District One Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4 District Two Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4 District Three Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4 District Four Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4 District Five Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4 District Six Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4 District Seven Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4 District Eight Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4 District Nine Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4 District Ten Bid Schedule Item A - Hot-Mix Asphalt Section 401 Base I F.O.B. Vendor Plant @$______per ton Per ton Item B - Hot-Mix Asphalt Section 401 37.5mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Item C- Hot-Mix Asphalt Section 401 Base II F.O.B. Vendor’s Plant @$______per ton Per ton Item D - Hot-Mix Asphalt Section 401 Patch & Level F.O.B. Vendor’s Plant @$______per ton Per ton Item E - Hot-Mix Asphalt Section 401 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item F - Hot-Mix Asphalt Section 402 Wearing IV F.O.B. Vendor’s Plant @$______per ton Per ton Item G - Hot-Mix Asphalt Section 401 19mm Superpave F.O.B. Vendor’s Plant @$______per ton Per ton Page 1 Bid Schedule Continued Item H - Item I - Item J - Item K - Item L - Item M - Item N - Item O - Item P - Hot-Mix Asphalt Section Scratch Course F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 9.5mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing I F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section 4.75mm Superpave F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Section Wearing III F.O.B. Vendor’s Plant Per ton Hot-Mix Asphalt Plant Run F.O.B. Vendor’s Plant Per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton 401 @$______per ton 402 @$______per ton @$______per ton Page 2 Bid Schedule Continued Item Q - Surcharge for PG70-22 Item R - Surcharge for PG76-22 Binder Binder @$____per ton @$____per ton (Item R will be ordered in 400 ton increments) Item S - Excavation for Shoulder Paving 0 to 1000 SY @$______per sq.yd. 1001 to 2000 SY @$______per sq.yd. 2001 to 3000 SY @$______per sq.yd. 3001 and greater SY @$_____per sq. yd. Item THMA Base 1 Shoulder Paving 0 to 100 tons @$______per ton 101 to 200 tons @$______per ton 201 to 500 tons @$______per ton 501 and greater tons @$______per ton Item U - HMA Base 2 Shoulder Paving 0 to 100 @$______per ton 101 to 200 @$______per ton 201 to 500 @$______per ton 501 and above @$______per ton Item V - Haul by Vendor @$______for first ton mile and @$______for each additional mile Item W - Lay Down of Materials Items A thru O, Each Site 0 to 100 tons@$______per ton 101 to 200 tons@$______per ton 201 to 500 tons@$______per ton 501 and up@$______per ton Item X - Cleaning & Sweeping @$______per sq. yd. Item Y - Bituminous Material for Tack Coat Or Prime All Types @$______per gallon Material furnished and applied under Item Y to be in accordance with Section 408 of the referenced specifications, as directed by the Engineer. Item ZDaytime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the purchase order quantity per paving location is less than 500 tons of Hot-Mix Asphalt and nighttime paving is not specified. Page 3 Item AA - Nighttime Paving Mobilization – A Mobilization for Paving Charge of $______may be made when the Engineer directs that the paving is to be done at night. Item AB - Off Season Plant Opening @$______for first day @$______for each additional day Item AC - Additional Heel-In Joints @$______per lineal foot Item AD - Skip Paving Surcharge @$______per ton Item AE - Mobilization for Profiling @$______per SCO Item AF - Pavement Profiling (Milling), square yards per SCO Less than 250 $_____per sq. yd. 250 less than 500$______per sq. yd. 500 less than 1000$_____per sq. yd. 1000 less than 2500 @$_____per sq. yd. 2500 less than 5000 @$_____per sq. yd. 5000 and greater @$______per sq. yd. Item AG - Pilot Truck and Driver @$______per day Item AH - Traffic Control Devices @$______per Unit Item AI - Flagger @$______per Hour Item AJ - Arrow Board @$______per Day Item AK - Milled Rumble Strips $______per LF Item AL – Mobilization for milled rumble strips @$______per SCO Item AM - Pavement Repair $_______per Ton of HMA Base 2 Item AN - Surcharge for Warm-Mix Asphalt $_______per Ton For Items A-O Vendor’s Plant Location Page 4