin cans, and bones.
.2 Debris: Includes both combustible and noncombustible wastes, such as leaves and tree
trimmings that result from construction or maintenance and repair work.
.D Chemical Waste - Includes petroleum products, bituminous materials, salts, acids, alkalis,
herbicides, pesticides, organic chemicals and inorganic wastes.
.E Sanitary Wastes – Includes:
.1 Garbage: Refuse and scraps resulting from preparation, cooking, distribution or consumption
of food.
.2 Sewage: Domestic sanitary sewage.
01515-1
FAF MASTER Project Manual Version 6.2 – February, 2006
GENERAL REQUIREMENTS
SOLID WASTE MANAGEMENT AND RECYCLING PLAN
Section 01515
Page 2 of __
1.04 INTENT
.A Owner is committed to promoting efforts to have the Work performed in an environmentally sensitive
manner.
.B To promote this effort the Contractor is required to:
.1 Make reasonable efforts to affect optimum control of solid wastes.
.2 Prepare and comply with a Project specific Solid Waste Management Plan.
1.05 SUBMITTALS
.A Submit the following according to the requirements of the Contract Documents:
.1 Solid Waste Management and Recycling Plan
.a No later than twenty-eight (28) Days after the start date for the Work stated in the Notice to
Proceed, Contractor must schedule and conduct a meeting with Owner to discuss
Contractor’s proposed Solid Waste Management and Recycling Plan.
.b No later than forty-five (45) Days after the start date for the Work stated in the Notice to
Proceed, prepare and submit three (3) copies of a written and/or graphic Solid Waste
Management and Recycling Plan including, but not limited to, the following:
.c
.1
Permit or license and the location of the solid waste disposal area(s).
.2
Procedures for Recycling/Re-Use Program.
Revise and resubmit Solid Waste Management and Recycling Plan as required by Owner.
.2 Review of the Contractor’s Solid Waste Management and Recycling Plan will not relieve the
Contractor of responsibility for adequate and continuing control of pollutants and other
environmental protection measures.
.B Prior to Owner’s recommendation to the Board of Supervisors for final Acceptance of the Work,
Contractor must submit two (2) copies of a summary of solid waste generated by the Contractor’s
operations.
.1 Submit on Form 01515-F1 or other form acceptable to Owner.
.2 Include manifests, weight tickets, receipts, and invoices specifically identifying the Project and
waste material from:
.a Recycling Centers.
.b Class III Landfills.
.c
Inert Fills.
1.06 RECYCLING REQUIREMENTS
.A Recycling: Implement a recycling program that includes separate collection of waste materials of the
following types:
.1 Concrete.
.2 Metal:
.a Ferrous.
.b Non-ferrous.
.3 Wood.
.4 Debris.
.5 Glass.
.6 Fluorescent light tubes
01515-2
FAF MASTER Project Manual Version 6.2 – February, 2006
GENERAL REQUIREMENTS
SOLID WASTE MANAGEMENT AND RECYCLING PLAN
Section 01515
Page 3 of __
.7 Paper:
.a Bond.
.b Newsprint.
.c Cardboard and paper packaging materials.
.8 Others as appropriate.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - FORMS
Form 01515-F1
SUMMARY OF SOLID WASTE DISPOSAL AND DIVERSION
Project Name:
Project Number:
Contractor Name:
Address:
License Number:
Enter the weight and cubic yardage of each Type of Material diverted or disposed of in the appropriate column.
Disposed in Class III
Disposed in Inert Fill
Diverted from Landfill by
Landfill
Recycling
Type of Material
Asphalt
Concrete
Porcelain
Ferrous metal
Non-ferrous metal
Wood
Debris
Glass
Red clay brick
Bond paper
Newsprint
Cardboard
Others
END OF SECTION 0151