PennDOT Emergency Projects Section 106 Consultation under FEMA Date: County: S.R.: Section: Lead Agency: FEMA ER #: Municipality: Name: To: Catherine McManus Federal Emergency Management Agency From: Brian Thompson, P.E., Director Bureau of Project Delivery Pennsylvania Department of Transportation MPMS #: As per agreement between the Federal Emergency Management Agency (FEMA), the Pennsylvania Historical and Museum Commission (PHMC), and the Pennsylvania Department of Transportation, the Department recommends that the above-referenced flood emergency project has a _____________________ Effect on historic properties. The following documentation is included or posted to Project PATH: ___ a copy of the Cultural Resource Field Assessment Form(s) or Package ___ Historic Resource Survey Data Sheet ___ a description of the project ___ the location of the project mapped on a USGS 7.5 Minute Topographic Map ___ one (1) copy of the archaeological survey report, and BHP report summary form ___ one (1) copy of the survey report, and one (1) copy of Pennsylvania Historic Resource Survey Forms Architectural Historian: ___________________________ Archaeologist: ________________________________ If FEMA agrees with the Department recommendations, please notify the PHMC and our Department of that agreement. If the PHMC does not object to the FEMA notification within 15 days, the Department will presume concurrence and will proceed with this project without further review. If you have any questions please contact Ira Beckerman @ 772-0830, or the Cultural Resources Professional(s) making this recommendation cc: BOPD Engineer: PHMC, Douglas McLearen PHMC, Regional Archaeologist and Architectural Historian District Environmental Manager: BOPD CR Section Chief: Ira Beckerman Agreement by FEMA: _______________________________________ Date: ______________ To be completed by District Professional: No objection received from FEMA or SHPO. Proceed with Project. FEMA disagrees with recommendation. Do not proceed until CR Section is contacted Objection received from SHPO. Do not proceed until CR Section is contacted Date______________ By:_________________________________ Posting date: ______________ 15 days after Posting: ______________