C. Schulz, Tobias Haas 1 March 2011 Memo: A Technical Support Group for XFEL Introduction During the construction, installation and commissioning phase as well as during eventual operation of the XFEL facility, there is a multitude of technical services to be provided to the groups building the different components and to the scientists setting up the future instruments. These services encompass Planning and installation support for the undulator systems, the photon beam lines, the photon diagnostics; Support the planning and supervise the buildup of the technical and scientific infrastructure in the experimental hall (XHEXP1), such as hutches, labs, experimental infrastructure; General support such as mechanical, electrical and electronics workshops Planning of the technical infrastructure for the office building in Schenefeld. In order to bundle these activities and to make most efficient use of human and capital resources, we propose to set up a Technical Support Group for XFEL. The scope of these activities, the organization and the size are described in this document. Scope of the Group The Technical Support Group should bundle technical support activities in order to optimize the use of human and capital resources. It should be organized in such a way as to optimally support work package activities, instruments and users of the facility. For instance, it is legally required to maintain a relatively large staff for the Technical Emergency Service (TES). However, the personnel employed for the TES can do valuable user support work around the facility such as in workshops, in maintaining the buildings and in access control to the facility while not on any particular emergency assignment. Specific Activities The technical coordination/photon systems coordination Acts as an interface between the work package leaders of WPG3 and the Project Office Supports the WPLs in their task to define the WP schedule; Supports the WPL’s documenting their activities, e. g. in EDMS; Supervises the logistics; Assigns common personnel and technical resources to the different work packages. Technical Safety (including “Technischer Notdienst”) This activity combines the legally required services of the “Technischer Notdienst” and the services provided by a safety engineer (Sicherheitsfachkraft). More details about the duties and the scope of the “Technischer Notdienst” are described in the appendix to this document. Technical User Services This activity combines mechanical, electrical and electronics workshops as well as engineering and technical user support in the experimental hall. This does not include administrative support such as user registration or guest services. These should be organized under an administrative umbrella. Facility Management Monitor and guarantee proper operation of technical infrastructure for: Laboratories (precision measurement rooms, laser rooms, clean rooms) in Schenefeld both in the office building and in the experimental hall Undulator measurement rooms in Building 36 on the DESY site, Precision air conditioning for the undulator sections (SASE1, SASE2 und SASE3) in the tunnels, Air conditioning for the server rooms in Schenefeld Air conditioning of the conference rooms, lecture theatre in Schenefeld Schenefeld campus heating This activity is on top of the services provided by WP34, which are basic cooling water, heating and power Resource requirements Human Resources 2011 1 Technical Coordinator 1 Engineer 2012 1 Technical Coordinator 1 Engineer 2013 1 Technical Coordinator 1 Engineer 2014 1 Technical Coordinator 1 Engineer 2015 1 Technical Coordinator 1 Engineer Technical User Support Technical Safety 1 Technician 1 Safety Engineer 1 Engineers 2 Technicians 1 Safety Engineer 1 Engineers 3 Technicians 1 Safety Engineer Facility Management 1 Facility Manager 1 Engineer 1 Facility Manager 2 Engineers 1 Facility Manager 2 Engineers 1 Technician 2 Engineers 4 Technicians 1 Safety Engineer 1 Technician 1 Facility Manager 2 Engineers 1 Technician 2 Engineers 6 Technicians 1 Safety Engineer 1 Technician 1 Facility Manager 2 Engineers 1 Technician Technical Coordination Note that it is foreseen to integrate all technicians within the Technical Group into the Technical Emergency Service. Only one engineer and one technician are foreseen to as exclusive to the Technical Emergency Service. Capital Resources Technical Coordination Technical User Support Technical Safety Facility Management Total Invest Consumables Travel Invest1 Consumables Travel Invest2 Consumables Travel Invest Consumables Travel 1600k 2011 2012 2013 2014 2015 10k 5k 50k 10k 10k 5k 100k 10k 10k 5k 300k 10k 10k 5k 300k 10k 10k 5k 300k 10k 10k 2.5k 10k 2.5k 50k 10k 2.5k 100k 20k 2.5k 10k 7.5k 100k 10k 7.5k 155k 10k 7.5k 405k 100k 20k 2.5k 10k 10k 7.5k 475k 10k 7.5k 465k Note that the greatest part of the investment comes from the need to equip workshops and the technical emergency service. Travel costs have been estimated at a level of 2.5k€/year per scientist or engineer. No travel cost has been foreseen for technicians. Appendix A: Plan for a Facility Management Group by C. Schulz These investments are driven by the need to equip workshops with machines These investments are driven by the need to set up a communication console/room for the Technical Emergency Service and to buy equipment. 1 2 Technical Facility Management- "Building and Technical Installations" Group with a focus on building services / construction in European XFEL GmbH Task: Organise, procure, contract and monitor measures for the operation for technical building infrastructure (1) Goal Monitor and guarantee proper operation of technical infrastructure for: - Laboratories (precision measurement rooms, laser rooms, clean rooms) in Schenefeld both in the office building and in the experimental hall - Undulator measurement rooms in Building 36 on the DESY site, - Precision air conditioning for the undulator sections (SASE1, SASE2 und SASE3) in the tunnels, - Air conditioning for the server rooms in Schenefeld - Air conditioning of the conference rooms, lecture theatre in Schenefeld - Schenefeld campus heating This activity is on top of the services provided by WP34, which are basic cooling water, heating and power. Design - Collect requirements and produce a first design and cost estimate for heating, ventilation, cooling, control, electrical and sanitary systems e.g., for laboratories, conference rooms, lecture theatre, electrical/EDP rooms, computer centre for the Schenefeld office building - Acquire and supervise planning by outside consultants for the creation of the detailed design - Supervise the acquisition process for the installation - Supervise construction (project monitoring) Operation - Participate in commissioning of the utilities transfer stations for the Schenefeld campus (beginning 2013) in order to take over maintenance management during the operation phase later on - Take care of maintenance of the general infrastructure on the Schenefeld campus once the facility is in operation (Regular inspections/maintenance of installations requiring monitoring) - Supervise operation of technical infrastructure in Schenefeld (Checking, organising and tracking of the infrastructure availability/maintaining climatic using a building management system) - Optimise operation (operation times, temperatures, humidity, etc. with the goal of reducing operating costs) - Monitor warranties (technical installations have warranty periods of 2 or 5 years from handover to the user in accordance with VOB, in the event of failure of the installation these are be to put in order by the supplier free of charge) - (2) Concept Implement energy and environmental management in compliance with current guidelines, laws and regulations (EnEV2009, EEWärmeG, Betr.SichV, BGV, fire safety regulations, LüAR, ...) and with consideration of available funds Organise and implement a Technical Facility Management Group as an independent entity with the aim of timely and cost-effective, demand-oriented technical building installations. (3) Implementation Civil Construction from 2010 - Organise collection of requirements for the calls for tender for the alteration work for the precision measuring rooms in building 36 on the DESY site and supervise the construction (in cooperation with ZBau/ DESY)- This task is currently on going - Participate in planning of the space requirements in the Schenefeld office building. - Organise calls for tender for laboratories/measuring rooms e.g., in the Schenefeld office building – This task is currently on going from 2015 Supervise external work by ZBau/ DESY Organise elevator maintenance Organise possible alterations Heating/Ventilation/Cooling/Measurement and Automation/Sanitary Installations from 2010 - Develop a concept and perform necessary calculations for the precision air conditioning in the undulator tunnels SASE1/ SASE2 / SASE3)- This task is essentially completed - Supervise and evaluate the CFD simulation of the air conditioning concept for the undulator tunnels, thus refining the concept - This task is in progress - Accompany the detailed design and procure the installation - Supervise construction of the air conditioning of the precision measuring rooms in building 36 (Hall V)- This task is in progress - Participate in IT infrastructure planning in AER 19 and organise electrical supply and cooling of server rooms, - Participate in the development of the conference room concept This task is in progress from 2011 - Prepare technical specification for the precision air conditioning system for the undulator tunnels, SASE1/ SASE2 / SASE3 - Call for tender for the precision air conditioning system for the undulator tunnels SASE1/ SASE2 / SASE3 - Supervise the installation and acceptance tests for the precision air conditioning system in the undulator tunnels, SASE1/ SASE2 / SASE3 - Organise regular inspections and maintenance of the precision measuring rooms in building 36 (Hall V) on the DESY site - Provide an initial design and costing for laboratories in the experimental area, laboratories, conference rooms, auditorium, electrical/EDP rooms, computer center in the Schenefeld office building - Organise the design and the tender documents for laboratories in the experimental area, laboratories, conference rooms, auditorium, canteen, electrical/EDP rooms, computer center, Schenefeld office building, with external design consultants - Supervise the construction of laboratories in the experimental area, laboratories, conference rooms, auditorium, electrical/EDP rooms, computer center, Schenefeld office building - Commission the technical installations for laboratories in the experimental area, laboratories, conference rooms, auditorium, electrical/EDP rooms, computer center, Schenefeld office building from 2015 - Organise operation of technical installations - Organise the inspection/maintenance of the precision air conditioning system in the undulator tunnels, SASE1/ SASE2 / SASE3 - Monitor the proper operation of the technical infrastructure of the facility using a building management system interface (e.g., room in office building XHEXP1 or at the entrance gate with data transfer and interface to the overall system) - Organise the maintenance of the building services installations by third-party maintenance companies or DESY depending on cost and availability - Monitor and organise the maintenance of fire protection and smoke extraction systems by third-party maintenance companies or DESY, depending on cost and availability - Organise the regular legally required (EnEV) inspection of air conditioning systems with cooling capacity > 12 kW - Implement energy management using a building management - Investigate improvements to the energy efficiency using better technologies in the future - Control the operating costs Building management of office building from 2010 Plan office space for office building Albert-Einstein-Ring 19 Act as liaison between Eur. XFEL GmbH and the building owner / manager Take care of necessary safety installations in the building following requirements set forth by safety engineer, such as surveillance cameras/firec extinguishers/first aid equipment, etc… Monitor cleaning services agreed upon in the Host Agreement Fitting out Cost monitoring of capital Documentation (4) Human Resources Prepare, review and archive infrastructure systems documents, such as manuals, drawings floor plans, etc.… Structure of the group from 2011 onwards Group leader / Tech. Installations engineer (ventilation / cooling) 1 Tech. Installations engineer (FH) (electrical/ measurement and automation technology) - 2011 1Tech. Installations engineer (FH) (heating/sanitary) - 2012 1 Technician/Assistant - 2013 What was planned? 4 people for energy, water, electricity, heating, ventilation (Staff structure European XFEL GmbH, 2007 appendix 2- item 4.3 and 4.4 Staff for technical service and computers) Example FAIR 1 Group leader / Tech. Installations engineer, 1 Tech. Installations engineer 1 Tech. Installations engineer 2 Building engineer Example MPG (MF2000) 1 Group leader / Tech. Installations engineer, 1 Tech. Installations engineer 1 Tech. Installations engineer 2 Building engineer (5) Necessary Software CAD-Licences for building and technical installations drawings for importing the drawings, viewing them and correction of small details - ADT Same programme as ZBau/ DESY Tender documentation licences for Bills of Quantities (specifications) for importing, correcting, cost evaluation for construction work / technical building installations ORCA Same programme as ZBau/ DESY (6) Investment costs ■ Measuring equipment: approx. €10,000 ■ Licences: €4,600.00/year (2x ORCA/ 1x ADT ; cost calculation DESY) ■ Travel expenses / training: €2,500.00 / person Example: Laboratories office building Schenefeld XFEL TC Basic evaluation of the scientific requirements and the room size X X Planning and supplying basic utilities electricity, refrigeration?, heating, gas? According to XFEL load calculations Specification of the clean room classification and basic equipment such as: XFEL Techn. Facility X Staff, material transfer, media supply, temperature stability, moisture requirements, safety cabinets, special exhaust systems, heating cabinets, etc. Basics and cost determination for laboratory space based on TC requirements including media column, media washing point, laboratory cabinets including extraction, identification of internal heat loads, determining size of air conditioning, power calculation, media, lighting, etc X Detailed design, construction and installation of the clean room X Maintenance and monitoring of the operation of the facility: X Example: Office building Schenefeld XFEL TC Basic evaluation of the scientific requirements and the room size X heating electric cooling X IT Staff, material transfer, media supply, temperature stability, moisture requirements, safety cabinets, special exhaust systems, heating cabinets, etc. Basic planning and cost estimates for heating, ventilation, plumbing, refrigeration, electrical DESY Basic services X Planning and supplying basic utilities electricity, cooling?, heating, gas? According to XFEL load calculations Specifications for number, size and equipment for laboratories, such as XFEL Techn. Facility electricity X Performance compilation for basic services Organisation and taking care of preliminary design, detailed design, construction and installation of heating, ventilation, cooling, IT, electronics, control technology, laboratory planning from building interface by external planning office X Maintenance and monitoring of the operation of the facility X