A Project Director with a long history on the successful delivery of Major Development, projects, encompassing
Infrastructure, Utilities, Healthcare Services & Luxury Resorts. With extensive exposure on the establishment of new
ventures and business streams that will provide the necessary expansion and growth, commensurate with the overall
development strategy and business plan of the indicative company with extensive experience on contacts management,
pre and post contract. A team leader with the ability to formulate, promulgate and implement strategic business plans
that create aggressive growth whilst providing inspirational leadership and teamwork that promotes focused and rapid
company growth whilst maintaining the P&L accountability.
Able to demonstrate adherence to best-practiced standards when developing and reviewing new business ventures &
contract management service & negotiations from tender processing through to operational and development stages
taking overall management responsibility for commercial and financial processes. Excellent presentation and interpersonal skills, able to interface effectively at all levels from Clients, Financiers, Shareholders through to operational
levels.
An effective communicator at boardroom level, quick to adapt to new ideas and technologies and environments. With
the capacity to identify and implement KPI’s through strategic planning and working within strict technical and
budgetary constraints. With the ability to keep a clear head in a crisis, and use experience, analysis and common sense
when problem solving, or decision making at the highest level. Experienced in transforming a multi national/cultural
group of workers into a successful efficient team. Good team player with the ability to get the best out of people, and
possess excellent personal management attributes. Able to work unsupervised and within a large or small team, often
working within difficult and hostile conditions. Also well versed in working against time and cost constraints
Higher Education:_________________________________________________________________
Sept 1990 – June 1995
Sept 1972 – June 1976
Law Degree with Honours LLB (Hons) Bristol University-Contract, Administrational,
Tort, Constitutional, Criminal, Forensic Science, Wills & Probate, International,
European, and all other aspects of law.
Engineering Degree B Eng, Bristol Polytechnic (later status change to Bristol University)
– All aspects of Mechanical Engineering, problem solving, etc
Further Education:_______________________________________________________________________
2 Years forensic Science study, dissertation published on ‘Challenges to DNA Evidence in Criminal Trials’
Fellowship of Society of Lawyers gained in disciplines—Wills & Probate, Charities Law & Law Cost Account
Certificate in Quality Control Assessor (ISO) in Legal Application (UK)
Certificate in Quality Control Assessor (ISO) in Engineering & Business (Thailand)
Education:______________________________________________________________________________
Sept 1988 – June 1990
Sept 1966 – June 1972
Sept 1966 – Sept 1972
Advanced Levels- Politics, Sociology, Law, (South Bristol College)
Advanced Levels – Maths, English, History (Weston-super-Mare Grammar School)
Ordinary Levels – Maths, English Lit, English Lang, History, Biology, Geography
(Weston-super-Mare Grammar School)
Career Objectives_____________________________________________________________________
Seeking a highly challenging and rewarding position within an established and well respected leading multi-national
organization
Career Details:__________________________________________________________________________
2012 – Present
PMC - Senior Manager Buildings – New Delhi, India. In charge of PMC Buildings with
currently 2 projects valued approximately $1.22 Billion USD, which are running parallel plus another large
Infrastructure and shopping mall project which are due to commence March 2013 and also run simultaneously.
(Confidential) Senior Manager Buildings for 9 high Rise Towers between 22 – 33 floors with 2 storey basements with
parking for 2,200 cars, Nursery School, Clubhouse and Infrastructure. Workforce of 1700+. Project consists of 1100 high
end apartments, plus retail.
(Confidential) Senior Manager Buildings for 8 high rise towers between 16 – 32 floors plus 2 storey basement with parking
for 2,050 cars, Nursery School, Clubhouse and Infrastructure. Workforce of 1550+. Project consists of 1050 high end
apartments, plus retail.
2008 – Current
Project Director — Vietnam
Imperia An Phu Residential (Confidential) Project Director of 4 high rise towers, over an podium and underground
basement parking for 1400 cars. 130,196.square meters consisting of four tower blocks of between 22 – 28 floors and one
basement. With a workforce of 1500+, this project comprises of 700 apartments for sale and ancillary accommodation high
end residential units and retail. It also consists of a communal swimming pool for adults and separate pool for children. A
club house, fitness centre, spa and sauna, landscape gardens, Library, kinder garden, convention centre, medical clinic,
restaurants,
Park City Urban Development (Confidential) Project Director of Urban Development consisting of 70 Hectares of
infrastructure, 12 high rise towers, 10 phases of villas, consisting of 172 villas in each phase, roads, drainage, sewage
treatment plant, with a workforce of over 1350+. Main focus on the provision of project management services to a joint
venture between a Malaysian and Vietnamese company. Phase 1 well under way as is the infrastructure package. Retail Park
to come online 2013 including shopping malls, industrial units, restaurants, swimming pool, etc
Water Mark Residential Complex Project—($21 million) Project Director with main focus on the provision of project
management services, relating to Resort & Commercial Development high end Real Estate/Property Management, and IPP
sector from initial design, pre-bid to development and operational level. Close liaison with fund managers (PFI) to ensure
optimum protection on P&L accountability, business development & provision of professional management services to
clients. 18 storey high and residential apartments, over a retail mall, with residential communal swimming pool, gymnasium,
bank, etc. 2 storey underground car park for cars and motorbikes. Preparation of Bid documents for this large construction
project in Hanoi. Recruitment drive in preparation of commencement of Project Management Contract. Compilation of
Contract Package Tender list and negotiations with local Contractors prior to Tender stage. Office set-up and Client &
Contractor start-up meeting initiated. Project still in preliminary design stage. Test Piling underway, Main contractor
Mobilised to site. Construction underway
Nokia Siemen’s Network – Vietnamese Headquarters – Pre-construction and construction services for the new NSN HQ
located in Hanoi Vietnam, design through to completion and ‘Going Live’
Nam Dan Plaza Complex Project - ($266 million) 2x44 storey mixed use towers upon 7 storey shopping retail outlet mall
and 5 storey underground car parking facility, offering over 500 car parking spaces and 1000 spaces for motorbike parking.
206,000m2 of Class ‘A’ Residential & Commercial usable space. In all there are 42 high speed elevators serving retail, and
both office and towers. The Plaza forecourt can host public events with its attractive setting amidst the landscape gardens
with a prominent Media Wall & Animated Lighting Display.
Chua Boc Residential Towers– ($186 million) 3 Tower mixed use class ‘A’ prestigious construction in the heart of Hanoi.
Preparation of Bid documents for this Chua Boc Residential Towers–3Tower mixed use class ‘A’ prestigious construction in
the heart of Hanoi. Preparation of Bid documents for this large construction project in Hanoi. Recruitment drive in preparation
of commencement of Project Management Contract. Compilation of Contract Package Tender list and negotiations with
local Contractors prior to Tender stage. Office set-up and Client & Contractor start-up meeting initiated. Project still in
preliminary design stage.
2007 – 2008
Business Development – Vietnam (SE Asia)
Business Development & Technical Director (EcoAfrica) – SE Asia
Business Development and Supply Chain Management for EcoAfrica (Eco Housing). Responsible for supply of raw and
manufactured materials, business development in Asia with links to South Africa and Sierra Leonne. Countries covered,
Vietnam, Thailand, Malaysia, China, Cambodia & Laos.
Mong Duong Power Station, North Vietnam – Campus and Infrastructure successful bid for construction supervision.
Design Management and Project Management. Facilities for Staff personnel prior to start-up of Coal Powered Power Station
2007 – 2008
Senior Projects Manager – Archetype Group Vietnam
Mercure Hanoi Hotel, Hotel includes total construction, deep piling, diaphragm retaining wall and total Mercure Branding
interior fit out, 10 floors plus basement, 102 Guestrooms, back of house, bar, kitchen, public areas, etc. Testing and
Commissioning of all MEP Equipment, such as Fire Pumps and Sprinkler systems, Kitchen Equipment’s, Electrical Main
Frame Circuits, Elevators, Water Treatment Plant, Alarm Systems, Etc
The Republic of Singapore Embassy -is new build extension annex plus structural and architectural renovation including
fit out, of existing buildings. Testing and Commissioning of all MEP Equipments, security alarm, fire fighting, bomb blast
building, cctv, etc.
Bac Kan Residential Vocational Training College –5200 m2 include total construction with conventional piling and
foundations and fit out with fitted furniture and workshop equipment’s of residential student vocational training college in
Bac Kan Province, North Vietnam.
2006 – 2007
Senior Projects Manager – Al Bader Construction and Steel Works – Doha, Qatar
Al Shaqab Equestrian Centre – Doha ($507 million) The centre, which boasts 800,000 square metres is a member of the
Qatar Foundation - an organisation which aims to develop its nation, founded by His Highness Sheikh Hamad Bin Khalifa
Al-Thani, Emir of the State of Qatar in 1995. With a workforce of over 2200+ the centre which is home to two ECB Equine
spas and the following facilities: Riding Academy and Clubhouse with full amenities, Emiri Stables and Majlis, Visitor's
Centre and Museum, Historic Ottoman Stables, Arabian Breeding and Training Centre, Endurance Training Centre, Track
and Research Facility, Veterinary Hospital, Farrier Area, Multiple Stable Blocks, Grass and Sand Paddocks, Staff and Groom
Accommodations. Responsible for the groundwork, foundation, civil and structural scope of the project.
Il Udeid US Air Base—Expansion of Existing US Air Base-Accommodation, Helicopter Repair Hanger, Service Hangers,
Training Centre, Education and Workshops. Responsibility included, steel structure installation supervision, utility and
service piping and equipment.
2004 – 2006
Project Manager Construction & Fit Out– UICHK Mongolia.
Terelj Hotel – Construction of Mongolia’s first 5 star hotel spa resort complex ($52,000,000) including complete fit out,
fitted furniture, millwork, ceramic tiling, mosaic, carpets, wallpaper, suspended ornate ceilings, Bar/Restaurant installation,
kitchen equipment installation and commissioning and testing. Infrastructure, roads, drainage and sewage, coal fired heating
boilers. Supervising of infrastructure, roads, drainage and sewage works. Installation, commissioning and testing of coal
fired heating boilers.
2003 – 2006
General Manager – Regal Hope Property Developers (Thailand) Ltd
House, Condo & Apartment construction. Road’s, swimming pools, walls, infrastructure
Regal hope Villas I, II, III, IV housing project villages with communal swimming pools, Gymnasium, shopping mall, staff
offices, residents guest rental rooms and infrastructure.
Regal hope 1- Condo 1 Construction of Condominium including deep piling diaphragm waterproof retaining wall, 16 floors,
with communal swimming pool and entertainment venue. Executive Beach Front Homes with private swimming pools
Island View Residence (Thailand) Ltd Executive beach front luxury homes with private swimming pools, roads, drainage,
sales office and infrastructure
1998 – 2003
Construction Manager – Generealty Co Ltd (Thailand)
Riverside Resort Thailand - Luxury Homes, with private swimming pools, club house, gymnasium, shopping arcade,
communal swimming pool, infrastructure, roads etc. Apartments, Condo renovations, extensions, swimming pool
renovations, etc. Managing the installation of roads, boundary walls, water and drainage, underground electric supply.
Executive Beach front villas – Luxury Homes on prime beach front plots, 3 storeys with ocean view deck with 180 degree
view to islands and ocean. Private swimming pools, private members club with access to private golf club, marina with
private mooring.
1999 – 2002
Construction Manager - Toyo Thai Corporation Company Limited Rayong, Thailand
Construction Expansion Plant Phase III ensuring Quality Control of Civil Infrastructure, Refractory and Insulation
On manufacturing plant construction
1998 – 1999
Construction Manager – Mahamirt - Thailand
Construction Expansion Power Plant EGAT Krabi RC Stack Construction 180 meter height, Civil and Refractory
Supervision Civil works including supervising major civil foundations, for boiler turbine hall and BOP structures,
continuing on with Insulation and refractory Supervision as the project matured. Lead a punch items team to ensure
full completion of project requirements.
1996 - 1998
Project Manager - Thai Interiors Flooring & Finishes Co., Ltd.
Laem Chabang School of Engineering - Vocational Engineering College affiliated with Swinburne/Tummasari University.
Main body construction Administration offices, teachers quarters, general instruction classrooms plus annexes, toilet and
shower blocks, restaurant, Computer and Science/Engineering labs, infrastructure, car park, etc