Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER Cebu 5th District Engineering Office V. Sotto Street, Cebu City INVITATION TO BID The Bids and Awards Committee (BAC) of the Department of Public Works and Highways-Cebu 5th District Engineering Office, invites contractors to bid for the following projects, viz; 1. Contract ID Contract Name Contract Location Scope of Work : 15HI0075 : Construction of 3 Storey 6-Classroom SB at Calero ES : Liloan, Cebu : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stairs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing, Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WTF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish with Floor Hardener; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 10,215,795.86 Contract Duration : 150 calendar days Source of Funds : FY 2015 BEFF – SHS 2. Contract ID Contract Name : 15HI0076 : Construction of 3 Storey 12-Classroom SB at Compostela Central E.S. Contract Location : Compostela, Cebu Scope of Work : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stairs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing, Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WTF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 18,131,157.46 Contract Duration Source of Funds : 210 calendar days : FY 2015 BEFF - SHS 3. Contract ID Contract Name Contract Location Scope of Work : 15HI0077 : Construction of 2 Storey 4-Classroom SB at Cabadiangan ES : Compostela, Cebu : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stairs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing, Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WTF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish with Floor Hardener; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 6,213,115.96 Contract Duration : 120 calendar days Source of Funds : FY 2015 BEFF - SHS 4. Contract ID Contract Name : 15HI0078 : Construction of 3 Storey 6-Classroom SB at Estefa O. Monte MNHS (Cabungahan NHS) Contract Location : Danao City, Cebu Scope of Work : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stairs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing, Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WTF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish with Floor Hardener; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 10,603,845.87 Contract Duration : 150 calendar days Source of Funds : FY 2015 BEFF –SHS 5. Contract ID Contract Name Contract Location Scope of Work : 15HI0079 : Construction of 2 Storey 4-Classroom SB at Dawis Norte ES : Carmen, Cebu : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stairs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing, Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WTF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish with Floor Hardener; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 6,138,490.94 Contract Duration : 120 calendar days Source of Funds : FY 2015 BEFF – SHS 6. Contract ID Contract Name Contract Location Scope of Work : 15HI0080 : Construction of 2 Storey 4-Classroom SB at Pili ES : Danao City, Cebu : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stairs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing, Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WTF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finishing Works; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 6,287,740.96 Contract Duration : 120 calendar days Source of Funds : FY 2015 BEFF – EJHS (Batch 3) 7. Contract ID Contract Name Contract Location Scope of Work : 15HI0081 : Construction of 2 Storey 4-Classroom SB at Santican NHS : Danao City, Cebu : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stairs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing, Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WTF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finishing Works; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : PHp 6,287,740.96 Contract Duration : 120 calendar days Source of Funds : FY 2015 BEFF – EJHS (Batch 3) 8. Contract ID Contract Name : 15HI0082 : Repair/Maintenance of Cotcot River Control (Upstream, Compostela Side) Contract Location : Compostela, Cebu Scope of Work : Mobilization and Demobilization; Provide Project Sign Board (2 pcs 4’x8’ DPWH, 1 pc 8’x8’ COA); Construction Safety and Health; Structure Excavation; Embankment (from Borrow); Embankment (from Excavation); Riprap (Class A); Grouted Riprap (Class A) Approved Budget for the Contract (ABC) : Php 2,310,680.66 Contract Duration : 84 calendar days Source of Funds : FY 2015 Regular Funds 9. Contract ID Contract Name : 15HI0083 : Repair/Maintenance of Cotcot River Control (Upstream, Liloan Side), Cotcot, Liloan, Cebu Contract Location : Liloan, Cebu Scope of Work : Mobilization and Demobilization; Provide Project Sign Board (2 pcs 4’x8’ DPWH, 1 pc 8’x8’ COA); Construction Safety and Health; Structure Excavation; Embankment (from Borrow); Embankment (from Excavation); Riprap (Class A); Grouted Riprap (Class A) Approved Budget for the Contract (ABC) : Php 2,310,680.66 Contract Duration : 84 calendar days Source of Funds : FY 2015 Regular Funds 10. Contract ID Contract Name : 15HI0084 : Repair/Maintenance of Danao River Control, Brgy. Suba, Danao City, Cebu Contract Location : Danao City, Cebu Scope of Work : Mobilization and Demobilization; Provide Project Sign Board (2 pcs 4’x8’ DPWH, 1 pc 8’x8’ COA); Construction Safety and Health; Structure Excavation; Embankment (from Borrow); Gabions Approved Budget for the Contract (ABC) : Php 1,546,410.77 Contract Duration : 84 calendar days Source of Funds : FY 2015 Regular Funds 11. Contract ID Contract Name : 15HI0085 : Repair/Maintenance of Danao River Control, Brgy. Guinsay, Sitio Libon, Danao City, Cebu Contract Location : Danao City, Cebu Scope of Work : Mobilization and Demobilization; Provide Project Sign Board (2 pcs 4’x8’ DPWH, 1 pc 8’x8’ COA); Construction Safety and Health; Structure Excavation; Embankment (from Excavation); Riprap (Class A); Grouted Riprap (Class A) Approved Budget for the Contract (ABC) : Php 1,562,878.03 Contract Duration : 84 calendar days Source of Funds : FY 2015 Regular Funds Bidding will be conducted through open competitive bidding procedures using a non-discretionary pass/fail criterion as specified in the Revised IRR RA 9184, otherwise known as the “Government Procurement Reform Act:. Bids received in excess of the ABC shall be automatically rejected at the opening of bid. The BAC will conduct the procurement process in accordance with the Revised IRR of R.A. 9184. Bids received in excess of the ABC shall be automatically rejected at the opening of bid. 1. 2. 3. 4. The significant times and deadlines of procurement activities are shown below: Issuance of bidding documents FROM: August 14, 2015 TO: Sept. 4, 2015 Pre-bid conference August 24, 2015 @ 10:00 A.M. Receipt of Bids September 04, 2015 @ 12:00 Noon Opening of Bids September 04, 2015 @ 2:00 P.M. The BAC will issue hard copies of Bidding Documents (BD’s) at DPWH-Cebu 5th District Engineering Office, upon payment of a non-refundable fee of: Amount of Bid Docs (per project) Project ID Nos. P 5,000.00 P 10,000.00 15HI0082, 15HI0083, 15HI0084, 15HI0085 15HI0075, 15HI0076, 15HI0077, 15HI0078, 15HI0079, 15HI0080, 15HI0081 Prospective bidders may also download the BD’s from the DPWH web site and shall pay the said fee on or before the submission of their bids. Bids must be accompanied by a bid security, in the amount and acceptable form as stated in Section 27.2 of the Revised IRR or a bid-securing declaration. Prospective bidders shall submit their duly accomplished forms as specified in the BD’s in two (2) separate sealed bid envelopes. The first envelope shall contain the technical component of the bid, which shall include a copy of the CRC. The second envelope shall contain the financial component of the bid. Contract will be awarded to the Lowest Calculated Responsive Bid as determined in the bid evaluation and post-qualification. The DPWH-Cebu 5th District Engineering Office reserves the right to accept or reject any bid, to annul the bidding process at any time prior contract award, without thereby incurring any liability to the affected bidder/s. For further information, please refer to: VERONICA P. PARADIANG DPWH Cebu 5th D.E.O. V. Sotto St., Cebu City / 253-5331 Website: August 14, 2015 Philgeps: August 14, 2015 Approved by: FERNANDO J. TALAGSA BAC Chairman Office Premises: August 14, 2015 Noted: SIGNED YUSOPH D. RASUMAN OIC- District Engineer