STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 California Public Utilities Commission Energy Efficiency Evaluation Measurement and Verification CPUC Contract Number: 09PS5863A Prime Contractor: Itron, Inc. Work Order Number: ITRON012 – Amendment #1 Work Order Project Title: Overarching Market and Process Evaluation, Nonresidential Programs ED Work Order Project Manager: Jean Lamming, 415-703-2142, (please direct any comments on this work order to JL2@cpuc.ca.gov) ED Contract Manager: Tim Drew Contractor Project Manager: Christina Torok Work Order Budget: $1,166,292 (Includes $153,650 under KEMA W.O.) Amendment: This Amendment adds scope and budget to WO012. The new total contract amount is increased from $441,515 to $1,012,640 for Itron and its subcontractors. Term: Effective Date through June 30, 2012 Planned Budget: $2.3M (through 6/30/2012) Includes XREF 17, XREF 56, and half of XREFs 36, 37 and 38 Purpose: This amendment work order governs the scope of work for EM&V Work Plan Study 17, 56, and the nonresidential portions of XREF 36, 37 and 38. The project name is “Nonresidential Overarching Process Evaluation and Market Research”. The work scope included in this Work Order Itron012 supports Contract Tasks 4, 5, and 6 of Contract 09PS5863A and its Amendment One. This Work Order Amendment does not authorize work that is beyond the scope of the work authorized by the underlying prime contract, may not expand the budget of the underlying prime contract, nor can this Work Order change, amend or modify any of the substantive terms and/or conditions of the underlying prime contract nor add any new substantive terms and/or conditions to the underlying prime contract. The actual costs to complete an approved Work Order shall not exceed the amount authorized in this Work Order. If, in the performance of the work, the Contractor determines that the actual costs are likely to exceed the estimated costs, the Contractor shall immediately notify the Energy Division Contract Manager and Project Manager. Upon such notification, the Energy Division Contract Manager will: (1) (2) (3) Amend the Work Order scope to accomplish the work within estimated costs; or Amend the Work Order budget to accomplish the existing scope; or Terminate the Work Order. Any expenses incurred by the Contractor that have not been authorized shall be borne by the Contractor. No amendments to this Work Order shall be made for work undertaken without the specific approval of the Energy Division Contract Manager. Approvals: 07/05/11 _________________________________________________ ED Contract Manager Date 1 ________________________________________________ Contractor Project Manager Date Work Order 12 Amendment 1 Section 1. Scope and Rationale for Amendment This amendment affects Tasks SOW. Objectives and required approach to this overarching evaluation have evolved to keep pace with the nonresidential process and market evaluation environment. Project Management Task 00 – Project Management This Task is being added to support ongoing management and coordination of the activities and objectives of this work order. It also provides regular status reports and meetings between WO12 project management and ED project management. This task also provides funding for the WO12 team to provide necessary management and quality control of work conducted by subcontractors retained for tasks contained in this work order. Budget: Itron $45,000: Study Development Framework Task 1 – Nonresidential Program and Portfolio Characterization The program characterization database was uploaded in late April. The overall effort took moderately more resources than anticipated, and was completed with a larger share of Itron resources than KEMA resources. Budget: Itron $70,000 (Old budget: Itron $60,800) Task 2 - Develop IOU-ED Collaborative Study Development Framework A meeting was held to gather input to build the framework. However, the degree to which collaboration in study scoping is practical or relevant no longer supports formalizing such a framework. This task is no longer needed and is terminated. Budget: Itron $0, (Old budget: Itron $7,000;) Nonresidential Market and Process Study Development Task 3 - Collaborate with IOU staff in Developing Study Scope This task funded the WO12 team efforts to contribute to scope development for IOU-led studies and to identify tasks and studies that should be undertaken by ED staff or its contractors. WO12 team met with IOU EM&V staff, met with IOU program managers, met with ED and ED consultants, reviewed monthly reports, previous evaluation studies, current tracking data, the California strategic plan and other sources to assist in scoping. The team worked with ED staff to prioritize studies to identify the most critical arenas for mid-course corrections, support for bridge funding decisions, and portfolio planning and strategy. Through these efforts the On-Bill Financing and Benchmarking studies were identified, and these studies are underway. Recently a need was identified for a study of Third Party programs that focus on the nonresidential sector, and this Work Order Amendment funds a research plan for that effort. 2 Document1 While most of the scoping work is complete, there is interest among some Energy Division and Itron/KEMA staff in exploring possible hybrid process/impact work. Over the coming weeks, WO12 team will meet with the impact team to discuss such research needs. If an additional study should arise from these discussions, it will be added as a new sub-task to Task 5. For IOU managed studies, ED staff and the Itron/KEMA team will continue to be involved in all aspects of study implementation, providing technical input and oversight, as well as facilitating coordination. The oversight of IOU managed projects will be funded through category 4 tasks, as discussed in the following text. The original budget for Task 3 covered collaborative study ideation and the designation of an entity to manage the study through planning and implementation. As described in the original work order, a small Itron/KEMA team was dedicated to this task, but the degree of effort required was difficult to predict. The original budget provided for Itron to spend approximately 215 hours. The actual hours needed exceeded these early expectations. However, the scoping work included the development of research needs in support of OBF and benchmarking, as well as the selection of contractors and writing of RFPs, the completion of a supporting data request for OBF, and refinement of selected subcontractor proposed SOW. Revised Budget: Itron $100,000; (Old Budget: Itron $40,425) Task 4 Oversight of IOU managed studies Two new IOU led process evaluation is added to the list of IOU managed studies with oversight provided by WO12. Task 4.4 Workforce Education and Training Process Evaluation Study Budget $500,000 Budget: Itron $8,000 Task 4.5 Oversight of IOU Nonresidential Process Evaluation Study Budget $1,750,000 Budget: Itron $36,750: Task 5 Plan and Implement ED-Led Market and Process Evaluation Studies Per the process described in work order 12, new sub-tasks to task 5 have been identified as follows: Task 5.2.1 Overarching Study on Integration Effectiveness, Study Implementation and Reporting Budget: Itron $107,500 : Task 5.4 On-Bill Financing Process Evaluation Study Budget: Itron $21,600: Cadmus $175,000 This majority of this evaluation study will be subcontracted to Cadmus. Specifics surrounding Cadmus tasks, deliverables, timeline, and personnel are provided in WO12 Task Order 5.4 subcontract to Cadmus. Task 5.5 Benchmarking Process Evaluation Budget: Itron $15,600: NMR $150,000 3 Document1 This majority of this evaluation study will be subcontracted to NMR. Specifics surrounding NMR tasks, deliverables, timeline, and personnel are provided in WO12 Task Order 5.5 subcontract to NMR. Task 5.6 Benchmarking Process Evaluation- Technical Report Budget: Itron $6,000 Optimal Energy $50,000 This majority of this Task will be subcontracted to NMR. Specifics surrounding NMR tasks, deliverables, timeline, and personnel are provided in WO12 Task Order 5.5 subcontract to NMR. Task 5.7.0 Third Party Assessment, Research Plan Budget: Itron: $25,000 This research plan will address nonresidential third party programs as a whole, investigating and documenting the unique successes and challenges of these program models and the associated administration. Task 5.8.0 Nonresidential Best Practices, Research Plan Budget: Itron: $25,000, Overarching Management and Quality Control Task 6 –Oversight of PPM and MTI Construction At this time the scope of this task is unclear. For now we reduce the budget, and will hold off activity until further notice. Budget: Itron $40,000 (Old budget: Itron $51,600) Task 7 - Data Collection Guidelines The scope for the data collection guidelines effort remains the same, but the Itron budget reduced. Budget: Itron $35,000 (Old budget: Itron $56,100) Task 8 – Coordinate Nonresidential Sector-Wide Primary Data Collection The Work Order 12 team will provide overarching coordination of data collection efforts. This coordination effort will span all data collection across the nonresidential sector, including CSS, process studies and impact work. Tools have been developed (under other work orders) that keep track of primary data collection efforts, including on-site surveys, logger/meter installs, and CATI surveys. These tools also house accomplishments versus quotas by strata for each effort. the WO12 Team will expand upon these tools to include data collection of IOU led studies, as well as creating a repository of IOU research documents. The Team will seek to match the opportunities present in the planned data collection activities to the needs of the overarching research. The data collection plans will be examined for opportunities to collect data in support of the overarching research, and those opportunities pursued in coordination with topical research study teams. The original budget for this task allowed for Itron to dedicate approximately 8 weeks of labor to this effort. However, there are somewhat fewer than anticipated IOU led process evaluations, and the team is able to 4 Document1 leverage existing data collection management tools (developed under other work orders) such that the expected cost for this activity is reduced. Budget: Itron $25,000 (Old Budget: Itron $51,800) Reporting Tasks 9 and 10 It is unclear at this time whether there is a need for overarching reporting above and beyond what is called for within the scopes of Tasks 1 through 8. Therefore, this additional layer of reporting is suspended until such a need is clear. No budget has been spent to date on these tasks. Budget: Itron: $0 Quarterly/Monthly Reports: Old budget: Itron $51,800; Annual Reports: Old Budget: Itron $44,800; 5 Document1 Section 2. Summary of Task Budgets and Work Order 12 Changes The overall Work Order Task Budget changes for Itron and its subcontractors retained for studies on Benchmarking and On-Bill Financing are summarized in Table 2. The Itron personnel rates are summarized in Table 3 and in the staff matrix workbook in Attachment B. Table 1. Work Order Budget Summary Task Tasks 1 - 3, Study Framework 00 Work Order Management/QC 1 Program Characterization DB Develop IOU-ED Collaborative Study Development 2 Framework 3 Study Ideation/RFP/SOW Task 4, Oversight of IOU Studies 4.1 Oversight - Sempra OA NR 4.2 Oversight ACEEE "Big Savers" Best Practices Study 4.3 Energy Savings Calculation Tools Development for EBCx 4.4 Oversight of WE&T 4.5 Oversight, IOU NR Process (XREF 19) Task 5, ED Studies 5.1.0 Selected NR Market Assessments, Research Plan 5.2.0 Integration Effectiveness Research Plan 5.2.1 Integration Effectiveness, Implementation and Reporting 5.3.0 Adoption Effectiveness Research Plan 5.4 On-Bill Financing 5.5 Benchmarking Study 5.6 Benchmarking Study - Technical 5.7.0 Third Party Assessment, Research Plan 5.8.1 NR Best Practices, Research Plan Tasks 6 - 10, Overarching Activities 6 PPM/MTI 7 Data Collection Guidelines 8 Coordinate Sector Wide Data Collection 9 Monthly Quarterly Rpting 10 Annual Reporting Total 6 Original Budget Itron Total New Budget Itron Sub Budget Change Itron Sub 60,800 76,000 45,000 70,000 - 45,000 9,200 - 7,000 40,425 9,333 56,595 100,000 - (7,000) 59,575 - 33,600 1,600 2,240 - 48,000 1,600 2,240 - 33,600 1,600 2,240 8,000 36,750 - 8,000 36,750 - 21,000 9,375 9,375 - 30,000 12,500 12,500 - 21,000 9,375 107,500 9,375 21,600 15,600 6,000 25,000 25,000 175,000 150,000 50,000 - 107,500 21,600 15,600 6,000 25,000 25,000 175,000 150,000 50,000 - 51,600 56,100 51,800 51,800 44,800 441,515 68,800 74,800 74,000 69,066 59,733 595,167 40,000 35,000 25,000 637,640 375,000 (11,600) (21,100) (26,800) (51,800) (44,800) 196,125 375,000 Document1 Table 2. Staff Information Matrix <Removed for Public Version> Section 3. Deliverables The preliminary list of deliverables for the Nonresidential Overarching Market and Process Evaluation includes the following items: 7 Task 1 – Program and Portfolio Characterization 1. Database of program information (delivered) Task 3 – Collaborate with IOUs Staff in Developing Study Scope 1. Initiation of work orders for ED-led Studies Task 4 – Oversight of IOU Managed Studies 1. Reviews of research plans, memorandums, data collection instruments and reports Task 5 – Plan and Implement ED Led Market and Process Evaluations 1. Selected Nonresidential Sector Market Assessments, Research Plan 2. Overarching Study on Integration Effectiveness, Research Plan (submitted) 3. Overarching Adoption Effectiveness Assessment, Research Plan (on hold) 4. CEI Research Plan 5. Benchmarking Process Evaluation 6. On-Bill Financing Process Evaluation Task 6 – Oversight of PPM and MTI Construction 1. Memorandum documenting construction, consistency of PPMs Task 7 – Data Collection Guidelines 1. Guidelines governing primary data collection in the areas of: 1. Firmographic characteristics 2. Satisfaction scales and questions 3. Integration effectiveness 4. Other topics, to be determined Task 8 – Coordinate Nonresidential Sector-Wide Primary Data Collection 1. Data collection coordination and reporting tool, maintenance and administration 2. Mapping of WO12 data collection needs to planned data collection efforts Document1