Wisconsin Center for Applied Microelectronics 1550 Engineering Drive Madison, WI 53706 Phone: 608/262-6877 Fax: 608/265-2614 OPERATING PROCEDURES Metal E-Beam Evaporator Rev. 01/07/15 Table of Contents Vent & Load First/Single Depositions Additional Depositions Vent & Unload Crystal Change Material Data Information Material Restrictions: All materials on your sample must be on the “allowed materials list” for this tool before using it. NO EXCEPTIONS. It is the user’s responsibility to make sure that the material(s) they are putting in a tool is on the allowed materials list for that tool. Here is how to check the Allowed Materials list for WCAM tools: 1. 2. 3. 4. Go to WCAM’s website at: http://wcam.engr.wisc.edu/ Click on the “Chemicals in the Lab” link. Click on the link at the top of the page “LIST OF APPROVED MATERIALS”. Scroll thru the document to find the tool you want to check the materials list for or hit Ctrl + F to bring up a search bar for the document and type in the tool’s name that you want to check the materials list for. 5. If the material(s) that you want to use in a tool are not on the approved list for that tool you may not put your sample in the tool. If you have no other way to process your sample and think it makes sense to use a particular material in a tool you may request that it be added to that tool’s material list by filling out the form on the “Chemicals in the Lab” webpage listed as “New Material Request Form”. Then email your material request form along with a MSDS for the material to the WCAM lab manager. The request will be reviewed by the WCAM advisory committee and you will get an email back from the lab manager approving or denying your material request for a particular tool. Page 1 Document1 Vent & Load OPERATING PROCEDURE Metal Evaporator Rev. 2/8/2016 Pre-Run Check 1. Ensure that the Cryo pump is on. The temperature should read 20K. 2. Ensure that the CVC AVC-485 is in AUTO mode. 3. Ensure that the water-cooling valve is closed (fully counterclockwise). 4. Check the pressure in the system to see if it is less than 2E-6 torr. If it is not check the log book to see if a recently opened system explains the high pressure. Contact staff if there is a problem. Vent 1. Ensure the Ion Gauge is OFF 2. Press VENT on the left side of the Automatic Valve Control. 3. Wait for the Atmosphere Lamp to light green.. 4. Turn and hold the HOIST switch in the RAISE position. The bell jar will lift. Release the HOIST switch once the bell jar has risen above the substrate holder. Page 2 Document1 Caution: Before working inside the chamber verify there is no high voltage present by touching the hearth and high voltage leads with the grounding rod. Loading the Substrates There are two choices for mounting samples in the evaporator: 1) On a wafer dome. This is a good Upper Level choice if your samples are whole wafers and you want to coat many of them at once. Domes are available with openings for 3” or 4” wafers. 2) On the small-parts mount, placed in the drop-in holder on the upper level of the chamber. This mount will hold small or irregularly shaped piece. Page 3 Document1 WAFER DOME DOME & UPPER LEVEL – Loading your substrates (continued) IF YOU ARE LOADING YOUR SAMPLE ON THE UPPER LEVEL: 1. There are three substrate holders: a 3” wafer dome, a 4” wafer dome and a square drop-in for use with the small-parts mount. 2. Remove the substrate holder you want to use from the dry box and place it on the tabletop. 3. If you are using the small-parts mount, attach your samples to it and place it in face down in the square opening of the substrate holder. If you are using one of the wafer domes, place your samples in the openings, and place “dummy” wafers into any wafer positions that you are not using. 4. Pick up the substrate holder by placing the “dome tool” into the hole in the dome or the hole in the angle on top of the square drop-in holder. 5. Using the “dome tool”, place the substrate holder on the upper level of the rack in the chamber. Position the substrate holder onto the support ring, pushing it back until the substrate holder rests against the posts on the back of the support ring. U THE 4” WAFER DOME, WITH WAFERS, IN THE CHAMBER RACK PPER LEVEL Page 4 Document1 Prepare the evaporator for deposition The mounting method you choose will affect the way you set up the film thickness monitor. LTHICKNESS MONITOR CRYSTAL OWER LEVEL Page 5 Document1 1. Check crystal life – push #1 on Keypad for LIFE, reading should be < 15%. a. XTAL is above the substrate holder. This is active when the shutter is open or closed. 2. Clean or replace mirror. Pull the mirror up and out of the metal mirror holder, DO NOT loosen the metal mirror holders 3. Place your materials in the hearth. OPEN the shutter and reach through the shutter opening to place the material in the hearth. Ensure you know what direction to turn the hearth rotation to change the materials during the deposition. 4. Close the shutter under the substrate. Ensure that you understand the proper direction to turn the shutter handle. 5. Turn and hold the HOIST switch in the LOWER position. The bell jar will lower. Release the HOIST switch once the bell jar is resting on the collar. Page 6 Document1 Pump down 1. Using the controller labeled CVC AVC-485: a.) Press START on the Automatic Valve Control After the system has been roughed out by the mechanical pump it will cross over to the Cryo Pump. You must be in attendance of the system to make sure that this happens and that it begins to pump down properly. b.)Wait (typically <1 hour) for the system to reach a low base pressure of less than 2.1e-6. 2. The base pressure can be checked on the Ion Gauge Controller after the low pressure gauge has gone to zero. a.) Press the FILAMENT ON/OFF switch to light the filament. b.) Read the pressure on the display above the switch. 3. Record your information in logbook: a.) Today’s date b.) Your Name c.) Time you started d.) Time you started to pump down. Page 7 Document1 First/Single Deposition OPERATING PROCEDURE Metal Evaporator Rev. 2/8/2016 Program the Rate Monitor 1. Log onto CRESS. a. If you are using WCAM Gold or Gold-Germanium, input the thickness you will deposit and pick the correct material from the list. If you are depositing other material or you are using your own gold or gold-germanium source material, pick ”Other Material.” 2. Turn ON the POWER switch on the XTC front panel if it was turned off. 3. On the XTC RATE MONITOR: a. If an Err 1 appears on the display, press START to clear. b. Press PROG to enter the program mode. c. Press and hold E until the cursor is at DENSITY. Using the numeric keypads enter the density of the material you want to evaporate, then press E . d. The cursor should now be at Z-RATIO. Using the numeric keypads enter the z-ratio of the material you want to evaporate, then press E . UPPER LEVEL – Advance the cursor until TOOLING FACTOR #1. Ensure that the tooling factor is correct. If not, using the numeric keypads enter the tooling factor then press E . If your samples are mounted on the upper level of the chamber, the tooling factor for XTAL 1 is 85%. e. DOME – If your samples are mounted on the Dome, the tooling factor is 48.7 %. f. Press PROG to exit the program mode. g. Ppress STOP and RESET. h. Press MPWR on the XTC to use the manual power control. It should read MANUAL in lower right corner of display. Page 8 Document1 Deposition Pressure must be < 2E-6 torr before starting. 1. Turn ON the cooling water using the valve on the back of the right side panel. Interlock should all be GREEN. 2. Turn KEY LOCK ON to the power supply. 3. Press MAIN POWER ON. Ensure all the green interlock lamps are lit. Page 9 Document1 4. Press the green HV ON push button. Observe the proper high voltage reading on the HV meter. (IF required adjust using the VOLTAGE ADJUST potentiometer to read 10.00 KV.) 5. Ensure the SOURCE EMISSION CURRENT ADJUST potentiometer is fully counter-clockwise (0). 6. Press the green SOURCE FILAMENT ON push button. 7. Slowly increase the SOURCE EMISSION CURRENT ADJUST potentiometer to the desired deposition condition. 8. Inspect the e-beam on the crucible for correct position. It may be necessary to adjust the ebeam. 1. STOP button – Displays STOP Use the lateral and longitudinal POSITION potentiometer to adjust location of the beam. The AMPLITUDE is the distance range of the e-beam oscillation. Page 10 Document1 The FREQUENCY is the rate of oscillation. 9. Open the shutter and simultaneously press #2 on Keypad to ZERO the deposition on the XTC monitor. 10. Watch the thickness value on the monitor until it reaches the desired deposition thickness. Close the shutter at the proper deposition thickness. 11. SLOWLY Decrease the SOURCE EMISSION ADJUST potentiometer to zero. 12. Press the red SOURCE OFF push button. 13. Press the red HV OFF push button. 14. Press STOP on XTC monitor. 15. If you are completely done with all layers, press MAIN POWER OFF and turn the KEY LOCK OFF. 16. If you are doing only one deposition then let the source cool for 20 minutes before turning off the water. 17. If you are not done and you need to deposit another layer let this source cool for 10 minutes before rotating the turret to the next material. Continue with the ADDITIONAL DEPOSITION section. Page 11 Document1 Additional Deposition OPERATING PROCEDURE Metal Evaporator Rev. 2/8/2016 Program the Rate Monitor 1. To deposition another layer on top of the previously deposited layer, rotate the hearth to the crucible containing the new material. 4. Reprogram the XTC RATE MONITOR for the new layer: a. If an Err 1 appears on the display, press START to clear. b. Press PROG to enter the program mode. c. Press and hold E until the cursor is at DENSITY. Using the numeric keypads enter the density of the material you want to evaporate, then press E . d. The cursor should now be at Z-RATIO. Using the numeric keypads enter the z-ratio of the material you want to evaporate, then press E . e. Press PROG to exit the program mode. f. Press STOP and RESET. g. Press MPWR on the XTC to use the manual power control. It should read MANUAL in lower right corner of display. NOTE: If the thickness of the previous layer is larger than the additional layer, use the previous layer’s z-ratio. If the thickness of the previous layer is thin compared to the additional layer, use the additional layer’s z-ratio. If the thickness of both layers is similar, use a weighted average of their z-ratio. Page 12 Document1 Deposition 1. The cooling water should be ON. 2. Turn KEY LOCK ON to the power supply. 3. Press MAIN POWER ON. Ensure all the green interlock lamps are lit. 4. Press the green HV ON push button. Observe the proper high voltage reading on the HV meter. (If required adjust using the VOLTAGE ADJUST potentiometer to read 10.00 KV.) 5. Ensure the SOURCE EMISSION CURRENT ADJUST potentiometer is fully counter-clockwise (0). 6. Press the green SOURCE FILAMENT ON push button. 7. Slowly increase the SOURCE EMISSION CURRENT ADJUST potentiometer to the desired deposition condition. Page 13 Document1 1. STOP button – Displays STOP NOTE: If the 8. Inspect the e-beam on the crucible for correct position. It may be necessary to adjust the ebeam. 9. Use the lateral and longitudinal POSITION potentiometer to adjust the location of the ebeam. The AMPLITUDE is the distance range of the e-beam oscillation. The FREQUENCY is the rate of oscillation. 10. Open the shutter and simultaneously press #2 on Keypad to ZERO the deposition on the XTC monitor. 11. Watch the thickness value on the monitor until it reaches the desired deposition thickness. Close the shutter at the proper deposition thickness. 12. SLOWLY Decrease the SOURCE EMISSION ADJUST potentiometer to zero. 13. Press the red SOURCE OFF push button. 14. Press the red HV OFF push button. 15. Press STOP on XTC monitor. 16. If you are completely done with all layers, press MAIN POWER OFF and turn the KEY LOCK OFF. 17. If this is the last deposition then let the source cool for 20 minutes before turning off the water. 18. If you are not done and you need to deposit another layer let this source cool for 10 minutes before rotating the turret to the next material. Continue with the ADDITIONAL DEPOSITION section. 19. Log off of CRESS Page 14 Document1 Vent & Unload OPERATING PROCEDURE Metal Evaporator Rev. 2/8/2016 Cool Down and Vent 1. Log off of CRESS if not already done 2. Ensure the MAIN POWER OFF and the key lock is OFF. 3. Turn OFF the cooling water. 4. Turn OFF the ionization gauge. a. On the Ion Gauge Controller press and release the FILAMENT ON/OFF switch to turn off the filament. 4. Press VENT on the left of the Automatic Valve Control. 5. Wait for the Atmosphere INDICATOR light to turn Green. 6. Turn and hold the HOIST switch in the RAISE position. The bell jar will lift. Release the HOIST switch once the bell jar has risen above the substrate holder. Caution: Before Working inside the chamber verify there is no high voltage present by touching the heath and high voltage lead with the grounding rod. Page 15 Document1 Unloading 1. Remove substrate holder from the support ring Pick up the substrate holder by placing the “dome tool” into the hole in the dome or the hole in the angle on top of the square drop-in. Remove the substrate holder from the system. Set the substrate holder onto the tabletop. Unload your substrates from the substrate holder. Unload any “dummy” wafers. Replace the substrate holder into the dry box. 2. Remove your materials from the hearth. OPEN the shutter and reach through the shutter opening to remove the materials from the hearth. Place the materials back into the proper locations in the dry box. Record deposition parameters in logbook. 3. Turn and hold the HOIST switch in the LOWER position. The bell jar will lower. Release the HOIST switch once the bell jar is resting on the collar. Page 16 Document1 Pump down Using the controller labeled CVC AVC-485: b.) Press START on the Automatic Valve Control After the system has been roughed out by the mechanical pump it will cross over to the Cryo Pump. You must be in attendance of the system to make sure that this happens and that it begins to pump down properly. Log the time that you are out of the system in the log book and changed the use indicator sign to “System Available” Page 17 Document1 CHANGING THE CRYSTAL SENSOR 2/8/2016 To replace crystals, following the instructions below: 1. The Crystal Sensor is located below the lower sample level and above the shutter level. (Fig 1) 2. It needs to be changed when the Crystal LIFE is greater than 15%. 3. To Change the Sensor: 4. Remove the sensor holder by pulling it straight away from the water cooled base. (Fig 2) 5. The sensor is held in the holder by a few small tabs around its circumference. (Fig 3) 6. Push the used sensor out by applying a small force to the exposed section on the front. 7. Install a new sensor into the holder by placing the sensor into the tabs from the back and applying a small force to seat the sensor between the tabs. 8. Install the holder back into the water cooled base. 9. Verify the sensor LIFE is now zero. Fig 1 Fig 2 Fig 3 Page 18 Document1 MATERIAL DATA INFORMATION Aluminum Chromium Copper Germanium Gold Gold /12% Ge Iron Molybdenum Nickel Palladium Platinum Silicon Silver Tantalum Titanium Tungsten Zirconium Al Cr Cu Ge Au Au/Ge Fe Mo Ni Pd Pt Si Ag Ta Ti W Zr Density g/cc 2.70 7.20 8.93 5.35 19.32 17.64 7.86 10.20 8.91 12.00 21.40 2.32 10.50 16.60 4.50 19.30 6.51 Z-Ratio 1.080 0.305 0.437 0.516 0.381 0.301 0.349 0.257 0.331 0.357 0.245 0.712 0.529 0.262 0.628 0.163 0.600 Melt Point °C °C 660 1890 1083 937 1062 1535 2610 1453 1550 1769 1410 961 2996 1675 3410 1852 Page 19 Document1 vapor pressure @ temp °C 1.00E-08 1.00E-06 1.00E-04 °C °C °C 677 821 1010 837 977 1157 727 857 1017 812 957 1167 807 947 1132 858 1592 927 842 1292 992 847 1960 1067 2117 1477 998 1822 1072 992 1492 1147 958 2240 1235 2407 1702 1180 2117 1262 1192 1747 1337 1105 2590 1453 2757 1987 Page 20 Document1