Instructions for SDDOT Categorical Exclusion Checklist and Environmental Commitments Checklist 1. Utilize this checklist for all federally funded projects coordinated as Categorical Exclusions (CE). 2. Reference the Programmatic Agreement Between the FHWA & the SDDOT Regarding the Processing of Determining Categorical Exclusions on DOT Projects to determine whether project qualifies as a Batched CE (CE 1), Certified CE (CE 2), or an Approved CE (CE 3). 3. FHWA signature is required for projects utilizing the information beneath the double line border on ANY of the NEPA Clearance Actions. More specifically, for projects that qualify as an Approved CE (CE 3). 4. FHWA Approval may be requested for Certified CE projects when a Section 404 Nationwide permit is required. The purpose for the request will be stated in Section C, Comments. 5. If FHWA signature is not required, then “N/A” will be entered on the FHWA Approval line in Section D. 6. The assigned ‘Project Design Manager’ to include in the Environmental Commitments Checklist can be located in the Approved Scope’s Executive Summary tab. 7. Upon certification/approval of the SDDOT CE Checklist & Environmental Commitments Checklist, distribute document to the Project Design Manager indicated on Environmental Commitments Checklist and any other necessary designees to ensure information proceeds to Section A – Estimate of Quantities and Environmental Commitments and plan set incorporation. 8. Significant changes to the project scope, work limits, or plans after a Categorical Exclusion has been certified or approved will require redetermination of CE validity. 9. Delete this entire page prior to certifying or approving document. i South Dakota Department of Transportation Categorical Exclusion Checklist Project: County: PCN: Environmental Initiation Date: 03/17/2014 CE Action: A. NEPA Clearance Actions Federally Threatened, Endangered, and Protected Species USFWS Concurrence that project will not adversely affect listed species received on: . Individual informal consultation conducted with USFWS and a biological assessment submitted. USFWS Concurrence to individual informal consultation received: Appended to Programmatic Biological Opinion on . Project determination of “May Affect, Is Likely to Adversely Affect” occurs to Federally listed species that are not addressed in the Biological Opinion. USFWS Concurrence received: . Section 4(f) and 6(f) No property will be affected. 23 CFR 774.13 Exc. applies to the requirement for Section 4(f) approval. FHWA concurrence: Section properties have been noted and documents were processed and approved by on . Historic and Archaeological Preservation A Finding of was received on SHPO/THPO has conditioned the finding. See attached documentation. Cultural resources will be affected by the project and Section 106 procedures have been completed. Memorandum of Agreement implemented on . Wetlands No wetlands are located within the anticipated work limits. Wetland impacts will be mitigated ; the Statewide Wetland Finding applies. One or more acres of wetland impacts will be mitigated FHWA approved a Wetland Finding on ;. . USACE Coordination on Dredge and Fill A Section 404 Permit is not required. SDDOT reasonably anticipates a Nationwide Permit will be received. An Individual Permit will be applied for and imposed conditions will be complied with. FEMA – Floodplain Impacts reviewed by on No designated floodplains exist within the project limits. Project is within a floodplain but will have no floodplain impacts. Project has an effect on the floodplains. See attached documentation. (Note: If the improvement results in a longitudinal encroachment on the floodplain, it must be discussed in detail.) Oct 2013 1 SDDOT - Categorical Exclusion Checklist Right-of-Way No right-of-way is required. Minor amounts of right-of-way are required. Type: Low Cost ; Strip Acquisition(s) ; Corner Acquisition(s) More than minor amounts of right-of-way are required. Displacement/Relocation is required Substantial affects to property functions DENR Coordination Completed: GFP Coordination Completed: Tribal Consultation X Tribal consultation was initiated with the Tribes checked below on 12/26/2012. Bureau of Indian Affairs X Sisseton – Wahpeton Oyate X Cheyenne River Sioux Tribe X Standing Rock Sioux Tribe X X Crow Creek Sioux Tribe X Flandreau Santee Sioux Tribe Lower Brule Sioux Tribe X Oglala Sioux Tribe Rosebud Sioux Tribe Tribal comments were received. [letter(s) attached] Yankton Sioux Tribe Iowa Tribe of Oklahoma Three Affiliated Tribes of ND Ponca Tribe of Nebraska Northern Arapaho Tribe Tribal coordination requests FHWA involvement. B. Other Unusual Circumstances Apply List: (noise, wild & scenic river, Coast Guard permits, air quality, public controversy, changes in traffic patterns, significant detour/traffic impacts, other). When it doesn't apply overwrite this field as "N/A". C. Comments List: (describe any attachments or additional information necessary to support project's NEPA coordination efforts) D. Environmental Project Certification and Approval This review finds the proposed project does not individually or cumulatively have a significant impact on the environment as defined by NEPA, or involve unusual circumstances as defined in 23 CFR 771.117(b), such that it is excluded from the requirements to prepare an environmental assessment or environmental impact statement. Certification: SDDOT Environmental Engineer 03/17/2014 Date Approval: FHWA Environmental Engineer Oct 2013 Date 2 ENVIRONMENTAL COMMITMENTS CHECKLIST PROJECT # ENVIRONMENTAL CLASS CODE COUNTY PCN PROJECT DESIGN MANAGER The following conditions, concerns, and issues described in this Environmental Commitment Checklist are based on the knowledge provided to secure the approved environmental classification date as exhibited on the Categorical Exclusion Checklist. Note to Project Design Manager: Changes to the project scope, work limits, or plans after approval of the Environmental Class Code that affect the environment or mitigation actions must be approved by the Environmental Office. Commitment A – Wetlands Yes Total Impacted Wetland Acreage: No n/a Total Compensatory Wetlands Needed: Comments: Commitment B – Federally Threatened, Endangered, & Protected Species Commitment B1: Topeka Shiner Yes No Commitment B2: Whooping Crane Yes No Commitment B3: American Burying Beetle Yes No Commitment B4: Bald Eagle Yes No Commitment B5: {other} Yes No Comments: Commitment C – Water Source Comments: n/a n/a n/a n/a n/a Yes No n/a Yes Yes No No n/a n/a Commitment E – Storm Water Yes Comments: {Identifty any Major receiving body of water(s):} No n/a Commitment F – Seasonal Work Restriction Comments: Yes No n/a Commitment H – Waste Disposal Site Comments: Yes No n/a Yes No n/a No n/a No n/a Commitment D – Water Quality Standards Commitment D1: Surface Water Quality Commitment D2: Surface Water Discharge Comments: Commitment I – Historical Preservation Office Clearances Comments: Commitment J – Construction Practices for Temporary Yes Works in Waterways of the U.S. Comments: Commitment K –Rapid City Area Air Quality Control Zone Comments: 1 Yes Oct 2013 ENVIRONMENTAL COMMITMENTS CHECKLIST Commitment L – Contaminated Material Comments: Yes No n/a Commitment M – Section 4(f)/6(f) Resources Yes No n/a If yes (check appropriate): Section 4(f) public park Section 4(f) wildlife refuge Section 4(f) historic site Section 4(f) recreational lands Section 4(f) waterfowl refuge Section 6(f) property 4(f) Type of Fee Simple Permanent Easement Temporary Easement Constructive Use: 6(f) Type of Temporary Non-conforming Use 6(f) Use – Conversion approval Use: Comments: {Include: property name, location, etc.} {Discuss if 4(f) impact requires 1 of the 5 programmatic evaluations, a De Minimis, or an individual determination} Commitment N – Section 404 Permit Comments: Commitment O – Tribal Monitoring and Traditional Cultural Properties Comments: Yes Yes Commitment P – Coordination with State Archaeological Research Center Comments: Commitment Q – Tree Replacement Comments: Commitment R – Fire Prevention in the Black Hills Area Comments: X No n/a No n/a Yes Yes No No Yes X n/a n/a No n/a Commitment S – Migratory Birds Work Restriction Comments: Yes No n/a Commitment T – {other} Comments: Yes No n/a 2 Oct 2013