RESUME Name : Khaled Omar Hussien Al-Abhari Address : Kuwait Nationality : Jordanian Date of Birth : 24-12-1967 Tel. No. : + 965 97124778 e-mail : Khaledomar67@yahoo.com Educational Qualifications Master in Civil Engineering, Structural Department Jordan University of Science and Technology1994, Jordan BSc. in Civil Engineering, Structural Department Jordan University of Science and Technology1991, Jordan CAREER SUMMARY (21) Years’ experience in construction supervision of villas, Residential Buildings, Water reservoirs and Tower in Jordan, a New headquarter of Major Bank (AUB) in Bahrain and Al-Manshar ROTANA Suites (Five Stars Hotel), two Residential Towers and two Industrial Projects in Kuwait. December 2010 – Present : Resident Engineer, Option One International, Kuwait Two Printing Presses (Newspaper & Commercial): British Industries- Printing and Packaging Co. April 2007 – December 2010 : Resident Engineer, Option One International, Kuwait Two Residential Towers (17 floors and 22 floors). September 2004 – March 2007 : Senior Civil Engineer, Option One International, Kuwait Al-Manshar ROTANA Suites in Fehehel, Kuwait. The hotel consists of 19 floors, 200 suites, meeting rooms, restaurants, health club and offices. Responsibilities: Follow-up the finishing works (block work, gypsum & cement plastering, external rendering, painting, remedial work to concrete, waterproofing, gypsum partitions & ceilings, steel work, ceramic & stone works, wood work, aluminum curtain walls & windows and furniture). Ensure contractor’s compliance with contract documents. Approval of materials, mock-ups and shop drawings. Review and approval of structural concrete & steel reinforcement shop drawings and inspect site installations. Page 1 of 2 December 2002 – August 2004 : Civil Site Engineer, Option One International, Bahrain Ahli United Bank (AUB) New Headquarter Building in Seef area, Kingdom of Bahrain. The bank consists of five stories main building, 12,000m 2 built –up area with two panoramic lifts & hanging staircase linking the office floors and a 9,000 m 2 multi storey car park building of 220 spaces shall be used by staff to enter the building through the glass bridge at each floor level. Responsibilities: Follow-up the finishing works (block work, plastering, painting, remedial work to concrete, gypsum partitions, steel work, stone work, aluminum curtain walls & windows, raised floor and wood work). Ensure contractor’s compliance with contract documents. Approval of materials, mock-ups and shop drawings. Review and approval of structural concrete & steel reinforcement shop drawings and inspect site installations. October 2001 to November 2002: Civil Site Engineer Lahmeyer-Sigma Consulting Engineers, Jordan Greater Amman’s water supply project. The project consists of three buildings for pumping stations, three concrete reservoirs of 6000 m3 capacity each and a 40m high water tower of 500m 3 capacity. Responsibilities: Approval of materials and shop drawings Inspection of formwork, reinforcing steel and concrete activities Follow up the finishing works (block work, plastering, painting, remedial work to concrete, gypsum work, steel work, stone work and aluminum windows). Reviewing Contractor’s reports and bills. August 1999 to September 2001 : Civil Site Engineer, Al-Sarraya’a Engineering Office, Jordan A palace with a built-up area of 1000 m2 with high quality finishes (stone wall cladding, columns & arches, gypsum arches and decorative columns & ceilings). Responsibilities: Similar to responsibilities and duties highlighted in Greater Amman’s water supply project. January 1993 to June 1999 : Civil Site Engineer, Saleh Al-Jetawi Engineering Offoce, Jordan Four multi-story buildings and a villa. Responsibilities: Similar to responsibilities and duties highlighted in Greater Amman’s water supply project. Page 2 of 2