Low Carbon Schools Service Delivery Plan FINAL Walsall Council Prepared by: Carol Edmondson, Project Lead Sponsor: Pauline Pilkington, Executive Director for Children’s Services Table of contents Executive Summary .............................................................................................................. 3 Foreword by Chief Executive and Project Sponsor ......................................................................... 5 Foreword by the Carbon Trust ................................................................................................. 6 1. About this document .................................................................................................... 7 2. Context .................................................................................................................... 8 2.1 National drivers ................................................................................................. 8 2.2 Local priorities ................................................................................................... 9 2.3 Schools carbon emissions and energy costs ........................................................... 9 2.4 Walsall Council – our work with schools .............................................................. 10 Carbon & Financial Baseline ........................................................................................ 12 3. 3.1 Carbon emissions in our schools ........................................................................ 12 3.2 Schools Energy Performance metrics .................................................................. 14 3.3 The business case – what we could achieve ......................................................... 17 Vision and aims ........................................................................................................ 19 4. 4.1 Our vision ....................................................................................................... 19 4.2 Objectives ....................................................................................................... 19 Delivery Plan ........................................................................................................... 20 5. 5.1 Our service for schools ..................................................................................... 20 5.2 Summary of Carbon/Financial Saving Opportunities ............................................. 21 5.3 Expected outcomes .......................................................................................... 21 5.4 Schools Communications Plan ............................................................................ 22 5.5 Resource Plan .................................................................................................. 23 5.6 Funding plan ................................................................................................... 24 5.7 Monitoring and evaluation ................................................................................. 25 6. Approach map / GANTT chart ....................................................................................... 26 APPENDICES ................................................................................................................... 30 A1. Case studies ........................................................................................................ 30 A2. Identified opportunities ............................................................................................ 38 A3. Additional data ................................................................................................... 40 Executive Summary School buildings in England are responsible for greenhouse gas emissions of 4 million tonnes of CO 2 equivalent annually, with a combined energy bill of £543 million, approximately 21% of the total emissions from the national public sector estate. The Climate Change Act commits the UK to reducing its emissions of carbon dioxide by 80% by 2050 from 1990 levels. A series of four-year “carbon budgets” sets out some interim steps towards achieving this goal, including a goal of reducing emissions by 34% by 2020 from 1990 levels. In 2011, schools in Walsall emitted just over 24,000 tonnes of CO2 which equates to nearly 65% of Walsall Council’s carbon footprint. The combined energy bill for schools in Walsall in 2011 was £4m. In its Carbon Management Plan, Walsall Council committed to a carbon reduction target of 30% by 2014 and 40% by 2019. Schools account for nearly 65% of the Council’s carbon footprint and, as such, will be a vital part of our efforts to reduce local emissions by the same percentage. The Department for Energy and Climate Change (DECC) estimates that energy prices will rise by 32% by 2017. This could increase energy costs to our schools by over £1 million. Under the Carbon Reduction Commitment Energy Efficiency Scheme (CRC), the carbon emissions from our schools incur a charge of £12 per tonne of CO2 emitted, resulting in an additional liability of £0.29 million per year for years 2011/12, 2012/13 and 2013/14. It is envisaged that this charge could rise to possibly £16 or £18 post 2014. The exact increase is still to be determined. In rolling out our low carbon school service to our whole schools estate over a five year programme, we could realise energy cost savings of almost £650,000 per year and £48,000 CRC cost savings that is a 16% saving on schools’ energy costs. This would also deliver a 16% reduction in carbon emissions, cutting CO2 by almost 4,000 tonnes per year. Using a variety of Carbon Trust resources we will take schools through solutions, the majority of which have been implemented in our pilot programme and provide opportunities for savings. So far savings in the region of 16% have been achieved based purely on behaviour change in the following activities: Active labelling of light switches Switch off lighting when not required Reducing out-of-hours electrical load IT equipment switch-off Getting the benefits of AMR* Walk-around energy audits for all schools Heating controls adjustment * At this present time not all schools in Walsall have had their AMR’s replaced by the local authority’s current electricity provider and therefore support can only be offered to those with the facility. 3 t’s appropriate to mention here that the council does not operate an ‘invest to save’ programme for schools. If this facility were available significantly greater savings could be achieved. This is borne out by the results of another local authority on the national pilot programme utilising the invest to save resource showing savings on energy bills of 30%. Although this is not an option for Walsall at this present time, mechanical and electrical maintenance projects funded from the Capital Programme will undoubtedly realise energy saving benefits from boiler replacements, the enhanced insulation of distribution pipes and flanges, window and roof replacements, and lighting upgrades coming out of rewiring schemes. The project team responsible for the schools’ pilot will also deliver the roll out programme, led and coordinated by the Compliance Reduction Officer and supported by the Energy Manager both of whom sit within Property Services. This core project team also benefits from having the Environmental Education and Information Officer as part of the team supporting and encouraging schools to achieve eco school and green flag status – energy being one of the themes. Schools that have an existing service level agreement for energy will receive this additional support. In terms of funding, there is no additional financial resource required to undertake this roll out programme, as it will be conducted from within respective services’ budget. In addition to the support detailed above, working with other council services, we will offer schools via signposting the following: Assistance with school travel plans, bikeability, walk to school campaigns Countryside Services support and advice on a range of educational activities on sites across the borough. Advice on sustainable procurement Walsall Council’s objective is to reduce total CO2 emissions from our schools by 16% over the fiveyear period from 2012 to 2017. We plan to roll this service out to 25 schools each year over a fiveyear period, so that all schools can benefit from this service. Achieving this 16% target is heavily dependant upon schools taking up this offer of assistance and ploughing back savings into very much needed resources. The Display Energy Certificate (DEC) chart demonstrates the range of performance of our schools. The majority of schools are rated D and E. Reducing energy consumption by 16% will improve ratings for each school. Taking part in the Carbon Trust Collaborative Low Carbon Schools Service programme has received full support from the Executive Director for Children Services, who is also the project Sponsor, and member of the Corporate Management Team. 4 Foreword Schools play a vital role at the heart of local neighbourhoods and communities across Walsall. They provide a hub for learning, development and play for children and young people, as well as an example to those living and working in our communities of how buildings can be managed and services delivered to the highest possible outcomes. Many of our schools have the opportunity to save both money and carbon – and to demonstrate the benefits to their local communities. Through our low carbon schools service, Walsall Council will provide schools with the capacity building, support and guidance that will help them make the best local decisions about their use of energy. Our aim is to work with all Walsall schools in the coming five year period to make a real difference to their energy bills and carbon emissions, and to help with delivery of Walsall Council’s wider Carbon Management Plan to reduce our emissions by 40% by 2019. Paul Sheehan Chief Executive Walsall Council … and a word from our Sponsor This year we have taken the opportunity to work with the Carbon Trust and a number of pilot schools in order to promote good practice in energy saving, thereby reducing carbon emissions and costs. Over the next 5 years we will to roll out the learning to all Walsall schools thereby providing the opportunity to schools to implement the developed resources, building capacity for carbon reduction with schools, pupils and other children’s services staff. We will demonstrate tangible energy savings to the schools and continue to build the strong working relationship between the council and schools. Hopefully we will engage pupils and in turn their families thereby further disseminating good practice and savings for Walsall families and the wider community. Pauline Pilkington (CLCSS Project Sponsor) Executive Director Children’s Services Walsall Council 5 Foreword Foreword text from the Carbon Trust to be added once plan approved 6 1. About this document This document is a delivery plan for the roll out of a low carbon schools service in Walsall. It examines the impact of energy use in our schools, both in terms of energy costs to schools and emissions of carbon dioxide. It then sets out the reductions in costs and emissions that can be achieved before presenting a plan for delivery of a low carbon schools service which will contribute to achieving this goal over a five year period to 2017. This delivery plan has been developed by Walsall Council in partnership with the Carbon Trust. It is supported by Councillor Christopher Towe (portfolio holder Finance and Personnel), Executive Director Children’s Services (sponsor), Executive Director Resources, Executive Director Social Care and Inclusion, Executive Director Regeneration and Executive Director Neighbourhoods. 7 2. Context 2.1 National drivers This section summarises the key national drivers influencing energy and carbon reduction in schools. Environmental drivers The Climate Change Act commits the UK to reducing its emissions of carbon dioxide by 80% by 2050 from 1990 levels. A series of four-year “carbon budgets” sets out some interim steps towards achieving this goal, including a goal of reducing emissions by 34% by 2020 from 1990 levels. Under the EU Energy Saving Directive, the UK is committed to take action to reduce energy consumption through energy efficiency; within this Directive there is also a commitment for the public sector to “lead by example”. Financial drivers There is a significant drive from Government to cut costs within the public sector. The schools sector has already seen a significant reduction in the amount of capital available for school building and refurbishment. That said, new sources of funding for investment are being provided nationally, such as Feed-in Tariffs, the Renewable Heat Incentive and invest to save schemes. Educational drivers The Government is committed to sustainable development and the importance of preparing young people for the future. It wants schools to make their own judgments on how sustainable development should be reflected in their ethos, day-to-day operations and through education for sustainable development, with a belief that schools perform better when they take responsibility for their own improvement. The Government’s White Paper, The Importance of Teaching, will free teachers from unnecessary statutory duties, creating more opportunities for different routes to learning, including learning outside the classroom, which can support educational attainment across the curriculum. The Natural Environment White Paper identifies that: “The study of science and geography ignites pupils’ curiosity about the world around them. They discover how scientific ideas contribute to technological change and improve quality of life. They recognise how human activity and natural processes can lead to changes in the environment, and engage with scientific debates, addressing important issues such as climate change. “ To help schools with their sustainable development policies, the Department for Education supports the Carbon Trust’s Collaborative Low Carbon Schools Service. The Department also supports other public sector and voluntary organisation initiatives, including the Sustainable Schools Alliance (SSA), led by the National Children’s Bureau and Sustainability and Environmental Education and EcoSchools, through its delivery partner Keep Britain Tidy in England. Opportunities for co-ordinated delivery across these initiatives are therefore encouraged. The move to greater school autonomy – through Academies and Free Schools – changes the relationship between Walsall Council and schools in the area. 8 2.2 Local priorities In its carbon management plan, Walsall Council committed to a carbon reduction target of 30% by 2014 and 40% by 2019. Schools account for nearly 65% of the Council’s carbon footprint and, as such, will be a vital part of our efforts to reduce local emissions. Delivering services efficiently is vital to Walsall Council and opportunities for cost reductions in both the short and long term need to be identified. Action to reduce energy use and carbon emissions can help to deliver savings to the energy bill and Carbon Reduction Commitment (CRC) Energy Efficiency Scheme costs to our schools. Energy prices are continually rising, and although electricity and gas consumption can be reduced, the hike in such fuel prices makes it even more important and imperative do all we can to effect a greater level of cost avoidance than if the schools were to carry on with a ‘business as usual’ attitude and mindset. By encouraging our schools to be low carbon and sustainable in their operations – and to make links to the curriculum around climate change and carbon emissions – Walsall Council can help local children and young people to better understand the impacts of all of our actions and be inspired to live sustainable lives, both at school and in the home. Our low carbon schools service is wider than energy and includes the work our road safety team do assisting schools in their schools travel initiative. The aims of this initiative are to: Reduce car use on the journey to school by pupils, staff and parents Improve health and fitness by encouraging cycling and walking Improve safety on the journey to school Reduce congestion outside schools Reduce atmospheric pollution in the local environment and reduce asthma and other related illnesses Increase children’s social interaction and their independence national campaigns such as walk to school month Bikeability cycle training Our Countryside Services team also work proactively with schools. 2.3 Schools carbon emissions and energy costs National emissions and costs School buildings in England are responsible for greenhouse gas emissions of 4.1 million tonnes of CO2 equivalent annually, with a combined energy bill of £543 million1, approximately 21% of the total emissions from the national public sector estate. 1 source: “Cross Cutting Review of Low Carbon Potential in the Public Sector – Peer Review Copy Final Report”, DECC/Carbon Trust, 18/11/09 9 Emissions from energy use in schools have risen by 24% since 19902. There has been a distinct rise in electricity emissions during this time (and particularly since 2002). This is, in part, due to the increase in the amount of ICT in school buildings, although lighting remains the major electrical load. Emissions associated with electricity have increased by 31% since 19902. The way we use our schools has changed significantly in this period. In particular, schools are now open for longer hours – generally 8am – 6pm every weekday during term time and more often in the evenings, at weekends and during holiday periods for community use. Even allowing for this, there has still been a significant rise in emissions. Emissions associated with travel to and from school by pupils and staff, and the embodied emissions in products and services purchased by schools, are excluded from this low carbon schools service proposal. However, their impact is significant (a further 3.2 million tonnes of CO 2 equivalent2) and future opportunities to tackle such emissions should be encouraged. Local emissions and costs In 2011, schools in Walsall emitted 24,469 tonnes of CO2. This equates to 64.6% of Walsall Council’s carbon footprint. The combined energy bill for schools in Walsall in 2011 was £3,899,157. Section 3 – Carbon & Financial Baseline – explores the costs and carbon emissions associated with energy use in Walsall schools in more detail. Walsall Council – our work with schools 2.4 Over a number of years, the Council has worked with schools on numerous awareness raising campaigns and initiatives such as: Schools Turnkey Energy Programme (STEP) seminars Energy Awareness Training to school caretakers The Green Roadshow Joint collaboration on Energy Saving Week Energy Audits and follow-up briefing sessions with headteachers and bursars Energy and water consumption reports are sent to schools quarterly Eco Schools In Walsall, 58 schools are registered as Eco Schools, 6 of which are Green flag schools; Kings Hill, Darlaston (4th flag) Castle School, Leamore (3rd flag) Fibbersley Park, Willenhall Millfield Primary, Brownhills Barr Beacon Language College, Aldridge Sunshine Infants, Blakenall “Carbon Management Strategy for Schools Sector”, Department for Education, 31/03/10 https://www.education.gov.uk/publications/standard/publicationDetail/Page1/DCSF-00366-2010 2 10 Since September 2010, the Energy topic has been compulsory for all Eco-Schools. This means that any school applying for their Green Flag Award after 1stJanuary 2011 must demonstrate how they have tackled Energy as part of their Eco-Schools project work. Vicky Bloor, Environmental Education officer has been working with the eco schools in the Walsall borough to raise awareness of energy usage in schools, this includes energy monitoring by regularly reading meters, students doing energy audits in classrooms and getting schools involved with “Switch it Off Fortnight”. Schools are now aware of the importance of their Display Energy Certificate and the need to tackle the ongoing problem of wasted energy in school. Collaborative Low Carbon Schools Service Since May 2011, Walsall Council has been part of the Collaborative Low Carbon Schools Service programme, delivered by the Carbon Trust with the aim of supporting carbon reduction and resource efficiency in schools across England. The Council has been one of 43 local authorities participating in the programme. CLCSS has helped the Council to refresh its approach to driving carbon reductions across our schools estate, building on our existing experience and demonstrating fast-track practical opportunities for energy savings. Our workwith the 12 pilot schools during the Autumn Term 2011 has informed the development of this delivery plan. 11 3. Carbon and Financial Baseline This section provides information about the current level of CO2 emissions from schools in Walsall. 3.1 Carbon emissions in our schools In 2011, schools in Walsall were responsible for 24,469 tonnes of carbon dioxide. The following pie chart shows the significance of the schools carbon emissions against our total building estate: Significance of combined school estate carbon emissions Remainder of LA Carbon Emissions 13,427 t CO2 / year (35.4%) School Carbon Emissons 24,469 t CO2 / year (64.6%) Total LA Carbon Emissions 37,896 t CO2 / year (100.0%) The following charts show the percentage carbon emissions from the various types of energy used within our schools. The conversion to cost of energy is influenced by the high kWh cost of electricity and hence electricity accounts for 55% of energy costs in schools. This programme has a significant focus on electricity use, where fast track saving can be delivered. 12 Breakdown of combined school estate carbon emissions Gas Oil (Diesel, 35 sec) 1,008 t CO2 / year (4.1%) Electricity 12,078 t CO2 / year (49.4%) Natural Gas 11,383 t CO2 / year (46.5%) School Carbon Emissons 24,469 t CO2 / year (100.0%) Breakdown of combined school estate energy costs Gas Oil (Diesel, 35 sec) £218,511 (5.6%) Natural Gas £1,518,934 (39.0%) Electricity £2,161,712 (55.4%) Combined School Estate energy cost £3,899,157 (100.0%) 13 Summary Energy Use across our schools estate: £ kWh tCO2 Electricity 2,161,712 22,325,302 12,078 Natural Gas 1,518,934 61,999,219 11,383 Gas Oil (Diesel, 35 sec) 218,511 3,649,887 1,008 Total 3,899,157 87,974,408 24,469 3.2 Schools Energy Performance metrics The energy performance of our schools can be assessed using a variety of metrics. Our schools performances are represented in the following graphs. Our objective is to work with all of our schools to improve performances to the red energy performance target indicated. Financial Metric The most influential reason to drive school interest is financial £/pupil/year energy cost. The following graphs show the current spread of £/pupil/year energy costs amongst our primary and secondary schools respectively. £/pupil (total energy) Primary (no pool) 350 £/pupil 300 250 200 150 100 50 0 78 108 29 84 34 24 54 101 76 110 41 45 86 27 69 48 25 55 119 118 36 66 58 77 52 39 106 49 80 56 60 105 102 33 100 35 63 116 97 103 96 42 98 114 26 51 31 46 89 47 59 65 75 93 88 37 104 81 90 91 43 82 72 61 57 117 95 30 21 68 20 22 53 28 62 87 70 23 74 85 67 44 38 71 94 99 115 83 Schools The national benchmark for primary schools without pools is £39 per pupil per year indicated by the red line. As the chart shows, five out of the borough’s schools in this category* are below this figure and some slightly exceeding it while others have some way to go to be brought into line with the benchmark figure. *This category includes nurseries and special schools which in the case of special schools explains the very high £/pupil spend. The reason for their inclusion is that our pilot included a special school and a nursery and therefore included in the Toolkit to extrapolate data. 14 £/pupil (total energy) Secondary (no pool) 160 £/pupil 140 120 100 80 60 40 20 0 18 12 4 11 15 16 13 7 Schools The red line indicates the national benchmark within this category of secondary schools without pools as £60 per pupil. If Walsall schools in all categories over the benchmark figure, with the exception of special schools, were to reduce their energy consumption to the benchmark level this would be consistent with Walsall’s carbon reduction target of 30%. Display Energy Certificate Metric The spread in energy performance is also illustrated by energy ratings given to schools in their Display Energy Certificates (these are annual ratings which take account of the school building and the amount of energy that is used within it; ratings run from A-G with A being the most efficient lowest energy users). The council will encourage and assist all schools to improve performance to D or less DEC rating (D represents typical energy performance, operational rating less than 100). DEC Operational Rating Primary (no pool) DEC Operational Rating 160 140 120 100 80 60 40 20 0 Schools 15 DEC Operational Rating DEC Operational Rating Secondary (no pool) 140 120 100 80 60 40 20 0 Schools Out-of-hours electricity waste One of the most significant causes of high school energy spend is electrical equipment being left on unnecessarily overnight. Where night metering is installed we are able to quantify the power consumed by the equipment that is being left on overnight. The charts below show this for primary schools and secondary schools: kW left on overnight Primary (no pool) kW left on overnight 60 50 40 30 20 10 0 Schools 16 kW left on overnight kW left on overnight Secondary (no pool) 100 90 80 70 60 50 40 30 20 10 0 Schools Whilst there will be an out-of-hours electrical consumption for fridges, freezers and IT server hub, it is typical that schools leave significant electrical load on out-of-hours, overnight, weekends and during holidays and this represents a key opportunity for simple cost savings. The graphs show the significant variance between schools. Each kW left on, adds over £350 per year to the school electricity bill. 3.3 The business case – what we could achieve Schools, in line with the wider public sector, will need to tackle all opportunities for financial efficiency. The majority of a school’s budget is for staff costs. Outside of employment, energy often represents over 15% of controllable costs and is perhaps the most productive issue to deliver fast, low cost savings for reinvestment in the schools. It will also reduce the exposure and risk from future rising energy prices; DECC estimates that energy prices will rise by 32%3 by 2017, which could increase energy costs to our schools by just over £1 million. Under the Carbon Reduction Commitment Energy Efficiency Scheme (CRC), the carbon emissions from our schools incur a charge of £12 per tonne of CO2 emitted, resulting in an additional liability of £0.29 million per year from 2011/12. Our recent work with pilot schools under the low carbon schools service has demonstrated that significant carbon and cost savings can be achieved in our schools. In rolling out our low carbon school service to our whole schools estate over a five year programme, we could realise energy cost savings of almost £650,000 per year and £48,000 CRC cost savings, that is a 16% saving on schools’ energy costs. This would also deliver a 16% reduction in carbon emissions, cutting CO2 by almost 4,000 tonnes per year. Based on Carbon Trust analysis of medium scenario increases from DECC www.decc.gov.uk/en/content/cms/statistics/projections.projections.aspx 3 17 This level of savings is represented by the schools performance analyses and supported by the opportunities demonstrated within our pilot schools (who have so far addressed “no cost” behavioural opportunities only). The commitment and achievements within our schools are demonstrated in the Case Studies, Appendix A1. Although significant additional savings could be achieved through invest to save measures, this is not currently possible within Walsall due to a lack of suitable budget funds. We do however have mechanical and electrical maintenance projects funded from the Capital Programme which will undoubtedly realise energy saving benefits from boiler replacements, the upgrading of insulation to distribution pipes and flanges, window and roof replacements, and lighting upgrades as a result of rewiring schemes. This project cannot and does not aim to influence scheduled work, or on which sites to carry out energy saving measures. We will however share with our design team lessons learnt from the schools pilot with regard to accessibility of electrical switches to facilitate power down of projectors and the benefits of fitting more than one light switch for multiple light fitments in a room. For a lot of our schools this has inhibited the opportunity to implement the active light labelling measure. Not being able to act on these measures will cost the school dearly in the long term, which will far outweigh the ‘cheaper’ (on the surface) installation cost. 18 4. Vision and aims 4.1 Our vision Walsall Council’s vision is for all of the Borough’s schools to be sustainable schools by 2020, taking advantage of the cost savings available from sustainable operations and making connections to the curriculum. The programme could potentially deliver substantial financial savings to the school budgets and CRC costs. 4.2 Objectives To help us towards this vision, Walsall Council plans to roll out a low carbon schools service to all of our schools over the coming five year period. Our objective is to reduce total CO2 emissions from our schools by 16% over the five year period from 2012 to 2017. This is relative to the council’s overall CO2 emissions reduction target of 30% over the five years. We aim to achieve this by: Offering a low carbon schools support service, which is available to all, and which aims to unlock the 16% carbon savings and particularly focus on behavioural change and low-cost changes to operational management of schools Providing dedicated handholding support Each year, Walsall Council will provide support to 25 additional schools (20% of our 120 schools). We will also continue to liaise and provide light touch assistance to previous years’ participant schools to maintain momentum and share best practice. 19 5. Delivery Plan This delivery plan outlines what we will do to meet our objectives and targets for carbon reductions in schools. 5.1 Our service for schools Walsall Council will offer an energy saving programme for schools, with a holistic approach to achieving Eco-Schools Green Flag status. Using a variety of Carbon Trust resources we will take schools through solutions, the majority of which have been implemented in our pilot programme and provide opportunities for savings. So far savings in the region of 16% have been achieved based purely on behaviour change in the following activities: Active labelling of light switches Switch off lighting when not required Reducing out-of-hours electrical load IT equipment switch-off Getting the benefits of AMR* Walk-around energy audits for all schools Heating controls adjustment * At this present time not all schools in Walsall have had their AMR’s replaced by the local authority’s current electricity provider and therefore support can only be offered to those with the facility. Working with other services, we will be offering schools the following service: Assistance with school travel plans, bikeability, walk to school campaigns Countryside Services support and advice on a range of educational activities on sites across the borough. o Opportunities for site visit to see and learn about log boiler heating system and sustainable woodland management o Tailored to cover aspects of carbon management and environmental sustainability o Activities to pupils or train teachers to deliver o Participation in a range of conservation tasks o Signposting Advice on sustainable procurement Walk-around energy audits Training workshops for all schools to help build engagement in the school and to develop skills in planning and implementing behavioural change campaigns Walsall Council plans to roll this service out to 25 schools each year over a 5-year period, so that all schools can benefit from this service. 20 Each school will participate over a one year period, although the programme will also focus on achieving longer term policies and whole school commitment. The programme will work to embed good practices and ongoing energy monitoring and performance assessment in the schools. It is anticipated that the Local Authority will continue to provide a light touch support programme to encourage sharing of best practice and maintain the momentum. 5.2 Summary of Carbon/Financial Saving Opportunities Annual Savings % of Schools ID Opportunity Type £ kWh tCO2 Cost of Measure (£) Payback Period (yrs) 1 Active labelling of light switches Electricity 49,000 495,000 274.3 0 0.0 25.0 2 Switch off lighting when not required Electricity 177,000 1,810,000 979.6 0 0.0 87.5 3 IT equipment switch-off Electricity 65,000 725,000 368.4 0 0.0 95.0 4 Reducing out-of-hours electrical load Electricity 79,000 830,000 449.3 0 0.0 100.0 7 Improved heating time control Fossil Fuel 167,000 6,905,000 1,304.0 0 0.0 75.0 10 Adjustments to heating temperatures Fossil Fuel 57,000 1,852,000 349.6 0 0.0 Weather compensation control adjustments Fossil Fuel 38,000 1,229,000 232.0 0 0.0 25.0 12 36 Replace breakfast club toasters Electricity 6,000 59,000 31.6 5,000 0.8 12.5 Electricity 376,000 3,919,000 2,103.2 5,000 Fossil Fuel 262,000 9,986,000 1,885.6 0 Total 638,000 13,905,000 3,988.8 5,000 16.4 15.8 16.3 % saving for combined school estate 25.0 See Appendix A2 for an explanation of these opportunities. Please note that where there is overlap between opportunities the savings are presented on a declining basis to prevent double accounting. 5.3 Expected outcomes The service is expected to deliver the following outcomes: Energy cost savings increasing by £127,600 each year and delivering savings of £638,000 per annum on completion of the programme. This equates cumulatively to energy cost savings of £1,914,000 over the five year programme. 21 5.4 Carbon savings increasing by 800 tonnes per year, building to 3,989 tonnes per annum on completion of the programme. This represents a 16% reduction in carbon emissions from schools in Walsall. CRC savings increasing by £9,600 each year, delivering savings of £48,000 per year on completion of the programme. Schools Communications Plan On the suggestion of the Portfolio Holder for Finance and Resources, the remaining schools’ estate were sent a letter informing them of the current pilot project, the reason for it and the benefits. Each school was also provided with their £ per pupil per year spend. This letter also alerted them to the fact that from March 2012, the plan would be to roll out the programme on a phased basis to the remainder of the borough’s schools. Audiences The target audiences for our low carbon schools service are: Headteachers – headteachers hold overall responsibility for management of the school and have a focus on building the school culture and delivering attainment outcomes for pupils. In order for behaviour change to be effective, it has to be driven and encouraged by the headteacher. Bursars – efficient management of resources and making the business case for investment are the responsibility of bursars or business managers in many of the schools in Walsall. Site Managers – site managers have day-to-day control of major building systems such as heating and lighting. They are likely to be key to the sustained delivery of reduced energy consumption in schools. Key messages To encourage schools to take part in future phases of the service, we will use the following messages: Good school management can save you up to 16% of your energy costs’ for a typical secondary school this could be around £9,000 per year; for a primary, around £3,000 per year. Much of this saving can be achieved without investment through simple operational changes Energy is one of the big lines in the school budget. Saving energy saves money, which could be used to provide much needed resources, and demonstrates that your school is providing value for money The steps to good school energy management are easy, and are supportive of attainment in the curriculum and positioning of your school within the community Walsall Council Low Carbon Schools Service can give you the help, support and resources you need to achieve these savings. 22 Communications activities We will undertake the following communications activities to promote the low carbon schools service: 5.5 Presentations to headteachers and Governors’ forums to keep schools updated on progress Face-to-face meetings with headteachers and Bursars/Finance Managers at high energy use schools (calculated based on council data) Case studies from successful schools (see Appendix A1 examples) will be circulated to other Walsall schools via the Well for general awareness raising Telephone follow-up to the letter sent to remainder of the borough’s schools’ estate making them aware of the pilot programme and roll-out to pull together second tranche. Resource Plan This section looks at the people who will be involved with delivering and supporting the low carbon schools service, and at how the service will be funded. Delivery team The low carbon schools service will be delivered by the following officers: Position and links to other roles within organisation Carbon Reduction Compliance Officer (CLCSS Project Lead) Department CLCSS Activity Property Services 2.5 - 3 days per week Property Services 4 hrs per week Education and Information Officer (Waste & Recycling) Already works closely with schools on the eco-schools programme Street Pride 1 day per week Communications Officer, Press Officer, Web Team Resources 1 day per school Property Services On request Co-project lead for Local Authority Carbon Management Programme (currently undertaking refresh of the CMP) Responsibility for reporting on the LA’s Green House Gas emissions Responsible for updating the LA’s Climate Change Strategy and Action Plan Sustainability and Carbon Management training to council staff Energy Manager Project lead for Carbon Management Programme CRC collation and reporting Energy contracts and schools SLAs (with regard to energy) Energy awareness in schools Mechanical Engineers Already supports schools who have bought into mechanical SLA agreement with BMS,heating advice and adjustments 23 The project will be coordinated by a core team comprising the Carbon Reduction Compliance Officer and Education/Information Officer and supported by the Project Sponsor (Executive Director Children’s Services and member of the Corporate Management Team). Stakeholder support As part of the pilot project, a Steering Group was developed which included members of the project team described above, as well as support and advice to schools from: One of the pilot schools Education Walsall, Serco Finance Procurement ICT Asset Management Countryside Services School Travel This group will initially meet prior to the commencement of the roll out in order to sign post schools to advice and support from the above teams. However once roll out begins the core energy group will meet regularly. For the next phase of the programme, the project team will seek to engage the Lead of the Bursars’ network in the Steering Group, through contact with Children’s Services. We will also work with Children’s Services to engage Governors with the low carbon schools service. We already have support from one school Governor who has been briefed as part of the pilot programme in his capacity as Portfolio Holder for Finance and Resources. In the context of the council’s carbon management programme and carbon reduction plan, schools have a vital part to play and the head of Property Services who is also the sponsor for the carbon management programme is fully supportive of the schools project. In fact three members of the carbon management project team are on the schools project team. The project team will work to engage stakeholders throughout the local authority and continue to encourage coordination and links to broader LA school services. 5.6 Funding plan Day-to-day management of the scheme is undertaken by the Compliance and Energy Team within Property Services. In addition, supporting schools with environmental and the eco-school process forms part of the day-to-day role of the Education and Information Officer. It is therefore proposed to resource this programme from within existing staffing budget. Whilst this programme will aim to embed good practice and encourage active performance monitoring and management at a school level, it is proposed to provide an on-going support role to continue to promote engagement and maintain Local Authority profile. This is envisaged as two half day visits/support meetings to each of the schools per year. 24 The projected financial savings to the schools are £638,000 per year in energy costs at today’s prices and £48,000 per year in CRC costs from the programme. The cumulative savings over the five year plan are £1.9 million. The majority of the savings are from the behavioural focus of this programme. Combined school energy and CRC costs On the basis of a 6% escalation of energy prices it is projected that the schools’ annual energy costs will rise from £4m to nearly £5m over the next five years. The additional CRC costs of £293,630 per year will increase this to £5m per year. The programme’s projected annual financial savings of £638,000 will be equivalent to a £740,000 saving in five years’ time, and £788,000 with the additional CRC saving. 5.7 Monitoring and evaluation This section outlines a plan for how the low carbon schools service will be monitored. Walsall Council aims to roll out a low carbon schools service to our 120 schools over the coming five year period. Each year, the number of schools participating in the programme will be monitored, with a view to increasing the scale of the programme if required. Our objective is to reduce total CO2 emissions from the borough’s schools by 16% over the five year period from 2012-2017. We believe this figure is achievable with total commitment from the schools. We will monitor annual energy use, carbon emissions and energy costs from all schools in the borough, as part of our reporting under the CRC Energy Efficiency Scheme. In addition, schools benefitting from the low carbon schools service will be expected to complete a school project register (which identifies the potential for savings within their schools), monitor project implementation and demonstrate actual savings achieved. This will help to monitor actual carbon savings achieved by these schools; it will be useful given that there may be changes to how the school building is used (eg further extension of school hours) which may appear to show rising energy consumption. The participating schools will provide energy consumption and cost data on an annual basis, which will assist the authority’s monitoring of schools’ energy consumption to demonstrate the value of the programme and assist with CRC returns. To ensure that our activities are as efficient as possible, Walsall Council will also monitor the effectiveness of communication activities (to identify which methods for recruiting schools are most effective). Progress reports will be submitted to the Steering Group on a termly basis for review by the Steering Group. An annual report of progress will also be provided to the Steering Group, the Corporate Management Team and to wider stakeholders. 25 6. Approach map / GANTT chart Low Carbon School Service: Phased Roll-out Actions Actions Owner/Action By Description/Notes Local Authority Team and Planning Define and agree project team Sponsor/ Carol Edmondson Depending on availability utilise core pilot project team Project team planning meeting Carol Edmondson End March 2012 Define project programme, deliverables and dates Sponsor/ Carol Edmondson Will mirror that for Pilot Programme Communication and links to broader LA schools services Carol Edmondson/ Melanie Lee Consider Low Carbon Resources and Service Carol Edmondson/ Core Project Team Consider target savings and objectives Kwame Alex-Eyitene/ Carol Edmondson As defined for pilot programme (wider project team) Whole School Approach – separate out measures ieLighting, IT Switch off, Active Light Labelling, Heating, AMRs Pro-rata in line with Carbon Management Plan targets Schools selection/recruitment and Launch Event Consider method for schools selection Carol Edmondson / Core Project Team Prepare communication to schools (interest raising) Carol Edmondson / Mel Lee Book venue for launch/recruitment event Carol Edmondson Explore pilot school or Serco hosting event Tailor launch and agree agenda Carol Edmondson/ Project Team Carol Edmondson By March 2012 Secure speakers and departmental support Design and despatch invites/confirmations Carol Edmondson/ Core Project Team 26 Schools that have already expressed an interest in the roll out and those with high energy consumption. Remainder of schools’ estate Sponsor, Pilot School (Alumwell Infant and Holy Trinity), Portfolio Holder for Finance & Resources (School Governor). Departmental support: wider project team Electronic Format. Request weekly meter readings at beginning and end of each Actions Owner/Action By Description/Notes week (4-6 weeks’ worth) from schools that have signed up for Roll Out End March/early April 2012 Confirm and follow up on delegates Carol Edmondson/ Core Project Team Complete toolkit & school performances Carol Edmondson March 2012 Prepare school business case reports Carol Edmondson Consider resources to be used, tailor to LA requirements Carol Edmondson/ Core Project Team Pull together welcome packs to include school performance indicators. EndMarch 2012 As per pilot with possible addition of AMRs Run launch event and school action planning Sponsor/ Carol Edmondson/ Project Team April 2012 Prepare team and agree school support Carol Edmondson/ Vicky Bloor Prepare for resources demonstration workshops Carol Edmondson/ Core Project Team At launch event arrange 1-1 followup site visit for walk-around energy audit and produce report and recommendations Carol Edmondson/ Vicky Bloor Liaison with Property Services Mechanical (Heating) Engineers Develop Heating Resources presentation. Liaise with Kwame Alex-Eyitene Allow 2 hrs for primary and half-a-day for secondary. Liaise with schools maintain momentum/interest Carol Edmondson and Vicky Bloor Follow-up on recommendations from site visits Assist schools internal communication and set up of whole school/eco-school structure Vicky Bloor School Assemblies; 1-1 visits Liaise with school and complete schools toolkit project register Carol Edmondson and Vicky Bloor Assess implementation and collate energy savings Carol Edmondson/ Vicky Bloor/ Kwame Alex-Eyitene Carol Edmondson/ Kwame Alex-Eyitene Schools Support Liaise with schools and assess energy bills/AMR to confirm savings 27 Encourage schools with Electric AMRs to sign up to Npower’s Encompass which will allow them to view data online. Actions Owner/Action By Description/Notes Programme savings report to steering group Carol Edmondson Each quarter Schools sharing and celebration event Encourage schools to complete case studies Carol Edmondson/ Vicky Bloor Prepare for sharing/celebration event Carol Edmondson/ core project team Book venue, secure speakers, including case studies Carol Edmondson and Vicky Bloor Invite interest from LA schools support services Carol Edmondson Agree agenda and despatch invites Sponsor/ Carol Edmondson Prepare event materials and programme performance feedback Carol Edmondson/ Core Project Team Use performance framework form Confirm and follow up delegates Carol Edmondson/ Vicky Bloor Sponsor/ Carol Edmondson and Project Team Attendance sheet Run sharing/celebration event 28 Determine whether end of twelve months with all schools involved in first year roll out Invite pilot school with large venue to host. Alternative would be Forest Arts Centre at a cost of £30/hour.Confirm in Sponsor’s diary, speakers to come from pilot schools Invite wider project team Promote achievements and invite Serco representation GANTT Chart/Programme 2012 Q1 Q2 2013 Q3 Q4 Q1 Q2 2014 Q3 Q4 Q1 Q2 2015 Q3 Q4 Q1 Q2 2016 Q3 Recruitment of schools* Authority** planning Capacity building Behaviour change Steering Group meetings Annual reports submitted * 2012 ‘Recruitment of schools’ in Year 1 was conducted in Q4 2011. ** 2012 ‘Authority Planning’ in Year 1 was conducted in Q4 2011. 29 Q4 Q1 Q2 2017 Q3 Q4 APPENDICES A1. Case studies Castle Business & Enterprise College o Taking control of your heating o Replace breakfast club toasters Alumwell Infant School o Switch off lighting when not required o Out-of-hours survey Holy Trinity CE Primary School o Thermographic Survey / Out-of-hours survey Barr Beacon School o Active light labelling o Lighting o IT equipment shut-down o Reducing heating times o Swimming pool cover 30 CASTLE BUSINESS & ENTERPRISE COLLEGE Case Study BACKGROUND Control panel for Trend BMS System. The Display Panel enables the user to view and adjust selected parameter Castle Business & Enterprise College is an outstanding 7-19 special school for pupils who have statements of special educational needs. The school is designated for pupils with moderate learning difficulties; however, the majority of pupils have additional needs, including autism, speech and language difficulties and some behavioural issues. Castle provides education for approximately 130 pupils and operates during normal teaching hours of 8.45am to 3.10pm. The building however may open as early as 6.30am and close at 6.00pm for cleaning purposes and extracurricular activities. Pupils are taught in small classes, which have teaching assistants, in teacher. We have 17 classrooms underway for a further three to operational by September 2012. the majority of addition to the and plans are be built and In January 2009 the school had a whole site electrical rewire and sensors were fitted to the lights. Approximately 225 Amps of electricity were used before the works, which reduced to 84 Amps after the rewire. This saves the school approximately £2,896 per year in electricity charges. CASE STUDY 1: TAKING CONTROL OF YOUR HEATING By participating in the Carbon Trust Low Carbon Schools Service, the school was able to benefit from information gained on ‘optimum start’ procedures with the gas boiler. CASE STUDY 2: USE OF DOMESTIC TOASTERS FOR BREAKFAST CLUB An electrical load test was carried out on the whole school site. The report identified a huge rise of 35.6 Amps of electricity being used between 9.00am and 9.15am. During this time 13 domestic toasters were used to provide toast for pupils in breakfast club. Domestic toaster used in breakfast club SAVINGS An industrial toaster was purchased and set up in the food technology classroom. A re-test was carried out and the electrical consumption dramatically reduced to 10 Amps during breakfast club. This has enabled the school to save approximately £6.00 per week in electricity charges (£294 a year). SAVINGS Our contracted Walsall Council heating engineer from Property Services, Russ Langley, was invited to the school and identified incorrect start and end times had been set on the heating control. The heating times have now been reduced by 45 minutes a day. Castle BEC will make savings of 9% on gas charges, approximately £324 per year. amounting One industrial toaster replaced 13 domestic toasters for use in break-fast club to 31 ALUMWELL INFANT SCHOOL Active Light Labelling and Switch Off Lighting When Not Required BACKGROUND Alumwell Infant School provides education for 270 children between the ages of 4-7 years. The school operates during normal teaching hours of 09:00 – 15:15 hours; however the buildings open as early as 07.00 hrs and close at 18:00 hours for cleaning purposes, extracurricular activities, after school meetings (e.g. governors meetings, parents evenings etc). The lights therefore remain on for prolonged periods of time. The site consumes approximately 64,344 kWh at an annual cost of nearly £6,000. The CO2 emissions from this energy use equate to 35 tonnes. It was common for the lights to be left on in our classrooms throughout the day. In particular, this was a clear waste when classrooms were unoccupied and on sunny days when there was adequate daylight where the lights could have been switched off. Therefore, Alumwell Infant School decided to take forward a lighting switch-off campaign. Lighting monitors were also tasked to ensure the appropriate use of blinds to avoid the frequent situation where lights are left on and blinds are closed. Classes have also worked together to ensure that windows are clear from posters and display work which blocks natural daylight. The lighting monitors, along with all pupils and staff, were also made aware of the need to switch lights off when the classrooms are vacated. The programme was communicated to all staff and pupils to ensure that everyone is aware of the method and that lights should be switched off when there is adequate natural daylight, or when the room becomes unoccupied. This was achieved by informing all staff and pupils in assembly, classrooms and to the Eco Team. Once everyone is happy with the marked switches, the stickers will be replaced with indelible red pen. CASE STUDY METHOD Pupils were selected to become lighting monitors by the class teachers. The lighting monitors were tasked to observe the level of daylight throughout the school day, and to match this to the use of lighting within the room. Classrooms benefitting from multiple light switches were then labelled appropriately. Where the lighting monitor considers there to be enough natural daylight to work comfortably at the desks they ask an adult to switch off the lights which are labelled, starting with switches connected lights closest to the windows. This behaviour is embedded through continued monitoring. Typical classroom with lights off SAVINGS The results of the active labelling of the lighting programme showed that some lighting could remain switched off permanently. It is estimated that this initiative will save £347 and 2 tCO2 per annum. This single measure delivers 15% saving in lighting on the school’s electricity bill. Karen Bennett, school Business Manager has expressed her support for the initiative: “this has proved to be an extremely effective way to reduce electricity consumption, and will help to involve all pupils and to maintain the momentum of saving. Pupils and staff are actively responsible for reducing our school’s carbon footprint”. Typical classroom where lights have been left on unnecessarily 32 ALUMWELL INFANT SCHOOL Out-of-hours Survey Typical equipment found to be left on unnecessarily were PC monitors and screens, projectors and lights. BACKGROUND Alumwell Infant School provides education for 270 children between the ages of 4-7 years. The school operates during normal teaching hours of 9.00 – 15.15 hours; however the buildings open as early as 7.00 a.m. and close at 18.00 hours for cleaning purposes, extracurricular activities, after school meetings (e.g. governors meetings, parents evenings etc). The site consumes approximately 64,344 kWh at an annual cost of £5,791. The CO2 emissions from this energy use equate to 35 tonnes. LABELLING OF EQUIPMENT A list was created which identified each item, and a coloured sticker was applied to the switch of each device using a traffic light coding system: Of the total annual electrical consumption, 20% (12.9 kW) of electricity is consumed when the building is closed. Alumwell Infant School was surprised at the effect that leaving equipment on overnight was having on their electricity bill; much of this was due to unnecessary items such as IT equipment, fans, hot water and lighting being left on. The school identified this as one of their key saving measures that could be improved and decided to conduct an out-of-hours energy survey in order to find where this energy was being wasted. A plan could then be put in place to make sure that these items remained off out-of-hours in the future. Green: indicates equipment which should be switched off when not in use Amber: highlights equipment which should be switched off, after ensuring that no-one is using it Red: Do not touch. This was allocated to equipment which should not be switched off. All equipment which had been labelled with a green or amber sticker was switched off, and the reduced energy consumption was checked at the meter. This was then communicated to all staff and pupils to ensure that all members of the school were aware of the new system and would then become involved in switching off all items with green and amber labels. This was achieved by communicating to all staff and pupils in assembly, classrooms and to the Eco Team to ensure that everyone was aware of the method. Checks have been carried out regularly to ensure that the overnight energy consumption does not rise above the best practice level overnight, at weekends and on closing the school for holidays. CASE STUDY METHOD The overnight electricity consumption (kW load) was calculated by reading the meter to show how much equipment was being left on out-of-hours. Following this, the Action Team undertook a survey of all school rooms, including the plant room and the exterior of the building to determine which of this equipment was being left on unnecessarily. SAVINGS The school was surprised at the amount of equipment found left running and on standby. The labelling of switches and plug sockets has enabled everyone to act to save. It is estimated that this initiative will save £271 and 1.64 tCO2 per annum. This single measure delivers nearly 5% saving on the school’s electricity bill. The school’s external lighting is on a time clock. After conducting the outside survey the site manager has since reduced this time by 4 hours! Karen Bennett, School Business Manager has expressed her support for the initiative: “This is a simple initiative to save and the simple labelling of switches and electrical equipment will continue to remind us and enable us all to play our part in reducing our out of hours energy use”. Equipment left on unnecessarily out of hours. 33 HOLY TRINITY CE PRIMARY SCHOOL Out-of-Hours Survey BACKGROUND Holy Trinity School first opened in 1880, the present building was opened in 1968 as a Infant School and in 1995 the school was given permission to grow to full primary status. By Easter 2000, Holy Trinity had experienced an extensive building programme and now provides education for 210 children between the ages of 4-11 years with 26 nursery places. The school opens for ‘Fun Club’ at 7.50am, school hours are 8.55am – 3.20pm and ‘Fun Club’ then continues until 6.00pm. There are also extra-curricular activities, after school meetings (eg governors meeting, parents’ evenings etc). Current annual Electricity consumption is 47,727 kWh at a cost of £4,343 and annual gas consumption is 155,923 kWh totalling just over £4,000. The total energy cost is £8,488 and the CO2 emissions from this energy use equate to 54.4 tonnes. CASE STUDY The Purpose of this case study is to reduce heat and energy loss in school therefore reducing energy costs. It is also an opportunity to teach children good habits about sustainability for the future. THERMOGRAPHIC SURVEY In February 2011 a Thermographic Survey was carried out on the school building and heating system. This is a survey that uses an infra-red camera to identify energy and heat loss. The camera detects areas of heat and energy loss through windows, doors, roofs, walls and pipe work insulation. Due to the extensive work carried out on the building in 2000, this survey showed that there was very little heat being lost through the fabric of the building and double glazed units may have better results as the image below shows. We then moved on to other areas where we could save energy and decided to focus initially on heating and lighting. OUT OF HOURS SURVEY On 24 November 2011 at 7.30pm a survey was carried out of the school to investigate the amount of equipment left on by school staff over-night. It revealed the following: 34 In the computer suite, out of the 18 computers there, seven of these had monitors left on and five had not been shut down completely. The photocopier was left on The library projector was showing a red light, indicating that it was switched on The library whiteboard showed a light indicating that it was switched on A main cause of heat loss at the school is a door that is left open at lunchtime to enable pupils to access the hall. However, this door is regularly left open after the lunchtime period. Alumwell Nursery School has solved this problem by purchasing a ‘thermal curtain’ that stops some of the heat escaping. A visit to Alumwell will be scheduled in the near future to see this. The staff-room computer was left switched on The reception class computer monitor was on The reception class projector and whiteboard were both showing lights left on The Nursery class whiteboard and projector were switched on METER READINGS In addition the thermographer who conducted the survey has agreed to return to the school to take an image of the door to show how much heat is being lost when it is open and will also attach a monetary value. We read the electricity meter at the peak of a school day when all electrical items would be running. This showed 24 kWh of electrical usage over a one hour period and this meter will be read on a weekly basis and the outcome recorded. A smart meter was installed on 21 December 2011. ENVIRONMENTAL REVIEW The school is conducting an environmental review that includes the following: ECO-WARRIORS The school have employed a team of Eco-Warriors to monitor lighting and electricity usage. A letter was sent in November 2011 asking for pupils and parents to volunteer if they wanted to learn more about saving energy and helping the environment. Eight pupils and two parents volunteered. The headteacher, bursar, Y6 teacher, site manager and a staff governor are also on the committee. Due to the amount of activities scheduled for Christmas, the first meeting was scheduled for 20 January 2012 and the focus of this meeting is heating and lighting. During this meeting the committee will tour the school identifying where electricity is being used and noting, where possible, reductions can be made. The pupils will then work in teams doing ‘spot checks’ twice a week initially at break times to ensure that lights are switched off and doors/windows are closed when the heating is on. Energy Litter Waste/recycling Water Transport Healthy Living Biodiversity School Grounds Global Perspective Pupil Participation Energy is the first item on our agenda but as the project continues the Eco-Committee will discuss all these elements of sustainability and an action plan drawn up accordingly. 35 Case Study BACKGROUND ACTIVE LIGHT LABELLING Barr Beacon School, formerly Barr Beacon Language College (a foundation school) converted to Academy status half-way through this pilot programme. The school provides education for nearly 1,500 children between the ages of 11-18. Barr Beacon School implemented ‘Active Light Labelling’ on 24 November 2011. The Eco Warriors sent an email to all form tutors informing them about the new ‘policy’ arising out of labelling of lights. They also went around classrooms and further explained what the labels were for. The original school was first built in the 1950s with an intake of under 500 children. Since then it has been extended to accommodate the growing number of children from the surrounding areas. The Sports Centre was built in late the 1970s and the pool was added on in the early 1980s. The most recent addition has been the development of the old music block into a two storey creative arts block. Previous to that the 6th Form block was built in 2007. Light switches with red stickers should not be activated or used unless at night or where natural daylight is inadequate. Through simple observation they have noticed that all classroom lights which have been labelled are now switched off. This has given teachers incentive to conserve energy by opening blinds and doors to allow natural light to enter. Also corridor lights have been left off during the day. They have also witnessed students turning off light switches. This has clearly demonstrated that this whole school policy has had a very positive impact on the entire school. The school is opened from Monday to Friday from 7am till 7.30pm to facilitate cleaning. The school has a sports centre which is opened to the community Monday to Friday till 10pm and from 9am till 6pm on Saturday and 9am till 2pm on a Sunday (occasionally up till 6pm). Current annual Electricity consumption is 723,000 kWh at a cost of £67,000 and annual gas consumption is 1,902,300 kWh totalling £33,000. The total energy spend is £99,758 and the CO2 emissions from this energy use equate to 740 tonnes. LIGHTING A maintenance roll out is now in place to replace T12 and T8 lamps with high frequency T5s. MEASURES TO REDUCE ELECTRIC HEATING CONSUMPTION The newly commissioned creative art block which is electrically heated, is of light-weight construction with heavy design thought given to the insulation of the building to minimise heat loss thus keeping consumption levels lower. The electric heaters have been fitted with time controls and heating occupancy detectors. One-third of external lighting now benefits from time clocks and times trimmed down. Previously external lights were on from dusk till dawn. New times are from 9pm and then on again at 6am. 36 IT EQUIPMENT SHUT-DOWN SAVINGS There are 500 computers in the school of which 350, since participation in the schools service programme, are now powered down from 4.15pm. The remainder are on a phased shut down: 6:45pm teaching staff (120 machines), and at 8pm for admin staff (30 machines). Previously these computers had to be manually switched off, relying on the caretaker to switch off those that had been left on. With adjustments to heating times above, totalling two-and-a-half hours a day, means that during the heating seating our school should see savings in our gas bills the region of nearly £5,000 a year. SWIMMING POOL COVER Changes to pool cover usage. Previously the pool cover was only activated at the end of each day. Now, the cover is not taken off until the pool is used and once empty is immediately replaced. By doing this will minimise heat loss in the pool and save in the region of up to 30% and avoid condensation build up in the pool hall. Power up times are: 7am for admin staff, teaching staff at 7.30am and the rest of the school’s computers on at 8am to allow for programme updates. REDUCING HEATING TIMES The school’s boilers were previously set to come on at 7am and off at 7pm in the main school areas. These times have now been trimmed to go off at 5.30pm. The Sports Centre heating is programmed to come on from 7am and off at 9pm. Previously the heating in this area was programmed to shut down at 10pm. Swimming Pool cover in place when pool not in use 37 APPENDICIES A2. Identified opportunities Our Low Carbon School Service will progress the following carbon reduction opportunities (summarised in section 5.2): Active labelling of light switches – Lighting in the schools often benefits from multiple switching and frequently excessive lighting is installed within classrooms. Significant savings can be delivered by assessing what lights do not need to be switched on and marking the switches with red dots that mean “do not touch”. The remaining light switches that are required are labelled with green dots. The whole school community can then be encouraged to only switch on the green marked lighting, unless the day is particularly overcast or the pupils/teacher require increased lighting levels. IT labelling - The active labelling of all equipment (switches and plugs) so that all school users know what they can switch off. Red dots mean do not touch, amber dots means equipment can be switched off after ensuring that no-one is using it, green dots mean equipment can be switched off when not in use Reduction of out-of-hours electricity – Whilst schools are increasingly being used for community activities and extended hours of use the buildings are still closed for a substantial time, typically 5,000 – 6,000 hours per year. The leaving on of equipment, services and lighting out-of-hours is the major electricity waste in schools and conducting regular out-of-hours checks to reduce the equipment left on delivers substantial savings. An out-of-hours check should be conducted after the school is vacated to record and switch off all unnecessary electrical equipment. The whole school community needs to be involved in ensuring active switch off at the end of the day and regular checking of out-of-hours use should be encouraged, particularly at the start of any holiday. Adjusting heating times – The management of heating is a complex issue and the recognition that this will benefit by forming a school heating control management team to involve the premises, business/bursar and administration functions is important, if control settings are to be optimised to deliver energy savings. A focussed and systematic approach to time and temperature settings delivers substantial savings within the schools. 38 Weather compensation control adjustments – Many school heating systems will include variable temperature heating water circuits (also known as weather compensated systems). These systems reduce energy consumption by reducing the water temperature flowing to the heat emitters as the outside air temperature rises. In more modern systems with condensing boilers, “direct acting” weather compensation allows the boiler to vary its operating flow water temperature automatically, to suit weather conditions and the temperatures inside the building. Weather compensation relies on communication between an internal sensor and one inside the boiler. The boiler’s water flow temperature is varied accordingly, rather than the boiler turning on and off which wastes energy. Replace breakfast club toasters – For schools operating a breakfast club, savings can be made by replacing multiple individual toasters with an industrial one has proved to be more efficient (and reduces the incidents of false alarms and fire evacuations from burning toast!) Swimming pool covers – Swimming pools lose energy in a variety of ways, but evaporation is by far the largest source of energy loss. Evaporating water requires tremendous amounts of energy. Savings of up to 30% can be achieved with the use of swimming pool covers and avoids condensation. 39 APPENDICIES A3. Additional data Draught-proofing – Many of our school buildings suffer from excessive infiltration through poorly fitting windows and doors. Heat loss also occurs as a result of doors leading out to the playground being pinned back for long periods of time even when the children have returned to lessons. Heat loss can be minimised by fitting PVC free flow curtains. Alumwell Nursery October 2011 PVC curtain Attached to the inside of the door. Curtain can be removed (un-hooked) if not needed e.g. in warm weather. It does not inhibit the function of the door. Nursery children have adapted easily to using it. Lighting replacements – There remains a substantial amount of old T12 flourescent lighting and even tungsten filament bulbs in corridors, cupboards and service rooms. Electrical savings in excess of 50% can be achieved by replacing fluorescent lights with modern high frequency, mirror reflector, T5, tri phosphor lighting or LED equivalents. In addition, all remaining tungsten bulbs should be replaced with compact fluorescent lamps that deliver a saving in the order of 80%. 40 Automatic Lighting controls – Automatic lighting controls to switch off lights, when there is no occupancy are particularly useful in intermittently occupied areas of our schools, such as sports halls, laboratories, temporary classrooms, etc. In addition, external lighting benefits from both photo-cell and occupancy sensing. The installation of lighting controls is well proven as being cost effective within our schools and significant further savings can be delivered through a roll-out programme. Store rooms will also benefit from timelag switches. Lessons Learnt following CLCSS pilot project – Conducting energy walk-round audits with each school within the pilot programme highlighted the importance of teams within Property Services working more cohesively together, ie Carbon Reduction team and electrical design teams. Certain Carbon Trust energy saving measures could only be partially implemented due to siting of electrical switches for ceiling projectors and insufficient rocker switches to light fittings. Both teams now work more closely together and as a result, a re-wire scheme currently taking place will have the facility to switch individual areas rather than a whole rooms from only one switch. A red switch shall be incorporated to allow control of light fittings nearest the window(s). This shall be explained to the teachers that the red switch should only be turned on as a last resort, if the room did not benefit from enough natural daylight. Boiler replacement – Replacing an old inefficient boiler with a modern energy efficient system can potentially reduce your gas energy consumption, as seen in the graph below from one of our pilot schools. The figures shown are from three meters, one of them a new replacement boiler. 800000 700000 600000 500000 2010/11 400000 2011/12 300000 2012/13 200000 100000 0 Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Consumption data below: 41 2010-2011 2011-2012 MONTH kWh Costs kWh Costs April 240360 754 233347 407 May 143516 335 106648 192 June 56430 96 58625 103 July 48917 84 51849 91 August 90999 191 52740 92 September 110539 225 75470 162 October 110539 225 75470 162 November 394627 998 223693 583 December 398477 1537 302222 756 January 711951 1557 February 711951 1496 March 466792 1145 3485098 8643 1180064 2548 TOTALS Consumption Data (Pool Hayes Community School) 42