Bid Schedule Revised

advertisement
District One
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
District Two
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
District Three
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
District Four
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
District Five
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
District Six
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
District Seven
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
District Eight
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
District Nine
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
District Ten
Bid Schedule
Item A -
Hot-Mix Asphalt Section 401
Base I
F.O.B. Vendor Plant @$______per ton
Per ton
Item B -
Hot-Mix Asphalt Section 401
37.5mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item C-
Hot-Mix Asphalt Section 401
Base II
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item D -
Hot-Mix Asphalt Section 401
Patch & Level
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item E -
Hot-Mix Asphalt Section 401
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item F -
Hot-Mix Asphalt Section 402
Wearing IV
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Item G -
Hot-Mix Asphalt Section 401
19mm Superpave
F.O.B. Vendor’s Plant
@$______per ton
Per ton
Page 1
Bid Schedule Continued
Item H -
Item I -
Item J -
Item K -
Item L -
Item M -
Item N -
Item O -
Item P -
Hot-Mix Asphalt Section
Scratch Course
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
9.5mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing I
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
4.75mm Superpave
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt Section
Wearing III
F.O.B. Vendor’s Plant
Per ton
Hot-Mix Asphalt
Plant Run
F.O.B. Vendor’s Plant
Per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
401
@$______per ton
402
@$______per ton
@$______per ton
Page 2
Bid Schedule Continued
Item Q - Surcharge for PG70-22
Item R - Surcharge for PG76-22
Binder
Binder
@$____per ton
@$____per ton
(Item R will be ordered in 400 ton increments)
Item S -
Excavation for Shoulder Paving
0 to 1000 SY @$______per sq.yd.
1001 to 2000 SY @$______per sq.yd.
2001 to 3000 SY @$______per sq.yd.
3001 and greater SY @$_____per sq. yd.
Item THMA Base 1 Shoulder Paving
0 to 100 tons @$______per ton
101 to 200 tons @$______per ton
201 to 500 tons @$______per ton
501 and greater tons @$______per ton
Item U - HMA Base 2 Shoulder Paving
0 to 100 @$______per ton
101 to 200 @$______per ton
201 to 500 @$______per ton
501 and above @$______per ton
Item V - Haul by Vendor
@$______for first ton mile and
@$______for each additional mile
Item W - Lay Down of Materials
Items A thru O, Each Site
0 to 100 tons@$______per ton
101 to 200 tons@$______per ton
201 to 500 tons@$______per ton
501 and up@$______per ton
Item X - Cleaning & Sweeping
@$______per sq. yd.
Item Y - Bituminous Material for Tack Coat
Or Prime
All Types @$______per gallon
Material furnished and applied under Item Y to be in accordance
with Section 408 of the referenced specifications, as directed
by the Engineer.
Item ZDaytime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the purchase order
quantity per paving location is less than 500 tons of Hot-Mix
Asphalt and nighttime paving is not specified.
Page 3
Item AA - Nighttime Paving Mobilization – A Mobilization for
Paving Charge of $______may be made when the Engineer directs
that the paving is to be done at night.
Item AB - Off Season Plant Opening
@$______for first day
@$______for each additional day
Item AC - Additional Heel-In Joints
@$______per lineal foot
Item AD - Skip Paving Surcharge
@$______per ton
Item AE - Mobilization for Profiling
@$______per SCO
Item AF - Pavement Profiling (Milling), square yards per SCO
Less than 250
$_____per sq. yd.
250 less than 500$______per sq. yd.
500 less than 1000$_____per sq. yd.
1000 less than 2500 @$_____per sq. yd.
2500 less than 5000 @$_____per sq. yd.
5000 and greater @$______per sq. yd.
Item AG - Pilot Truck and Driver
@$______per day
Item AH - Traffic Control Devices
@$______per Unit
Item AI - Flagger
@$______per Hour
Item AJ - Arrow Board
@$______per Day
Item AK - Milled Rumble Strips
$______per LF
Item AL – Mobilization for milled rumble strips
@$______per SCO
Item AM - Pavement Repair
$_______per Ton of HMA Base 2
Item AN - Surcharge for Warm-Mix Asphalt
$_______per Ton
For Items A-O
Vendor’s Plant Location
Page 4
Download