ITIS3110 Lab 06
Team Project Proposal Work Time
Overview
Goals
Team work time to develop the team project.
Due Dates

End of this lab: Initial project proposal, filled in with project name, high level details, dates, and signatures
o Team Name and Initial Proposal form (with signatures): ..\3110Text\3110 TeamNameSignatures.docx

Beginning of next lab: Completed project proposal with details and dates
o Completed Proposal form: ..\3110Text\3110 TeamProposal.docx
o The above form completed with signatures
Deliverables

Initial project proposal (end of lab 6)
o Team Name
o 10 pts for PROPERLY filled form
 Only one per team
o Everyone: Team Name in Moodle
o Captain only: Team Name document uploaded to Moodle
 Final project proposal (beginning of lab 8)
o 10 pts for PROPERLY filled form
 Only one per team
o Everybody: Team Project name in Moodle
o Captain only: Team Proposal document uploaded to Moodle
Sample proposal form follows. The second time it will be filled out with more detail.
Project Essentials
The project must contain at least 4 elements from 2110/3110 (e.g. DNS, Web Server, etc.) demonstrating an IT infrastructure.
At least two of the elements must be from 3110. Also at least one element outside of what was taught in 2110/3110 must be
included.
2/9/2016 10:31:00 AM
Page 1 of 5
ITIS3110 Lab 06
Team Project Proposal Work Time
3110 Team Project Proposal
The K Team
L03 #4
10/05/2013
2/9/2016 10:31:00 AM
Page 2 of 5
ITIS3110 Lab 06
Team Project Proposal Work Time
Team number: : L03 #4
Team name: The K Team
Proposal: _x_ Initial ___Final
Project Title
XAMMP Web Server
Outline of Project
Create a small interactive Web server using XAMPP with security as a feature…
…
The working project will deliver active web pages through a secure environment with only the Web
server exposed on a DMZ.
Deliverables
Web Server
 Apache
 …
RDMS
 MySQL
 …
Firewall


DNS

Cisco 5105
…
…
...
Equipment Required
Raspberry Pi
Cisco 5105 ASA
CentOS VM
…
2/9/2016 10:31:00 AM
Page 3 of 5
ITIS3110 Lab 06
Team Project Proposal Work Time
Initial Schedule

Oct 5: Initial proposal

Oct 12: Final proposal

Oct 17: Pi configured as Web Server

Oct 24: CentOS configured as MySQL server

…

Nov 20: Final testing and configuring

Nov 26: Project Presentaion
2/9/2016 10:31:00 AM
Page 4 of 5
ITIS3110 Lab 06
Team Project Proposal Work Time
Team Members (alphabetical by last name):
Capt
*
Name (printed)
1) Baker, Jimmy
Signature
2) Collins, Joan
3) Peabody, Sherman
4) Queenofscotts, Mary
5)
Capt: Identify the team captain as point of contact with an asterisk (only one)
2/9/2016 10:31:00 AM
Page 5 of 5
Download