11 KV INDOOR BUS BAR 13. Bus Bar Supporting Insulators (broken/chipped, etc) 14. Bus Bar Spout 15. Feeder Cable Spout Yes - Should be OK and no damage Yes - - - Yes - - 16. Vermin Proofing Yes - - - 17. Cleaning of Bus Bar - Yes - - Should be OK as per design, intact, secured and no stresses. Should be OK as per design, intact and no stresses. Should be as per design, intact and secured Should be OK. Clean and no dust, etc. Tests on 11kV Bus Bar 18. Insulation Resistance test (Megger test) - Yes - 19. DC Hi Pot Test - - Yes - Contact Resistance Test for Electrical Joints - Yes - Should be as per commissioning test results and/or specifications after correction of test results at 20 °C Should be as per commissioning test results and/or specifications Good electrical joint has resistance ≤ 5µΩ 1 9. MAINTENANCE OF STATION GROUNDING SYSTEM A typical Earth Mesh of Grounding System at Grid Station Equipment Grounding Connection with Earth Mesh Overhead Ground Conductor Shield/Sky Wire Connections 2 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF STATION GROUNDING SYSTEM Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Earth Mesh Layout Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. - - - - 3. Equipment Ground Connections (each equipment) 4. Fence Ground Connections 5. Station Building Ground Connections 6. Laying of Overhead Ground Conductor Shield/Sky Wire and Angle of Protection 7. Overhead Ground Conductor Shield/Sky Wire Connections with earth mesh, Condition, Fittings, Tension or Sag 8 Direct Earthing of Overhead Ground Conductor Shield/Sky Wire at Earth Mast 9. Earth Mesh Conductor Condition and Connections with Earth Electrodes Yes - - - Should be OK as per Approved Earth Mesh Layout Plan Should be OK and intact as per design - Yes - - - Yes - - Yes - - - - - Yes - Yes - - - Should be OK and intact as per design - - - Yes Should be OK and intact as per earth mesh design/earth mesh layout plan. Check by digging the earth as applicable Yes - - Should be OK as recommended (should be < 2 Ω) - - Yes Should be OK and intact as per Tests 10. Earth Resistance Test (at Each Equipment Ground Connections) 11. Earth Mesh Integrity - Should be OK and intact as per design/earth mesh layout plan Should be OK and intact as per design (separate mast) Should be OK as per design. A 30° angle from top of the structure should be sufficient to protect the area. Should be OK and intact as per design 3 Test (at Each Equipment design. Comparison of the test Ground Connections) with results with commissioning test 300 A Primary Injection results and/or previous test results Test Set and/or with Proper can also be a reference. Test Set Note. In heavy polluted areas, give special attention to equipment ground connections and grounding copper conductor. Follow special instructions in this regard if any. 4 10. MAINTENANCE OF 11KV CIRCUIT BREAKERS 11kV Circuit Breakers Panel Board at 220kV G/S NTDC NKLP Lahore 5 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF 11 KV CIRCUIT BREAKERS Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Abnormal Sound and Smell 3. Panel Board Indication Lamps 4. Operation Counters Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - Yes - - - - - - - There should be no abnormal noise, sound and smell Should be OK and intact as per design Should be OK and intact and operative Should be OK and intact as per design Should be OK and intact, tight and secured - - - - - - Should be OK and intact and operative - - Should be OK and tight and secured - - Should be OK and no defect/damage Yes 5. Panel Board Indicating Yes meters 6. Panel Board Ground Yes Connections (I/C and last O/G panels) 7. Inter-Panels Ground Yes Connections 8. LV Compartment: Yes Doors, Door locks, Door packing, Door stops, Light, Cleaning, Vermin proofing, Ground connections, etc. 9. Space heaters & Yes Thermostat setting if applicable 10. Wiring and Terminal Yes Blocks 11. Protection Relays and Yes Accessories Note. LV Compartment are normally sealed change CB Trolley & Compartment 12. Trolley Rack IN/OUT Yes way and Floor Level 13. Oil Replacement (for Yes Should be OK and intact, tight and secured Should be OK and no defect/damage so the inspection and maintenance frequency may - - Should be OK and no defect/damage - - * Replace oil after 6-10 tripping 6 OCB) and/or* 14. SF6 Gas Pressure (for GCB) Yes and/or* - 15. Contact Wipe Check (for VCB) Yes and/or* ] 16. Doors, Door locks, Door packing, Door stops, Cleaning, etc. 16. Auxiliary Plug Connector 17. Panel Ground Connections 18. Trolley Rack In/Out Guide Ways 19. Arm Contacts (Bus Bar/Cable Side) 20. CB Mechanism (Inspection, Cleaning, lubrication, etc.) 21. Trolley Rack In/Out Locking (Service, Test, and Withdrawal Positions) 22.CB Major Maintenance / Overhauling - Yes - - whichever comes first. DES of oil > 30kV at 2.5 mm gap. Oil level should be OK as per indicator. The indicator should be kept clean and visible. Should be no oil leakage * Check SF6 gas pressure after 6-10 tripping whichever comes first, should be OK as recommended and/or as per specifications. If needed makeup SF6gas pressure. Should be no gas leakage * Check contact wipe after 6-10 tripping whichever comes first, as per the method prescribed in the equipment instruction book. Should be OK as per design Should be OK and no defect/damage - Yes - - Should be intact as per design - Yes - - Should be intact as per design - Yes - - Should be intact as per design - Yes - - Should be intact as per design - Yes and/or* - - Yes - - *Should be carried out after 6-10 tripping whichever comes first and should be OK and no defect/damage Should be intact as per design - - - Yes Should be recommended specifications - Yes - Yes - Should be OK and intact as per design Should be OK and intact as per design Yes - Bus Bar & Cable Compartment 23. Bus Bar & Cable Spouts 24. Alignment of Trolley Contacts with Bus Bar & Cable Spouts. Means for physical verification of contact grip. 25. Power Cable Termination - carried and/or out as as per Should be OK and intact as per design. Should have no stresses 7 26. Power Cable Sheath/shield Grounding 27. O/G Panel CT (Mounting, cleaning, connections, etc.) 28. I/C Panel CT/PT (Mounting, cleaning, connections, etc.) Tests 29. Insulation Resistance Test (Poles, Bus Bar, Power Cables) - - Yes - Should be OK and intact and no damages Should be OK and intact/ secured as per design - - Yes - - - Yes - Should be OK and intact/secured as per design - - Yes - 30. DC Hi Pot Test (Poles, Bus Bar, Power Cables) (special test) 31. Contact Resistance Tests of CB - Yes - - Yes - 32. Vacuum Degree of VCB Interrupters (using VIDAR or DC Hi Pot set) 32. Contact Wipe Check of VCB Interrupters - Yes - - Yes - 33. Earth Resistance Test of Panel Board Ground connections Yes - - Should be OK as per commissioning test results and/or as per specifications after correction of test results at 20 °C Should be OK as per commissioning test results and/or as per specifications Should be OK as per commissioning test results and/or as per specifications Should be OK as per commissioning test results and/or as per specifications Should be OK as per commissioning test results and/or as per specifications Should be OK as per commissioning test results and/or ˂ 2 Ω 8 11. MAINTENANCE OF DC BATTERIES/STATION BATTERY BANK DC Battery Room at 220kV G/S NTDC Sammundri Road Faisalabad 220 VDC Battery Bank 9 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF DC BATTERIES/STATION BATTERY BANK Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Battery Room Exhaust Fan 3. Electrolyte Level in Cells 4. Voltage of Pilot Cell (s) 5. Specific Gravity of Pilot Cell (s) 6. Voltage of each Cell 7. Specific Gravity of each Cell 8. Battery Stand Level and Condition 9. Inter-cell Spacing and Connectors Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book.. Yes - - - Should be OK and operative Yes Yes Yes - - - - Yes Yes - - Yes - - - Yes - Should be OK as per indicator Should be OK as per specification. Should be OK as per specifications after correction of S.G. at 25 °C Should be OK as per specification Should be OK as per specification after correction of S.G. at 25 °C Should be OK as per design and no damage Should be OK as per design, adjust if required. Connector should be tightened at recommended torque. Should be cleaned with water. Do not rub the ceramic venting plugs Should be cleaned, and apply nooxide compound. Put the battery bank on manual boost charge for 24 hours Must always be available in battery room - 10. Vent Plugs or Filters of Cells 11. Cell terminals Cleaning - Yes - - Yes - - 12. Manual Boost Charge Yes - - 13. Battery Maintenance Yes Tools and Accessories (Hydrometer, Thermometer, Volt meter, Insulated Spanner, Plastic jug, Plastic funnel, PPE, etc. Tests 14. Battery Impedance Test - - - - - Yes - 15. Battery Ampere Hour - - - Yes - Should be OK as per commissioning test results and/or specifications. Replace the suspected cell/s Arrangements should be initiated for 10 (AH) Capacity Test replacement of the battery bank if test AH capacity is ˂ 80% Correction of SG at 25°C temperature S25 = St + 0.0007 (t-25) where S25 = Corrected SG at 25 °C, St = SG at temperature t °C of electrolyte, 0.0007 = assumed temperature coefficient of SG Correction of AH discharge capacity at 25°C C25 = Ct / 1 + 0.008 (t – 25) where C25 = the discharge capacity corrected at 25 °C, Ct = AH capacity at temperature t °C of electrolyte, 0.008 = assumed temperature coefficient of discharge capacity. Impedance correction at temperature 77 °F for the conventional flooded battery types or vented batteries Zb = 0.008 (Zm) / (T+30)^-0.520 Ω where: Zb = Corrected battery impedance to 77 °F Zm = Measured impedance value T = Measured temperature of electrolyte in °F Note. This formula is not applicable to Valve-Regulated or sealed cell batteries 11 12. MAINTENANCE OF DC BATTERY CHARGERS 220 VDC Battery Charger at 220kV G/S NTDC NKLP Lahore 12 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF DC BATTERY CHARGERS Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Abnormal Sounds and Smell 3. Vermin proofing 4. Cubicle: Doors, Door locks, Door packing, Door stops, Light, Cleaning, etc. 5. Front panel Indication lamps 6. DC Grounding Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - Yes Yes - - - Should be OK and no abnormal sound/smell Should be OK and intact Should be OK and no defect/damage Yes - - - Should be OK as per design - Yes - 7. Control Switches and Accessories 8. Automatic Float/Boost Function 9. Manual Float/Boost Function 10. Float/Boost Voltage Setting 11. Ripple in output DC voltage 12. Indicating Meters Accuracy 13. Under/Over Voltage Protection 14. Current Limiter Setting 15. Body Ground Connections 16. Audible Alarm Function Yes - - - Should be no grounding of + or – DC supply (give attention to grounding relay) Should be intact as per design - Yes - - - Yes - - - Yes - - - - Yes - - - Yes - Should be OK as per specifications (ripples should be < ± 3%) Should be OK As per specifications - - Yes - Should be OK as per specifications Yes - Yes - - Should be OK as per specifications Should be OK and intact and tight Yes - - - Should be OK and intact and operative Should be OK and intact and operative Should be OK and intact and operative Should be OK as per specifications 13 17. Wiring and Terminal Blocks Yes - - Should be OK and tight and secured 14 13. MAINTENANCE OF AUXILIARY SUPPLY SYSTEM Three-phase, 250KVA, 11000V/400V Auxiliary Transformers at 220kv G/S NTDC NKLP Lahore 220VDC, 110DC and 400VAC Auxiliary Supply Panels at 220kv G/S NTDC NKLP Lahore 15 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF AUXILIARY SUPPLY SYSTEM Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) Auxiliary Transformers 2. Abnormal Sounds and Smell 3. Vermin Proofing 4. Cubicle: Doors, Door locks, Door packing, Door stops, Light, Cleaning, Proper Glands for Cable Entrance, Vermin Proofing, etc. 5. Cable Terminations 6. MCB, Switches and Fuses 7. Transformer Body Ground Connections 8. Transformer Neutral Ground Connections 9. Off circuit tap changer Transformer Tests 10. Insulation Resistance Test Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - Yes Yes - - - Should be OK and no abnormal sound/smell Should be OK and intact Should be OK and no defect/damage Yes Yes - - - - Yes - - - Yes - - - - Yes - - - - Yes - - Yes - - - - - - 11. Oil DES Test Auxiliary Supply Panels (AC/DC) 12. Abnormal Sounds and Yes Smell 13. Vermin Proofing Yes 14. Doors, Door locks, Door Yes packing, Door stops, Light, Cleaning, Proper Glands for Should be OK intact and secure Should be OK and intact as per design Should be OK and intact and secured Should be OK and intact and secured Should be OK and operative As per commissioning test results and/or specifications after correction of test results at 20 °C DES value should be >30kV Should be OK and no abnormal sound/smell Should be OK and intact Should be OK and no defect/damage 16 Cable Entrance, Cable Numbering, Vermin Proofing, etc. 15. Cable Terminations Yes - - - 16. MCB, Switches and Yes Fuses 17. Ground Connections Yes - - - - - - 18. Wiring and Terminal Blocks 19. DC Grounding Relay Yes Yes - - - - - 20. No/Loss of AC supply Yes Relay - - - 21. Space heaters thermostat setting applicable 22. Cable Numbering Yes - - - Yes - & if - Should be OK and intact and secured Should be OK and intact as per design Should be OK and intact and secured Should be OK and tight and secured Should be OK and intact and functioning. Test the relay after every 6 months. Alarm and indication function should be OK and intact Should be OK and intact and functioning. Test the relay after every 6 months. Alarm and indication function should be OK and intact Should be OK and intact and operative Should be OK and intact and secured as per scheme 17 14. MAINTENANCE OF SHUNT REACTORS 500 kV 22MVAR Shunt Reactor at 500 kV Grid Station NTDC Sheikhupura 18 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS SHUNT REACTORS Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Oil level: Conservator Tank Main Specified Time Period Remarks/Criteria/Standard/Safety D/W M3-6 Y1 Y5-10 Precautions Yes Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. 3. Oil level: Bushings Yes 4. De-railing locking devices 5.Cooling System (AF): Fans Yes - - - Yes Yes - - - 6. Cooling System(OF): Oil Yes Circulation Pumps - - - 7. Oil Temperature Gauges 8. Oil Temperature Indicators 9. Winding Temperature Gauges 10. Winding Temperature Indicators 11. Ground Connections of Neutral Terminal Yes Yes - - - Should be OK as per indicator. The indicator should be kept clean and visible. Should be no oil leakages Should be OK as per indicator. The indicator should be kept clean and visible. Should be no oil leakages Should be intact as per design Should be as per transformer construction design and operative. Check for proper speed, correct direction and noisy bearings. Should be as per transformer construction design and operative. Check for correct direction and noisy bearings. Should be healthy and accurate Should be OK at local/remote Yes - - - Should be healthy and accurate Yes - - - Should be OK at local/remote Yes - - - 12. Ground Connections of Yes Body Tank - - - Measure neutral current with clipon-ammeter to ensure healthy connection between terminal and the earth mesh. Transformer neutral is grounded at two points i.e. with earth mesh and with separate earth electrode. Should be proper and tight. Measure leakage current with clip-on- 19 13. Silica-gel Breather of Yes Main Conservator Tank - - - 14. Oil Leakages all around Yes the transformer 15. Bushing Condition (HV, Yes Neutral, etc.) 16. Bushing Terminal Yes* Connections (HV, Neutral, etc.) - - - - Yes - 17. Radiator Tubes Fixture Yes - - - 18.Radiator Tubes Valves - - Yes - 19. Pressure Relief Devices (PRD)/Auto Reset Relief Vent 20. Buchholz Relay - - Yes - - Yes - ammeter to ensure healthy connection between the body tank and earth mesh. Transformer body tank has two grounding points. Bubbling in the oil indicates healthy breathing. The colour of silica-gel should be BLUE and oil in glass pot clean. If 1/3 volume of the silica-gel has changed colour into PINK then recondition of replace the whole silica-gel Should be no oil leakages Should be neat and clean, no damages and no oil leaks Dismantle connections, clean properly, apply corrosion inhibitor and fix/tight with recommended torque. Should be no hotspot/s (* check during night patrolling/thermovision survey). While handling bushing terminal connections, take care of oil sealing system, arcing horns (if provided), the spacing between electrodes should be as per recommendations and/or in accordance with 1cm per kV of the rated phase-to-ground voltage. In 500/220 transformers, tertiary winding terminals are enclosed in separate cubicle, give special attention to water proofing and vermin proofing of the cubicle. Should be secured with proper clamping/supports The valves should always be kept opened, operative and no oil leaks (the temperature of radiator tubes should be observed by touching the tubes and feeling the degree of hotness by comparison with each other tube Should be intact, no damages, and healthy micro switch and wiring terminal connections Should be operative, no damages, 20 arrow mark points toward o conservator tank, 0.5 to 1o ascending level towards conservator tank, gas sampling valve operative (in some models a separate device for gas collection is provided near ground level of the transformer tank) , no oil leaks, cover packing healthy, neat & clean, proper glands at wiring cable entrance and moisture proofing, wiring terminals tight, velocity setting (65/100/150 cm per second, factory setting is normally at 100 cm/s), etc. Control Cubicle 21. Doors, Door locks, Door packing, Door stops, Light, Cleaning, Ground connections, Proper glands at wiring cable entrance, Wiring cable numbering, Vermin proofing, etc. 22. Space heaters & Thermostat setting 23. Wiring and Terminal Blocks 24. Control Switches and Accessories Tests 25. DES test of Oil of main tank and OLTC compartments 26. Chemical Analysis of Oil Yes - - - Should be OK and no defect/damage - Yes - - Should be intact and operative - - Yes - Should be tight and secured - Yes - - Should be as per design, healthy and secured - - Yes - - - - Yes 27. Tangent Delta (Tan δ) test of Oil 28. Dissolved Gases Analysis (DGA) of oil 29. Insulation Resistance test (Megger test) of Windings - - Yes - Yes - - Yes - 30. Insulation Resistance test (Megger test) of Core and/or Clamping 31. Capacitance and Dissipation Factor test - Yes - - Yes - DES value should be >30kV, 40kV, 50kV at 2.5 mm gap for 66kV, 132kV, 220kV/ 500kV respectively Should be as per test laboratory specifications Should be as per test laboratory specifications Should be as per test laboratory specifications Should be as per commissioning test results and/or specifications after correction of test results at 20 °C Should be as per commissioning test results and/or specifications after correction of test results at 20 °C Should be as per commissioning test results and/or specifications after 21 (C&DF test) of windings and bushings 32. Winding Resistance test - - Yes - correction of %DF test results at 20 °C Should be as per commissioning test results and/or specifications after correction of test results at 75 °C(*) Should be as per commissioning test results and /or factory test results Should be OK and intact 33. Sweep Frequency Yes Response Analysis (SFRA) 34. Buchholz Relay Yes functional tests; Alarm and Trip, Indications and Alarm 35. Oil temperature; Alarm Yes Should be OK and intact and Trip test, Indications and Alarm 36. Winding temperature; Yes Should be OK and intact Alarm and Trip test, Indications and Alarm 37. Pressure Relief Device Yes Should be OK and intact (PRD); Trip test, Indications (local, mechanical and remote) and Alarm Note. CORRECTION OF INSULATION RESISTANCE TEST RESULTS AT STANDARD TEMP ERATURE 20 °C Because most of the insulation materials have a negative temperature co-efficient i.e. , the resistance decreases with increase in temperature, so the IR value should be corrected to a standard temperature of 20 °C. Roughly IR value decreases to ½ of its value for every 10 °C rise in the temperature above 20 °C. So for correction at 20 °C, for every 10 °C rise in the temperature above 20 °C, increase the measured value to 2 times. Formula for accurate temperature correction calculations; IR 20 = IRt x 2^(t – 20) /10 where IR 20 is the corrected value at 20°C, t is the temperature of insulation mass and IRt is the measured insulation resistance value at temperature t °C. IR value is usually in mega ohms (M Ω). Note. CORRECTION OF WINDING RESISTANCE TEST RESULTS AT STANDARD TEMPERATURE 75 °C The measured of winding resistance value should be corrected to a standard temperature of 75 °C. R 75 = Rt (235 + 75) / (235 + t) Ω where R 75 is the corrected value at 75°C, t is the winding temperature and Rt is the measured winding resistance value at temperature t °C. 22 15. MAINTENANCE OF GIS SUB STATTION 220kV GIS System at University Grid Station Islamabad 23 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF GIS SUB STATION Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, position of opening and closing indicators, etc.) 2. Test Operation of Ventilation Fans from Control at each Entrance Door of GIS Hall 3. Test Operation of Warning Bells 4. Availability of Respirators at each Entrance Door of GIS Hall 5. Unusual Noise in Switchgear and Bus Bar Ducts 6. SF6 Gas Pressure (GCB) Specified Time Period D/W M3-6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/ Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-onammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - Should be OK defect/damage Yes - - - Yes - - - Yes - - - Yes - - - 7. Steel Structure Ground Yes Connections 8. HV In/Out Terminal Connections - - - Should be OK and no defect/damage Respirators should always be available There should be no unusual/abnormal noise Should be OK as per rated pressure/indicator and corrected at temperature 20 °C (*). The indicator should be kept clean and visible. Should be no gas leakages *(+0.025 bar for every 1°C above 20 °C) Should be OK as per design - Yes - 9. Supporting Structure Nut/Bolts/Level 10. Alignment Check of Disconnecting Switches/Isolators, as applicable Yes - - Yes - - and no Dismantle connections, clean properly, apply corrosion inhibitor and fix/tight with recommended torque. Should be no hotspot/s (check during night patrolling/thermovision survey) Should be OK as per design, and tight and secured Should be OK as per provision in design and check method (in SE Switzerland make system at Ravi GIS 24 11. Visual Check of CB Contacts Through Inspection Glass Hole, as applicable 12. CTs; Secondary Terminal Box: Cover, Cover locks, Cover packing, Cleaning, Proper glands at wiring cable entrance, Wiring cable numbering, Vermin proofing, Ground connections, etc. 13. CTs; Secondary Terminal Connections 14. PTs; Secondary Terminal Box: Cover, Cover locks, Cover packing, Cleaning, Proper glands at wiring cable entrance, Wiring cable numbering, Vermin proofing, Ground connections, etc. 15. PTs; Secondary Terminal Connections 16. Earthing connections / Terminals Control Cubicles 17. Cubicle Doors, Door locks, Door packing, Door stops, Light, Cleaning, Proper glands at wiring cable entrance, Wiring cable numbering, Vermin proofing, Ground connections, etc. 18. Control switches, Key switches, Indications, Accessories, etc. 19. Space heaters & Thermostat setting 20. Wiring and Terminal Blocks substation Lahore, this alignment is checked by inserting a Teflon pin in the check holes) Should be OK as per provision in design and check method (in SE Switzerland make system at Ravi GIS substation Lahore, provision has been made for visual check of the CB contacts through an inspection glass hole) Should be OK and no damage/no defect, water proofing & vermin proofing intact Yes - - - - - Yes - Should be tight and secured Yes - - - Should be OK and no damage/no defect, water proofing & vermin proofing intact - - Yes - Should be tight and secured Yes - - - Should be tight and secured Yes - - - Should be OK defect/damage and no Yes - - - Should be OK defect/damage and no Yes - - - Should be intact and operative - - Yes - Should be tight and secured 25 21. Operation Counter Yes CBs; Motor Spring Operating Mechanisms 22. Cubicle Doors, Door locks, Yes Door packing, Door stops, Light, Cleaning, Proper glands at wiring cable entrance, Wiring cable numbering, Vermin proofing, Ground connections, etc. 23. Control switches, Key Yes switches, Indications, Accessories, etc. 24. Space heaters & Thermostat Yes setting 25. Wiring and Terminal Blocks 26. Operation Counter Yes 27. Cleaning Yes 28. Closing Spring Motor Charging Time - - Should be intact and operative - - Should be OK defect/damage and no - - Should be OK defect/damage and no - - Should be intact and operative Yes Yes - 29. Lubrication of Yes moving/sliding/rolling parts 30. Closing Dash Pot Oil Level Yes 31. Opening Dash Pot Oil Level Yes 32. Manual Charging of Closing Yes Spring 33. Supporting Structure Yes Nut/Bolts/Level 34. CB Close/Open or ON/OFF Indication (electrical/mechanical indicators) CBs; Hydraulic Oil Pressure Operating Mechanisms 35. Cubicle Doors, Door locks, Yes Door packing, Door stops, Light, Cleaning, proper glands at wiring cable entrance, Wiring cable numbering, Vermin proofing, Ground connections, etc. 36. Control switches, Key Yes switches, Indications, Accessories, etc. 37. Space heaters & Thermostat Yes setting 38. Wiring and Terminal Blocks Yes 39. Operation Counter Yes 40. Hydraulic Oil Level Yes 41. Hydraulic Oil Replacement - - Should be tight and secured Should be intact and operative Should be OK neat and clean Should be OK as recommended (usually < 15sec) Should be OK as per recommendations Should be OK as per design Should be OK as per design Should be OK as per design - Should be OK as per design, tight and secured Should be in accordance with the actual position of CB and OK as per design - Should be OK defect/damage and no - Should be OK defect/damage and no - Should be intact and operative Yes Should be tight and secured Should be intact and operative Should be OK as per design Should be replaced as per 26 42. Hydraulic Oil Pressure 43. Hydraulic Oil Leakages 44. N2 Gas Pressure 45. Hydraulic Oil: Low Pressure Alarm and Lockout Check 46. Hydraulic Oil Filter Check recommendations Should be OK as per design Should be no leakages Should be OK as per design Should be OK as per design and remote indications Should be OK as per design, clean or replace the filter as per recommendations Should be OK as per recommendations Should be OK as per recommendations Should be OK as per design, Tight and secure Yes Yes - - Yes Yes - - - Yes - 47. Hydraulic Oil Pressure Safety Valve Function Check 48. Hydraulic Oil Pump: Cut IN/OUT Pressure Value Check 49. Hydraulic Oil Pump and Yes Accessories Mounting Structure Nut/Bolts/Level CB; Pneumatic Operating Mechanisms 50. Cubicle Doors, Door locks, Yes Door packing, Door stops, Light, Cleaning, proper glands at wiring cable entrance, Wiring cable numbering, Vermin proofing, Ground connection, etc. 51. Control switches, Key Yes switches, Indications, Accessories, etc. 52. Space heaters & Thermostat Yes 53. Wiring and Terminal Blocks 54. Operation Counter Yes 55. Rated Air Pressure Yes 56. Rated Air Pressure: Low Pressure Alarm and Lockout Check 57. Air Compressor: Air Intake Filter Check - Yes - - Yes - - - - - - - Should be OK defect/damage and no - - - Should be OK defect/damage and no Yes - Yes - Should be intact and operative Should be tight and secured Should be intact and operative Should be OK as per design Should be OK as per design and remote indications Yes - - 58. Air Compressor: Lubrication Oil Level and Condition Check 59. Air Compressor: Operation Hours Counter Check 60. Air Pressure: Safety Valve Function Check 61. Air Compressor and Accessories Mounting Structure Nut/Bolts/Level Tests - Yes - - Yes - - - Should be OK as per design, clean or replace filter as per recommendations Should be OK as per design, replace oil as recommended Should be intact and operative - - Yes - Yes - - Should be OK as per recommendations Should be OK as per design, and tight and secured 27 62. Test Operation: ON/OFF Local/Remote/Auto 63. CB Position Mechanical Indication (ON/OFF) 64. D/S or Isolator Position Mechanical Indication (ON/OFF) 65. SF6 Gas Purity Test (GCB) 66. SF6 Dew Point/Moisture Contents Test (GCB) - - Yes - Yes - - - Yes - - - - - Yes Yes - 67. Contact Resistance Test - - Yes - 68. Close/Open Time Test - - Yes - 69. Anti-Pumping Feature Check 70. Pole Discrepancy Control Feature Check (applicable in single-pole operated CBs) 71. Minimum Voltage Close/Open Test - Yes Yes - - Yes - 72. SF6 Gas: Low Pressure Alarm and Lockout Check - Yes - Should be intact and operative along with remote indications Should be correct as per actual position Should be correct as per actual position Purity should be > 97 % Dew point should be >-15°C or Moisture contents should be < 50 PPM Should be OK as recommended Should be OK as recommended. The permissible differences between timings of 3-poles and between timings of breaks within 1-pole are: Closing time: 5ms (1/4 cycle) Opening time: 3.33ms (1/6 cycle) Within breaks of 1-pole: 2.5ms (1/8 cycle) Should be OK and intact Should be OK and intact, remote indication The CB should open at 5075% voltage of rated value and close at 80% voltage of rated value Should be OK as per design and remote indications 28 16. MAINTENANCE OF POWER CABLES AND CONTROL CABLES 11kV Power Cables Connected with 132/11 kV Power Transformer Control Cables laid in Trench 132kV XLPE Power Cables Connected with 132kV GIS System at 220kV GIS University Islamabad Control Cables Coming from Cable room. 29 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECK/TESTS OF POWER CABLES AND CONTROL CABLES Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Cable Marking / Numbering 3. Cable Terminations and Shield Ground 4. Oil Pressure in OilFilled Cables 5. Patrolling along the Cable Route Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - Should be OK as per design - Yes - - - - - - Should be OK and intact and secured as per design Should be OK as recommended - Yes - - 6. Control Cables Laying (runners, cable hangers, cable raceways, cable trays, in the trenches and cable room, etc.) Tests 7. Capacitance and Dissipation Factor test (C&DF test) Yes - - - Yes - 8. Insulation Resistance test (Megger test) - Yes - Patrolling should be carried regularly, there should be no damage, no encroachment, etc along the cable route. Should be OK as per design Should be as per commissioning test results and/or specifications after correction of %DF test results at 20 °C Should be as per commissioning test results and/or specifications after correction of test results at 20 °C Note. 1. Each length of cable should be calculated according to requirements of design and route to reduce the cable joints. 2. Power cables and control cables should not be placed on the same line of the support. 3. In the three phase four wire system, the cable with four cores should be applied. The cables with three cores combined with another single cable or wire must be forbidden and the metal sheath of three core cables cannot be used as the neutral line. 4. The electric power cables which are servicing in a parallel formation, both cable type and length 30 shall be same. 5. The distance among each supporting point and bend radius should comply with the requirement of the design. 6. High and low voltage power cable and control cable should be placed in sequence. 7. DC supply and AC supply control cable should be placed in sequence. 8. Installation of Cable in Pipe; The cable pipes should be clean before the cable is installed. There should be no ponding or sundries in the pipe. When the cable is installed, the protective cover layer should not be damaged. The non-corrosive lubricant/powder should be applied. 9. Installation of cable directly buried; There may be mechanical damage, chemical damage, underground current, vibration, heat, humid substances, and insect damage to underground cable, therefore the protective measure should be applied. 10. The soft soil and sand should be covered under and on the cable no less than 100mm and the protective cover should be placed. The covered width should be more than 50mm of the two sides of the cable. The protective cover could apply concrete plate or brick. There should be no stone or other substance in the soft soil and sand. 11. The marking signs should be installed at the turning corner, straight joints connection position of cable routine at regular intervals in cable route. 31 17. MAINTENANCE OF SHUNT CAPACITOR BANKS 11kV Capacitor Bank at 220kV Grid Station NTDC NKLP Lahore 32 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS SHUNT CAPACITOR BANKS (132KV & 11KV) Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Capacitor Tank Condition Specified Time Period Remarks/Criteria/Standard/Safety D/W M3-6 Y1 Y5-10 Precautions Yes Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - 3. Capacitor Oil Leakage 4. Fuses Condition (for 11kV only) 5. De-railing locking devices 6.Bus Bar or Line Connections Yes Yes - - - Yes - - Yes - 7.Ground Connections 8. Supporting Structure Nut/Bolts/Level 9. Porcelain Insulators Condition 10.Neutral CT Condition Yes - Yes - - Yes - - - Yes - - - 11. Neutral CT Connections (P1&P2) - Yes - 12. Oil Level in Neutral CT Yes (132kV only) - - - 13. 132kV Neutral CT: Yes Secondary Terminal Box: Cover, Cover locks, Cover - - - Tank body should be intact and have no signs of bulging or rupture. OK as per indicator. The capacitor unit should be kept clean Should be no oil seepage or leakages Should be OK as per design Should be intact as per design Dismantle connections, clean properly, apply corrosion inhibitor and fix/tight with recommended torque. Should be no hotspot/s (check during night patrolling/thermovision survey). Should be OK as per design Should be OK as per design, and tight and secured Should be clean and no damage Should be OK as per design, and tight and secured Dismantle connections, clean properly, apply corrosion inhibitor and fix/tight with recommended torque. Should be no hotspot/s (check during night patrolling/thermovision survey) Should be OK as per indicator. The indicator should be kept clean and visible. Should be no oil leakages Should be OK and no damage/no defect, water proofing & vermin proofing intact 33 packing, Cleaning, Proper glands at wiring cable entrance, Wiring cable numbering, Vermin proofing, Ground connections, etc. 14. Neutral CT: Secondary Terminal Connections 15. Grounding/Discharging Switch Condition Tests 16. Capacitance Test of Bank or unit Capacitor (or C&DF Test as applicable). C&DF Test of Neutral CT - Yes - Should be tight and secured - Yes - Should be OK as per design, and operative and secured - - Yes 17. Insulation Resistance test (Megger test) of Insulators - - Yes 18. Neutral CT: Magnetizing or Exciting Current/KneePoint Voltage Test (special test) 19.Neutral CT: Current Ratio and Accuracy Test (special test) - - Yes Should be as per name plate data or commissioning test results and/or specifications after correction of %DF test results at 20 °C Should be as per commissioning test results and/or specifications after correction of test results at 20 °C Should be as per commissioning test results and /or specification - - Yes As per selected primary/secondary current ratio and /or specifications. Accuracy test results should be in accordance with the relevant Metering/ Protection core specifications. Note. 1) All capacitor units in the bank must be of the same Voltage rating and KVAR rating. 2) Upon damage of one or more capacitor units in the bank, it must be ensured to avoid voltage in excess of 110% on the remaining units in a group in each phase. 3) Before working on capacitor units, these must be discharged completely. 34 18. MAINTENANCE OF FIRE DETECTION AND FIRE FIGHTING ARRANGEMENTS Fire Fighting arrangements at Grid Station 35 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECK/TESTS OF FIRE DETECTION AND FIRE FIGHTING ARRANGEMENTS Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Fire/Smoke detectors Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. - Yes - - 3. Water Sprinkling System (heat sensors, water supply and water storage tanks, piping, valves/regulators, etc.) 4. Oil Sump below the Transformers 5. Nitrogen Gas (N2) Injection System (Surgisystem) for Transformers 6. Portable fire extinguishers chemical-foam type, CO2 gas type, etc. 7. Sand Buckets, Water Buckets, Shawls, 8. Partition Wall between Transformers Yes - Yes - Should be OK as per design intact and operative Should be OK as per design intact and operative Yes - - - Yes - - - Yes - - - Should be OK and as per design, intact and operative Yes - - - Yes - - - Should be OK and as per design, intact and useable Should be OK and as per design, and intact Should be OK and intact as per design Should be OK as per design, intact and operative 36 19. MAINTENANCE OF ARRANGEMENTS FOR WORK SUPPORT AND FACILITIES AT CONTROL BUILDING A view of Control Room at 220kV G/S NTDC NKLP Lahore 37 SOP CHECK SHEET: MAINTENANCE SCHEDULE OF ARRANGEMENTS FOR WORK SUPPORT AND FACILITIES AT CONTROL BUILDING Description of Inspection and Maintenance Work 1. Visual inspection of control and office buildings (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Safety and security arrangements, 3. Work support provisions and facilities at Control room, Relay room, Battery room, Offices, Stores, Wash rooms, etc. (cleaning, drinking water supply, standby electricity supply arrangements, emergency lights, air conditioning, doors fittings, window fittings, fire detection, fire protection and fire fighting, personal protective equipment (PPE), distribution supply boards, first-aid-arrangements, emergency exits, safety awareness arrangements of the employees, etc.) 4. Lightning Arrangements (including emergency lights) Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - Yes - - - Should be OK intact and secured as per yardstick requirements Should be intact and secure as per yardstick requirements Yes - - - Should be OK as per design, intact and operative 38 20. MAINTENANCE OF ARRANGEMENTS FOR WORK SUPPORT AND FACILITIES AT OUTDOOR SWITCH YARD AREA Outdoor Switch Yard at 220kV Grid Station NTDC NKLP Lahore 39 SOP CHECK SHEET: MAINTENANCE SCHEDULE OF ARRANGEMENTS FOR WORK SUPPORT AND FACILITIES AT OUTDOOR SWITCH YARD AREA Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Lightning Arrangements Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - security Yes - - - 4. Transformer ways Yes - - - 5. Roads/walking ways Yes - - - 6. Sanitation , rain water drainage and disposal arrangements 7. Overall cleaning and pollution free atmosphere (maintenance of lawns, dealing with wild growth, etc.) 8. Elimination or control of hazardous conditions for safety of the employees and the equipment. 9. Cable Trenches and Covers Yes - - - Should be OK as and operative Should be OK secured as requirements Should be OK operative Should be OK operative Should be OK operative Yes - - - Should be OK and cleaned, intact and secured Yes - - - Adequate safety should be made Yes - - - Should be OK and cleaned, intact and secured 3. Safety and arrangements, per design, intact and intact and per yardstick and intact and and intact and and intact and arrangements 40 21. MAINTENANCE OF ARRANGEMENTS FOR LIVING SUPPORT AND FACILITIES AT RESIDENTIAL COLONY OF THE GRID STATION Mosque at Residential Colony of 220kV Grid Station NTDC NKLP Lahore 41 SOP CHECK SHEET: MAINTENANCE SCHEDULE OF ARRANGEMENTS FOR LIVING SUPPORT AND FACILITIES AT RESIDENTIAL COLONY OF THE GRID STATION Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Safety and security arrangements 3. Drinking Water Supply Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - Yes - - - 4. Roads/Streets/walking ways/Parks 5. Sanitation , rain water drainage and disposal arrangements 6. Overall cleaning and pollution free atmosphere (maintenance of lawns, dealing with wild growth, etc.) 7. Elimination or control of hazardous conditions for safety of the residents. Yes - - - Yes - - - Should be OK intact and secured as per yardstick requirements Should be OK, clean/safe and secured as design Should be OK and intact and operative Should be OK and intact and operative Yes - - - Should be OK and cleaned Yes - - - Adequate safety should be made arrangements 42 6. MAINTENANCE SCHEDULE AND CHECKS OF PROTECTION RELAYS AND INSTRUMENTAION (P&I) Preventive maintenance is a cycle of planned inspections, work activities and tests to be implemented to get and ensure for safe and reliable performance of different equipment and infrastructure components of the grid system. The maintenance cycle or frequency of implementation is given in terms of time-periods which can be modified due to weather conditions and constraints of the man-hours and quantity of the equipment in the jurisdiction of the work crew. Periodic maintenance tests of protection relays/instruments and other devices are required to identify failure and degradation in service, so that corrective action can be taken. Because a protection scheme only operates under fault conditions, defects may not be revealed for a significant period of time, until a fault occurs. Regular testing assists in detecting faults that would otherwise remain undetected until a fault occurs. The check sheets given hereunder describe only the maintenance schedules and checks/tests in terms of what to do and when to do. For the aspect of how to do, one should consult relevant manufacturer’s instructions, TSG training course books and/or TSG technical experts. In addition to the inspection and maintenance activities given in this SOP, manufacturer’s recommended instructions are also applicable. The symbols used for time-periods for inspection and maintenance/frequency of implementation are as under: D stands for daily, W stands for weekly, M stands for monthly, Y stands for yearly. 43 A view of Relay Room at 220 kV NTDC G/S NKLP Lahore An old Model Distance Protection Relay L8b & LZ 32 at 220 kV NTDC G/S NKLP Lahore 44 6.1 MAINTENANCE OF CONTROL PANELS (CP) 45 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF CONTROL PANELS (CP) Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Abnormal Sounds and Smell Vermin Proofing 3. Indications bulbs/lamps Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multimeter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - Yes Yes - - - 4. Semaphore Indicators Yes - - - 5. Indication Test/Reset Buttons 6. Indicating Meters AC & DC 7. Audible Alarm (Hooter) 8. Control Markings 9. Doors, Door locks, Door packing, Door stops, Light, Cleaning, Proper Glands for Cable Entrance, etc. 10. Cable Terminations 11. Cable Numbering Yes - - - Should be OK and no abnormal sound/smell Should be OK and intact Should be OK and healthy as per design Should be OK and healthy as per design Should be OK and intact and operative Yes - - Yes Yes Yes - - -- Should be OK and healthy as per design Should be OK and intact and operative Should be OK as per design Should be OK and no defect/damage Yes - - Yes - 12. MCB, Switches and Fuses 13. Wiring and Terminal Blocks 14. Ground Connections 15. Space heaters & thermostat setting if applicable Yes - - - Should be OK and intact and secure Should be OK and intact and secured as per scheme Should be OK and intact as per design - Yes - - Should be OK and tight and secured Yes - Yes - - Should be OK and tight and secured Should be OK and intact and operative 46 6.2 MAINTENANCE OF PROTECTION RELAY PANELS (RP) Front view of Protective Relay Panels Back side view of Protective Relay Panels 47 SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF PROTECTION RELAY PANELS (RP) Description of Inspection and Maintenance Work 1. Visual inspection (A walk around visual inspection from ground level and keeping in view the safe limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2.Abnormal Sounds and Smell 3. Vermin Proofing 4. Relay Fittings Specified Time Period D/W M3/6 Y1 Y5/10 Yes - Remarks/Criteria/Standard/Safety Precautions Wear PPE and carry basic tools, multi-meter, clip-on-ammeter, etc. Make entries of the observations in check sheets/note book. Yes - - - Yes Yes - - - 5. Relay Indication Lamps, Flags, etc. 6. Control Number Markings 7. Doors, Door locks, Door packing, Door stops, Light, Cleaning, Proper Glands for Cable Entrance, etc. 8. Cable Terminations Yes - - - Yes - - - Should be OK and no abnormal sound/smell Should be OK and intact Should be OK and intact and secured Should be OK and intact and secured Should be OK as per design Yes - - - Should be OK and no defect/damage Yes - - - 9. Cable Numbering - - Yes - 10. MCB, Switches and Fuses 11. Wiring and Terminal Blocks 12. Ground Connections 13. Space heaters & thermostat setting if applicable Yes - - - - Yes - - Should be OK and intact and secured Should be OK and intact and secured as per scheme Should be OK and intact as per design Should be OK and tight and secured Yes - Yes - - Should be OK and tight and secured Should be OK and intact and operative 48 6.3 MAINTENANCE OF TRANSMISSION LINE PROTECTION RELAYS AND INSTRUMENTATION (P&I) SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF TRANSMISSION LINE PROTECTION RELAYS AND INSTRUMENTATION (P&I) Note. The Electromechanical relays have to be checked and tested annually as recommended below, whereas for the Numerical relays the test schedule should be on 5-10 yearly bases Description of Inspection Specified Time Period Remarks/Criteria/Standard/Safety and Maintenance Work D/W M3/6 Y1 Y5/10 Precautions 1. Visual inspection (A walk Yes Wear PPE and carry basic tools, around visual inspection multi-meter, clip-on-ammeter, etc. from ground level and Make entries of the observations in keeping in view the safe check sheets/note book. limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Distance/Impedance Yes Should be OK as per specifications Protection Relays and protection scheme 3. Over Current Protection Yes Should be OK as per specifications Relays and protection scheme 4. Earth Fault Protection Yes Should be OK as per specifications Relays and protection scheme 5. Under Frequency Yes Should be OK as per specifications Protection Relays and protection scheme 6. Under Voltage Protection Yes Should be OK as per specifications Relays and protection scheme 49 6.4 MAINTENANCE OF TRANSFORMER PROTECTION RELAYS AND INSTRUMENTATION (P&I) SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF POWER/AUTO TRANSFORMERS PROTECTION RELAYS AND INSTRUMENTATION (P&I) Note. The Electromechanical relays have to be checked and tested annually as recommended below, whereas for the Numerical relays the test schedule should be on 5-10 yearly bases Description of Inspection Specified Time Period Remarks/Criteria/Standard/Safety and Maintenance Work D/W M3/6 Y1 Y5/10 Precautions 1. Visual inspection (A walk Yes Wear PPE and carry basic tools, around visual inspection multi-meter, clip-on-ammeter, etc. from ground level and Make entries of the observations in keeping in view the safe check sheets/note book. limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) 2. Differential Protection Yes Should be OK as per specifications relays and protection scheme 3. Over Current Protection Yes Should be OK as per specifications Relays and protection scheme 4. Earth Fault Protection Yes Should be OK as per specifications relays and protection scheme 5. Restricted Earth Fault Yes Should be OK as per specifications Protection relays and protection scheme 6. Over Excitation Yes Should be OK as per specifications Protection relays and protection scheme 7. Buchholz Protection Yes Should be OK as per specifications relays and protection scheme 8. OLTC Protection relays Yes Should be OK as per specifications and protection scheme 9. Oil Temperature Yes Should be OK as per specifications Protection relays and protection scheme 10. Winding Temperature Yes Should be OK as per specifications Protection relays and protection scheme 11. Rough Balance Yes Should be OK as per specifications Protection relay and protection scheme 12. HV Connection Yes Should be OK as per specifications Protection relay and protection scheme 13. LV Connection Yes Should be OK as per specifications Protection relay and protection scheme 50 14.Over Voltage Protection relay - Yes - Should be OK as per specifications and protection scheme 51 6.5 MAINTENANCE MISCELLANEOUS PROTECTION RELAYS AND INSTRUMENTATION (P&I) SOP CHECK SHEET: MAINTENANCE SCHEDULE AND CHECKS/TESTS OF MISCELLANEOUS PROTECTION AND INSTRUMENTATION (P&I) EQUIPMENT Description of Inspection Specified Time Period Remarks/Criteria/Standard/Safety and Maintenance Work D/W M3/6 Y1 Y5/10 Precautions 1. Visual inspection (A walk Yes Wear PPE and carry basic tools, around visual inspection multi-meter, clip-on-ammeter, etc. from ground level and Make entries of the observations in keeping in view the safe check sheets/note book. limits of approach to live and moving parts to check apparent condition, abnormal noise, rust on body of the equipment and component parts, etc.) Miscellaneous Protections Note. The Electromechanical relays have to be checked and tested annually as recommended below, whereas for the Numerical relays the test schedule should be on 5-10 yearly bases 1. Bus Bar Protection relays Yes Should be OK as per specifications and protection scheme 2. Breaker Failure Protection Yes Should be OK as per specifications relays and protection scheme 3. DC Supervision relays Yes Should be OK as per specifications and protection scheme 4. Trip Coil and Trip Circuit Yes Should be OK as per specifications Supervision relays and protection scheme 5. Verification of Cross Trip Yes Should be OK as per specifications Schemes and protection scheme 6. Verification of Inter- Yes Should be OK as per specifications tripping Schemes and protection scheme 7. Annunciation Devices Yes Should be OK as per specifications and protection scheme 8. Metering Devices Yes Should be OK as per specifications and protection scheme 9. Auto Re-closing Schemes Yes Should be OK as per specifications and protection scheme Shunt Capacitor Bank Protection Note. The Electromechanical relays have to be checked and tested annually as recommended below, whereas for the Numerical relays the test schedule should be on 5-10 yearly bases 1. Unbalance Protection Yes Should be OK as per specifications relays and protection scheme 52 2. Over Current Protection Yes Should be OK as per specifications relays and protection scheme 3. Synchronous Switching Yes Should be OK as per specifications relay (if provided) and protection scheme 11kV Feeder Protection Note. The Electromechanical relays have to be checked and tested annually as recommended below, whereas for the Numerical relays the test schedule should be on 5-10 yearly bases 1.Over Current Protection Yes Should be OK as per specifications and protection scheme 2. Earth Fault Protection Yes Should be OK as per specifications and protection scheme Energy meters 1. Accuracy check and Yes Should be OK as recommended calibration of Energy meters at internal metering points in the same company 2. Accuracy check and Yes Should be OK as per calibration of Energy meters recommendations of WPPO at Cut off points/Common Department delivery points 3. Accuracy check and Yes Should be OK as per calibration of Energy meters recommendations of WPPO at IPPs connected with Department NTDC/DISCOs Note. These energy meters are to accuracy checked at the time of Annual Dependable Capacity (ADC) test 53 7. MAINTENANCE SCHEDULE AND CHECKS OF TRANSMISSION LINES Preventive maintenance is a cycle of planned inspections, work activities and tests to be implemented to get and ensure for safe and reliable performance of different equipment and infrastructure components of the grid system. The maintenance cycle or frequency of implementation is given in terms of time-periods which can be modified due to weather conditions and constraints of the man-hours and quantity of the equipment in the jurisdiction of the work crew. The check sheets given hereunder describe only the maintenance schedules and checks/tests in terms of what to do and when to do. For the aspect of how to do, one should consult relevant TSG training course books and/or TSG technical experts. In addition to the inspection and maintenance activities given in this SOP, manufacturer’s recommended instructions are also applicable. The symbols used for time-periods for inspection and maintenance/frequency of implementation are as under: D stands for daily, W stands for weekly, M stands for monthly, Y stands for yearly. 54 7.1 MAINTENANCE OF TRANSMISSION LINES 220kV Double Circuit, Twin-bundle Transmission Line 55