National Highway Authority of India PIU SOLAPUR Sub: Four Laning of Solapur-MAH/KNT Border Section of NH-9 in the state Maharashtra under NHDP Phase III B Km. 249/000 to Km. 348/800 The Government of India has mandated the National Highways Authority of India (NHAI) to implement the National Highway Development Project (NHDP). The National Highway – 9 (NH-9) connects the state of Maharashtra with Karnataka and Andhra Pradesh. This is one of the major corridors from North and West to South and vice versa. This is one of the major highdensity traffic corridors in India connecting Northern and Western India with Southern India and is a major and integral part of NHDP. The Section from Mumbai to Pune is already four laned and the section from Pune to Solapur is in the advance stage of 4 laning. The project under consideration starts from Solapur in Maharashtra and Join Sangareddy in Andhra Pradesh. The project length from Solapur to MAH/KNT Border i.e. Km 249/000 to Km. 348/800 = 100.06 Km is under PIU Solapur. The silent feature of the project length under PIU Solapur is as below: (A) Implementation Details :Sr. No. Description Details 1 Name of Project Four Laning of Solapur-MAH/KNT Border Section of NH-9 in the state Maharashtra under NHDP Phase III B Km. 249/000 to Km. 348/800 2 Name of Concessionaire M/s. Coastal and SREI (M/s. STPL) 3 Name of Independent Consultant M/s. Artefact Projects Ltd., Nagpur. 4 Name of EPC Contractor M/s. Varaha Infra Ltd & M/s. PBA Infrastructure Ltd. 5 Date of Signing of Agreement 29/02/2012 6 Appointed Date (Date of Start) 03/06/2014 7 Construction Period 910 days 8 Actual / Schedule Date of Completion 26/12/2016 of Construction work 9 Concession Period 25 years. 10 Length of Project (Km) 100.06 Km in Maharashtra. 11 Project Cost 923.04 Crores (B) Scope of Work / Silent Features of the Project :Sr. No. 1 Description The total length of project Details 100.06 Km. in Maharashtra 2 Major Bridges 5 nos. 3 Minor Bridges 28 nos. 4 Culverts 143 nos. 5 Inter changes/Flyovers Nil 6 Road Over Bridge (ROB) Nil 7 Vehicular Underpasses 6 nos. 8 Pedestrian Underpasses 2 nos. 9 Bypasses 2 nos. Naldurga Bypass - Existing Ch. 287/200 (Design Ch. 287/800) to Existing Ch. 294/700 (Design Ch. 294/300) = 6.5 Kms. ii) Umarga Bypass - Existing Ch. 327/000 (Design Ch. 326/400) to Existing Ch. 332/160 (Design Ch. 332/400) = 6.0 Kms. 46.060 Km i) 10 Service Roads 11 Major Road Junctions 8 nos. 12 Minor Road Junctions 36 Nos. 13 Bus bays with passenger shelter 14 Truck Lay byes 15 Toll Plaza 2 x 12 nos = 24 places in Both directions. 2 nos. LHS & RHS. 2 Nos. at Design Ch 280/300 (Existing Ch 281/000) Design Ch. 343/850 (Existing Ch. 343/600) Base Traffic/ (PCU)-2010 16 18611 PCU at km 256/000 18080 PCU at km 293/700 Rest Area 17 2 Nos. (C) Progress of the Project :- NIL Sr. No. 1 (D) Description Physical Progress Financial Arrangements:This is a premium project with premium of Rs. 27.99 Cr. Details NIL