Loaves and Fishes Ministry Projects

advertisement
Loaves and Fishes Ministry Projects
www.loavesandfishesmin.org/Project-Page.html
Summer-Fall 2015
Pictures available upon request
Food Pantry:
1. Walls and Ceiling – construct/patch small amount of walls and ceilings that had to be removed to accommodate the new
door’s inward swing where walk-in freezer is installed. This will prevent the AC/heat from escaping into the attic.
Red Door House Mission House:
1. Deck - New 12’ x 24’ deck installed just above ground level and without railing. A 12ft section of privacy fence along the
street side end would privatize the area. Rough cut to match the adjoining fence would be nice. Pictures available upon
request.
2. Bathroom – Plumb and install 60”W x 30” deep one piece shower/tub unit in first floor bathroom. Generous, clean, dry
and lighted crawl space for easy access to install water lines and to attach drain. Tub/shower unit and hardware on site.
3. Sidewalk Flooding – Address rainwater flooding down the side walkway. Remedy will likely involve some cement.
4. Trim & Paint – Some interior trim needed. Some materials and tools on site. Paint interior doors doors and door trim.
All paint on site.
5. Doors – Several interior door sills needed.
6. Gutters – Straight run under metal roof along Liberty Street side only. One downspout.
We are now praying for God to furnish the Red Door House with the following:
Living Room: A love seat, living room chair, two smallish end tables, one 6 x 8 area rug for living room, four sets of white window sheers
(35-1/2W x 52-1/2H openings) and simple curtain hanging hardware.
Kitchen: Second electric stove, table cloths (One to fit large table with three leafs. One to fit table that seats 6).
Little House Ministry House:
1. Roof – Correct the sag of the front porch overhang by removing shingles and inspecting to determine solution. Correct
sag of SMALL roof area above the bathroom by removing shingles and inspecting to determine the solution. Remove two
chimneys and patch openings, and shingle over remaining 85% of existing shingles on the BACK HALF of the roof. Many
new shingles on site. I have the nails for a nailer. I can rent the nailer. The FRONT HALF of the house to be covered in red
metal. Any part of this project would be a blessing!
2. New Bedroom/Bathroom Addition: (This new addition is now framed, sheathed, roofed, secured with windows and
has an exterior door. Drains and cold water lines are installed. The ceiling is dry walled. The following is a list of finishing
needs we are currently praying about.):
Insulation – ceilings; 16’x20’ and 8’ x10’ (400sf - R30 15” unfaced).
Paint – prime and paint walls and ceiling.
Paint exterior door red. Paint on site.
Bedroom flooring (laminate) 16 x 20 space.
Bathroom flooring (decent peel-n-stick vinyl). 8 x 6 space.
Provide interior bathroom door and hardware. Paint both doors. Install 2 sills.
Trim - base, windows and doors (1x4). Prime and paint trim before installation.
Window blinds & curtains (2 sets).
Window privacy screen (bathroom).
Couch and love seat. Floor lamp. 8x10 or 5X7 rug.
Railing on new porch and stairs.
Stain/waterproof porch and stairs.
Bust up cement walks along the side and in front of the house. Jackhammer available locally.
After gutters installed, design and install water removal piping from downspouts. Some underground.
3.
4.
5.
6.
7.
Residence:
1.
2.
3.
4.
City of Lynch:
Porch – Paint porch floor. Paint provided.
Gutters and downspouts. Entire house including the new addition. Some changes to fascia required.
Fascia – Inspect and address gaps that allow wasps in. Likely resolve would be caulking gaps. Possibly some repair.
Interior – Install small amount of 1x4 trim around fireplace. Sand and flat polyurethane fireplace brick.
Paint (exterior) – Two sides, rear and trim of original house. Paint on site.
Fascia – Remove and discard gutters along one side of the house only. Inspection and some wooden fascia repair likely
needed.
Gutters and downspouts – Replacement needed whole house after partial fascia repair.
Crawl space – Install vapor barrier (4-6 mil plastic). Insulate basement ceiling.
Foundation – Paint foundation. Paint and supplies provided.
Cut back brush and clear stairway from city parking lot to Main Street across from the Post Office.
(The above prayer list will be updated and posted regularly and should be considered current and accurate. If you have any
questions, you may call us at 606-733-5513. Teams to provide materials for above projects unless noted otherwise.)