NOTICE TO BIDDERS
AMMENDED 2/25/2015
New and edited language is highlighted below
PONCA CITY KAW HYDRO & TONKAWA TRANSMISSION LINE
VEGETATION CONTROL
OKLAHOMA MUNICIPAL POWER AUTHORITY
EDMOND, OKLAHOMA
Notice is hereby given that Bid Proposals will be received at Oklahoma Municipal Power Authority
(OMPA), 2701 W. I-35 Frontage Rd., Edmond, Oklahoma 73013 or via e-mail adobson@ompa.com until
4:00 P.M., Local Time, March 12, 2015, for the Ponca City Kaw Hydro & Tonkawa Transmission Line
Vegetation Control project.
The documents may be examined at the office of OMPA. Questions, requests for specifications and
documents, or comments concerning the project should be directed to Alex Dobson at 405-359-2512.
Bids received after this time will not be accepted. Bids received more than 96 hours early will not be
accepted. Bids will be opened publicly and read aloud immediately after the specified closing time.
All bids must be accompanied by executed Non-Collusion and Business Relationship Affidavits. Forms
for said affidavits are included.
The successful bidder will be required to submit proof of Workers’ Compensation and General Liability
insurance prior to a purchase order being issued. The successful bidder will also be required to execute
and provide to OMPA the form W9.
Oklahoma Municipal Power Authority reserves the right to reject any and/or all bids, or to accept the bid
deemed to be in the best interest of the Oklahoma Municipal Power Authority.
OKLAHOMA MUNICIPAL POWER AUTHORITY
By: s/David W. Osburn, General Manager
By: s/Andrea Simmons, Ass’t Secretary (SEAL)
Summary:
OMPA is requesting bids for clearing of trees, brush and vegetation in the 69kV Transmission line right of
way near Ponca City, Oklahoma and Tonkawa, Oklahoma. The Kaw Hydro line is 9.2 miles long, the
Tonkawa line is 0.6 miles long. Work within the approach distance of 69kV or 12kV conductors may be
required. Contractor shall obtain Hot Line Orders from OMPA when working within the approach
distance of any energized conductor. Weed and brush control chemicals may be required. Workers must
be qualified to work near energized conductors and handle vegetation control chemicals.
Specific details of bid request:
Please provide a price for each section in which you are able to provide service.
a) Tree trimming, brush clearing and vegetation control spraying
Price $_____________
a. Represent OMPA to all property owners who may be affected by trimming and/or
spraying activities. OMPA expects contractor to act cooperatively with land
owners.
b. Trim or remove all trees within 25’ of 69kV centerline (easement is 25’ on each
side) until no branches are within 20’ of phase conductors. In the wildlife
protection area immediately south of the dam, cutting trees to the ground is not
permitted, but trees may be trimmed . Brush hog or otherwise remove vegetation
in overgrown areas in the line right of way and apply chemical controls (contractor
to supply chemicals) to prevent re-growth (except in the wildlife protection areas
south of the dam). Remove trimmed branches and materials from site. Exercise
extreme caution in areas where chemicals may enter nearby water or agricultural
areas.
Figure 1-Ponca City Kaw Hydro Line
Figure 2-Tonkawa Line
For additional information, please contact:
Alex Dobson, P.E.
adobson@ompa.com
405-359-2512
Non-Collusion Affidavit
STATE OF ________________________________
)
) SS
COUNTY OF ______________________________
)
A.
For purposes of competitive bids, I certify:
1.
I am the duly authorized agent of ____________________________, the
bidder submitting the competitive bid which is attached to this statement, for the
purpose of certifying the facts pertaining to the existence of collusion among bidders
and between bidders and state officials or employees of the Oklahoma Municipal Power
Authority, as well as facts pertaining to the giving or offering of things of value to
government personnel in return for special consideration in the letting of any contract
pursuant to the bid to which this statement is attached;
2.
I am fully aware of the facts and circumstances surrounding the making of
the bid to which this statement is attached and have been personally and directly
involved in the proceedings leading to the submission of such bid; and
3.
Neither the bidder nor anyone subject to the bidder’s direction or control
has been a party:
a.
to any collusion among bidders in restraint of freedom of
competition by agreement to bid at a fixed price or to refrain from
bidding,
b.
to any collusion with any state official or employee as to quantity,
quality or price in the prospective contract, or as to any other terms
of such prospective contract,
c.
in any discussions between bidders and any state official
concerning exchange of money or other thing of value for special
consideration in the letting of a contract, nor
d.
to any collusion with any state agency or political subdivision official
or employee as to create a sole-source acquisition in contradiction
to Section 85.45j.1 of Title 74 of the Oklahoma Statutes.
B.
I certify, if awarded the contract, whether competitively bid or not, neither the
contractor nor anyone subject to the contractor’s direction or control has paid, given or
donated or agreed to pay, give or donate to any officer or employee of the State of
Oklahoma or the Oklahoma Municipal Power Authority any money or other thing of
value, either directly or indirectly, in procuring the contract to which this statement is
attached.
______________________________
Signature
______________________________
Printed Name
Subscribed and sworn to before me this _________________ day of
___________________, 20 _______.
______________________________
Notary Public
My Commission Expires:
_____________________________
Business Relationships Affidavit
STATE OF ____________________
)
) SS
COUNTY OF __________________
)
__________________________________________________, of lawful age, being first
duly sworn, on oath says that (s)he is the agent authorized by the Bidder to submit the
attached bid. Affiant further states that the name of any partnership, joint venture, or
other business relationship presently in effect or which existed within one (1) year prior
to the date of this statement with the architect, engineer, or other party to the project is
as follows:
Affiant further states that any such business relationship presently in effect or which
existed within one (1) year prior to the date of this statement between any officer or
director of the bidding company and any officer or director of the architectural or
engineering firm or other party to the project is as follows:
Affiant further states that the names of all persons having any such business
relationships and the positions they hold with their respective companies or firms
are as follows:
(If none of the business relationships hereinabove mentioned exist, affiant should so
state.)
Subscribed and sworn to before me this_____________________ day of
___________________, 20 ____________.
______________________________
Notary Public
My Commission Expires: _____________________
Download