Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER Cebu 5th District Engineering Office V. Sotto Street, Cebu City INVITATION TO BID The Bids and Awards Committee (BAC) of the Department of Public Works and Highways-Cebu 5th District Engineering Office, invites contractors to bid for the following projects, viz; 1. Contract ID Contract Name : 15HI0086 : Construction of 3 Storey 6-Classroom School Building at Mulao NHS Contract Location : Compostela, Cebu Scope of Work : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stirs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish with Floor Hardener; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Wires and Wiring Devices; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 10,564,045.85 Contract Duration : 150 calendar days Source of Funds : FY 2015 BEFF - SHS 2. Contract ID Contract Name : 15HI0087 : Construction of 3 Storey 6-Classroom School Building at Maslog National High School Contract Location : Danao City, Cebu Scope of Work : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stirs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish with Floor Hardener; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Wires and Wiring Devices; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 10,633,695.86 Contract Duration : 150 calendar days Source of Funds : FY 2015 BEFF - SHS 3. Contract ID Contract Name : 15HI0088 : Construction of 2 Storey 4-Classroom School Building at Maslog Elementary School Contract Location : Danao City, Cebu Scope of Work : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stirs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish with Floor Hardener; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Wires and Wiring Devices; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 6,138,490.94 Contract Duration : 120 calendar days Source of Funds : FY 2015 BEFF - SHS 4. Contract ID Contract Name : 15HI0089 : Construction of 3 Storey 6-Classroom School Building at Cantumog NHS Contract Location : Carmen, Cebu Scope of Work : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stirs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish with Floor Hardener; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Wires and Wiring Devices; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 10,414,795.85 Contract Duration : 150 calendar days Source of Funds : FY 2015 BEFF - SHS 5. Contract ID Contract Name Contract Location Scope of Work : 15HI0090 : Construction of 1 Storey 2-Classroom School Building at Delfin Dawe E.S. (Toilet Attached) : Danao City, Cebu : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Fire Escape & Steel Railings (Stirs, Ramp & Rail Guard); Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Plain Cement Finish with Floor Hardener; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Wires and Wiring Devices; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 2,108,013.01 Contract Duration : 60 calendar days Source of Funds : FY 2015 BEFF – EJHS (Batch 6 6. Contract ID Contract Name : 15HI0091 : Construction of 1 Storey 2-Classroom School Building at Guinacot Integrated School (Toilet Attached) Contract Location : Danao City, Cebu Scope of Work : Mobilization/Demobilization; Personal Protective Equipment (PPE); Safety and Health Officer; Rail; Steel Trusses and Framing Works; Reinforcing Steel Works; Masonry Works (CHB); Excavation of Column Footing and Wall Footing; Backfilling of Excavated Materials; Gravel Bedding @ SOF, CF & WF, FTB and Trench; Embankment; Reinforced Concrete Works; Soil Poisoning; Carpentry for Ceiling with Insulation, Drywall Partition and Blackboard; Jalousie Window; Panel and Hollow Core Door; Plumbing and Fixtures; Pre-painted Metal Sheets; Tile Finish and Finishing Works; Cement Plaster Finish; Masonry Painting; Wooden Painting; Metal Painting; Conduits, Boxes and Fittings; Wires and Wiring Devices; Lighting Fixtures, Fire Alarm System, Panel Boards and Cabinets Approved Budget for the Contract (ABC) : Php 1,928,912.97 Contract Duration : 60 calendar days Source of Funds : FY 2015 BEFF – EJHS (Batch 7) Bidding will be conducted through open competitive bidding procedures using a nondiscretionary pass/fail criterion as specified in the Revised IRR RA 9184, otherwise known as the “Government Procurement Reform Act:. Bids received in excess of the ABC shall be automatically rejected at the opening of bid. The BAC will conduct the procurement process in accordance with the Revised IRR of R.A. 9184. Bids received in excess of the ABC shall be automatically rejected at the opening of bid. 1. 2. 3. 4. The significant times and deadlines of procurement activities are shown below: Issuance of bidding documents FROM: Sept. 7, 2015 TO: Sept. 28, 2015 Pre-bid conference September 15, 2015 @ 10:00 A.M. Receipt of Bids September 28, 2015 @ 12:00 Noon Opening of Bids September 28, 2015 @ 2:00 P.M. The BAC will issue hard copies of Bidding Documents (BD’s) at DPWH-Cebu 5th District Engineering Office, upon payment of a non-refundable fee of: Amount of Bid Docs (per project) Project ID Nos. P 5,000.00 P 10,000.00 P 25,000.00 15HI0090, 15HI0091 15HI0088 15HI0086, 15HI0087 & 15HI0089 Prospective bidders may also download the BD’s from the DPWH web site and shall pay the said fee on or before the submission of their bids. Bids must be accompanied by a bid security, in the amount and acceptable form as stated in Section 27.2 of the Revised IRR or a bid-securing declaration. Prospective bidders shall submit their duly accomplished forms as specified in the BD’s in two (2) separate sealed bid envelopes. The first envelope shall contain the technical component of the bid, which shall include a copy of the CRC. The second envelope shall contain the financial component of the bid. Contract will be awarded to the Lowest Calculated Responsive Bid as determined in the bid evaluation and post-qualification. The DPWH-Cebu 5th District Engineering Office reserves the right to accept or reject any bid, to annul the bidding process at any time prior contract award, without thereby incurring any liability to the affected bidder/s. For further information, please refer to: VERONICA P. PARADIANG DPWH Cebu 5th D.E.O. V. Sotto St., Cebu City / 253-5331 Approved by: SIGNED ORIGINAL FERNANDO J. TALAGSA BAC Chairman Website: September 7, 2015 Philgeps: September 7, 2015 Office Premises: September 7, 2015 Noted: SIGNED ORIGINAL YUSOPH D. RASUMAN OIC- District Engineer