Pharmacy Renovation for Bedside Rx Delivery

advertisement

Institution A

Pharmacy Renovation for

Bedside Prescription Delivery Service

Developed collaboratively by the ASHP Research and Education Foundation, the ASHP Section of Pharmacy Practice Managers, and ASHP Advantage.

Visit www.pharmacycsuitetoolkit.org

1

Summary Plan – Bedside Prescription delivery 7am to 11pm

Less than 10% of all hospital discharge prescriptions are filled by Institution A pharmacy today.

This plan proposes to capture and deliver 25% of all home going prescriptions to the bedside before discharge. This program will be offered house-wide 7 days per week between the hours of 7am to 11pm when the majority of patients leave the main campus. This service will result in improved patient experiences (HCAPS scores), incremental revenue and margin gained, and the potential to decrease medication-related readmissions. Current staffing is inadequate for extended outpatient hours or the ability to offer delivery house-wide 7 days per week.

FINANCIAL ANALYSIS

Rx Volume

Revenue

Drugs

Total Expenses

EBIDA

YR1

49,225

YR2

50,702

YR3

52,223

YR4

53,789

4,411,925 4,803,436 5,145,440 5,511,795

YR5

55,403

5,904,235

3,414,875 3,721,577 3,986,554 4,270,396 4,574,449

3,948,105 4,270,804 4,552,257 4,853,071 5,174,604

463,820 532,631 593,183 658,724 729,632

Capital estimate is $600,000 from Office of Construction Management.

OPERATIONAL INTERDEPENDENCIES

Pharmacy will work closely with physicians, nursing, care management, and hospital throughput personnel on facilitating the prescription delivery process. A key assumption that will drive success is early identification of which patients are being discharged along with completed medication orders. Insurance benefit verification and copay collection is required prior to discharge. The pharmacy is not allowed to place the prescription charge on the patient’s hospital bill. Institution A will be renovated in its current space and robotic dispensing technology will be installed to support prescription volume growth.

EXIT STRATEGY AND ASSOCIATED COSTS

There is capital investment required for the renovation of the Institution A pharmacy and the addition of pharmacy robotic equipment. Should this volume not materialize, the equipment could be moved to another busy pharmacy operation.

PROJECT TRACKING AND REPORTING MECHANISM

Measures of success will be as follows:

Developed collaboratively by the ASHP Research and Education Foundation, the ASHP Section of Pharmacy Practice Managers, and ASHP Advantage.

Visit www.pharmacycsuitetoolkit.org

2

Patient experience HCAPS and net promoter scoring monthly

 P&L statement monthly

PROJECT MANAGEMENT

The Institution A pharmacy renovation will take 3-6 months after it is funded. Pharmacy will work closely with assigned Construction Manager to deliver project. Pharmacy will coordinate discharge bedside delivery with nursing leadership in phases with the goal of hospital-wide access within the first 12 months of go-live.

RECOMMENDATION

Finalize Institution A pharmacy construction estimate, request funding source and FTEs be approved, and launch program.

Developed collaboratively by the ASHP Research and Education Foundation, the ASHP Section of Pharmacy Practice Managers, and ASHP Advantage.

Visit www.pharmacycsuitetoolkit.org

3

Appendix 1: P&L and FTEs Bedside Prescription delivery 7am to

11pm

ASSUMPTIONS:

Used Institution A cost & revenue/script as basis for incremental Institution A volume

Used Institution A cost & revenue/script as basis for incremental hospital volume

Rx Volume

Revenue

Drugs

S&B

Med/Surgical Supplies

Non Medical Supplies

Purchased services

Software maintenance

Other misc expense

Total Expenses

EBIDA

YR1

49,225

YR2

50,702

YR3

52,223

YR4

53,789

4,411,925 4,803,436 5,145,440 5,511,795

3,414,875

478,530

3,721,577 3,986,554

492,886 507,672

YR5

55,403

5,904,235

4,270,396

522,903

4,574,449

538,590

13,500

14,000

13,905 14,322

14,420 14,853

14,752 15,194

15,298 15,757

18,000

7,200

18,540 19,096

7,416 7,638

19,669 20,259

7,868 8,104

2,000 2,060 2,122 2,185 2,251

3,948,105 4,270,804 4,552,257 4,853,071 5,174,604

463,820 532,631 593,183 658,724 729,632

Staffing

Pharmacist

Technician

Days Evenings Nights Subtotal

0.4 1.4 1.8

0.4 4.2 4.6

6.4

Total W/ 17%

Coverage

2.1

5.4

7.5

Developed collaboratively by the ASHP Research and Education Foundation, the ASHP Section of Pharmacy Practice Managers, and ASHP Advantage.

Visit www.pharmacycsuitetoolkit.org

4

Appendix 2: Capital Cost Estimates for Each Project Area

Items

Institution A Pharmacy

Cost Comment

$250,000

Order of magnitude provided by

OCM Construction

Fixtures, equipment, casework

Robot

Design

Contingency

Total

$100,000 Quote received from vendor

$170,000 Quote received from vendor

55,000

$25,000

$600,000

Developed collaboratively by the ASHP Research and Education Foundation, the ASHP Section of Pharmacy Practice Managers, and ASHP Advantage.

Visit www.pharmacycsuitetoolkit.org

5

Appendix 3: Institution A Pharmacy Renovation Layout Using

Existing ~ 2200 square feet

(no additional space)

Developed collaboratively by the ASHP Research and Education Foundation, the ASHP Section of Pharmacy Practice Managers, and ASHP Advantage.

Visit www.pharmacycsuitetoolkit.org

6

Download