July 14, 2015 The Board of Trustees met for their regular meeting Tuesday, July 14th, 2015, at 7 pm in the city meeting room. The meeting was called to order by Chairman DeShaw. Present were DeShaw, Lange, Guthrie and Melchert. Absent, none. Motion by Lange, seconded by Guthrie, to approve the agenda and the minutes of the June meeting. Ayes, all. Carried. The bills were presented for payment as follows: ELECTRIC: PAYROLL PAYROLL TAXES CHAPMAN METERING CITY OF MCLEANSBORO RIESBERG RENTAL BLACK HILLS ENERGY TRIPLE C RUNDE AUTO RPGI TERRY-DURIN CO DAKOTA AMERICAN TRANSFORMERS TREAS STATE OF IOWA BHMG IAMU CITIZENS STATE BANK CITY LAUNDERING CO IOWA DEPT OF TRANSPORTATION PMUG IOWA UTILITIES BOARD LEADER PUBLICATIONS USPS USPS SMILEY'S COMPUTER SERVICES US CELLULAR WINDSTREAM WELLMARK BCBS TREAS STATE OF IOWA CITIZENS STATE AGENCY JOHN DEERE FINANCIAL THE MINI MART IAMU DELHI LUMBER PRAIRIE ROAD BUILDERS LESS TAXES & INS FED WH-SS-MED-IPERS-IA WH SERVICE RPGI CONNECTION USED SWITCHGEAR CEMENT SAW RENTAL JULY BILLINGS GAS 2015 CHEVROLET PICKUP PURCH PWR (401,369 kWh) LED SEC LITES, ELBOWS, LOCATOR REP 75 KVA PADMOUNT LESS SALVAGE CR 2nd QTR USE TAX SWITCHGEAR REPLACEMENT SUMMER ENERGIZER MONTHLY CASH MNGMNT FEE MAT & TOWEL SERVICE 2015 CHEVROLET USE TAX USER GROUP ANNUAL DUES FY16 IA ENRGY CNTR & CGRER ASSESS. PROCEEDINGS & SIGNATURE JUNE BILLS ENERGIZER MAILING CLEANING SUPT COMPUTER JULY SERVICE JUNE BILLING JULY HEALTH INS BAL OF 2nd QTR SALES TAX ADD'L INS ON NEW PICKUP BLADES GAS 1/3 ECIASSO DUES - JULY - SEPT SCREWS ST REPAIRS WATER: US CELLULAR WINDSTREAM JULY SERVICE JUNE BILLING $8,295.91 6,018.98 133.75 30,000.00 97.89 67.70 167.60 25,778.00 22,368.74 1,946.38 775.00 173.00 265.50 145.52 18.95 75.68 1,288.90 50.00 588.00 107.81 101.85 96.65 49.76 121.96 164.17 1,184.00 970.00 726.00 13.90 187.03 108.43 32.10 90.25 121.96 59.06 July 14, 2015 WELLMARK BCBS TREAS STATE OF IOWA CITIZENS STATE AGENCY JOHN DEERE FINANCIAL THE MINI MART IAMU DELHI LUMBER PRAIRIE ROAD BUILDERS J & R SUPPLY INC CHEMSEARCH MUNICIPAL SUPPLY INC HAWKINS MUNICIPAL UTILITES IOWA ONE CALL BARD MATERIALS KEYSTONE LAB USA BLUE BOOK IA DNR JULY HEALTH INS BAL OF 2nd QTR SALES TAX ADD'L INS ON NEW PICKUP GALV FITTINGS BLEACH 1/3 ECIASSO DUES - JULY - SEPT LUMBER & REBAR ST REPAIRS REPAIR LIDS, SDL, CORP & CURB STOP PIPE SEALANT 1" METERS AZONE PUMPING & PWR 5/20-6/18/15 MAY / JUNE NOTIFICATIONS SIDEWALK REPAIRS SAMPLE ANALYSIS STENNER RLLR & PIN ASS'Y, TEST SUP ANNUAL WATER SUPPLY FEE METER: PATRICK LECLERE MTR DEP REFUND 926.05 427.00 242.00 10.65 5.76 108.43 48.70 381.00 396.25 108.26 728.30 499.43 454.48 16.20 100.00 22.00 290.38 73.30 75.00 Motion by Guthrie, seconded by Lange, to allow the bills as presented. Ayes, all. Carried. Supt. Melchert reported on the following items: The watertower was cleaned and inspected last week but was not power washed as part of the process. The inside paint was found to be in good shape. This was noted to be the last cleaning/inspection of the 10 year contract schedule with Watertower Paint and Repair (Maguire Iron). Fransyl Repair reported that one of the rods ordered to repair the bucket truck was the wrong part and needed to be reordered which will delay the completion of the repair by at least another week. The new 2015 Chevrolet pickup has been delivered. It will be taken to Manchester this week to have it undercoated and bedliner sprayed in. Footings have been poured for the switchgear enclosure. The rest of the concrete work is scheduled to be completed this week to prepare for delivery of the unit July 29th or 30th. The damaged cement block wall along First St sidewalk has been removed and a steel replacement will be built once the switchgear unit is in place. The power outage Monday, July 13th, for the east part of town, was caused by a tree limb rubbing on a wire along College St. It is on the schedule to operate the generator next week. A discussion was held concerning the waterlines at the cemetery. Melchert informed the Board that the line along the first north/south road has several splices in it and needs to be totally replaced. Also on the agenda, is to repair the waterline to Memorial Park that was damaged when Alliant bored their new July 14, 2015 line in. He discussed the possibility of having someone from Alliant here when the repair is made as there are several high voltage lines in the area where work needs to be done. DNR recently performed their annual inspection of our water system. Everything was found to be in satisfactory condition as no deficiencies or recommendations were reported. A brief discussion was held concerning safety equipment. The superintendent informed that Board that general consensus is to fan rather than shore and he would prefer to fan any excavations than use shoring equipment. Other equipment currently being used was reviewed. Delinquent accounts were reviewed. Meeting adjourned at 7:32 pm. Receipts for June: Electric $46,809.03 Water 5,670.80 Meter 300.00 Sales tax 1,409.47 MMG 58.13 Investments Balance 6/30/15: $18,767.74 90,818.88 6,774.00 734.67 151,605.54 $35,000.00 ________________________________ Secretary ______________________________ Chairman