49355 Procurement Plan (including contract packaging) 09/07/08Version I General 1.1 Project information: Country: China Sub-Borrower: Xi’an Municipal Government Project Name: Xi’an Urban Transport Project Loan/Credit No: 7558 -CHA Project ID: P0 Project Implementing Agencies: XDRC: PMO in Xi’an Foreign Loan Management Office under Xi’an Development and Reform Commission. (XDRC) for overall project preparation, oversight and coordination. IIC: Xi’an Infrastructure Investment General Co. (IIC) for overall project management, supervision and debit repayment. MPWMC: Xi’an Municipal Public Works and Management Commission for Road Networks –Xi’an city component (RNC) Huxian County Government: Huxian County Construction Bureau and Huxian DRC for Road Networks –Huxian component (RNH) XMCB and XPTC Xi’an Municipal Communications Bureau (XMCB) and Xi’an Public Transport General Company (XPTC) for public transport component (PT) XPSB: Xi’an Public Security Bureau Traffic Police Detachment (XPSB) for Traffic Management component (TM) XEPB : Xi’an Municipal Environment Protection Bureau (XEPB) for Air Quality Management component (AQM) XMCHB Xi’an Municipal Culture Heritage Bureau (XMCHB) for Culture Heritage – Ancient Roads in Han Chang’an city-Weiyang Palace component (CH1) XCSWC : PMO in Xi’an Municipal City Wall Scenery Spot Committee (XCWSC) for Culture Heritage – Ming City Bicycle Network component (CH2) 1.2 Bank’s approval date of the Procurement Plan: Original___of 2007; Revision 1: __of 2008, Revision 2:__of 2009, Revision 3: __of 2010…] Period covered by the Procurement Plan (PP): 2007 -2011, The PP in the first year is ready to be implemented. The PP for rest years is only indicative subject to the adjustment approved by the Bank later. The cost estimate in original PP is based on the feasibility study (Huxian project is based on cost estimate of preliminary design). The cost estimates in the revised PP will be replaced by cost estimate based on the preliminary design and detailed construction design whenever the preliminary design and detailed construction design are completed. 1.3 Date of General Procurement Notice(GPN): Before any Specific procurement Notice(SPN) Advertisement for SPN: All ICB regardless of contract value and consultant contract above $200,000 shall be at least on a national newspaper and dgMarket & UNDB on line All NCB contracts above $2 million for Works and above $300,000 for Goods, all consultant contracts for firms regardless of contract value shall be at least on a national newspaper. All NCB contracts below $2 million for Works and below $300,000 for Goods shall be at least on a provincial newspaper. Disclosure information for bid/proposal evaluation and contract award: Bid evaluation and contract award information for all ICB procurement of works and goods, for all QCBS, QBS, CQS and SSS procurement of consultant services shall be published on UNDB on line and dgMarket in accordance with the stipulations in Bank’s procurement Guidelines. Disclosure of bid evaluation and contract award information for all NCB and Shopping procurement of works and goods will follow local procedures. 1.4 Procurement Method Threshold for Goods and Works and non-consulting services. Procurement Civil Works Method 1. ICB >$20 million 2. NCB <$20 million 3. Shopping NA Note: NA = Not Applicable for the project 1.5 Goods >$400,000 <$400,000 <$100,000 Non-Consultant Services NA NA NA Prequalification : Bidders for contract value >$20 million under ICB Works shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. No prequalification, but post qualification, for all goods and NCB works under the project. 1.6 Domestic Preference: Domestic preference applies for ICB goods procurement only. No domestic preference for works contracts and NCB/Shopping contracts. 1.7 Procurement Method Thresholds for Selection of Consultants and Training Selection 1. 2. 3 1.8 Method QCBS/QBS/FBS CQ Section V of guidelines Consultant Firm including trainings offered by the firm(if any) >$200,000 <$200,000 NA Individual Consultant NA NA Any value Training (for those not included in consultant services) NA NA NA Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 300,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 1.9 Prior Review Thresholds for Goods, Works, Non-consulting Services, Consultant Firm, Individual Consultant and Training Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Category Prior Review Threshold 1. Works >$4 million 2. Goods >$300.000 3. 4. 5. 6. Non-Consultant Services Consultant Firm Individuel Consultant Training NA >$100,000 >$50,000 NA First NCB contract First Shopping contract NA First contract First contract NA All design & drawings All TOR All TOR All TOR In addition, the procurement for first contracts for each implementing agency and for each type procurement method, all drawings for civil works and all TOR for consultant services regardless of contract value shall also be sent to the Bank for prior review. (80% by value). II III VI Reference to (if any) Project Operational/Procurement Manual: Procurement Manual prepared by IIC will be distribute to all procurement staff on. Any Other Special Procurement Arrangements: NA. Procurement Packages with Methods and Time Schedule List of contract packages to be procured in the first year and late years: All TOR, preliminary design, detailed construction design and drawings for bidding documents shall be submitted to the Bank for prior review for all contracts including contracts subject to Bank post review. Prequalification apply for ICB works contracts and post qualification apply for NCB works and goods procurement. The letters at beginning of Contract No.: RN Road Network 1. RNC : Road Network in Xi’an City, 2. RNH : Road Network in Huxian, PT: Public Transport 3. PT1: Bus Interchange, 4. PT2: Bus Priority lanes, 5. PT3: Bus Maintenance Depot, TM: Traffic Management, 6. TM1: Area Traffic Control (ATC) 7. TM2: Road Safety 8. TM3: Enforcement & Road User Education (RUE) 9. TM4: Parking 10. TM5: Traffic Facilities AQ:Air Quality Management, 11. AQ1: Air Quality Monitoring Center 12. AQ2: MV Emission Inspection 13. AQ3: Air Quality Monitoring Network 14. AQ4: Information Management and Data Analysis 15. AQ5. TA for MV Emission Control CH: Cultural Heritage 16. CH1: Han Chang'an Weiyang Palace Han Dynasty Roads 17. CH2: Ming City Bicycle Route ID: Institutional Development 1 One U.S dollar is in equivalence of 7.09 Yuan RMB No . Contract No. Contract name, feature Cost Estimates USD million/ RMB 10K Procurement method RNC11 Yuxiangmen Interchange 0.86 km Changlemen Interchange 0.8km 11.33/8042 NCB 6.64/4712 NCB RNC13 South 1st Ring Road, 3.9km 84.77/60190 ICB RNC21 2nd Ring Road North-East Interchange(StageⅠ) 1.3 km 2nd Ring Road South-East Interchange - 1.08 km Tai Bai Nan-Zhang Ba Interchange 2.05 km 10.44/7410 NCB 9.92/7044 NCB 22.03/15642 ICB 1. RNC12 2. 3. 4. RNC22 5. RNC31 6. Total Notes: 1. 2. Prior review or post review Prior review Prior review Contract signing year Contract duration months 2009-10 15 2009-10 12 Prior review Prior review Prior review Prior review 2010 30 2008-10 18 2009-7 12 2010 24 145.13/103040 All six contracts are civil works construction contracts. Equipment for pumping stations, lighting, ventilation and safety in RNC11, RNC12, and RNC13 is included in the civil works contracts. RNC 13 will be divided into 2-3 packages after the completion of preliminary design. Contract packages for the Road Network Subcomponent in Huxian (RNH) No . Contract No. Contract name and feature Cost Estimates USD million/ RMB 10K Procurem ent methods RNH5 Meibi Road 3.6km 4.05/2878 NCB RNH3 Lvgong Road 2.8km 4.38/3108 NCB RNH4 3.19/2266 NCB RNH1 Railway Crossing (Underpass) on Lvgong Road 0.75km Xincheng Road 5.1km 10.39/7374 NCB RNH2 Dongcheng Road 2km 4.03/2826 NCB 7. 8. 9. 10. 11. Total Notes: 1. 2. Prior review or post review Prior review Prior review Prior review Prior review Prior review Contract signing year Contract duration months 2009-9 18 2009-9 18 2010 18 2010 18 2010 18 26.04/18488 RNH 4 is shown as a separate contract to RNH3 as it involves a railway crossing and will therefore be only open to contractors approved by China Railways. Pumps are included in RNH4 Contract packages for Public Transport Component PT 1 Bus Rapid Transit No. Contract No. Contract name Cost Estimates USD million/ RMB 10K 12. PT1.1 South Bus Interchange 2.27/1686 Procurem ent methods Prior review or post review Contract signing year Contract duration months NCB Post 2010 18 2009 18 Civil Works 13. PT1.2 Textile Town Bus Interchange Civil Works review 3.75/2665 NCB Prior review 14. PT1.3 South Bus Interchange Facilities: Bus Performance Testing Equipments 0.36/252 NCB prior review 2010 6 15. PT1.4 South Bus Interchange Facilities: Bus Repairing Testing Equipments 0.36/255 NCB prior review 2010 6 16. PT1.5 Textile Town Bus Interchange Facilities: Bus Performance Testing Equipments 0.36/252 NCB prior review 2011 6 17. 1.6 Textile Town Bus Interchange Facilities: Bus Repairing Testing Equipments 0.36/255 NCB prior review 2011 6 18. 1.7 Automatic telescopic gate 0.18/130.00 NCB Post review 2010 2 Total 7.74/5495 PT2 Bus Priority Lanes No . Contract No. Contract name Cost Estimates USD million/ RMB 10K Procurem ent methods Prior review or post review Contract signing year Contract duration months 19. PT2.1 Weiyang-S/N Street-Chang’an R, 17.87km, 22 stops 3.51/2491 NCB post review 2010 10 20. PT2.2 Hongqichang-Taihua R-1RR East-Taiyi R-Qujiang 23 stops, 14.65 km 2.36/1672 NCB post review 2010 10 21. PT2.3 Jiefang R-Heping R-Dayanta 5.87km, 18 stops 1.35/961 NCB post review 2010 10 22. PT2.4 Keji R-Xixieqi R-Jixiang R-Xiaozai E&W R-Xiying R 25 stops, 13.22 km 1.74/1237 NCB post review 2010 10 23. PT2.5 Laodong R-Gaoxing R, 9 stops, 5.34 km 0.91/647 NCB post review 2010 10 24. PT2.6 Xinqing R km 0.61/432 NCB post review 2010 10 25. PT2.7 Youyi R 9.97km, 13 stops 1.57/1113 NCB post review 2010 10 26. PT2.8 Zhuhong R-Xinghuo R-1SS West-Taibai R 19 stops, 15.6 km 1.81/1288 NCB post review 2010 10 27. PT2.9 Hangcheng R –Zhangbabei R 10 stops, 9.29 km 0. 60/427 NCB post review 2011 10 28. PT2.10 Honguan R-Fenggao R-Xiguanzhengjie-E&W Street-Shiyuan R-Huzhu R-Hansen R 23 stops, 13.14 km 2.07/1468 NCB post review 2011 10 29. PT2.11 Zhangbadong R(Xiwanglukou-Zhuque Street) 4km, 8 stops 0.83/586 NCB Post review 2010 10 30. PT 2.12 Xianningzong R-Xiangningxi R-1SS South-Fengqing R 10.56km, 27 stops 2.44/1734 NCB Post review 2011 10 31. PT 2.13 Zhuque R (Zhangbadong R-Zhuque Gate) 5.88km, 15 stops 1.80/1280 NCB Post review 2011 10 6 stops, 3.07 Total 21.60/153.36 PT3 Bus Depot No. Contract No. Contract name Cost Estimates Procurement methods USD million/ RMB 10K Prior review or post review Contract signing Contract duration months year 32. PT3.1 Depot Civil works 11.16/7921 NCB prior review 2011 17 33. PT3.2 Automatic telescopic 0.27/190 NCB Post 2012 6 gate, washing station and petrol station review 34. PT3.3 Bus Performance Testing Equipments 0.25/181 NCB post review 2012 6 35. PT3.4 Bus Repairing Testing Equipments 0.31/223 NCB prior review 2012 6 36. PT3.5 Bus repairing machines、 tools 0.24/169 NCB post review 2012 6 37. PT3.6 Office facility 0.28/200 NCB Post review 2012 6 38. PT3.7 Office furniture 0.20/144 NCB Post review 2012 6 39. PT3.8 Management facility 0.16/112 NCB Post review 2012 6 Total 12.87/9140 Contract packages for Traffic Management Component – TM 1 No Contract No. Area Traffic Control Contract name Cost Estimates USD million/ RMB 10K Procurem ent methods Prior or post review Contract signing year Contract duration months 40. TM11 ATC, signals & controllers for 200 road junctions & associated equipment 8.96/6359 ICB Goods Prior review 2009 24 41. TM12 200 road junction channelizations (see Note 1) 4.99/3541 NCB works Prior review 2010 24 42. TM13 100 CCTV traffic monitoring cameras 2.43/1722 ICB Prior review 2010 24 Prior review 2011 12 Goods 43. TM14 Communications system for ATC,CCTV,VMS Total Notes: 1.34/958 ICB Goods 17.72/12580 1. Includes 177 junctions mostly within MWC ATC, plus 23 junction allowance for other components. 2. Implementation of ATC is split into four contracts (TM 11-14) as experience has shown this is most efficient way to implement ATC TM 2 No . Contract No. Road Safety Contract name Cost Estimates USD million/ RMB 10K 44. TM21 Accident analysis software 0.20/141 and database development 45. TM22 Accident Remedial Measures -Engineering, Enforcement, Education arising from AAS TA 0.66/470 Procurem ent methods Prior review or post review Contract signing year Contract duration months CQS Prior 2009 16 services review NCB Works Post review 2011 18 46. TM23 Accident investigation equipment Total TM3 No . Contract No. 1.82/1293 ICB Goods Prior review 2009 18 Procurem ent methods Prior or post review Contract signing year Contract duration months 2.48/1904 Enforcement and RUE Contract name Cost Estimates USD million/ RMB 10K 47. TM31 National "Golden Shield" ITS local deployment 1.56/1108 QCBS services Prior review 2011 12 48. TM32 36 VMS Variable Message Sign and 212 detectors 3.49/2481 ICB Goods Prior review 2010 24 49. TM33 100 Enforcement Cameras ("Electronic Police") 2.38/1687 ICB Goods Prior review 2009 18 50. TM34 Road User Education (RUE) Development of Campaigns 1.04/740 QCBS services Prior review 2009 12 Total Notes: 8.47/6016 TM34 road users education (RUE) development of campaigns will be the optoelectronic and sound devices for demonstration in road-user training base, and the procurement model is to be determined. TM4 No Contract No. Parking Contract name Cost Estimates USD million/ RMB 10K 51. TM41 Parking meters & signs 0.98/696 Procurem ent method Prior or post review Contract signing year Contract duration months ICB Goods Prior review 2011 24 Procurem Prior or Contract Contract (Supply and Install) Total 0.98/696 TM5Traffic Facilities No Contract Contract name Cost Estimates No. USD million/ RMB 10K ent method post review signing year duration months 52. TM51 Traffic facilities (Supply and Install) for bicycles and pedestrians(Marking、mark line、protect a column ) 2.09/1482 NCB Works Post review 2009 12 53. TM52 Equipment to apply & remove 0.24/171 NCB Post 2010 6 Goods review thermoplastic lines Total 2.33/1653 Contract packages for the Air Quality Management Component No. Contract No. Contract name Cost Estimates USD million/ RMB 10K Procurem ent methods Prior review or post review Contract signing year Contract duration months 54. AQ1.1 Air Quality Monitoring Center Building 19,271 m2 6.2/4389.6 NCB Works Prior review 2010 30 55. AQ1.2 lifts 0.12/84.8 NCB Post review 2010 24 56. AQ1.3 Boilers (one set) 0.07/47.7 Shopping Post 2011 12 2011 12 Prior review 2009 21 Prior review 2009 12 Prior review 2010 12 review 57. AQ1.4 a/c 0.27/190.8 NCB Post review 58. 59. 60. AQ2.1-1a AQ2.1-1b AQ2.1-2 Automatic Noise Monitioring System including Display Screen and 2 Ambient Air Quality Monitoring Sub-Stations(fixed monitoring point) 0.36/239.1 Motor Vehicle Driving Conditon Pillution Emission Monitoring and 2 Automatic Traffic Pollution Monitoring sub-stations 0.37/239.1 Motor Vehicle Tail Gas Emission Remote Sensing Monitoring Equipment including one 17-seat monitoring vehicle 0.3/212 NCB, Goods NCB, Goods NCB Goods 61. 62. AQ2.2-1 AQ2.2-2 Non-conventional pollutant monitoring system for experimental 0.07/47.7 Motor vehicle simple operating condition monitoring system 0.99/699.6 Shopping Post review 2011 12 Prior review 2011 12 Goods ICB Goods 63. AQ3.1 Ambient Air Quality monitoring vehicle and Motor Vehicle Tail Gas Emission Montioring Vehicle 1.44/1022.8 ICB Goods Prior review 2009 12 64. AQ3.2b Simple Information-Processing System of Monitoring Station 0.2/160.8 NCB Post 2009 21 Goods review Equipments maintenanace and Spare Parts Replacement 0.098/75 ICB Prior review 2011 12 Online monitoring system for key air pollution source(10 sets) 0.67/477 Prior review 2009 12 Air Quality Data Ananlysis IT system 0.9/636 Prior review 2011 21 65. 66. 67. AQ3.3 AQ4.1 AQ4.2 Goods ICB Goods ICB Goods 68. AQ5.1 Simple Data System for Motor Vehicle Emission Pollution Monitoring in Xi'an 0.11/80 CQS Post review 2009 24 69. AQ5.2 Xi'an Motor Vehicle Emission Pollution Assessment 0.11/75 CQS Post review 2010 24 70. AQ5.3 Xi'an Urban Traffic Pollution Prevention and Treatment Plan 0.07/50 CQS Post review 2010 36 Procurement methods Prior review or post review Contract signing year Contract duration months NCB Works Prior review 2010 Total 12.75/8970 Contract packages for Culture Heritage Component: CH 1 No. Contract No. Han Changan Dynasty Weiyang Palace Contract name Cost Estimates USD million/ RMB 10K 71. CH1.1 5 Han road 8.4 km, 110,000 m2 8.59/6096 12 72. CH1.2 2 km 10kv transmission line & 2 units 500kva transformer Electric power engineering 0.44/314 NCB Electric power engineering Post review 73. CH1.3 30 units of 8-seats electric cars 0.34/240 NCB Goods Prior review 74. CH1.4 30 units of horse car 0.05/36 Shopping Prior review 75. CH1.5 100 units of bikes 0.017/12 Shopping Post review 76. CH1.6 Site monitoring camera etc. 0.10/70 Shopping Post review 2010 Procurem ent methods Prior review or post review Contract signing year Contract duration months Total 2010 2010 2010 2010 6 5 5 5 5 9. 537/6768 CH2 Ming City Bicycle Route (CH2) No. Contract No. Contract name Cost Estimates USD million/ RMB 10K 77. CH2.1 12 exclusive bicycle streets and 26 junctions 16.45/11677 NCB Works Prior review 2010 18 78. CH2.2 22 bicycle lanes and 28 junctions 5.73/4066 NCB Works Prior review 2010 18 79. CH2.3 Landscaping of 34 bicycle route sections 0.32/226 NCB Works Post review 2011 6 80. CH2.4 Street furniture on 34 bicycle route sections 3.65/2592 NCB Works Post review 2011 6 81. CH2.5 2,000 bicycles 0.28/200 NCB, Goods Post review 2012 6 Prior review Contract signing Contract duration Total 26.42/18761 Contract packages for the Institutional Development Component No. Contract No. Contract name Cost Estimates Procurem ent methods or post review QCBS Prior review 2009 18 18 USD million/ RMB 10K year 82. ID1.1 Xian Urban Comprehensive Strategic Transport Study 2.25/1600 83. ID1.2 Financial planning 0.84/600 QCBS Prior review 2009-8 84. ID2.1 TM-ATC Technical specification, bidding documents and bid evaluation. 0.07/50 CQS post review 2009 85. ID2.2 TM-Accident Analysis Study 0.07/50 CQS post review 2011 86. ID3.1 Domestic Training 0.21/150 Training Prior review 2009- months 6 6 25 2011 87. ID3.2 International Training 0.71/500 Training Prior review 20092012 Total 4.15/2950 Notes: QCBS= Quality and Cost Based Selection, CQS = Selection, on Consultant Qualification 9