DEBRA P. HICKS, PE/LSI PRESIDENT & CEO PRINCIPAL ENGINEER EDUCATION: Bachelor of Science, Civil Engineering, 1984 New Mexico State University, Las Cruces, NM LICENSES: Professional Engineer New Mexico #10871 Texas #79887 Oklahoma #18989 Kansas #15228 PROFESSIONAL ORGANIZATIONS: National Society of Professional Engineers; American Society of Civil Engineers; New Mexico Society for Professional Engineers American Council for Independent Laboratories; American Council of Engineering Companies New Mexico; Academy of Civil, Agricultural, and Geological Engineering; Leadership NM. Throughout her 28+ year career, Mrs. Hicks has had various project management responsibilities, including preliminary design, applications for funds, subsurface investigations, geotechnical engineering, civil design, bidding and negotiating services, construction engineering, inspection, staking, and project closeout, as well as overall assistance with any issues that may arise. Since 1989, Mrs. Hicks has served as the Principal Engineer in responsible charge for design and construction engineering on all Projects for which the Firm is Engineer of Record. Mrs. Hicks has been the Professional Engineer responsible for the design of concrete and asphaltic mixtures as well as materials testing for soils, concrete, asphaltic mixtures, and aggregate for more than 20 years. Mrs. Hicks’ experience includes design, field inspection and testing of construction projects that include materials such as cast-in place and pre-cast concrete, masonry, timber, steel, asphaltic mixtures, Portland cement concrete, and soil cement. REPRESENTATIVE PROJECT EXPERIENCE NMJC On-Call Professional Engineering and Surveying Services | Hobbs, NM; 1995 to present Mrs. Hicks serves as the Client Manager/Project Lead for New Mexico Junior College. Mrs. Hicks is responsible for all client and subcontractor contract negotiations, budgeting, safety, quality control/quality assurance, critical path timeline management, staffing, and regulatory compliance. Pettigrew & Associates, P.A. provides New Mexico Junior College comprehensive civil engineering, surveying, and materials testing on an as needed basis. Services include preliminary studies and surveys, land and construction surveys, Environmental Site Assessments, comprehensive design, and construction management, including construction inspection, concrete and asphalt mix design review, construction quality control, and construction materials testing. Completed construction projects included a variety of services. 1995 Paving Improvements 2000 Preparation of a study to determine the existing traffic flow patterns, evaluate the level of service, analyze facility usage, and provide recommendations for improved service and future growth 2002 Re-design of Circle Drive and Entrance to accommodate two-way traffic, resurfacing of the Circle Drive, redesign of existing speed bumps for multipurpose as walkway, and obliteration of the existing entrance from NM 18 2002 Design of new concession stand with restrooms 2003 Proposed Student Apartments - Subsurface Investigation 2003 Preparation of Annexation Plat 2003 Proposed Student Apartments (Private) – Legal Description 2003 Water Rights Survey and Application Submittal 2003 Traffic Study 2003 Ben Alexander Student Center Additions/Renovations – Subsurface Investigation 2004 Design of acceleration/deceleration lanes for the westbound traffic on West Millen Drive, construction of new south entrance to NMJC, and construction of additional parking facilities 2004 Don Whitaker Automotive Technology Center – Materials Testing 2004 Boundary Survey and Phase I Environmental Site Assessment for Lots 23-24 Block 36 of Original Hobbs Addition 2004 Proposed Student Apartments (Revised Location) – Subsurface Investigation 2004 Communications Tower – Subsurface Investigation and Survey 2005 Student Apartments Phase I and II – Topographic Survey, Subsurface Investigation/Storm Water Pollution Prevention Plan 2005 West Millen Drive Right of Way Survey 2006 Xcel Easement 2006 Tunnel Transformer Foundation 2006 Millen Drive Fence Survey 2006 Workforce Training Center – Offsite Utilities 2006 NMJC CDL Pad 2007 John Watson Student Apartments Survey 2007 Oil Field Training Center – Subsurface Investigation, Survey, Design 2008 Central Plant Addition and Electrical Distribution Line – Subsurface Investigation, Topographic Survey, Subsurface Utility Engineering 2008 Decel Lane and Rodeo Arena Access Road 2008 Western Heritage Museum Parking Improvements 2009 Student Apartments Drainage Analysis 2009 Water Metering Coordination/Irrigation Study 2010 Pannell Library Water Testing 2010 Water Rights Survey and Application Submittal 2010 City of Hobbs Annexation Plat 2011 Entrance Left Turn Lane COMMUNITY: Lea County Improvement Corporation; Rotary; University of the Southwest Institutional Resources Chair; New Mexico Junior College Foundation; MyPower, Inc; Project 40:31; AWARDS: Entrepreneur in Residence, University of the Southwest; NM Business Woman Top City of Hobbs On-Call Professional Engineering Services | Hobbs, NM; 2004 to present Mrs. Hicks serves as the Client Manager/Project Lead for the City of Hobbs On Call Professional Engineering Services. Mrs. Hicks is responsible for all client and subcontractor contract negotiations, budgeting, safety, quality control/quality assurance, critical path timeline management, staffing, and regulatory compliance. Pettigrew & Associates has provided continuous on-call services to the City of Hobbs since 2004. For these projects, Pettigrew has provided comprehensive engineering services through a Task Order process, including the following major projects: 2005 S.R. 18 & Millen Drive Dual Left Turn Lane – Comprehensive Civil Engineering 2005 Plats & Legal Descriptions 2005-2011 S. R. 18 Beautification and Trail Project Phase A, B, & C – Comprehensive Civil Engineering 2006 North Grimes Roadway Improvements – Design and Construction Engineering, Inspection and Surveying 2007 North Acres Drainage – Construction Engineering 2007 HIAP/HAAF B-17 Site Development Project - Comprehensive Civil Engineering . Mosaic Potash Drainage Study | Carlsbad, NM; 2011 Mosaic Potash is in the process of preparing a Design-Build package for the reconstruction of their railroad through the plant site. Pettigrew was contracted to prepare the Preliminary Site Drainage Analysis including proposed drainage improvements. This project involves an approximately 23,000 acres. As Principal Engineer, Mrs. Hicks is responsible for direction, control and supervision of the work. Pettigrew & Associates will also provide construction administration and engineering for the site grading and drainage portion of the project. NMJC Entrance Left Turn Lane | Hobbs, NM; 2011 Pettigrew & Associates developed a traffic volume study in order to provide New Mexico Junior College with a left turn access from NM18 north bound. The project entails calculations to determine queue storage capacity, civil site design, construction administration and engineering and periodic field review. As Principal Engineer, Mrs. Hicks is responsible for direction, control and supervision of the work. Turner Street Pavement Investigation | Hobbs, NM; 2011 Pettigrew & Associates has been contracted by the City of Hobbs to perform the Turner Street Pavement Investigation. This project is a 4.5 mile phase that connects Downtown Hobbs to State Highway 18. The roadway cross-section varies in width from five lanes with a center turn lane to two lanes. The investigation focus includes NMDOT design standards and analysis in accordance with AASHTO Pavement Design Guide and economic viability. As Geotechnical Engineer, Mrs. Hicks is responsible for the engineering analysis and report. State Road 18 Beautification & Trail Project | Hobbs, NM; 2001 -2011 Pettigrew & Associates, P.A. served as the civil engineer on this important project in Lea County. The S.R. 18 Trail will ultimately serve as a link from a residential/commercial area of Hobbs to the following places: Lea County Events Center, New Mexico Junior College, Zia Park and Black Gold Casino, Lea Regional Hospital, and a path to connect to the University of the Southwest and the Ocotillo Golf Course. Located adjacent to the Lovington/Hobbs Highway, the trail welcomes travelers from surrounding areas with its beauty and will provide a pleasant walking/biking environment for the locals. The City of Hobbs is currently in the process of extending the trail from the Millen Drive south to Grimes Street. The complete project will provide a six mile trail for walking, biking, or jogging. As Principal Engineer, Mrs. Hicks is responsible for direction, control and supervision of the design and construction engineering. The scope of work included: Complete Topographic Survey to Establish Location of Existing Features Including Trees, Trail, Grades and Irrigation System Along The Trail Corridor. Utility Coordination Design of Horizontal Alignment and Vertical Alignment Design of Drainage and Grading Features Along Trail Design of Structural Section Construction Administration and Engineering Construction Staking Periodic Inspection Construction Materials Testing for Soil, Aggregate, Asphaltic Mixtures and Concrete Silverado Real Estate, LLC. O’Reilly’s Auto Parts | Lovington, NM; 2011 Silverado Real Estate, LLC contracted Pettigrew & Associates to perform Surveying and Engineering services for a new O’Reilly’s Auto Parts Store in Lovington, NM. Scope of Work includes Boundary and Topographic Surveys, Geotechnical Investigation, Environmental Assessment, and Civil Design. As Principal and Geotechnical Engineer, Mrs. Hicks over-sees all aspects of the Civil Design and the Subsurface Investigation for the development. . Nor-Lea Hospital District Outpatient Center Expansion | Lovington, NM; 2011 Nor-Lea General Hospital in Lovington, NM recently completed a $15 million expansion project to house an Outpatient Care Center. As Principal Engineer, Mrs. Hicks was responsible for direction, control and supervision of the work. The project involved approximately 35,000 square feet of new and renovated space including a central registration, wound care center, rehabilitation center, sleep center, specialty clinic, chemotherapy center, cardiology/neurology clinic, new lab facility, MRI suite, and a new dining and conference center. Pettigrew & Associates provided civil site design, utility design, storm water design, Storm Water Pollution Prevention Plan, construction staking, construction administration and engineering, periodic field review for preparation of construction progress estimates, steel inspection, and construction materials testing for the hospital. Choose Life Church Youth Programs Building | Hobbs, NM; 2011 As Principal Engineer, Mrs. Hicks was responsible for direction, control and supervision of the preliminary site drainage study and grading and drainage plans for proposed construction of a youth building and a new worship center at Choose Life Church. The purpose of the study was to determine finished floor elevations for the proposed buildings. The site is located in adjacent to a major drainage relief channel. Public Safety Complex/City of Hobbs Fire Station # 4 | Hobbs, NM; 2011 As a sub consultant to Teske Architects, Pettigrew & Associates provided a subsurface investigation, preparation of construction documents and a Storm Water Pollution Prevention Plan for site design of the centralized public safety complex and Fire Station. As Principal and Geotechnical Engineer, Mrs. Hicks over-sees all aspects of the Design and Construction Engineering as well as the Subsurface Investigation for the project. New Mettie Jordan Elementary School | Eunice, NM; 2011 The New Mettie Jordan Replacement Elementary School project consists of the design and construction of a new single-story, 76,978 square foot elementary school located on the existing school property. The project will be designed to be harmonious with the surrounding architecture of both the natural and built environments. The design consists of two classroom wings unified by a centrally located administration. The layout of the building provides open areas around the structure for use as outdoor classrooms, play areas, pedestrian circulation, and semi-public gathering areas. Pettigrew & Associates was contracted by Eunice Public Schools to provide a geotechnical investigation. As Geotechnical Engineer, Mrs. Hicks was responsible for performing geotechnical analysis for recommendations regarding pavement typical section, site grading, building foundation design, and native soil suitability. In addition, Pettigrew provided surveying services including establishment of horizontal and vertical control, boundary and topographic surveys, subsurface utility exploration, and preparation of vacation plats. Eunice Vocational Schools | Eunice, NM; 2010 Mrs. Hicks served as the Geotechnical Engineer for this proposed development which includes the construction of a 20,000 square foot, single story building. Mrs. Hicks was responsible for performing geotechnical analysis for recommendations regarding pavement typical section, site grading, building foundation design, and native soil suitability. . Carlsbad Municipal School Sports Complex | Carlsbad, NM; 2010 In her capacity as Principal Engineer, Mrs. Hicks was responsible for direction, control and supervision of the drainage study for the Carlsbad Municipal Schools. The project consisted of preparation of a digital topographic base map for construction documents, on-the-ground surveys, preparation of contour maps, identification of flow line and invert elevations of existing drainage facilities. Construction Documents Preparation included grading plans and designs of new drainage structures including drop inlets, slotted drains, storm water piping, drainage basins, detention basins, and outlet structures. The Carlsbad Municipal Schools’ vision of this initiative was to design and construct a state of the art sports complex for the youth of Carlsbad, New Mexico. The centrally located complex provides a safe, secure facility, housing softball, baseball, soccer and football fields, which greatly compliments the community’s strong support and participation in organized youth sports. Lea County Fairgrounds Master Plan and Assessment | Lovington, NM; 2010 In 2010, Lea County commissioned a master plan and needs assessment for the Lea County Fairgrounds in Lovington, New Mexico. The purpose of the study was to assess the condition of the existing facilities, analyze and project demand for the facilities in the future, prepare a phased (prioritized) master plan to meet the future needs, and to project costs to assist in identifying funding sources for capital improvements. Mrs. Hicks served as Principal Engineer for the project team, responsible for direction, control and supervision of the analysis of future demand projections for the Fairgrounds infrastructure (drainage, parking, and utilities), as well as project costs. SPS 115/230 kV Dbl Ckt Seven Rivers - Eagle Creek | Eddy County, NM; 2010 As Geotechnical Engineer, Mrs. Hicks was responsible for performing geotechnical analysis and recommendations for foundation design for the structures from Seven Rivers Substation to the Eagle Creek Substation in Eddy County. Professional Surveying services for the 34 mile route included an alignment survey, Right of Way acquisition, and design and construction survey and mapping. Approximately 10 miles of additional secondary route was added to the project through re-routes for environmental and landowner considerations. Lea County Sheriff’s Department | Lea County, NM; 2010 The Lea County Law Enforcement Facility consists of two buildings totaling 31,093 square feet, type II‐ B construction, housing ‘B’ and ‘S1’ occupancies. Major components of this project include site work, storm drainage and sewer systems, parking lots, curb and gutter, detention basins, landscaping, utilities, foundations, steel framing, masonry, metal panels, aluminum storefront and glazing, roofing, drywall and finishes, doors and hardware, mechanical systems, plumbing systems, electrical systems, fire protection, and alarm systems and security and access systems. Pettigrew was contracted by Lea County to perform the Subsurface Investigation for this project. As Principal Engineer and Geotechnical Engineer, Mrs. Hicks was responsible for engineering analysis and recommendations for foundations and pavement design. Pettigrew & Associates provided pre-construction topographic and boundary survey, construction staking, quality assurance construction inspection, and materials testing. Pettigrew & Associates provided inspection services for Lea County during the construction of the Sheriff’s Department. Capitan Family Dollar | Capitan, NM; 2010 Capitan, New Mexico is located in the southern Rocky Mountains. This site provided several challenges for grading, drainage, and access to a substantially sloped site which drained to an existing NMDOT Right of Way. Pettigrew & Associates conducted a variety of engineering services for the Family Dollar store in Capitan, NM, including NMDOT Site Threshold Analysis, preparation of driveway permit, traffic control plan, construction documents and construction administration. The construction documents included Civil Site and Civil Control Plans along with Grading and Draining Plans and Civil Utility Plans. Mrs. Hicks was responsible for direction, control, and supervision of the work. Hobbs Municipal Schools Warehouse/Maintenance Facility | Hobbs, NM; 2010 Hobbs Municipal Schools constructed two single story metal buildings, 13,000 square feet, on approximately 3+/- acres of land to serve as a maintenance facility and storage. As a sub consultant to Teske Architects, Pettigrew & Associates provided geotechnical and civil site engineering. As Geotechnical Engineer, Mrs. Hicks performed geotechnical analysis for recommendations regarding pavement typical section, site grading, building foundation design, and native soil suitability. In addition Mrs. Hicks, as Principal Engineer was responsible for direction, control and supervision of the engineering work associated with preparation of the design and construction drawings, technical specifications and a Storm Water Pollution Prevention Plan. . NMJC Pannell Library | Hobbs, NM; 2009 The 30,000 square foot library was renovated to create a more open, inviting, student friendly space. Fixed stack books shelves were replaced with space saving mobile units. Pettigrew performed the design survey of the existing building, including modeling of the existing roof heights and parapets in the area of the proposed construction, geotechnical investigation and civil site design as a sub consultant to the architect. As Principal Engineer, Mrs. Hicks was responsible for direction, control and supervision of all aspects of the Civil Design. In addition, as Geotechnical Engineer, Mrs. Hicks performed geotechnical analysis for recommendations regarding site grading, building foundation design, and native soil suitability for the renovations. NMJC Equine Instructional Facility | Hobbs, NM; 2009 The proposed Equine Instructional Facility encompasses approximately 13.3 acres with three major building elements: Main Arena Building - 125,000 square feet, seating for approximately 2,500 to 3,000 people, and warm-up area Indoor horse pen - approximately 40,000 square feet that will house 150 horses Educational Spaces including a large lab, public space, classrooms, and office. As Principal Engineer, Mrs. Hicks was responsible for direction, control and supervision of all aspects of the preliminary studies for infrastructure, drainage, soil conditions, and traffic. Conceptual working drawings and probable cost estimates for on-site and offsite development were prepared in accordance with PSFA specifications. This project was programmed as a certified LEED Silver project. Conceptual drawings included water harvesting utilizing cisterns. Upon completion of the conceptual drawings and probable cost ($19 million), NMJC requested that the architects/engineers perform value engineering to reduce the projected budget to approximately $12 million. Pettigrew & Associates performed value engineering for site development. The project was not placed on the GEO bond and is currently on hold. P. R. Leyva Middle School Auditorium | Carlsbad, NM; 2009 Proposed construction for this project included a single story restroom and dressing annex, and ADA access ramps at entries. Pettigrew & Associates performed a subsurface investigation for the proposed construction. As Geotechnical Engineer, Mrs. Hicks performed geotechnical analysis for recommendations regarding site grading, building foundation design, and native soil suitability for the renovations. NMJC Workforce Training Center | Hobbs, NM; 2008 Construction was completed in 2008 for a new 14,000 sq. ft. workforce training center on the campus of NMJC just off Millen Drive across from Zia Park and Black Gold Casino. The center blends a state-of-the-industry workforce training focus with NMJC’s existing Continuing Education, video conferencing, transportation, and online learning programs, as well as the Small Business Development Center. Pettigrew & Associates provided professional engineering and surveying services for site work, including utilities, concrete and asphalt paving, utility main extensions, and landscape. Specific tasks included Topographic Surveys for Design, Geotechnical Investigation, Civil Design, Utility Design for Trunk Line Extension, Construction Administration and Engineering, Construction Materials Testing, Construction Staking. As Principal Engineer, Mrs. Hicks was responsible for direction, control, and supervision of all aspects of the Civil Design. In addition, as Geotechnical Engineer, Mrs. Hicks performed geotechnical analysis for recommendations regarding site grading, building foundation design, and native soil suitability for the new construction. . City of Hobbs North Grimes Roadway Improvement | Hobbs, NM; 2008 Pettigrew & Associates provided design and construction engineering services for the North Grimes Roadway Improvement Project. As Principal Engineer, Mrs. Hicks was responsible for direction, control and supervision of the design and construction engineering. The scope of work entailed Preparation of Project Construction Documents, which included contract documents, technical specifications, special provisions, quantity tables, special details, and bid tabulation; engineering review and verification of construction plans and quantities. Preconstruction Surveying included establishment of alignment for centerline, stationing, and elevation correlation to construction plans. Construction Engineering Services (Resident Construction Representation) included construction observation; field engineering as necessary; and construction documentation for pay estimates, change orders, request for information and material submittal review, etc. Construction Staking included cross sections for excavation, staking curb and gutter, fillets, valley gutters and drive pads; drainage structures – drop inlets, junction boxes, manholes, fire hydrants, water manholes, valve boxes, and drainage pipe; cut off wall and keystone wall; light bases; signalization; and Project Right of Way. Pettigrew & Associates also provided materials engineering for a pavement investigation and structural section design, as well as construction materials testing for soils, aggregate, Superpave mixtures, and concrete. NMJC Central Plant Addition NMJC Electrical Distribution Line | Hobbs, NM; 2008 Pettigrew & Associates performed a subsurface investigation and subsurface utility engineering for the approximately 1,000 sq. ft expansion of the existing central plant and new electrical distribution line supplying power to the central plant, library and administration buildings. As Geotechnical Engineer, Mrs. Hicks was responsible for performing geotechnical analysis for recommendations regarding site grading, building foundation design, and native soil suitability. Bel-Aire Shopping Center Improvement Impact Drainage Study | Hobbs, NM; 2008 Pettigrew & Associates performed a Drainage Study to determine the impact of a proposed 26,000 square feet commercial building and eight duplexes located on the eastern side of the shopping center. Digital terrain modeling was used in conjunction with HEC RAS to perform hydraulic analysis. As Principal Engineer, Mrs. Hicks was responsible for direction, control and supervision of the drainage analysis and study. Lovington Aquatic Facility | Lovington, NM; 2008 Pettigrew & Associates provided topographic survey, civil design, and construction inspection and construction surveying services for the Lovington Aquatic Facility. As Principal Engineer, Mrs. Hicks was responsible for direction, control and supervision of the design and construction engineering. The scope of work included complete topographic survey to establish location of existing features and grades in the proposed area of the facility as well as civil design including access roads, drainage structures to address existing drainage ditch, parking facilities, utilities, and general civil engineering services. . Colorado Energy Management Hobbs Generating Station - 550MW Power Plant, | Lea County, NM; 2008 Xcel Energy selected Colorado Energy Management to permit, construct, and operate a new gas fired power plant in Lea County, New Mexico in order to fulfill the area’s growing power needs. Pettigrew & Associates provided the 160-acre site ALTA and topographic survey for design coupled with a geotechnical investigation consisting of nine original bore holes at 50' depth and an additional 14 geotechnical boreholes. In addition, Right of Way and design surveys were performed for over 10 miles of offsite water lines, gas lines, access roads, etc., and construction layout surveys for the facility. Materials testing included soil resistivity testing and other construction materials testing for construction and permitting. As Geotechnical Engineer, Mrs. Hicks was responsible for performing geotechnical analysis for recommendations regarding pavement typical section, site grading, building foundation design, and native soil suitability. As Principal Engineer, Mrs. Hicks was responsible for direction, control, and supervision of all materials testing for the project. Homestead Estates | Hobbs, NM; 2008 The Homestead Estates comprises 258 acres with a spread of 937 lots between Bender Boulevard and the Seminole Highway. The lots are designed to support single and multifamily homes. As Principal Engineer, Mrs. Hicks was responsible for direction, control and supervision of the project. As Geotechnical Engineer, Mrs. Hicks was responsible for performing geotechnical analysis for recommendations regarding pavement typical section, site grading, building foundation design, and native soil suitability. Pettigrew & Associates provided comprehensive engineering services including: Boundary and Topographic Survey Restoration and/or establishment of monumentation Subsurface Investigation Environmental Phase IA (Performed by Subcontractor) Traffic Impact Analysis Analysis of existing conditions, future traffic analysis, and traffic signal warrant analysis Drainage Study/Preliminary Design Identification of all drainage patterns Detailed hydrologic analysis to identify all existing drainage patterns and storm drain systems and to determine the magnitude of the run-off flow rates for the appropriate design frequencies Detailed hydraulic design of all required drainage features Drainage Report incorporating all finding, including Inventory of existing drainage structures/systems Detailed structure recommendations including drainage areas, design discharges, and head water depths Preliminary Utility Analysis Analysis of existing sewer and water capacity, determination of site demands, coordination with City of Hobbs Utilities Department, and determination of other utilities necessary for the site Preparation of Design Documents Carlsbad Caverns Repair & Rehabilitate Sewer System | Carlsbad, NM; 2007 Pettigrew & Associates provided geotechnical engineering/observation services for the construction o f the new sewer collection system. Responsibilities included observation and documentation of geologic formations for the installation of stanchions to support the line. In addition, Pettigrew provided construction surveying and materials testing support for this important project. Pettigrew provided to the National Park service the original topographic design survey for this project in 2002. As Principal Engineer and Geotechnical Engineer, Mrs. Hicks was responsible for direction, control, and supervision the geotechnical engineering and field observation. . Southwind Capital, LLC Windscape Apartments | Hobbs, NM; 2007 Southwind Capital, LLC engaged Pettigrew & Associates to provide professional engineering and surveying services on a Class A, 202-unit multi-family housing development in Hobbs, NM. The project was the community’s first significant multi-family investment in the market in 20+ years. The project included construction of 10 multi-story buildings, 202 units, a clubhouse, a pool, and a parking area, as well as a 41’ wide minor collector roadway, Central Drive. Services included Coordination of Development through Municipal Process, Preparation of an ALTA/ACSM Land Title Survey, Preparation of Summary Subdivision Plat and Legal Descriptions, Preparation of Annexation Plat, Preparation of Access Easements, Topographic Survey for Design, Geotechnical Investigation, Traffic Impact Analysis, Drainage Analysis, Civil Site Design Including Grading and Drainage, On-Site and Off-Site Utilities, Roadway Design, Periodic Field Review for Preparation of Construction Progress Estimates, Construction Staking, Construction Materials Testing, and Project Close-out Documentation. In addition, most recently Pettigrew completed a Letter of Map Revision to the Federal Emergency Management Agency including hydraulic and hydrologic computations in support of the map revision. As Principal Engineer, Mrs. Hicks was responsible for all municipal coordination, preliminary studies, design and construction engineering and materials testing for the new complex. Waste Isolation Pilot Plant (WIPP) | Carlsbad, NM; 2003-2006 Explosion Isolation Walls Intake and Exhaust Drifts – Panel Closures 1, 2, and 3 As an independent consulting engineering and testing firm, Pettigrew & Associates provided the Quality Management System for construction of the Panel Closure System for Panels 1,2, and 3. As Principal Engineer in direct responsible charge, Mrs. Hicks was responsible for all contract negotiations, budgeting, safety, /quality assurance, critical path timeline management, staffing, and regulatory compliance for this project. The scope of the work included: Development and implementation of the Work Plan Development and implementation the Quality Control Plan Development and implementation of Job Hazard Analysis Design review of masonry unit mix and mortar mix Daily inspection of construction of the Explosion Wall including placement of masonry units and mortar, quality of workmanship including lay-up configuration, board time for mortar, mortar joint spacing, and header placement. Daily testing of mortar and masonry units Project Documentation Project Close-out Zia Park Racetrack and Casino | Hobbs, NM; 2005 Completed in 2005, the entertainment casino and thoroughbred-racing complex design incorporated a program that included a horseracing clubhouse, an entertainment venue, and lodging. Zia Park is one of the nation’s first racetrack/casino entertainment destinations to be integrated from project commencement. Zia Partners, LLC contracted Pettigrew & Associates, P.A. to provide land surveys, environmental and engineering reports for 640 acres, oversight for environmental cleanup, design, and construction management services. As the Civil Engineer of Record, Pettigrew provided site grading and drainage, utility design, roadway and parking facilities, and offsite utility extension design. Construction Management Services included preparation of the Storm Water Pollution Prevention Plan, quality assurance materials testing, construction inspection (including structural steel and fireproofing), and construction staking for the 312-acre site. Additionally, Pettigrew & Associates provided civil design services, construction management services, and Right of Way services for approximately 2,560 linear feet of 12” water main and 2,560 linear feet of 12” sewer main along the south boundary of Millen Drive to tie into the City of Hobbs utility mains. As Principal Engineer, Mrs. Hicks was responsible for direction, control, and supervision of the design and construction engineering. In addition, as Geotechnical Engineer, Mrs. Hicks performed geotechnical analysis for recommendations regarding site grading, building foundation design, and native soil suitability for the new construction. .