Proceedings of the Niranthara Jyothi Yojana work progress
review meeting held at Conference Hall, II Floor,
Corporate Office, BESCOM on 12.03.2014
The officers present in the meeting, as per the records.
In the Chair: Managing Director, BESCOM.
Managing Director welcomed all officers for the Progress Review Meeting
of Niranthara Jyothi Yojane and reviewed the Circle Wise progress
serially as mentioned below:
1. KPTCL ISSUES
The Managing Director entrusted resolving the
KPTCL issues
pertaining to Tumkur Circle and Kolar Circle to Director (Tech) with
reference to provision of individual and independent Breakers to
Niranthara Jyothi feeders. All the KPTCL officers present were
requested to make provision for Annunciation panels for individual
Breakers identified for NJ feeders Director (Tech), BESCOM is to
resolve issues pertaining to KPTCL in BRC/Kolar/Tumkur. No KPTCL
issues were reported to be pending in Davanagere Circle.
The payment of testing and commissioning fees to RT for arranging
pre commissioning tests of Breakers is to be resolved by Director
(Tech).
The superintending Engineer (Ele), Tumkur Circle was directed to
take all the NJ feeders which are in Y-operation on independent
Breakers. SEE (O&M), Tumkur promised that the same would be
accomplished by 20th March 2014.
Page 1 of 16
2. KAVIKA ISSUES
The status of present PO placed on M/s Kavika is tabulated below:
KAVIKA ISSUES 12.03.2014
Sl.
Name of
PO issued
No.
Division
for
KAVIKA
25
Kva
1
Madhugiri
2
Chintamani
3
CB Pura
4
Nelamangala
5
Tiptur
6
KGF
7
Hiriyur
8
Ramanagar
9
Tumkur
10
DVG
11
Chitradurga
12
Kolar
13
Harihara
Total
63
Kva
Supplied
from Kavika
25
Kva
63
Kva
Balance to
be Supplied
from Kavika
25
Kva
Target
Rema
rks
Date
PO
Placed
on
10-012014
Mar-14
63
Kva
473
479
473
324
0
155
473
479
473
324
0
155
It is informed by GM(Projects) that extension orders to an extent of 25% of
the ordered quantity have already been placed on M/s Kavika, Ltd.,
Bangalore which are scheduled for completion by April 2014.
Status of Transformers.
A list of Transformer allocation to NJ phase-2 works Lotwise/division wise
is tabulated below for reference. The concerned SEEs/EEs shall verify the
table and ascertain the status of balance transformers listed in the last
column. It is directed that if any of the transformers have been diverted to
works other than NJ, then the same have to be replenished from the
Transformer Bank established in each divisional stores. Further it is noted
that a large quantity of transformers are held in stock at divisional stores.
Page 2 of 16
The concerned officers were advised to utilize these Transformers on
priority for NJ works within available guarantee period.
A. Status of 25 kVA Transformers allotted/Balance
Sl.
No.
1
Division
Nelaman
gala
Lot
As per
DWA
As per
Survey
Allot
ted
Erec
ted
Balance
to be
supplie
d as per
survey
Doddabal
apura Lot1
150
162
148
79
14
36
89
2
Nelamang
ala Lot-02
16
3
Ramana
gar Lot-03
104
4
Channapa
tna Lot-04
5
Gubbi Lot
05
120
6
Tumkur
Lot -24
84
94
72
94
22
153
155
60
48
95
7
Turuveker
e Lot-06
Ramanag
ar
Tumkur
51
25
16
12
0
4
125
60
9
12
65
51
120
108
60
12
24
48
-22
12
8
105
9
C.N.Halli
(part-11)
Lot-08
11
130
28
96
10
155
69
79
C.N.Halli
(part-1)
Lot-07
Tiptur
Avail
able
in
store
Status of
Balance
to be
furnished
by
Divisional
Executive
Engineer
(Ele)
96
108
73
-12
24
35
105
56
25
49
31
Madhu
giri
Koratager
e Lot-09
168
148
K.G.F
Bangarpet
Lot-10
195
164
81
31
12
83
148
100
22
48
12
78
Page 3 of 16
14
12
Mulabagal
Lot-11
13
Kolar Lot12
224
154
112
98
42
107
144
138
109
6
29
43
14
Kolar
Srinivaspu
ra Lot 14
15
Chintama
ni
Chintama
ni Lot-13
Chickabal
apura Lot15
16
Chickabal
lapura
79
133
173
88
23
85
65
177
84
110
93
0
-26
40
90
90
77
0
13
Gowribidn
ur Lot 16
62
Gudiband
e Lot-17
25
Chitradurg
a Lot-18
87
20
Holalkere
Lot-19
78
78
48
15
30
52
52
48
12
4
21
Challakere
Lot-20
Molakalm
uru Lot-21
156
Harihara
HariharaL
ot-22
30
61
51
25
10
33
Davanger
e
Davanger
e Lot-23
176
176
72
23
104
29
17
18
19
Chitradur
ga
Hiriyur
22
23
24
Total
103
115
43
-12
21
72
25
25
12
0
13
111
72
3
39
90
33
59
166
84
40
69
36
82
44
26
49
2482
2881
2045
1132
836
411
913
Page 4 of 16
B. Status of 63 kVA Transformers allotted/Balance
As per
DWA
As per
Survey
Allotte
d
Erected
Balanc
e to be
supplie
d as
per
survey
Doddabalapura
Lot-1
157
172
182
128
-10
143
2
Nelamangala
Lot-02
9
3
Ramanagar
Lot-03
101
4
Channapatna
Lot-04
5
Gubbi Lot 05
Sl.
No.
1
Division
Nelamang
ala
Rama
nagar
Tumkur
Lot
0
168
98
55
43
9
18
0
-9
2
156
119
28
91
142
142
132
54
10
0
23
43
20
Turuvekere
Lot-06
104
106
27
27
79
94
8
C.N.Halli (part1) Lot-07
9
C.N.Halli (part11) Lot-08
89
89
128
27
-39
91
110
128
78
-18
10
Koratagere Lot09
Bangarpet Lot10
216
99
169
129
114
40
180
190
171
162
19
7
Tiptur
Madhugiri
11
12
K.G.F
Mulabagal Lot11
13
Kolar
Kolar Lot-12
18
37
43
Tumkur Lot -24
54
70
44
6
Availa
ble in
store
Status of
Balance
to be
furnished
by
Divisional
Executive
Engineer
(Ele)
78
-20
0
94
63
77
31
18
-14
101
0
50
216
207
21
9
18
186
15
4
9
Page 5 of 16
Srinivaspura
Lot 14
241
Chintamani
Lot-13
173
Chickabalapura
Lot-15
127
Gowribidnur
Lot 16
349
Gudibande Lot17
58
Chitradurga
Lot-18
75
20
Holalkere Lot19
105
105
36
6
69
94
94
18
13
76
21
Challakere Lot20
Molakalmuru
Lot-21
1
14
15
Chintaman
i
16
17
Chickaball
apura
18
19
Chitradurg
a
Hiriyur
22
23
24
Harihara
HariharaLot-22
Davangere
Davangere Lot23
Total
182
109
38
73
71
154
92
159
62
0
-67
126
127
113
-1
14
262
279
136
-17
21
143
58
36
42
22
-6
158
54
4
104
72
30
29
12
26
1
50
5
-14
25
34
53
36
18
17
23
81
81
36
13
45
11
2807
2949
2274
1357
675
198
18
23
917
3. Electrical Inspectorate issues
The Chief Electrical Inspectorate highlighted the pendency of the case
wise and clearance up to-date. The clearance of NJ works would be
issued on top priority after submission of completion of works and
concerned drawings/documents.
Chief Electrical Inspectorate further intimated that the exemption of
super grade license is already being extended to contract firms, who
have been contracted prior to 01.07.2013 and the matter is placed
before Additional Chief Secretary for a suitable order.
Page 6 of 16
4. Progress of Niranthara Jyothi Phase-1 and Niranthara Jyothi
Phase- II 24 Lots.
CEE, Chitradurga Zone/SEE, BESCOM, Tumkur and all the officers
present in the meeting shall inspect works of all the NJ feeders within
their jurisdiction and furnish the details of the NJ feeders that are yet
to be taken off in phase-2 before Noon on 13/3/2014 without fail. The
contract firms was advised to comply with the commitments made in
the meeting towards completion/commission target provided by
themselves, any slippage would be viewed seriously and would lead to
process of Blacklisting.
Managing
Director,
BESCOM
advised
all
the
contractors
to
concentrate on the feeders that have already been started and
complete them before embarking on the new feeders.
The poor progress of M/s Deepak Cables,
M/s Transglobal Ltd.,
Bangalore, M/s Shivachetana Electricals, M/s KGN Electricals and
M/s Inland Surveyors was noted and the firms were advised to pull
up and achieve the progress as committed otherwise the projects
awarded to them would not be completed as per extended schedule.
The failure to complete the projects as per schedule would lead to
short closure and Blacklisting.
The
concerned
Chief
Engineer/Superintending
Engineers
were
instructed to list out the NJ feeders that are yet to be taken off and
provide the information to GM(Projects) for short closing the award to
the extent and arrange for retendering with revised estimates.
The incident of failure 11 kV AB cable and subsequent bursting of
cable utilized under RAPDRP part-B in Kanakpura Taluk was taken
serious note and GM(QS&S) present in the meeting was directed to
identify the Engineers responsible for the inspection and clearance
and initiate action against them and instruct the inspectors to follow
scrupulously the inspection procedures laid down by the BIS and
DWA.
Page 7 of 16
The Executive Engineers were advised to ensure that nil, villages are
there in their jurisdiction deprived of NJ benefits. Any such leftovers
will be accounted to them as personal responsibility.
All the contractors were advised to employ more manpower
and achieve the completion/commissioning as per schedule which is
already extended.
All the officers/firms shall co-ordinate positively to complete the NJ
feeder works in their jurisdiction award by April 2014 without fail.
The same has been agreed to, by all the officers/firms present in the
meeting, accordingly Managing Director, BESCOM instructed for
smooth co-ordination in the completion of NJ works in time scheduled
as committed in the meeting. An action plan with man power
deployment shall be furnished to projects as compliance.
Managing Director informed the meeting that no further extension
requests would be entertained and only disciplinary measures would
be indicated.
Director (Finance) who was present in the meeting informed about
sanctioning of loan by REC for NJ phase-2 schemes. He informed the
meeting that claims have to be sent to the REC as per the prescribed
formats before 17th March. Hon’ble Managing Director advised all the
Engineers to comply within the scheduled date.
As such GM(Projects) requested all the officers to submit the details
as per claim formats be duly filled in pertaining to the Lot/Taluk of
his/her jurisdiction on or before 17/3/2014 to enable the Corporate
Office to be able to consolidate and place before the Managing
Director, BESCOM before forwarding the same to M/s REC Limited
for reimbursement.
The
commitment
made
by
the
contractors
with
reference
to
completion and commissioning of Phase I and Phase II Niranthara
Jyothi feeder are noted below:
Page 8 of 16
Detailed Progress of NJ Phase-I
Sl.
No.
Cir
cle
2
DVG
1
DIVISION /
Taluk
LOT
No
/LOI
Date
Name of
the Firm
Ramanag
ara
Kanakap
ura-2
23
21.12
.2009
M/s.
Harihara
Honnali
5
21.12
.2009
M/s. Sree
No. of
Prop
osed NJY
Feeders
Ishwar
Ele
11
Enterpris
es
Total
No of
Feeders
comple
ted
10
Remarks
Feeders
Comple
ted/Com
missioned
from
12.2.14
to
12-3-14
No. of
feeders
Commis
sio ned
Target
for the
Balance
feeder
to be
Comp
leted/
Commis
sioned
10
1 Nos.
1.
Hooku
nda
By
20th
Mar-14
WUP
1 Nos.
Koda
thal
1 Nos.
Koda
thal
1\2
0\1
Name/
No of
feeder
to be
Commiss
ioned
before
10th
April2014
Feeders
complet
ed From
12.2.14
to
12.3.14
11
11
11
22
21
21
Detailed Progress of Niranthara Jyothi Phase-II: 24 Lots
1
BRC
SL
NO
Na
me
of
Cir
cle
Division
LOT No
taluk
name /
LOI Date
Nelama
ngala
LOT01(Dodd
aballa
pur)
/22.09.
2011
Name of
the Firm
M/s.
Maruti
Electrica
ls
No.
of
Prop
osed
NJY
Feed
ers
17
No. of
Feeders
Comple
ted
10
No. of
feeders
Commi
ssioned
7
Name/No
of feeder
to be
Comple
ted
before
10th
April2014
1 No.
Kanasa
vadi
2 Nos
1.
Kanna
man
gala
2.
Huskur
1 No
Raghu
nathpu
ra
Feeders
commiss
ioned
From
12.2.14
to
12.3.14
WUP
Page 9 of 16
2
3
Nelama
ngala
LOT-02
(Nelama
ngala)
/20.11.
2012
M/s
Transglo
bal
Power
Ltd
Raman
agar
Lot-03
(Bidadi)
/18.10.
2012
M/s
Maruthi
Mechani
cal &
Electrica
ls (P) Ltd
Raman
agara
4
Chikab
alla
pura
LOT-16(
Gouribi
danur)/
2.09.
2011
M/s ME
Electrica
ls
M/s.
Godrej&
Boyace
Mfg.Ltd
1
10
19
2
0
3
10
2
3 No's.
1.
Modala
kote
2.Hassi
ruvally
3.
Dodd
eri
WUP
0
1 No.
1.
Manchn
ayakana
halli
_
WUP
3
4 Nos
1.Mena
shigana
halli
2.
Neraloo
ru
3.
Hosahal
li
4.
Tagacha
gere
5.Devar
hosahal
li
6.Govin
dahalli
4 Nos
1.Mena
shigan
ahalli
2.
Neralo
oru
3.
Hosah
alli
4.
Tagach
agere
5.Deva
rhosah
alli
6.Govi
ndahal
li
2 Nos.
1.
Menas
higana
halli 2.
Neraloo
ru
2 Nos.
1.
Menas
higana
halli 2.
Neraloo
ru
5
4 Nos
1.
Thokah
alli
2.G.Kot
hur
3.Alipur
4.Jeela
kunte
WUP
4.Kana
ganako
ppa
2 Nos.
1.
Bandar
lahalli
2.
Namag
ondlu
2 Nos.
1.Dodd
apeyal
agurki
2.
Lingas
shettip
ura
1 No.
1.Para
sadi
nne
Kolar
5
LOT4(Chann
apatna)
/
8.07.20
13
7
3 No's.
1.
Modala
kote
2.Hassir
uvally
3. Dodd
eri
6
Chicka
balla
pura
Lot 15
(Chicka
balla
pura)
/20.11.
2012
M/s
Sealwel
Corpora
tion Ltd
11
8
6
3 Nos
1.
Konden
ahalli 2.
Kangan
ahalli 3.
S.
Gollahal
li
2No's
1.
Melya
WUP
WUP
-
Page 10 of 16
Chicka
balla
pura
7
9
10
11
12
Tumukur
13
14
M/s
Macrovi
sion
Network
1 Nos
3
LOT13(Chint
amani)
/22.09.
2011
M/s.
Godrej&
Boyace
Mfg.Ltd
Kolar
Lot-12
(Kolar)/
20.11.2
012
M/s
Pawani
Controls
&
Panels
Ltd
Kolar
LOT-14
(Srinivas
apura)
/20.05.
2013
M/s
Transglo
bal
13
KGF
LOT10(Bana
grpet)
/22.09.
2011
M/s.A2
Z
16
KGF
Lot11(M
ulabagal
u)
/20.11.
2012
M/s
Pawani
Controls
&
Panels
Ltd
Tum
kur
Lot- 05
(Gubbi)
/20.11.
2012
M/s
Transglo
bal
Power
Ltd
Tum
kur
LOT24/(Tu
mukur
Part3)/2
9.05.20
13
M/s Sri
Lakshmi
narasim
ha
Chinta
mani
8
Lot17
(Gudiba
ndae
PH
2)/2.11.
2012
15
2
1
Jangala
halli
12
14
9
WUP
1 No.
1.Buru
dugunt
e
WUP
11
2 Nos1.
Krishna
pura2.
Bellamb
uri
1 No.
1.Vokk
aleri
1 No.
Bellam
buri
2 Nos.
1.
Vokkal
eri 2.
Bellur
3
1
1 No
1.
Pulgurk
ote
2 Nos
1.
Yeldur
2.Lax
misa
gar
WUP
1 No
1.
Gollah
alli
0
0
8
2.Yagav
akote
21
1 No.
Garuda
charia
halli
2 Nos.
1. Kai
wara
2.
Mittah
alli
13
2 Nos
1.
Kaiwara
1 No
1.
Thiru
mani
13
8
7
9
Retendered due on 20.03.2014
5
1 No
1.
Domma
sandra
3
1 Nos.
1.
Bhogasa
ndra
8
-
3 Nos.
1.Rajen
drahalli
2. K.
Bypally
3.
Domma
sandra
4 Nos.
1.
Mallena
halli
2.
Bennur
3.Kalin
ganahal
li 4.
G.Oblap
ura
1 Nos.
1. DG
Halli
1 No
1.
Dom
masa
ndra
WUP
WUP
WUP
1 Nos.
1.
DG
Halli
WUP
Page 11 of 16
15
Tiptur
17
Tiptur
Tumukur
16
Tiptur
Madhu
giri
18
Hiriyur
M/s
KGN
Electrica
ls
7
LOT-08
(Chikka
nayakan
ahalli
Part2/22.09
.2011
M/s.
A2Z
8
LOT-06
(Turuve
kere)
/20.05.
2013
LOT09(Korat
egere)
/22.09.
2011
LOT-20
(Challak
ere)
/27.07.
2013
M/s.
Trans
global
M/s.
Manju
Electri
cals
M/s
Shiva
cheth
ana
5
3
2 Nos.
1.
Agrahara
2.
Rampura
14
11
13
2
3
8
3
2
2
4
0
20
Davana
gere
LOT-23
(Davana
gere)
/29.07.
2013
M/s
prakash
Motors
18
5
3
2 Nos
1.
Malligere
2.
Gode
kere
2.
G1de
kere
WUP
Retendered due on 20.03.2014
2 Nos.
2 Nos
1.
MARA
SAND
RA
2.Dan
dinas
hivara
2 Nos.
1. T.
Palya
2.Appasa
ndra
1 Nos
1.
Badrika
shrama
WUP
2 Nos
1.
Mavathu
r
2.
Chikkad
oddavadi
1 No.
1.Sidde
shwara
temple
WUP
WUP
4 Nos
1. M.D.
Pura
2.
T.K.Hall
y
3.Jajoor
3 Nos
1.
Kalama
rahally
2.
Yadalag
atta
3.Soora
nahally
3 Nos
1.
Kalam
arahal
ly
2.
Yadal
agatta
3.Soo
ranah
ally
WUP
2 Nos
1.
Gangana
katte
2.Honnu
r JGY
3 Nos
1.
Mudaha
dadi
2.
Kukkaw
ada JGY
3.Honn
ur JGY
2 Nos
1.
Muda
hadad
i
2.
Kukk
awada
JGY
Davangere
19
LOT-07/
(Chikka
nayakan
ahalli
Part-1)
/3.10.2
012
1 No
Hoovi
nama
du
Page 12 of 16
Hari
hara
21
Hiriyur
Lot -21
(Molakal
muru)
/20.11.
2012
M/s
Shivach
ethana
M/s
Deepak
Cable(In
dia) Ltd
10
10
5
3
1
2
Davangere
22
Lot-22
(Hari
hara)
/20.11.
2012
23
24
Chitra
durga
Chitra
durga
LOT-18
(Chitra
durga)
/10.06.
2013
LOT-19
Holala
kere
10-1013
Total
M/s
Inland
Surveyo
rs
M/s
KGN
Electrica
ls
16
3
0
14
1
0
289
126
77
2 Nos.
1.
Karlahall
i
2.
Banniko
du
3 Nos.
1.
Halivan
a
2.
Budihal
3.
Belludi
4.Nandi
thavare
2 Nos.
1.
Nandi
thava
re
2.
Bellud
i
WUP
3 Nos.
1.
Kondlah
alli
2.Nagasa
mudra
3.Konna
sagara
2 Nos.
1.
Nagasa
mudra
2.
Ghatap
arthi
WUP
WUP
4 Nos
1.Malali
2. Hullur
3.
Palakihal
ly
4. JGY-3
Kasavara
hatty &
Pallavag
ere
5 Nos
1.Beera
vara
2.
Sibara
3.Adavi
gollarah
ally
4.Palaki
hally
5. JGY3
Kasavar
ahatty
&
Pallavag
ere
2 Nos
1.Siba
ra
2.
Adavi
gollar
ahally
WUP
4 Nos
1.Kunug
ali
2. R D
kaval
3.
Hireyem
miganur
4.Uduger
e
2 No
1.Malen
ahally
2. R.D
kaval
1 No
1.Mal
enaha
lly
WUP
48
51
18
12
Page 13 of 16
Please Note:
All the Field Officers were instructed to furnish the Agenda
notes as per the format before 5th of every month so as to
enable Corporate Office to consolidate and project the same in
the monthly meeting scheduled on 10th of every month.
General Manager (Ele)
Projects, BESCOM
Copy submitted to:
1) The Chief Engineers (Elecy), Transmission Zone, Bangalore, KPTCL.
2) The Chief Engineers (Elecy), C, O&M Zone, BRAZ/CTAZ, BESCOM.
3) The Chief General Manager (Ele), (Corporate Affairs), Corporate Office,
BESCOM, Bangalore.
4) The Chief General Manager (Ele), (Operations), Corporate Office, BESCOM.
Bangalore.
Copy with compliments to:
1) The General Manager (QS&S), Corporate Office, BESCOM. Bangalore.
2) The General Manager (Expenditure), Corporate Office, BESCOM. Bangalore.
3) The Superintending Engineers (Ele), C, O & M Circles,
BRC/Tumkur/Kolar/Davanagere, BESCOM.
4) The Superintending Engineers (Ele), Bangalore/Tumkur/Davanagere (W&M)
Circles KPTCL.
5) M/s Chief Electrical Inspector to Govt. of Karnataka, Crescent Towers,
Crescent Road, Bangalore-01.
6) M/s Mysore Electrical Industries Ltd., P.B. No. 2221, Tumkur Road,
Bangalore – 560 022.
7) M/s Kavika Limited, P.B. No. 2610, Mysore Road, Bangalore.
Copy to:
1) All the Executive Engineers (Ele), C, O & M divisions, BESCOM,
BRAZ/CTAZ.
2) All the Asst. General Managers (Ele) & (F&C)/Managers, Projects Section,
Corporate Office, BESCOM to attend the meeting along with relevant documents.
3) Head Clerk, Corporate Office, BESCOM. Bangalore for information
and to arrange refreshments.
4) The Asst. General Manager (E & S), Corporate Office, BESCOM for
information and to arrange payment for refreshments during the meeting.
5) PS to M.D to place before M.D for kind information.
6) PS to D.T to place before D.T for kind information
Page 14 of 16
7) PS to D.F to place before D.F for kind information & with a request to
attend the meeting.
8) M/s. Godrej & Boyce Mfg. Co. Ltd., Bangalore.
9) M/s Maruthi Mechanicals & Electricals (P) Ltd., Bangalore.
10) M/s Manju Electricals, Koratagere.
11) M/s Pavani Controls & Panels Limited, Hyderabad.
12) M/s Sealwel Corporation Private Limited, Hyderabad.
13) M/s Shiva Chetana Electricals, Sindharur.
14) M/s KGN Electricals, Tumkur.
15) M/s. Transglobal Power Limited, Bangalore.
16) M/s Macrovision Networks, Bangalore.
17) M/s Lakshminarasimha, Electricals, Tumkur.
18) M/s ME Electricals (P) Ltd., Bangalore.
19) M/s Prakasha Motors Engineers & Electricals, Davanagere.
20) M/s Sagar Steels Private Limited, Bangalore.
21) M/s Deepak Cables Pvt. Ltd. Bangalore.
22) M/s Inland Surveyors, Bangalore
23) MF/OC.
Page 15 of 16
Page 16 of 16
Download