Method Statement Guidance This document should be read in conjunction with other, more specific, Health and Safety Policies, Guidance, Information sheets and other guidance as is appropriate Department Safety, Health and Environmental (SHE) Author Jo Smith / Claire Doran Authorised by Pro-Vice Chancellor, Operations Implementation by SHE Department Document Control No. GUI/HS/13-14/021 Document Replaced New Document Version No. V1 Approval Committee n/a Date Approved 25/11/13 Minute No. n/a Status Draft/Approved/Uncontrolled Implementation Date 25/11/13 Period of Approval 3 years 124/11/16 Review Date What is a method statement? A method statement (MS), sometimes referred to as a safe work method statement (SWMS) or a safe work procedure, is a part of a workplace safety plan. It is predominately to describe a document that gives specific instructions on how to safely perform a work related task, or operate a piece of plant or equipment. Under the Health and Safety at work Act etc. 1974 the employer must ensure so far as reasonably practicable the health, safety and wellbeing of its employees, furthermore it must ensure that there is suitable information, instruction, training and supervision of its employees. The method statement is a response to this legislation and is generally used as part of a safety induction to a task and then referred to as required throughout a workplace. The statement is generally used to outline all the hazards that are likely to be encountered when undertaking a task or process and provide detailed guidance on how to carry out the task safely. The MS will establish any hazards associated with the task and a risk assessment must be produced, as required by law. Who completes the Method Statement? You. If you are responsible for the task within the department or if you are the supervisor of the task. Then you must complete the paperwork process. You must complete all sections of the method statement and attach all documents that are mentioned in the MS and referenced. You must make sure that all those involved with the task are aware of the method statements existence, its sequence, emergency procedures and what to do if changes are to be made. The line manager must also register his/her understanding of the document and agree to its process. Completing the form Ensure you input as much detail as possible. Guidance has been provided in blue type which can be deleted from your document. If needs be consult with other staff members to ensure all points to the task are covered. Ensure that all paperwork is kept in the vicinity of the task for future reference or in your department Health and Safety Folder. The SHE Dept. are available to review documents if you require and offer guidance if necessary. You can contact us on 01978 29(3423) or email healthandsafety@glyndwr.ac.uk A blank form can be found on Glynfo Document1 GUI/HS/13-14/021 Method Statement Job Name Job Ref. Put job name here Input a ref number Method Statement for: Very brief description of the task or job title Prepared by Date Document Ref. Issue Name in Block Capitals Date MS Written Ref number Issue no. Line Manager Name Line Manger Signature Date Approved/Declined/Amended Name in Block Capitals Signature Date MS Status Declaration (All those involved in the task must sign here to agree they understand the task and what is contained within the document) I confirm that I have read or the document has been read out to me and that I understand the contents and agree to abide by them: Signed Date Continue on separate sheet if necessary. Document1 GUI/HS/13-14/021 Method Statement Scope Provide a brief description of the task? E.g. the method statement covers the engineering works and building works associated with digging a trench. Resources State what resources are needed to complete the task? List the staff, machinery and plant to be used. Method Sequence Provide a detailed work schedule based on the scope. Ensure that any preparatory work is included e.g. barriers required, communication with those the task affects etc. Number and list the sequence of the task e.g. 1. Close area off for access by non-employees 2. Put signs up directing flow of traffic References The following documents have been considered in the above method sequence: (think about including University policies and procedures) 1. Room Drawings 2. HSE Guidance Documents COSHH Identify any COSHH implications and or relevant to the task if so you need to mention it here and attach COSHH risk Assessments and MSDS sheets to the back of this document. Keep the documents at the point of use. Department Rules Materials and Equipment List any materials used and the rules relating to them e.g. All hand held tools are to be inspected prior to use at regular intervals and then placed back where they came from. The equipment used must be fit for purpose Personal Protective Equipment List the PPE that the staff/student is mandated to wear. This must not be allowed to be deviated from. Training List the training requirements needed for the task to be completed. E.g. if using a ladder for the task has the person completed a working at height training course? Include relevant documents to prove training and competency. Only competent persons are to carry out the task. Estate Arrangements Ensure you know if there are any specific rules for the area the task is being completed in. For example you may but putting up a shelf and there is asbestos present. Are there any restrictions to the area such as only trained personnel allowed? Manual Handling What manual handling is required during the task, you must endeavour to eliminate lifting, can you use mechanical aides, use safe handling techniques, seek assistance if item/task is heavy Environmental Document1 GUI/HS/13-14/021 Identify within the task any impact on the environment around you? Are you using substances that need to be removed by licensed carrier? In the event of a spill what will you do, in the event of escaped gases what will you do? Access and Egress The rooms being used must be kept tidy at all times ensure fire exits are not blocked ensure a briefing session has occurred to let all know of the rules of the room. Access and egress is only for those undertaking the task. Emergency Arrangements First Aid What provisions do you have in place, who is the first aider, where is the nearest kit, is it suitable and sufficient for the accidents that may occur as a result of the task? E.g. welding = burns = burns kit. How do you get hold of a first aider, where is the nearest hospital how long does it take to get there. What other equipment and training is required? Fire In the event of a fire you must evacuate, where is this done to and do you have all those with you who were in your care. Detail here that you will brief the persons in your care of the procedures. Accident/Incident reporting All accidents/incidents/near misses must be reported to the Supervisor – what is the department’s procedure, what is the Universities procedure? You must ensure that you report the incident as soon as possible it may require further investigation. Document1 GUI/HS/13-14/021 Management of Change If during the course of the task it is found that there is a need to carry out procedures other than those detailed on the method statement? Then you must STOP, TAKE 5 minutes and assess the situation, amend the method statement and risk assessment, state and record any changes made. Significant changes If there is significant changes required to the method statement the task must STOP and the method statement and risk assessment revised. Minor Changes If during the course of the task there is need to take minor adjustments to the method statement the following section(s) must be completed. ALL changes must be briefed to all relevant persons, signatures must be gained to confirm re-briefing Minor Changes This method statement and associated risks should only be changed in consultation with those involved in the task and/or the supervisor/line manger Section Change agreed by: Change debrief completed by Document1 Name Name Name Name Signature Date & Time GUI/HS/13-14/021