Providing facilities and assets We will proactively manage the ongoing maintenance and development of Council's assets and facilities to meet our community's current and future needs. 12.0 Managing assets We will implement strategies for the development and ongoing renewal of Council’s physical assets. Community outcome Assets, activities and processes are well managed and deliver safe and usable facilities. 13.0 Leisure and sporting facilities We will manage, develop and improve Council’s physical assets for long-term sustainability, amenity and public safety. Community outcome High quality leisure and sports facilities for everybody to enjoy. Our performance City of Boroondara Annual Report 2012-13 80 Achievements New playgrounds New playgrounds featuring new and innovative equipment were constructed at Macleay Park, Stradbroke and Radnor Reserves. The playground at Macleay Park features a birds nest swing, in-ground mini trampoline, a rope pyramid and a 25 metre flying fox. The playgrounds offer a wide variety and selection of play opportunities throughout the municipality. Camberwell Fresh Market improvements The Camberwell Fresh Food Market is being revitalised as part of a plan to improve the customer experience and raise the market's profile. Council has prepared designs for a number of significant upgrades to the market's facade and the surrounding public spaces to rejuvenate the iconic shopping destination. The first stage of the project includes the design of a 'master vision' for the precinct and the painting of the Riversdale Road frontage. Future works are to include a new canopy and signage, an improved public space and walkway and an upgrade of the Market Plaza. Hays Paddock pavilion reopens A new-and-improved Hays Paddock pavilion opened in March 2013. The $2 million project has seen the ageing facility transformed into a modern pavilion that will serve a range of sporting clubs and local residents. The new pavilion features specific design elements to cater for hearing impaired sporting groups, disability toilet and baby change facilities, change rooms, multipurpose rooms and public toilets. Corporate system updates To facilitate the integration of data and visual representation street trees, park assets and lane data was added to Conquest, the corporate asset management system, and Weave GIS. The data created in the systems enables users to access the data and spatial data using links between the applications. In addition, the data update included the modification to work flows and processes. Kew Recreation Centre In June 2013, Kew Recreation Centre won the Aquatics and Recreation Victoria annual Health Club Award for 2013. The nomination was submitted by the Young Men's Christian Association (YMCA) Kew Recreation Centre, a community partnership with the City of Boroondara. The award recognises the quality of the Kew Recreation Centre's redevelopment works provided by Council and the quality of Our performance City of Boroondara Annual Report 2012-13 the facility management provided by the YMCA. Challenges Conquest Asset Management System The upgrade of the Conquest Asset Management System has been delayed due to various integration issues. Work is continuing to overcome these issues and progress the upgrade and is anticipated to be completed by December 2013. Footpath management and maintenance: The maintenance of over 1,200 kilometres of footpaths containing over 60,000 street trees is an ongoing challenge for Council. A review of footpath management has been conducted with the aim of improving footpaths whilst protecting street trees within the municipality. Road Management Plan review In accordance with statutory requirements a review of the Road Management Plan was undertaken. The review provided an opportunity to incorporate recommendations from the Municipal Association of Victoria and improve communication of the plan to the community. The amended Road Management Plan was adopted by Council on 22 July 2013. Looking ahead Provide enhanced leisure and recreational opportunities through the provision of new and expanded services that will be available at the new Hawthorn Aquatic and Leisure Centre including a warm water indoor pool, expanded gymnasium and flexible program rooms. Optimise use of Council facilities to meet changing community needs by undertaking a community facilities audit. Ensure that the service levels contained in the Road Management Plan are achieved. Improve the quality and accessibility of asset information to enable informed decision making. Provide a safe and functional footpath network by undertaking annual risk inspections and programming defects for remedial action. Further reduction of waste going to landfill, especially in conjunction with future "whole of sector" state government proposals associated with green organics. Ensure all our assets are maintained to a reasonable level to meet the needs of the community. 81 Implement Council's review of footpath management and maintenance, which will include the development of a detailed implementation plan and community consultation. Consultation with users of the Balwyn Leisure Centre, Boroondara Sports Complex and local community members is being undertaken to progress the development of architectural plans to consolidate the two facilities onto the Boroondara Sports Complex site. This project will provide a quality facility that best meets the needs of all users. Consultation with Ashburton Pool and Recreation Centre service users on their recreation and fitness needs has resulted in the development of an architectural concept design that includes an upgrade to existing facilities, additional wet and dry change room facilities, upgrade plant and equipment and expanded gymnasium and program areas. Detailed design will be undertaken during the 2013-14 financial year with construction of the renewed facility due to commence in July 2014 and be completed in mid 2015. Ashburton Pool and Recreation Centre The Ashburton Pool and Recreation Centre is a highly valued and successful facility providing a broad range of recreational services. The facility is due for major renewal works to ensure it is able to continue to respond to community needs into the future. A feasibility study was undertaken from November 2012 to early May 2013 as part of the initial planning. The feasibility study included assessments of plant and equipment as well as community consultation to understand the recreation and fitness needs of users. The feedback has informed development of concept plans for renewal of this highly valued community facility. Our performance City of Boroondara Annual Report 2012-13 82 At a glance Operating expenditure $15.29 million Equivalent full time positions 56.10 Core activities Interesting facts Our performance City of Boroondara Annual Report 2012-13 Develop and manage the approved Environment and Infrastructure Capital Works Program ensuring value for money Provide project management services and technical advice on Council's projects Incorporate environmentally sustainable design principles into building and engineering projects Maintain the City's infrastructure including buildings, footpaths and roads, shopping centres, drains, street furniture and signs Investigate and develop solutions to major drainage issues Administer and develop Council's asset management system Develop and update the ongoing renewal program for road assets Facilitate and promote occupational health and safety compliance on all environment and infrastructure worksites Coordinate the review of asset management plans and their integration with Council's Long Term Financial Plan Management of 75 leased sporting and community facilities, ensuring tenant groups are resourced to run a range of club activities Management of Council's five leisure and aquatic centres and the Boroondara Tennis Centre Coordinate seasonal tenant sport clubs on Council's 56 sportsgrounds. Strategic and operational support of Council's nine neighbourhood houses Plan, manage, develop and promote leisure facilities consistent with the needs of the community Undertake programmed risk and condition inspections of Council's road assets 35,000 stormwater pits, including pit lids and grates are maintained 692 km of stormwater pipes are managed and maintained 714 km of drains 1,171 km of footpaths 1,099 km of kerb and channel 12.4 km kerb and channel replaced, 10.1 km bluestone and 2.3 km concrete 567 km of local roads 2.5 km of drains surveyed using CCTV 3.84 km of drainage pipes installed 31.7 km of road resurfacing 4,619 children undertaking aquatic safety education training 2 new sporting pavilions constructed, Eric Raven Reserve and Burwood Reserve 6 sporting pavilion upgrades, Tuck Stand preservation works, Hays Paddock main pavilion and archery pavilion, Highfield Park pavilion, Howard Dawson pavilion, Camberwell Bowls Club pavilion and Victoria Park north pavilion 83 Graphical information Note: Data is for locally maintained asset classes only and as such exclude VicRoads maintained assets. Note: 2012-13 result is due to the major projects expenditure. Our performance City of Boroondara Annual Report 2012-13 84 Note: The result for land and buildings is mainly due to the timing of cash expenditure of major projects including, Hawthorn Aquatic and Leisure Centre, Hawthorn Town Hall Arts Precinct, Ashburton Library and Learning Centre, Ashburton Pool and Recreation Centre. Total attendance 2.53 million Our performance City of Boroondara Annual Report 2012-13 85 Status of Council Plan June 2012 commitments Key Directorate CEO's office Community Development City Planning Environment and Infrastructure Communications and Engagement Corporate Services Status Completed Commenced Deferred Commitments 12.0 Managing assets 12.1 Review the program for the defect inspection of footpaths and roads to improve safety and amenity in areas of high usage such as at shopping centres and adjacent to schools and aged care facilities. 12.2 In support of services delivered to our community, undertake our annual asset renewal program, including: Responsible Directorate Status road refurbishment and road re-sheeting drain renewal building renewal park asset renewal footpath renewal 12.3 Continue to work with Melbourne Water to develop flood mitigation plans and strategies for Boroondara. 13.0 Leisure and sporting facilities 13.1 Meet the current and future health/wellbeing needs of the local community by progressing the redevelopment of the Hawthorn Aquatic and Leisure Centre. Our performance City of Boroondara Annual Report 2012-13 86 Results for Council Plan June 2012 Strategic Indicators Strategic Indicator Performance measure Managing assets Percentage completion of twice per year risk ratings for local and VicRoads roads carrying more than 2,000 cars per day. Managing assets Requests for bin pickups as a percentage of bins. Managing assets Percentage of planned facilities maintenance completed. Managing assets Number of proactive strip shopping centre maintenance inspections completed. Leisure and sporting facilites Total number of attendances at Boroondara leisure and aquatic centres. 2012–13 Target 2012-13 Result 100% 100% 100% Less than 0.1% 0.08% NA 98% 99% NA 98 158 98 2,540,000 2,529,019 NA Result 2013-14 Target Comment: A faulty door counter at Ashburton Pool and Recreation Centre has reduced the actuals reported by approximately 23,000 during the period. Leisure and sporting facilities Percentage of users satisfied or very satisfied with the Boroondara leisure and aquatic centres. 85% 92% 85% NA - Target no longer applicable Our performance City of Boroondara Annual Report 2012-13 87