WORLD METEOROLOGICAL ORGANIZATION ____________________ CBS/OPAG-IOS/OSDW2 / Doc. INF. 4 Rev. 5 (09.02.2016) _______ COMMISSION FOR BASIC SYSTEMS OPEN PROGRAMMME AREA GROUP ON INTEGRATED OBSERVING SYSTEMS Original: ENGLISH SECOND AD HOC IPET-OSDE WORKSHOP ON OBSERVING SYSTEM NETWORK DESIGN GENEVA, SWITZERLAND, 2-4 FEBRUARY 2015 TENTATIVE TIME TABLE (Submitted by the Secretariat) (as of`2 February 2015) Day Monday 2 February Time 10:00 – 12:30 Room(s) Agenda Items 7L 1.1(30), 1.2(15), 1.3(5) 2.1(30), 2.2(15) 3(25), 4(30) 6.4(30), 5(15), 6.5(30) 6.1(15), 6.2(30), 6.3(30), 6.6(30) 7(plenary discussion; formation of break-out groups; break-out groups) 7(plenary report back; break-out groups) 14:00 – 17:30 7L Tuesday 09:00 – 12:30 7L & 7J 3 February 14:00 – 17:30 7L & 7J Wednesday 09:00 – 12:30 7L 4 February 14:00 – 16:00 7L 7(report back)(30), 8(60), 9(60), 10(30) Summary outcome of break-out groups, review of draft report (110), 11(10) Note: Estimated duration (in minutes) for each agenda item is shown in parentheses. Morning and afternoon sessions last 3h, excluding coffee break of about 30 min. __________