IOU UPDATE Q4 2014 EM&V STAKEHOLDER MEETING Loan Nguyen, SCG Rob Kasman, PG&E Kevin McKinley, SDG&E Shahana Samiullah, SCE December 9, 2014 EM&V Project Status 2 Please refer to the Project Status Reporting (PSR) System for current information on study status: http://www.emvpsr.com/Projects/Default.aspx?tabid=1068 IOU PCG leads are responsible for updating IOU-led studies in the PSR. IOU PCG leads will soon have the capability to update PDA (Public Document Area). IOU-led studies in PSR - Sectors 3 Residential 21 Large Com, Ind & Ag 13 Lighting 10 HVAC 6 Finance 4 Local Government Partnership 4 Emerging Technologies 3 Zero Net Energy 2 Codes & Standards 3 Small Commercial 2 IDSM - Res and Small Commercial 1 Workforce Edu and Training (WE&T) 1 0 5 * Some projects may be combined under one study. 10 15 20 25 Number of Projects in 2013-14* IOU-led studies in PSR - Status 4 1-Initiation 1 2-Scoping 9 3-RFP 6 The majority of projects are in the design and data collection/analysis stage. 6 projects are in RFP stage: 4-Design 11 5-Data/Analysis 17 6-Draft Report 8 7-Completed 9 Other * 9 0 5 10 15 20 Number of Projects in 2013-14 * On-hold, transition to ED, or cancelled. 2030c - Lighting Pilots/Trials: SCE Sustainable Office Lighting Control Pilot Study 2036 - IOU Local Government Partnerships 2044 - Res Workpaper Update: MF Pool Pump 2046 - MF-EUC/MIDI Pilot & MFEER Change 2047 - Process Eval for WH/EUC Changes 2048 - Determine Average CAHP Energy Savings PSR Key Fields 5 More Fields to Show… 6 Notes ED Program Manager Sector Plan Posted to PDA ED Consultants PGE Contact SCE Contact SDG&E Contact SCG Contact Project Coordination Group PCG Coordinator PCG ED Rep PCG Other ED