ENVIRONMENTAL CHECKLIST THIS PROJECT HAS BEEN CATEGORICALLY EXCLUDED version 11/2009 PROJECT # COUNTY PCN This list is required for all rural and urban roadway reconstruction projects and bridge replacement projects. THREATENED OR ENDANGERED SPECIES Contact with USF&WS indicates no conflicts RIGHT-OF-WAY . No right-of-way is required. Contact with USF&WS indicates a biological assessment is required. BA Approval: . Right-of-way is required. DREDGE AND FILL SECTION 4(f) and 6(f) Project was reviewed on A 404 Permit is not required. and no 4(f) or 6(f) property will be affected. Section properties have been noted and and approved by the FHWA on . documents were processed A 404 Permit applied for and imposed conditions will be complied with. Attach letter if appropriate. FEMA – FLOODPLAIN IMPACTS HISTORICAL AND ARCHAEOLOGICAL SITES A Finding of was received on SHPO/THPO has conditioned the finding. No designated floodplains exist within the project limits. See attached letter if Significant cultural resources will be affected by the project and 106 procedures have been completed . WETLANDS Project was reviewed on anticipated work limits. Project is within a floodplain but will have no floodplain impacts. Project has an effect on the floodplains. See attached discussion. (Note: If the improvement results in a longitudinal encroachment on the floodplain, it must be discussed is detail.) TRIBAL COORDINATION and no wetlands are located within the Less than 1 acre of wetlands will be impacted; Statewide wetland finding applies. Wetlands exist within construction limits (1 acre or more). The FHWA approved a wetland finding on . DENR COORDINATION: COMMENTS: Project does not require tribal coordination (surfacing, lighting etc.) Project has been coordinated with the Tribe(s) checked below on . Cheyenne River Sioux Tribe Rosebud Sioux Tribe Crow Creek Sioux Tribe Sisseton – Wahpeton Oyate Lower Brule Sioux Tribe Standing Rock Sioux Tribe Oglala Sioux Tribe Yankton Sioux Tribe Flandreau Santee Sioux Tribe Three Affiliated Tribes of ND Iowa Tribe of Oklahoma Tribal comments were received. [letter(s) attached] Approval: ________________________________ SDDOT Environmental Engineer Approval: _______________ Date ________________________________ FHWA Environmental Engineer _______________ Date