IOU UPDATE
Q4 2014 EM&V STAKEHOLDER MEETING
Loan Nguyen, SCG
Rob Kasman, PG&E
Kevin McKinley, SDG&E
Shahana Samiullah, SCE
December 9, 2014
EM&V Project Status
2
Please refer to the Project Status Reporting (PSR) System for current
information on study status:
http://www.emvpsr.com/Projects/Default.aspx?tabid=1068
IOU PCG leads are responsible for updating IOU-led studies in the PSR.
IOU PCG leads will soon have the capability to update PDA (Public Document Area).
IOU-led studies in PSR - Sectors
3
Residential
21
Large Com, Ind & Ag
13
Lighting
10
HVAC
6
Finance
4
Local Government Partnership
4
Emerging Technologies
3
Zero Net Energy
2
Codes & Standards
3
Small Commercial
2
IDSM - Res and Small Commercial
1
Workforce Edu and Training (WE&T)
1
0
5
* Some projects may be combined under one study.
10
15
20
25
Number of Projects in 2013-14*
IOU-led studies in PSR - Status
4

1-Initiation
1
2-Scoping
9

3-RFP
6
The majority of projects are in the
design and data collection/analysis
stage.
6 projects are in RFP stage:

4-Design
11
5-Data/Analysis

17
6-Draft Report
8
7-Completed

9

Other *
9
0
5
10
15
20

Number of Projects in 2013-14

* On-hold, transition to ED, or cancelled.
2030c - Lighting Pilots/Trials: SCE
Sustainable Office Lighting Control
Pilot Study
2036 - IOU Local Government
Partnerships
2044 - Res Workpaper Update: MF
Pool Pump
2046 - MF-EUC/MIDI Pilot & MFEER
Change
2047 - Process Eval for WH/EUC
Changes
2048 - Determine Average CAHP
Energy Savings
PSR Key Fields
5
More Fields to Show…
6













Notes
ED Program Manager
Sector
Plan Posted to PDA
ED Consultants
PGE Contact
SCE Contact
SDG&E Contact
SCG Contact
Project Coordination Group
PCG Coordinator
PCG ED Rep
PCG Other ED
Download