The following are the planned actions to be taken on Recommendations and other texts at the closing plenary of the Study Group 17 meeting. These lists may change based on agreements reached during the closing plenary of this study group meeting. Texts are given with reference to the results of the January 2014 SG17 meeting. - Table a) Recommendations and other texts planned for approval or agreement - Table b) Recommendations planned for consent or determination - Table c) Recommendations planned for initiation of deletion procedure -2- Planned actions on Recommendations and other texts at the September 2014 SG17 meeting Recommendations and other texts planned for approval or agreement at the September 2014 SG17 meeting a) Acronym Title New / Revised Editor(s) Location of text 2/17, (3/17) X.mgv6** Supplement to X-series Recommendations – ITU-T X.1037 – Supplement on security management guideline for implementation of IPv6 environment in telecommunications organizations New Masashi Eto, Koji Nakao 4/17 X.1211 (X.eipwa)* Capability requirements for preventing web-based attacks New Xie Wei, Heung Youl Youm Q(1) 4/17 11/17 12/17 X.1500 Amd.6 Overview of cybersecurity information exchange – Amendment 6 Note (2) – Revised structured cybersecurity information exchange techniques Equivalent Start of e.g., ISO/IEC work Timing C 224 2011-04 2014-09 COM 17 – R 26 2009-09 2014-09 2014-01 2014-09 Youki Kadobayashi TR HBPKI*** Technical Report: New challenges for Public-Key Infrastructure standardization: Mobile Networks, Machine-to-Machine communication, Cloud Computing and Smart Grid New Eric Andersen TD 0627 (2013-09) 2013-09 2014-09 Z.Sup1** Supplement 1 to Z-series Recommendations – ITU-T Z.100series – Supplement on methodology on the use of description techniques Revised Rick Reed TD 0934 2010-12 2014-09 Notes: * Recommendation is for TAP approval ** Supplement for agreement *** Technical Report for agreement (1) In case of joint Question activity, the lead Question is given without parentheses and other Questions are shown in parentheses; such entries are only shown in the table against the lead Question. -3- (2) Amendment 6 supersedes Amendment 5. Summaries for these draft Recommendations and other texts are given in COM 17 – R 23 Annex H (TD 1145). Further updates will be posted at http://www.itu.int/ITU-T/workprog/wp_search.aspx?isn_sp=1749&isn_sg=1759&isn_status=-1,1,3,7&details=0&view=tab&field=ajv b) Recommendations planned for determination or consent at the September 2014 SG17 meeting Q(1) Acronym Title New / Revised Editor(s) Location of text 4/17 X.cwss* Common weakness scoring system New Robert A. Martin 5/17 X.ticvs* Technologies involved in countering voice spam in telecommunication organizations New 6/17 X.msec-7 Note (4) Guidelines on the management of infected terminals in mobile networks New 6/17 X.msec-8 Note (4) Secure application distribution framework for communication devices New 6/17 X.unsec-1 Security requirements and framework of ubiquitous networking New X.sap-5 Guideline on local linkable anonymous authentication for electronic services 7/17 7/17 7/17 Equivalent Start of e.g., ISO/IEC work Timing TD 3095 (2012-09) Note (2) 2009-09 2014-09 Xuetao Du, Tao Lou TD 0956 Rev.1 2011-09 2014-09 Xuetao Du, Lou Tao, Chen Zhang TD 0942 2012-03 2014-09 TD 0943 Rev.2 2012-03 2014-09 Lijun Liu, Junjie Xia, Shilin You TD 1016 Rev.2 2010-12 2014-09 New Sok Joon Lee TD 0249 (2013-04) 2009-09 2014-09 X.sap-7 Technical capabilities of fraud detection and response for services with high assurance level requirements New Tae Kyun Kim, Hyung-Jin Lim TD 0813 2011-09 2014-09 X.sap-8 Multi-factor authentication mechanisms based on mobile devices New 2012-09 2014-09 Mijoo Kim, Yutaka Miyake, Heung Youl Youm Keun Ok Kim, Seong-Hyeon Song, TD 0976 Rev.2 Heung-Youl Youm -4- Q(1) Acronym Title New / Revised Editor(s) Location of text 7/17 X.sap-9 Delegated non-repudiation architecture based on ITU-T X.813 New Keun-ok Kim, Hee-won Shim, Seong-Hyeon Song TD 0901 X.bhsm Information technology – Security Techniques – Telebiometric authentication framework using biometric hardware security module New Myung Geun Chun, Yong Nyuo Shin TD 1010 9/17 X.tam A guideline to technical and operational countermeasures for telebiometric applications using mobile devices New Jae-Sung Kim, Yong Nyuo Shin 9/17 X.th2* Note (3) Telebiometrics related to physics New 10/17, (8/17) X.idmcc* Requirements of IdM in cloud computing New X.520 Cor.1 Information technology – Open Systems Interconnection – The Directory: Selected Attribute Types – Technical Corrigendum 1 Eric Andersen 11/17 X.691 Cor.3 Information technology – Specification of Packed Encoding Rules (PER) – Technical Corrigendum 3 Paul. E. Thorpe TD 1019 11/17, (7/17) X.cmail Certified mail transport and certified post office protocols New David Keller, Laura Prin Z.100 Annex F1 Specification and Description Language - Overview of SDL-2010 – SDL formal definition: General overview Revised Rick Reed 9/17, (11/17) 11/17 12/17 Equivalent Start of e.g., ISO/IEC work Timing 2012-09 2014-09 2010-12 2014-09 TD 1000 2011-09 2014-09 Michele Peiry TD 0885 Rev.1 2009-02 2014-09 Mark Jeffrey, Xia Junjie TD 0613 (2013-09) 2010-12 2014-09 ISO/IEC 9594-6 Cor.1 2014-01 2014-09 ISO/IEC 8825-2 Cor.3 2014-01 2014-09 TD 0983 Rev.1 2013-04 2014-09 TD 0924 2013-04 2014-09 ISO/IEC 17922 -5- Q(1) Acronym Title New / Revised Editor(s) Location of text 12/17 Z.100 Annex F2 Specification and Description Language - Overview of SDL-2010 – SDL formal definition: Static semantics Revised Rick Reed 12/17 Z.100 Annex F3 Specification and Description Language - Overview of SDL-2010 – SDL formal definition: Dynamic semantics Revised Rick Reed 12/17 Z.161 Testing and Test Control Notation version 3: TTCN-3 core language Revised Dieter Hogrefe Z.161.1 Testing and Test Control Notation version 3: TTCN-3 language extensions: Support of interfaces with continuous signals Revised Z.161.2 Testing and Test Control Notation version 3: TTCN-3 language extensions: Configuration and deployment support 12/17 12/17 12/17 12/17 12/12 12/17 Equivalent Start of e.g., ISO/IEC work Timing TD 0925 2013-04 2014-09 TD 0926 2013-04 2014-09 ETSI ES 201 873-1 2013-04 2014-09 Dieter Hogrefe ETSI ES 202 786 2013-04 2014-09 Revised Dieter Hogrefe ETSI ES 202 781 2013-04 2014-09 Z.161.3 Testing and Test Control Notation version 3: TTCN-3 language extensions: Advanced parameterization Revised Dieter Hogrefe ETSI ES 202 784 2013-04 2014-09 Z.161.4 Testing and Test Control Notation version 3: TTCN-3 language extensions: Behaviour types Revised Dieter Hogrefe ETSI ES 202 785 2013-04 2014-09 Z.161.5 Testing and Test Control Notation version 3: TTCN-3 Language extensions: Performance and real time testing New Dieter Hogrefe ETSI ES 202782 2014-01 2014-09 Z.165 Testing and Test Control Notation version 3: TTCN-3 runtime interface (TRI) Revised Dieter Hogrefe ETSI ES 201 873-5 2013-04 2014-09 -6- Q(1) Acronym Title New / Revised Editor(s) 12/17 Z.165.1 Testing and Test Control Notation version 3: TTCN-3 extension package: Extended TRI Revised Dieter Hogrefe ETSI ES 202789 2013-04 2014-09 12/17 Z.166 Testing and Test Control Notation version 3: TTCN-3 control interface (TCI) Revised Dieter Hogrefe ETSI ES 201873-6 2013-04 2014-09 12/17 Z.167 Testing and Test Control Notation version 3: TTCN-3 mapping from ASN.1 Revised Dieter Hogrefe ETSI ES 201873-7 2013-04 2014-09 12/17 Z.168 Testing and Test Control Notation version 3: The IDL to TTCN-3 mapping Revised Dieter Hogrefe ETSI ES 201873-8 2013-04 2014-09 12/17 Z.169 Testing and Test Control Notation version 3: Using XML schema with TTCN-3 Revised Dieter Hogrefe ETSI ES 201873-9 2013-04 2014-09 Z.170 Testing and Test Control Notation version 3: TTCN-3 documentation comment specification Revised Dieter Hogrefe ETSI ES 201873-10 2013-04 2014-09 12/17 Location of text Equivalent Start of e.g., ISO/IEC work Timing Notes: * Recommendations are for determination; all non-marked Recommendations are for consent. (1) In case of joint Question activity, the lead Question is given without parentheses and other Questions are shown in parentheses; such entries are only shown in the table against the lead Question. (2) Documents relative to Study Period 2009 – 2012. (3) TSB should wait for a new version before editing this document. (4) Draft Recommendation is required to become mature at interim meeting. Summaries for these draft Recommendations are given in COM 17 – R 23 Annex H (TD 1145). Further updates will be posted at http://www.itu.int/ITU-T/workprog/wp_search.aspx?isn_sp=1749&isn_sg=1759&isn_status=-1,1,3,7&details=0&view=tab&field=ajv ________