BULGARIA - ASSIGNMENTS IN PROGRESS AS AT 15

advertisement

ASSIGNMENTS IN PROGRESS IN BULGARIA AS AT 15 MAY 2015

RAIL, AIR AND MARITIME (13)

Support for Developing Strategic Planning Capacity of BPIC

Preparation of investment initiative for purchase of rolling stock in the next programming period

Plovdiv Integrated Urban Transport Project

Pleven Integrated Urban Transport Project

Ruse Integrated Transport Project

Practical consultation during the introduction of new PMIU structures in NRIC

Navigation improvements (Battin/Belene)

Preparation of Investment project for the third line of Sofia metro - “Knyazhevo” residential area –

CCP – ”Botevgradsko shose” blvd

Stara Zagora Integrated Urban Transport Project

Assessment of the preparation process for transport projects

Support to implementation of Sofia Integrated Urban Transport project

Bulgarian Transport Strategy

Support for Sofia IUT Project - Phase II

ROADS (3)

Preparation of Hemus Motorway

Moderniastion of "Kalotina - Sofia" speedway

Construction of Struma Motorway - Lot 3

ENERGY AND SOLID WASTE (1)

Energy Utilization Plant for Municipal Solid Waste at Toplofikacia Sofia EAD

WATER AND WASTEWATER (5)

Implementation support to water projects and the OP Environment

Pilot Feasibility Study for Integrated Regional Water and Wastewater Project

Peer Review of Benchmarking and ad-hoc Support to National Regulator

TOR for the preparation of a pipeline of Feasibility Studies

Peer Review of Agglomerations and Project Costing

SMART DEVELOPMENT (0)

Download