The Government of the Russian Federation The state educational budgetary establishment for the higher professional education «National Research University Higher School of Economics» Computer Science Faculty Program Engineering Department Program of the training course «Datacenter in modern information infrastructure» for direction 09.04.04 – «Program engineering» of training for the master Authors: Evgeniy Isaev Maxim Amzarakov Rafael Sukhov eisaev@hse.ru m.amzarakov@uptimetechnology.ru r.sukhov@uptimetechnology.ru Approved at the meeting basic chair of the Stack Group Head of Department _______________ E.A. Isaev « » 2015 г. Moscow – 2015 This document may not be reproduced or redistributed by other Departments of the University without permission of the Authors. I. Course summary Program Authors: Evgeniy Isaev, Doctor of Science, Professor, Head of Department for Education Stack Group. Maxim Amzarakov, Director of Uptime and Energy efficiency Data Center technologies Institute (Uptime Institute) Independent Non-profit Organization, Moscow, Russia. Rafael Sukhov, Financial Executive of Uptime and Energy efficiency Data Center technologies Institute (Uptime Institute) Independent Non-profit Organization, Moscow, Russia. General course data: The main course application is in the master level program “Management of software development” at the department of the program engineering of business-informatics faculty. The course takes place as the optional professional skills courses in the master level program of education. The course scheduled to be given during the second semester of first year of education. The code of the course in the educational plan is М2.В.ДВ.6. The number of credits – 6, total hours – 192. A classroom hour 76 consists of: 20 hour of lectures, 32 hours of seminars. The number of hours for self-study – 140. The student’s knowledge requirements: The course requires the basic knowledge of technical fields of science. II. Course description The program is based on the practical experience of the lecturers brought from the business of development, operation and auditing the datacenters (DC), from the high-grade specialists, companies, partners in connection with the lecturers. The accurate selection of the given data and material and practical studies provides the student with clear understanding of the subject: the role of the datacenters in informational era; economical aspects of the datacenter business; diversity of the services coming from the datacenters; datacenters providers and consumers; basic DC components and its reliability and economy. III. Course goals The students will receive the knowledge of: - The modern DCs role in the information world and macroeconomics; - The purpose and benefits of using DC; - The main players in the world of DC; - The set of services provided by DC operators; - The Russian DC market and its demand. The students will got the first experience of: - The design of the DC and its components; - Assessment of economic effects of using DC; - Assessment of reliability and technical aspects of the DC; - Classifying DC by its reliability and provided services; - Classifying DC by the target customer (the niches); - Risk analyses of the IT infrastructure using DC; - DC topology selection in order to meet desired level of reliability of IT; - DC topology assessment. The course develops the following competencies: 1. Projecting activities Skills to form the technical requirements and ability to manage the software development process (ПК-7); Skills to assess and select the methodology of the design (ПК-8). 2. Technological activities The ability to apply modern technologies of software development applying the computer systems and software for planning and management, provide the quality control of the developed software (ПК-9). 3. Production activities The skills to make a planning and management of the software development process (ПК-10). 4. Organizational and management activities The ability to count and assess the circumstances and consequences of the management decisions (ПК-14); The ability to develop the technical requirements and to develop the economical arguments (ПК-15); The ability to arrange the work of the group of software developers, the skills to manage the work of subcontractors (ПК-16). 5. Service and support activities The ability to select the technical and economical model of the software lifecycle (ПК-17). IV. Course schedule Subject 1 2 3 4 5 6 7 8 9 10 11 12 13 Total hours Course and company summary, DC explanation. Topic 1. Datacenter today. History of datacenter. Current state. Development tendencies. Topic 2. Datacenter in the market. DC services. DC market review. Module 1 subtotal: Topic 3. DC visit. Reliability and power capacity of the DC. Technologies of the DC Topic 4. Low and regulations basis of the datacenter security. Datacenter standards. Topic 5. Modern approach of the datacenter design and operation. Modular DCs Topic 6. DC economics. Design and build economics. Run and operations economics. Module 2 subtotal: Topic 7. Worldwide economics. Datacenters. Money as debt. Loan or service. Topic 8. Establishing the 24/7 operation staff. Topic 9. DC market overview. DC outsourcing. Growth trends worldwide. Reports and analytics. Topic 10. DC technology components. DC security. Topic 11. The history of the Internet. Information and technology security Topic 12. DC business planning based on the general services. Return of investments. Examinaiton Module 3 subtotal: Total: Classroom hours Lectures Self-study Seminars 10 2 2 6 8 2 - 6 12 2 4 6 30 6 6 18 16 2 2 12 15 1 2 12 15 1 2 12 20 2 6 12 66 6 12 48 11 1 2 8 15 1 2 12 15 1 2 12 16 2 2 12 13 1 - 12 16 2 2 12 10 108 192 18 20 4 16 32 6 74 140 V. References Vasilyev R.B., Kalyanov G.N., Lyevochkina G.А. Development management of information systems. –М.: hot line–Telekom, 2009. Tsarev V.V., Kantarovich А.А., Chernish V.V. Competitiveness evaluation of companies.-М.: YuNITI-DANA, 2008. Fleisher К., Bensussan B. Strategin and competitive analysis. –М.: Binom. Knowledge laboratiry, 2009. Basin I., Shurshalin S. DPC outsourcing // Connect! Connection world (Мир Связи) № 8, 2008. Aksenov Е, Altschuler I. Outsourcing: 10 commandments and 21 tools.-SPb: SaintPetersburg, 2009. Sukhov R.R., Amzarakov M.B. How much will my business the energy efficiency /Bankovskie technologii/ #6, 2011. Sukhov R.R. How calculate the costs of data center /Network World/ #4, 2008. Bullen, C.V. & Rockart, J.F. (1981). A primer on critical success factors. Cambridge, MA: Massachusetts Institute of Technology, Sloan School of Management, Centre for Information Systems Research. (CISR No. 69. Sloan WP No. 1220-81.) Shifrin М.B. Strategic management –SPb.: Saint Petersburg, 2009. Orlov S. Virtualization «from and to» / «Magazine for network solutions/LAN», №2, 2010. Orlov S. DPC service outsourcing: does it worth it?/ « Magazine for network solutions /LAN», №7,2009. Pavlov А. Rules for current DPC operation // Magazine for network solutions LAN, №7, 2007. APC. 2007. Determining total cost of ownership for data center and network room infrastructure. American Power Conversion. White paper #6, Revision 3 A Simple Model for Determining True Total Cost of Ownership for Data Centers, Version 2.1, March 31, 2008, By Jonathan Koomey, Ph.D. with Kenneth Brill, Pitt Turner, John Stanley, and Bruce Taylor HIGH PERFORMANCE DATA CENTERS, A Design Guidelines Sourcebook, January 2006 by Rumsey Engineers, in part, based upon work by Lawrence Berkeley National Laboratory supported by the California Energy Commission's Public Interest Energy Research program. . SP–3-0092 document: (TIA-942 standard, 7.0 edition, February 2005 The Invisible Crisis in the Data Center: The Economic Meltdown of Moore’s Law, By Kenneth G. Brill, 2007 Belady, Christian L. “In the data center, power and cooling costs more than the IT equipment it supports.” Electronics Cooling. February 2007. pp. 24-27. The Green Grid. 2007. Green Grid Metrics: Describing Data Center Power Efficiency. The Green Grid, Technical Committee. Turner, W. Pitt, John H. Seader, and Kenneth G. Brill. 2006. Tier classifications define site infrastructure performance. Santa Fe, NM: The Uptime Institute. Turner, W. Pitt, and John H. Seader. 2006. Dollars per kW Plus Dollars Per Square Foot are a Better Data Center Cost Model than Dollars Per Square Foot Alone. Santa Fe, NM: Uptime Institute. TIA/EIA-942. Telecommunications Infrastructure Standard for Data Center . Abdeev R.F. Philosophy of information civilization. - М.: Vlados, 1994 Kevin Kelly. New Rules for the New Economy, Viking Penguin, 1998 Ed Sperling, Next-generation Data Center, Forbes, 2010 Kharatishvili D. Data centres: Yesterday, Today, Tomorrow. Computer Press №11, 2007. Zaetdinov R. Data center. «Banks and business world», № 1, 2006. Basina N. Data centres: Key factors. «CIO» №2, 2005. VI. Forms and types of testing Final Score: examination at the end of 4th module; Intermediate score: given at seminars. Form of scoring – control work. Subjects of testing see “Control works”. The score rating of the testing is 10 degrees scale. Final score includes testing (control work). Examination score structure: Form Contribution to the final score (%) Control work 30 Work on seminars 30 Exam 40 Assessment compliance table – ten-point rating to 5-point rating Ten-point scale Five-point scale 1 – unsatisfactory 2 - very bad 3 – bad 4 - satisfactory 5 – very satisfactory unsatisfactory - 2 6 - well 7 – very well Well – 4 8 - almost perfect 9 - perfect 10 - excellent excellent - 5 satisfactory - 3 VII. Course contents Course and company summary, DC explanation. Theme contents: Tutor and students introduction Course review Company introduction. Brief history. DC development history Modern information infrastructure overview. Information society Information infrastructure development tendencies References Abdeev R.F. Philosophy of information civilization. - М.: Vlados, 1994 Kevin Kelly. New Rules for the New Economy, Viking Penguin, 1998 Ed Sperling, Next-generation Data Center, Forbes, 2010 Vasilyev R.B., Kalyanov G.N., Lyevochkina G.А. Development management of information systems. –М.: hot line–Telekom, 2009. Tsarev V.V., Kantarovich А.А., Chernish V.V. Competitiveness evaluation of companies.-М.: YuNITI-DANA, 2008. Basin I., Shurshalin S. DPC outsourcing // Connect! Connection world (Мир Связи) № 8, 2008. Aksenov Е, Altschuler I. Outsourcing: 10 commandments and 21 tools.-SPb: Saint-Petersburg, 2009. Sukhov R.R., Amzarakov M.B. How much will my business the energy efficiency /Bankovskie technologii/ #6, 2011. Sukhov R.R. How calculate the costs of data center /Network World/ #4, 2008. Topic 1. Datacenter today. History of datacenter. Current state. Development tendencies. Theme contents: History of datacenter. From ENIAC/ENIGMA till today DC today. DC positioning on customers and providers. Service triangle. DC terminology. Main DC components. DC development tendencies. DC services DC consumers. References Kharatishvili D. Data centres: Yesterday, Today, Tomorrow. Computer Press №11, 2007. Tsarev V.V., Kantarovich А.А., Chernish V.V. Competitiveness evaluation of companies.-М.: YuNITI-DANA, 2008. Shifrin М.B. Strategic management –SPb.: Saint Petersburg, 2009. Orlov S. Virtualization «from and to» / «Magazine for network solutions/LAN», №2, 2010. The Invisible Crisis in the Data Center: The Economic Meltdown of Moore’s Law, By Kenneth G. Brill, 2007 Topic 2. Datacenter in the market. DC services. DC market review. Theme contents: DC categorization by consumers and by providers Service triangle Services catalog Consumers and providers of DC services on the Russian market DC services consumers of today's life DC geography References Zaetdinov R. Data center. «Banks and business world», № 1, 2006. Basina N. Data centres: Key factors. «CIO» №2, 2005. Vasilyev R.B., Kalyanov G.N., Lyevochkina G.А. Development management of information systems. –М.: hot line–Telekom, 2009. Tsarev V.V., Kantarovich А.А., Chernish V.V. Competitiveness evaluation of companies.-М.: YuNITI-DANA, 2008. Fleisher К., Bensussan B. Strategin and competitive analysis. –М.: Binom. Knowledge laboratiry, 2009. Basin I., Shurshalin S. DPC outsourcing // Connect! Connection world (Мир Связи) № 8, 2008. Sukhov R.R., Amzarakov M.B. How much will my business the energy efficiency /Bankovskie technologii/ #6, 2011. Bullen, C.V. & Rockart, J.F. (1981). A primer on critical success factors. Cambridge, MA: Massachusetts Institute of Technology, Sloan School of Management, Centre for Information Systems Research. (CISR No. 69. Sloan WP No. 1220-81.) Shifrin М.B. Strategic management –SPb.: Saint Petersburg, 2009. Pavlov А. Rules for current DPC operation // Magazine for network solutions LAN, №7, 2007. Topic 3. DC visit. Reliability and power capacity of the DC. Technologies of the DC. Theme contents: o o o Terminology: Reliability Availability Power capacity End user SLA calculation methodology DC technology impact on reliability of the high level service DC Technology design approach. Reliability levels and money efficiency Dive into the technology details of the datacenter References Sukhov R.R. How calculate the costs of data center /Network World/ #4, 2008. HIGH PERFORMANCE DATA CENTERS, A Design Guidelines Sourcebook, January 2006 by Rumsey Engineers, in part, based upon work by Lawrence Berkeley National Laboratory supported by the California Energy Commission's Public Interest Energy Research program. . SP–3-0092 document: (TIA-942 standard, 7.0 edition, February 2005 The Invisible Crisis in the Data Center: The Economic Meltdown of Moore’s Law, By Kenneth G. Brill, 2007 Belady, Christian L. “In the data center, power and cooling costs more than the IT equipment it supports.” Electronics Cooling. February 2007. pp. 24-27. The Green Grid. 2007. Green Grid Metrics: Describing Data Center Power Efficiency. The Green Grid, Technical Committee. Turner, W. Pitt, John H. Seader, and Kenneth G. Brill. 2006. Tier classifications define site infrastructure performance. Santa Fe, NM: The Uptime Institute. Turner, W. Pitt, and John H. Seader. 2006. Dollars per kW Plus Dollars Per Square Foot are a Better Data Center Cost Model than Dollars Per Square Foot Alone. Santa Fe, NM: Uptime Institute. TIA/EIA-942. Telecommunications Infrastructure Standard for Data Center . Topic 4. Low and regulations basis of the datacenter security. Datacenter standards. Theme contents: Certification and licensing requirements for the DC services providers Certification and licensing authorities Standardization institutions in relation to the DC Datacenter and governmental offices inter-relations. DC standards. Standards review and the field of its applications. DC standards list. Source of standards documents. Real life DC example. Reliability category assessment. References Basina N. Data centres: Key factors. «CIO» №2, 2005. Tsarev V.V., Kantarovich А.А., Chernish V.V. Competitiveness evaluation of companies.-М.: YuNITI-DANA, 2008. Fleisher К., Bensussan B. Strategy and competitive analysis. –М.: Binom. Knowledge laboratiry, 2009. Basin I., Shurshalin S. DPC outsourcing // Connect! Connection world (Мир Связи) № 8, 2008. Shifrin М.B. Strategic management –SPb.: Saint Petersburg, 2009. Pavlov А. Rules for current DPC operation // Magazine for network solutions LAN, №7, 2007. SP–3-0092 document: (TIA-942 standard, 7.0 edition, February 2005 The Green Grid. 2007. Green Grid Metrics: Describing Data Center Power Efficiency. The Green Grid, Technical Committee. Turner, W. Pitt, John H. Seader, and Kenneth G. Brill. 2006. Tier classifications define site infrastructure performance. Santa Fe, NM: The Uptime Institute. Turner, W. Pitt, and John H. Seader. 2006. Dollars per kW Plus Dollars Per Square Foot are a Better Data Center Cost Model than Dollars Per Square Foot Alone. Santa Fe, NM: Uptime Institute. TIA/EIA-942. Telecommunications Infrastructure Standard for Data Center . Topic 5. Modern approach of the datacenter design and operation. Modular DCs Theme contents: General service of the DC Cost structure of DC Cost structure of DC service DC technologies Modular approach DC resources. Modular technologies Topic 6. DC economics. Design and build economics. Run and operations economics. Theme contents: DC economics DC build economics DC operation economics Energy efficiency General approach of assessment of DC. Costs for space and power. DC reliability and costs. Mass effect. DC cost structure Own land/building vs rent. Economical risks. DC cost evaluation DC costs examples. Small corporate and huge commercial DC operation cost structure DC outsourcing cost effect References Vasilyev R.B., Kalyanov G.N., Lyevochkina G.А. Development management of information systems. –М.: hot line–Telekom, 2009. Sukhov R.R., Amzarakov M.B. How much will my business the energy efficiency /Bankovskie technologii/ #6, 2011. Sukhov R.R. How calculate the costs of data center /Network World/ #4, 2008. APC. 2007. Determining total cost of ownership for data center and network room infrastructure. American Power Conversion. White paper #6, Revision 3 A Simple Model for Determining True Total Cost of Ownership for Data Centers, Version 2.1, March 31, 2008, By Jonathan Koomey, Ph.D. with Kenneth Brill, Pitt Turner, John Stanley, and Bruce Taylor Belady, Christian L. “In the data center, power and cooling costs more than the IT equipment it supports.” Electronics Cooling. February 2007. pp. 24-27. The Green Grid. 2007. Green Grid Metrics: Describing Data Center Power Efficiency. The Green Grid, Technical Committee. Turner, W. Pitt, John H. Seader, and Kenneth G. Brill. 2006. Tier classifications define site infrastructure performance. Santa Fe, NM: The Uptime Institute. Turner, W. Pitt, and John H. Seader. 2006. Dollars per kW Plus Dollars Per Square Foot are a Better Data Center Cost Model than Dollars Per Square Foot Alone. Santa Fe, NM: Uptime Institute. Topic 7. Worlwide economics. Money. DC. Theme contents: The history of money Monetarism Valuable money Demonetization of the gold Money as debt IMF and worldwide financial system Money and power DC services as kind of credit Topic 8. 24/7 support Theme contents: What to operate in DC Systems and services an operator’s view DC operations orgchart Dispatching, Monitoring, Control 24/7 ready emergency staff Topic 9. DC market overview. DC outsourcing. Market volume Theme contents: DC classification based on the set of services Company products Company services Targets, Technics, Results Serivices triangle Service catalogue Targets, resource, results of the service Market research reports. How to read the market research report. Classifications and comparisons References: Basina N. Data centres: Key factors. «CIO» №2, 2005. Zaetdinov R. Data center. «Banks and business world», № 1, 2006. Vasilyev R.B., Kalyanov G.N., Lyevochkina G.А. Development management of information systems. –М.: hot line–Telekom, 2009. Tsarev V.V., Kantarovich А.А., Chernish V.V. Competitiveness evaluation of companies.-М.: YuNITI-DANA, 2008. Fleisher К., Bensussan B. Strategin and competitive analysis. –М.: Binom. Knowledge laboratiry, 2009. Basin I., Shurshalin S. DPC outsourcing // Connect! Connection world (Мир Связи) № 8, 2008. Aksenov Е, Altschuler I. Outsourcing: 10 commandments and 21 tools.-SPb: Saint-Petersburg, 2009. Sukhov R.R., Amzarakov M.B. How much will my business the energy efficiency /Bankovskie technologii/ #6, 2011. Sukhov R.R. How calculate the costs of data center /Network World/ #4, 2008. Topic 10. DC Theme contents: DC infrastructure levels DC components specifics Components tasks and functions DC security Information and technology security Topic 11. Internet inside – battlefield Theme contents: Internet as the subject to scientific discovery Internet phenomena History of Internet. Technology and humanity Definition of Internet. Internet security Topic 12. DC business planning based on the simple set of services. Theme contents: Business plan and business case Financial plan Analytics and reporting VIII. Test materials subjects Topics to prepare the exam work 1. Uptime Institute datacenter topology classification. Classify the certain DC. 2. New DC costs assessment based on the source data and category. 3. DC operation costs based on the source data and category. Or outsourcing efficiency estimation. Questions to assess the quality of the understanding of the discipline Define datacenter Describe the DC categories based on consumers and providers Describe main technology components of the DC Describe basic services of the DC Describe: reliability, availability, power capacity Describe any methods of SLA calculation How to assess the reliability of the high level service Describe different technologies in the DC Describe the approach in DC reliability category assessment Describe requirement in certification and licensing for DC provider company Describe main standard in the field of datacenter Describe the TIA-942 classification Describe coast structure of the DC build project Descibe DC services Analyse and calculate the TCO of the DC based on the basic DC parameters Student record (Scoring) Student record is performed in the oral form. Program authors __________________ M. Amzarakov, E. Isaev, R. Sukhov