Village of Saukville Electrical Permit Application Administered by: Village of Grafton Inspection Department 860 Badger Circle, Grafton, WI 53024-9436 p (262) 375-5305 f (262)375-5312 tjohnson@village.grafton.wi.us JOB ADDRESS: ___________________________________________________________________ Type: Residential New Commercial Alteration Industrial Addition Exempt PROPERTY OWNER INFORMATION Property owner’s name: _____________________________________________________________ Address of owner (if different than job address): __________________________________________ City/State: _________________________ Zip: _____________ Phone: ______________________ If Applicable: Lessee name: _____________________________ Address: _______________________________ City/State: _________________________ Zip: _____________ Phone: ______________________ CONTRACTOR INFORMATION Business’ name: ____________________________ Address: ______________________________ City/State: _________________________ Zip: _____________ Phone: ______________________ E-mail address: ____________________________________________________________________ License holder: _____________________________Village Electrical License #: _______________ (Please submit the separate Contractor Information Form, if not already on file.) Description of work: ______________________________________________________________ Value of Electrical work: $__________________________________________________________ PLEASE COMPLETE & TOTAL PROJECT/FEE INFORMATION ON REVERSE SIDE I hereby certify that all statements, forms, and attachments submitted hereto are true and correct to the best of my knowledge and belief: Name of applicant (please print):______________________________________________________ Applicant’s signature: ___________________________________ Date: ____________________ **Request for inspections will not be scheduled unless the permit number is supplied at the time of the request** CD 01 ITEM (CIRCLE IF APPLICABLE & INDICATE NUMBER) Quantity X Fee = TOTAL Switches & Outlets_______, 02 Incandescent Light Fixtures______, ______________________________ .60/ea___________ 03 Lighting: Mercury ____, Sodium ____, MI ____,_______________________________________________5.00/Fx___________ 06 Fluorescent Lamps per Section________________________________________________________________2.50 ea__________ 07 Reballasting/per ballast___________________________________________________________________ 1.00/ea___________ 08 Appliances - Dshwshr ____, Dispsl ____, Sump Pump ____, Whrlpool____, Tub____, Jacuzzi ____, Range____, 15 Oven____, Cook Top____, Dryer____, Water Htr____,__________________________________12.00/ea___________ 20 Furnace____, Boiler____, Unit Heater______, etc______________________________________________ 15.00/ea___________ 21 Air Conditioning - Sleeve______, Central Air______, PATC_____, to 3 Ton____ __________________ 20.00/ea__________ 24 Cost per ton after 3 Ton (Max. 50 Ton)_______________________________________2.50/ton___________ 25 RTUs 0-5 ton ______$50.00 ea, 6-25 ton______$75.00 ea, 26+ tons______$125.00____________________ 28 Fans: Bath____, Kitchen____, to 1/2HP etc.____________________________________________________ 5.00/ea__________ 30 Low voltage systems: Doorbell____, Switching Sys____, Detector____, Fire Alarm____, etc._____________ 2.00/ea___________ 34 Refrigeration – Per rack - vertical___________________________________________________________25.00/rack___________ 35 Per section - horizontal____________________________________________________5.00/sec___________ 36 Electric Heat - per Kw____________________________________________________________________ 5.00/ea___________ 37 Fuel Pumps per product dispensed at Island___________________________________________________50.00/ea___________ 38 Bus duct systems__________________________________________________________________________1.00/ft___________ 39 Generator_______ $50.00 ea, 40 Transformer & Capacitor___________ $20.00 ea,___________________________________ 41 Motors - Max. 5HP______________________________________________________________________ 6.00/ea___________ 42 Per HP over 5HP_________________________________________________________________15.00/ea___________ 43 Signs – Incandescent / Fluorescent Sign – first section________________________________________25.00_________________ 44 Incandescent / Fluorescent Sign – Additional sections________________________________ 5.00/add. sec.___________ 45 Neon & like - ____________________________________________________________________25.00 per sign____________ 46 Neon & like - _______________________________________________________________plus 4.00/trns___________ 47 Fire Alarm Systems – 1st Panel ______$50.00 ea, Additional panels_____25.00/ea,____________________________________ 49 Devices: Horn/Strobe____, Detector____, Pull Station____, Test switch_____,_______.60/ea___________ 53 Services - New or Change per Meter (includes Temporary Service or any components) 0-100 AMP_____ 40.00 ea, 101–200 AMP______50.00 ea, 201-600 AMP______75.00 ea, 601 & greater_______125.00 ea,___ TOTAL___________ 57 Meter Equipment_______________________________________________________________15.00/ea___________ 58 Sub Panels ____________________________________________________________________30.00/ea__________ 59 Feeders 50 amp & greater_________________________________________________________________25.00/ea___________ 60 Medical Equipment_____________________________________________________________________50.00/ea___________ 61 Power Outlets above 120 Volts/20 amp______________________________________________________10.00/ea___________ 62 Outdooor Lighting per Pole______________________________________________________________25.00/pole___________ 63 Trenching Minimum_____________________________________________________25.00______________ 64 Trenching – First 100’___________________________________________________25.00 ______________ 65 Additional footage ______________________________________________________.50/ft ____________ 66 Swimming Pools Above Ground___________________________________________________________30.00/ea___________ 67 In Ground / Grid________________________________________________________25.00_____________ 68 Pool Light fixture________________________________________________________15.00/ea___________ 69 Reinspection__________________________________________________________________________ 50.00_____________ 70 Inspections - After Hours_______________________________________________________________ 100.00/ea___________ 71 Rewiring, Alterations or Repairs______________________________________________________________ 25.00__________ 72 Security Systems – Panel/CPU_____ 50.00 ea + Devices: Detectors_______, Cameras_______, Other______.60/ea _________ 76 NEW HOME GROUP (140 - Swit/Out 30 – Fixtures 1 - Dishwasher 1 – Disposal 1 – Sump Pump 1 – Furnace 4 – Fans 7 – Detectors/Doorbell 1 – 200 Amp Ung Service)____________________237.00___________ 77 Dimmers,/GFCI/AFCI _______________________________________________________________________ 6.00/ea________ 78 MINIMUM PERMIT (Only if above is less than $35)_______________________________________________ 35.00__________ 11/11 TOTAL _______________